Category:LEGAL TRANSCRIPTS & ORDERS & PLEADINGS
MONTHYEARML20063N7471982-10-0606 October 1982 Motion for Termination of Proceedings.Util Decided to Cancel Plant.Certificate of Svc Encl ML20063N7591982-10-0606 October 1982 Withdrawal of Application for CP ML20055A7221982-07-15015 July 1982 Memorandum & Order Denying Jf Doherty 820615 Submittals, Treated as Motion to Reconsider ASLB 820602 Order.Motion Untimely Filed & Failed to Show Significance or Gravity of Issues ML20055A3551982-07-12012 July 1982 Amended Contention 59.Certificate of Svc Encl ML20054L4521982-07-0202 July 1982 Response Opposing J Doherty 820615 Motion to Reopen Record to Add Contention 59.Motion Fails to Establish Timeliness &/Or Significance of Issues Sought to Be Raised.Certificate of Svc Encl ML20054L5531982-07-0202 July 1982 Response Opposing Doherty 820615 Motion to Reopen Record to Add Contention 59.Motion Should Be Considered Motion for Reconsideration of ASLB 820602 Order.Timeliness & Significance of Issues Not Established.W/Certificate of Svc ML20054J9371982-06-28028 June 1982 Response Opposing J Doherty 820615 Request to Reopen Record. Request Improper & Insufficient to Support Relief.Commission Rules Cannot Be Circumvented by Refiling Same Argument After ASLB Ruling Issued.Certificate of Svc Encl ML20054F9861982-06-15015 June 1982 Motion to Reopen Record to Take Evidence on Contention 59. Gravity of Issues Warrants Reopening ML20054G0171982-06-15015 June 1982 Contention 50 Re Brown & Root Deficiencies in Quadrex Rept. Certificate of Svc Encl ML20053D0861982-05-24024 May 1982 Response in Opposition to Util 820519 Motion to Strike Doherty Contention 58 Re Applicant Conduct on Reporting Violations.Contention Should Be Treated as Such,Not as Motion.Certificate of Svc Encl.Related Correspondence ML20052H8621982-05-19019 May 1982 Motion to Strike J Doherty Reply to Applicant 820507 Response to Doherty 820422 Motion to Add Contention 58. Commission Rules Do Not Allow Reply.Certificate of Svc Encl ML20052H4441982-05-14014 May 1982 Reply Opposing Applicant 820507 Response to J Doherty 820422 Motion to Add Contention 58.Contention Should Be Admitted W/Amends.Aslb Should Judge Conduct of Applicants. Certificate of Svc Encl ML20052F3121982-05-0707 May 1982 Response Opposing J Doherty 820422 Motion to Add Contention Re Alleged Failure to Rept Design Defects.Substantively, Motion Is Motion to Reopen Record & Stds Have Not Been Met. Certificate of Svc Encl ML20052D1221982-04-29029 April 1982 Findings of Fact on Supplemental Issues to Tx Pirg Addl Contention 31 Re Technical Qualifications.Certificate of Svc Encl ML20052A4541982-04-22022 April 1982 Submittal of Contention 58 Re Applicant Conduct on Reporting Violations at Plant.Certificate of Svc Encl ML20054E0561982-04-21021 April 1982 Supplemental Findings of Fact on Tx Pirg Addl Contention 31 Re Technical Qualifications.Certificate of Svc Encl ML20050J1111982-04-0606 April 1982 Answers to Second & Third Sets of Interrogatories,Questions 29 & 8 Respectively,Re Quadrex Rept.Certificate of Svc Encl. Related Correspondence ML20050E2961982-04-0505 April 1982 Answers & Objections to Seventh Set of Interrogatories. Certificate of Svc Encl.Related Correspondence ML20050E2891982-04-0505 April 1982 Answers & Objections to Doherty Sixth Set of Interrogatories.Related Correspondence ML20050C4211982-04-0202 April 1982 Objections to Request for Admissions.Requests Untimely, Irrelevant to Issues Before ASLB & Extremely & Unduly Burdensome.Certificate of Svc Encl.Related Correspondence ML20050C4081982-03-31031 March 1982 Answers & Objections to Fifth Set of Interrogatories. Certificate of Svc Encl.Related Correspondence ML20050C4791982-03-29029 March 1982 Answers & Objections to Jf Doherty Fourth Set of Interrogatories Re Tx Pirg Contention 31 & Quadrex Matters. Certificate of Svc Encl.Related Correspondence ML20042C6181982-03-29029 March 1982 Response Opposing J Doherty 820315 Motion for ASLB to Subpoena Quadrex Corp Employee Witnesses as ASLB Witnesses. Request Is Based on Misperception of Scope of Reopened Hearings.Certificate of Svc Encl ML20042C6431982-03-29029 March 1982 Motion for ASLB to Call DE Sells as Witness for Tx Pirg Addl Contention 31 & Quadrex-related Matters.Testimony Needed to Explain Why NRC Did Not Immediately Obtain Quadrex Rept. Certificate of Svc Encl ML20050C5091982-03-26026 March 1982 Response to Jf Doherty 20th & 21st Requests for Documents. Certificate of Svc Encl ML20050C5041982-03-26026 March 1982 Testimony of Lj Sas on Tx Pirg Addl Contention 31 Re Quadrex Rept.Rept Raises No Issue as to Whether Ebasco Can Properly Engineer Project.Prof Qualifications Encl ML20050C5011982-03-26026 March 1982 Supplemental Testimony of Jh Goldberg on Technical Qualifications.Brown & Root Terminates Due to Lack of Engineering Productivity,Not Due to Allegations in Quadrex Rept ML20042C5201982-03-25025 March 1982 Motion to Compel Discovery from Applicant & to Postpone Evidentiary Presentations at 820412 Hearings.Applicant Objections to Interrogatories Unsupported & Necessitate Hearings Be Delayed.Certificate of Svc Encl ML20049K0671982-03-25025 March 1982 Reply to Tx Pirg 820315 Addl Proposed Findings of Fact & Conclusions of Law.Certificate of Svc Encl ML20049K0801982-03-25025 March 1982 Answers & Objections to Interrogatories.Certificate of Svc Encl ML20042C5481982-03-23023 March 1982 Fourth Set of Requests for Admissions Re Quadrex Rept & Tx Pirg Contention 31.Certificate of Svc Encl ML20049K0841982-03-23023 March 1982 Answers & Objections to Third Set of Interrogatories. Certificate of Svc Encl ML20049K0941982-03-23023 March 1982 Answers & Objections to Second Set of Interrogatories. Certificate of Svc Encl ML20042A4791982-03-17017 March 1982 Response Opposing J Doherty 820310 Motion for Postponement of 820412 Hearings.Sufficient Grounds Not Provided to Justify Delay.Certificate of Svc Encl ML20042B2351982-03-17017 March 1982 Seventh Set of Interrogatories Re Tx Pirg Addl Contention 31 & Quadrex Rept Matters.Certificate of Svc Encl ML20042B2381982-03-15015 March 1982 Sixth Set of Interrogatories Re Tx Pirg Addl Contention 31 & Quadrex Rept Matters.Certificate of Svc Encl.Related Correspondence ML20042B2451982-03-15015 March 1982 Motion for Subpoena of Quadrex Corp Employees.Testimony Necessary for Clear Understanding of Brown & Root Deficiencies Despite Util Supervision & Specific Steps Needed to Correct & Prevent Problems.W/Certificate of Svc ML20041F0761982-03-10010 March 1982 Fourth Set of Interrogatories Re Tx Pirg Contention 31 & Quadrex Rept.Certificate of Svc Encl.Related Correspondence ML20041F0871982-03-10010 March 1982 Motion for Postponement of 820412 Hearing on Tx Pirg Addl Contention 31 & Quadrex-related Matters.Addl Time Needed to Complete Discovery.Certificate of Svc Encl ML20049J6571982-03-0808 March 1982 Answers to First Set of Interrogatories Re Tx Pirg Contention 31 & Quadrex Matters.Certificate of Svc Encl ML20041E1001982-03-0505 March 1982 First Set of Interrogatories & Request for Production of Documents.Certificate of Svc Encl ML20041E1071982-03-0505 March 1982 First Set of Interrogatories & Request for Production of Documents Re Tx Pirg Contention 31.Certificate of Svc Encl ML20041E1181982-03-0505 March 1982 Third Set of Interrogatories Re Tx Pirg Contention 31 & Quadrex Rept Matters.Related Correspondence ML20041E1201982-03-0505 March 1982 Motion for Order Directing Applicant to Provide Forthcoming Bechtel Quadrex Rept Review.Rept Pertinent to Remaining Issue.Certificate of Svc Encl.Related Correspondence ML20041E1741982-03-0505 March 1982 Brief Opposing R Alexander Appeal from ASLB 820112 Order Denying Petition to Intervene.Aslb Did Not Abuse Discretion in Denying Petition.Certificate of Svc Encl ML20041E0711982-03-0404 March 1982 Second Set of Interrogatories Re Tx Pirg Contention 21 & Quadrex Rept Matters.Certificate of Svc Encl.Related Correspondence ML20049H8881982-03-0101 March 1982 Response Opposing D Marrack 820213 Motion for Review of Dates for Reopening Hearings & Continuance.No Commission Regulations or Atomic Energy Act Provisions Require Applicant Irrevocable Commitment.Certificate of Svc Encl ML20041B5381982-02-22022 February 1982 Reply to Intervenors Proposed Findings of Fact & Conclusions of Law.Certificate of Svc Encl ML20041C0671982-02-22022 February 1982 Response Opposing Tx Pirg 820209 Motion for Addl Time to File Proposed Findings of Fact & Conclusion of Law.Motion Mooted by Tx Pirg Filing Proposed Findings on 820212. Certificate of Svc Encl ML20041B5421982-02-17017 February 1982 First Set of Interrogatories Re Tx Pirg Contention 31 & Quadrex Matters.Certificate of Svc Encl.Related Correspondence 1982-07-02
[Table view] Category:TRANSCRIPTS
MONTHYEARML20050C5011982-03-26026 March 1982 Supplemental Testimony of Jh Goldberg on Technical Qualifications.Brown & Root Terminates Due to Lack of Engineering Productivity,Not Due to Allegations in Quadrex Rept ML20050C5041982-03-26026 March 1982 Testimony of Lj Sas on Tx Pirg Addl Contention 31 Re Quadrex Rept.Rept Raises No Issue as to Whether Ebasco Can Properly Engineer Project.Prof Qualifications Encl ML20009H2161981-07-30030 July 1981 Suppl Testimony of D Marrack Re Viable Fishery ML20009E3641981-07-24024 July 1981 Transcript of Rc Iotti Testimony on Behalf of Util on Bishop Contention 17 Re Tnt Detonation ML20009E8661981-07-20020 July 1981 Transcript of DA Hamon Testimony on Behalf of Util Re Tx Public Interest Research Group Addl Contention 55 (Rapid Depressurization - Steam Break).Prof Qualifications Encl ML20009E2941981-07-20020 July 1981 Transcript of Wf Mercurio Testimony on Behalf of Applicant Re ASLB Question 8 (Reactor Bldg Subsurface Soil Mechanics) ML20009E2961981-07-20020 July 1981 Transcript of R Cheng Testimony on Behalf of Applicant Re ASLB Question 10 (Drywell Pressure Testing).Prof Qualifications Encl ML20009E3531981-07-20020 July 1981 Transcript of Wf Mercurio Testimony on Behalf of Util Re Doherty Contention 29,blockage of Intake Canal ML20009E3591981-07-20020 July 1981 Transcript of Cg Robertson Testimony Re Doherty Contention 8 & ASLB Question 3 on Atws.Prof Qualifications Encl ML20009E3031981-07-20020 July 1981 Transcript of GL Sozzi on Doherty Contention 32 Re ECCS Vaporization Rate ML20009E3151981-07-20020 July 1981 Transcript of Rl Call 810720 Testimony on Doherty Contention 26 (Stud Bolts).Prof Qualifications Encl ML20009E4351981-07-20020 July 1981 Transcript of Gw Oprea & Jh Goldberg Testimonies on Technical Qualifications & Tx Public Interest Research Group Addl Contention 31.Corporate Nuclear Organization Chart Encl ML20009E3481981-07-20020 July 1981 Transcript of G Martin Testimony on Behalf of Util on Mccorkle Contention 9 Re Chlorine Monitoring.Prof Qualifications Encl ML20009E3451981-07-20020 July 1981 Transcript of G Martin Testimony on Behalf of Util Re Doherty Contention 40,10CFR100 Releases.Prof Qualifications Encl ML20009E3431981-07-20020 July 1981 Transcript of Rc Iotti Testimony on Behalf of Util on Bishop Contention 6 & ASLB Question 12 Re Shell Oil Co 6-inch Liquid Petroleum Gas Pipeline ML20009E3171981-07-20020 July 1981 Transcript of Jc Elliott,Tc Cheng,Md Weingart,Pa Ranzau & Cg Robertson 810720 Testimony on Tx Public Research Interest Group (Prig) Addl Contention 53,ASLB Questions 4B & 4A & Pirg Contentions 28 & 52.W/prof Qualifications ML20009E3211981-07-20020 July 1981 Transcript of SA Hucilk & Jj Boseman Testimonies on Doherty Contention 17,RL Huang Testimony on Tx Public Research Interest Group Addl Contention 41 & Jn Bailey Testimony on Doherty Contention 42.Prof Qualifications Encl ML20009E3111981-07-20020 July 1981 Transcript of MR Lane 810720 Testimony Re Doherty Contention 41 (Reactor Water Level Indicators).Prof Qualifications Encl ML19347F5361981-05-11011 May 1981 Testimony of DG Tees Re Doherty Contention 47,turbine Missiles.Related Correspondence ML19347F5391981-05-11011 May 1981 Testimony of Fj Meyer Re Doherty Contention 30, Interconnection/Grid Stability.Prof Qualifications & Certificate of Svc Encl.Related Correspondence ML19347F5201981-05-11011 May 1981 Testimony of DC Papone Re Board Question 6,ability of Applicant to Demonstrate Compliance w/10CFR50,App A.Prof Qualifications Encl.Related Correspondence ML19347F5241981-05-11011 May 1981 Testimony of RA Clarke & Jf Montalbano Re Doherty Contention 10,diesel Generator Reliability.Prof Qualifications Encl. Related Correspondence ML19347F5271981-05-11011 May 1981 Testimony of Rc Iotti & Ws Carnes Re Doherty Contention 47, Turbine Missiles.Prof Qualifications Encl.Related Correspondence ML19347F5291981-05-11011 May 1981 Testimony of Ma Ross Re Doherty Contention 48,control Rod Drive Return Line.Prof Qualifications Encl.Related Correspondence ML19347F5301981-05-11011 May 1981 Testimony of Cw Dillman Re Doherty Contention 6, Recirculation Pump Overspeed.Prof Qualifications Encl. Related Correspondence ML19347F5311981-05-11011 May 1981 Testimony of Mf Alesky Re Doherty Contention 50,jet Pump Beams.Prof Qualifications Encl.Related Correspondence ML19347F5341981-05-11011 May 1981 Testimony of s Ranganath Re Tx Pirg Contention 39,Generic Task A-11,fracture Toughness.Prof Qualifications Encl. Related Correspondence ML19347F5351981-05-11011 May 1981 Testimony of Rl Baron Re Tx Pirg Addl Contention 21, Occupational Exposure.Prof Qualifications Encl.Related Correspondence ML19347F5321981-05-11011 May 1981 Testimony of Jf Montalbano & FP Barbieri Re Tx Pirg Contention 12,cable Fires.Prof Qualifications Encl.Related Correspondence ML19347F5371981-05-11011 May 1981 Testimony of Ma Ross Re Board Question 8,Seismic Category 1 Control Rods.Prof Qualifications Encl.Related Correspondence ML19347F5221981-05-11011 May 1981 Testimony of MD Weingart & F Barbieri Re Tx Pirg Addl Contention 10 & Mccorkle Contention 30,charcoal Adsorber Fires.Prof Qualifications Encl.Related Correspondence ML19347F5151981-05-11011 May 1981 Testimony of R Williams & N Horton Re Doherty Contentions 14 & 25,on Main Steam Line Radiation Monitor & Fuel Failure/ Flow Blockage,Respectively.Prof Qualifications Encl.Related Correspondence ML20003G6781981-04-20020 April 1981 Testimony on Tx Pirg Addl Contention 26 Re Computer Code Error.Prof Qualifications & Certificate of Svc Encl ML20003G6711981-04-20020 April 1981 Testimony on Behalf of Util Re Doherty Contentions 3,39 & 20(a) Re Fuel Specific Enthalpy,Fuel Swelling & Gap Conductance,Respectively.Prof Qualifications Encl ML20003G6751981-04-20020 April 1981 Testimony on Behalf of Util on Tx Pirg Contention 6 (Mccorkle Contention XI) Re Aircraft Hazards.Prof Qualifications Encl ML20003G6761981-04-20020 April 1981 Testimony on Behalf of Util on Doherty Contention 9 Re Containment Buckling.Prof Qualifications Encl ML20003G6771981-04-20020 April 1981 Testimony on Behalf of Util on Doherty Contention 27 Re Reactor Pedestal.Prof Qualifications Encl ML20003G6741981-04-20020 April 1981 Testimony on Behalf of Util on Bishop Contentions 4,5,7,9 & 10 Re Tx Electric Svc Co 24-inch Natural Gas Pipeline & Pipelines Crossing Brazos River Upstream from Facility.Prof Qualifications Encl ML20003G6731981-04-20020 April 1981 Testimony on Behalf of Util on Doherty Contention 7 Re LPCI Cold Slug.Prof Qualifications Encl ML19345H1121981-04-20020 April 1981 Testimony Supporting Doherty Contention 3 on Inadequacy of Design Safety Limit of Applicant Fuel Rods.Prof Qualifications & Certificate of Svc Encl ML20003B2381981-02-0606 February 1981 Errata Sheet for L Perl Testimony,Page 12,Line 13 & Table 9. Certificate of Svc Encl ML20003A2101981-01-27027 January 1981 Errata Sheet to s Michaelson Testimony.Certificate of Svc Encl ML19343B8481980-12-18018 December 1980 Testimony on Behalf of Util Re Bishop Contention 1 Concerning Population Projections ML19340D1401980-12-18018 December 1980 Testimony Re Tx Pirg Contention 1(f) Re Population Risks. Pp 1-8 ML19343B8451980-12-18018 December 1980 Testimony on Behalf of Util Re Hinderstein Contention 5 Concerning Coastal Sites ML19343B8491980-12-18018 December 1980 Testimony on Behalf of Util Re Hinderstein Contention 5 Concerning Coastal Site.Tera Corp Coastal Site Comparison Rept, Encl ML19343B8391980-12-18018 December 1980 Testimony on Behalf of Util Re Tx Pirg Contention 5 Concerning Solid Waste Combustion ML19343B8471980-12-18018 December 1980 Testimony on Behalf of Util Re Tx Pirg Contention 1 Concerning South Texas Project 3 Versus Allens Creek 1. Analysis of Prime Farmland Soils Encl ML19343B8461980-12-18018 December 1980 Testimony on Behalf of Util Re Hinderstein Contention 5 Concerning Coastal Sites ML19343B8441980-12-18018 December 1980 Testimony on Behalf of Util Re Tx Pirg Contention 1 Re South Texas Project 3 Versus Allens Creek Site.Listing of Cost Savings Encl 1982-03-26
[Table view] Category:DEPOSITIONS
MONTHYEARML20050C5011982-03-26026 March 1982 Supplemental Testimony of Jh Goldberg on Technical Qualifications.Brown & Root Terminates Due to Lack of Engineering Productivity,Not Due to Allegations in Quadrex Rept ML20050C5041982-03-26026 March 1982 Testimony of Lj Sas on Tx Pirg Addl Contention 31 Re Quadrex Rept.Rept Raises No Issue as to Whether Ebasco Can Properly Engineer Project.Prof Qualifications Encl ML20009H2161981-07-30030 July 1981 Suppl Testimony of D Marrack Re Viable Fishery ML20009E3641981-07-24024 July 1981 Transcript of Rc Iotti Testimony on Behalf of Util on Bishop Contention 17 Re Tnt Detonation ML20009E8661981-07-20020 July 1981 Transcript of DA Hamon Testimony on Behalf of Util Re Tx Public Interest Research Group Addl Contention 55 (Rapid Depressurization - Steam Break).Prof Qualifications Encl ML20009E2941981-07-20020 July 1981 Transcript of Wf Mercurio Testimony on Behalf of Applicant Re ASLB Question 8 (Reactor Bldg Subsurface Soil Mechanics) ML20009E2961981-07-20020 July 1981 Transcript of R Cheng Testimony on Behalf of Applicant Re ASLB Question 10 (Drywell Pressure Testing).Prof Qualifications Encl ML20009E3531981-07-20020 July 1981 Transcript of Wf Mercurio Testimony on Behalf of Util Re Doherty Contention 29,blockage of Intake Canal ML20009E3591981-07-20020 July 1981 Transcript of Cg Robertson Testimony Re Doherty Contention 8 & ASLB Question 3 on Atws.Prof Qualifications Encl ML20009E3031981-07-20020 July 1981 Transcript of GL Sozzi on Doherty Contention 32 Re ECCS Vaporization Rate ML20009E3151981-07-20020 July 1981 Transcript of Rl Call 810720 Testimony on Doherty Contention 26 (Stud Bolts).Prof Qualifications Encl ML20009E4351981-07-20020 July 1981 Transcript of Gw Oprea & Jh Goldberg Testimonies on Technical Qualifications & Tx Public Interest Research Group Addl Contention 31.Corporate Nuclear Organization Chart Encl ML20009E3481981-07-20020 July 1981 Transcript of G Martin Testimony on Behalf of Util on Mccorkle Contention 9 Re Chlorine Monitoring.Prof Qualifications Encl ML20009E3451981-07-20020 July 1981 Transcript of G Martin Testimony on Behalf of Util Re Doherty Contention 40,10CFR100 Releases.Prof Qualifications Encl ML20009E3431981-07-20020 July 1981 Transcript of Rc Iotti Testimony on Behalf of Util on Bishop Contention 6 & ASLB Question 12 Re Shell Oil Co 6-inch Liquid Petroleum Gas Pipeline ML20009E3171981-07-20020 July 1981 Transcript of Jc Elliott,Tc Cheng,Md Weingart,Pa Ranzau & Cg Robertson 810720 Testimony on Tx Public Research Interest Group (Prig) Addl Contention 53,ASLB Questions 4B & 4A & Pirg Contentions 28 & 52.W/prof Qualifications ML20009E3211981-07-20020 July 1981 Transcript of SA Hucilk & Jj Boseman Testimonies on Doherty Contention 17,RL Huang Testimony on Tx Public Research Interest Group Addl Contention 41 & Jn Bailey Testimony on Doherty Contention 42.Prof Qualifications Encl ML20009E3111981-07-20020 July 1981 Transcript of MR Lane 810720 Testimony Re Doherty Contention 41 (Reactor Water Level Indicators).Prof Qualifications Encl ML19347F5361981-05-11011 May 1981 Testimony of DG Tees Re Doherty Contention 47,turbine Missiles.Related Correspondence ML19347F5391981-05-11011 May 1981 Testimony of Fj Meyer Re Doherty Contention 30, Interconnection/Grid Stability.Prof Qualifications & Certificate of Svc Encl.Related Correspondence ML19347F5201981-05-11011 May 1981 Testimony of DC Papone Re Board Question 6,ability of Applicant to Demonstrate Compliance w/10CFR50,App A.Prof Qualifications Encl.Related Correspondence ML19347F5241981-05-11011 May 1981 Testimony of RA Clarke & Jf Montalbano Re Doherty Contention 10,diesel Generator Reliability.Prof Qualifications Encl. Related Correspondence ML19347F5271981-05-11011 May 1981 Testimony of Rc Iotti & Ws Carnes Re Doherty Contention 47, Turbine Missiles.Prof Qualifications Encl.Related Correspondence ML19347F5291981-05-11011 May 1981 Testimony of Ma Ross Re Doherty Contention 48,control Rod Drive Return Line.Prof Qualifications Encl.Related Correspondence ML19347F5301981-05-11011 May 1981 Testimony of Cw Dillman Re Doherty Contention 6, Recirculation Pump Overspeed.Prof Qualifications Encl. Related Correspondence ML19347F5311981-05-11011 May 1981 Testimony of Mf Alesky Re Doherty Contention 50,jet Pump Beams.Prof Qualifications Encl.Related Correspondence ML19347F5341981-05-11011 May 1981 Testimony of s Ranganath Re Tx Pirg Contention 39,Generic Task A-11,fracture Toughness.Prof Qualifications Encl. Related Correspondence ML19347F5351981-05-11011 May 1981 Testimony of Rl Baron Re Tx Pirg Addl Contention 21, Occupational Exposure.Prof Qualifications Encl.Related Correspondence ML19347F5321981-05-11011 May 1981 Testimony of Jf Montalbano & FP Barbieri Re Tx Pirg Contention 12,cable Fires.Prof Qualifications Encl.Related Correspondence ML19347F5371981-05-11011 May 1981 Testimony of Ma Ross Re Board Question 8,Seismic Category 1 Control Rods.Prof Qualifications Encl.Related Correspondence ML19347F5221981-05-11011 May 1981 Testimony of MD Weingart & F Barbieri Re Tx Pirg Addl Contention 10 & Mccorkle Contention 30,charcoal Adsorber Fires.Prof Qualifications Encl.Related Correspondence ML19347F5151981-05-11011 May 1981 Testimony of R Williams & N Horton Re Doherty Contentions 14 & 25,on Main Steam Line Radiation Monitor & Fuel Failure/ Flow Blockage,Respectively.Prof Qualifications Encl.Related Correspondence ML20003G6781981-04-20020 April 1981 Testimony on Tx Pirg Addl Contention 26 Re Computer Code Error.Prof Qualifications & Certificate of Svc Encl ML20003G6711981-04-20020 April 1981 Testimony on Behalf of Util Re Doherty Contentions 3,39 & 20(a) Re Fuel Specific Enthalpy,Fuel Swelling & Gap Conductance,Respectively.Prof Qualifications Encl ML20003G6751981-04-20020 April 1981 Testimony on Behalf of Util on Tx Pirg Contention 6 (Mccorkle Contention XI) Re Aircraft Hazards.Prof Qualifications Encl ML20003G6761981-04-20020 April 1981 Testimony on Behalf of Util on Doherty Contention 9 Re Containment Buckling.Prof Qualifications Encl ML20003G6771981-04-20020 April 1981 Testimony on Behalf of Util on Doherty Contention 27 Re Reactor Pedestal.Prof Qualifications Encl ML20003G6741981-04-20020 April 1981 Testimony on Behalf of Util on Bishop Contentions 4,5,7,9 & 10 Re Tx Electric Svc Co 24-inch Natural Gas Pipeline & Pipelines Crossing Brazos River Upstream from Facility.Prof Qualifications Encl ML20003G6731981-04-20020 April 1981 Testimony on Behalf of Util on Doherty Contention 7 Re LPCI Cold Slug.Prof Qualifications Encl ML19345H1121981-04-20020 April 1981 Testimony Supporting Doherty Contention 3 on Inadequacy of Design Safety Limit of Applicant Fuel Rods.Prof Qualifications & Certificate of Svc Encl ML20003B2381981-02-0606 February 1981 Errata Sheet for L Perl Testimony,Page 12,Line 13 & Table 9. Certificate of Svc Encl ML20003A2101981-01-27027 January 1981 Errata Sheet to s Michaelson Testimony.Certificate of Svc Encl ML19343B8481980-12-18018 December 1980 Testimony on Behalf of Util Re Bishop Contention 1 Concerning Population Projections ML19340D1401980-12-18018 December 1980 Testimony Re Tx Pirg Contention 1(f) Re Population Risks. Pp 1-8 ML19343B8451980-12-18018 December 1980 Testimony on Behalf of Util Re Hinderstein Contention 5 Concerning Coastal Sites ML19343B8491980-12-18018 December 1980 Testimony on Behalf of Util Re Hinderstein Contention 5 Concerning Coastal Site.Tera Corp Coastal Site Comparison Rept, Encl ML19343B8391980-12-18018 December 1980 Testimony on Behalf of Util Re Tx Pirg Contention 5 Concerning Solid Waste Combustion ML19343B8471980-12-18018 December 1980 Testimony on Behalf of Util Re Tx Pirg Contention 1 Concerning South Texas Project 3 Versus Allens Creek 1. Analysis of Prime Farmland Soils Encl ML19343B8461980-12-18018 December 1980 Testimony on Behalf of Util Re Hinderstein Contention 5 Concerning Coastal Sites ML19343B8441980-12-18018 December 1980 Testimony on Behalf of Util Re Tx Pirg Contention 1 Re South Texas Project 3 Versus Allens Creek Site.Listing of Cost Savings Encl 1982-03-26
[Table view] Category:NARRATIVE TESTIMONY
MONTHYEARML20050C5011982-03-26026 March 1982 Supplemental Testimony of Jh Goldberg on Technical Qualifications.Brown & Root Terminates Due to Lack of Engineering Productivity,Not Due to Allegations in Quadrex Rept ML20050C5041982-03-26026 March 1982 Testimony of Lj Sas on Tx Pirg Addl Contention 31 Re Quadrex Rept.Rept Raises No Issue as to Whether Ebasco Can Properly Engineer Project.Prof Qualifications Encl ML20009H2161981-07-30030 July 1981 Suppl Testimony of D Marrack Re Viable Fishery ML20009E3641981-07-24024 July 1981 Transcript of Rc Iotti Testimony on Behalf of Util on Bishop Contention 17 Re Tnt Detonation ML20009E8661981-07-20020 July 1981 Transcript of DA Hamon Testimony on Behalf of Util Re Tx Public Interest Research Group Addl Contention 55 (Rapid Depressurization - Steam Break).Prof Qualifications Encl ML20009E2941981-07-20020 July 1981 Transcript of Wf Mercurio Testimony on Behalf of Applicant Re ASLB Question 8 (Reactor Bldg Subsurface Soil Mechanics) ML20009E2961981-07-20020 July 1981 Transcript of R Cheng Testimony on Behalf of Applicant Re ASLB Question 10 (Drywell Pressure Testing).Prof Qualifications Encl ML20009E3531981-07-20020 July 1981 Transcript of Wf Mercurio Testimony on Behalf of Util Re Doherty Contention 29,blockage of Intake Canal ML20009E3591981-07-20020 July 1981 Transcript of Cg Robertson Testimony Re Doherty Contention 8 & ASLB Question 3 on Atws.Prof Qualifications Encl ML20009E3031981-07-20020 July 1981 Transcript of GL Sozzi on Doherty Contention 32 Re ECCS Vaporization Rate ML20009E3151981-07-20020 July 1981 Transcript of Rl Call 810720 Testimony on Doherty Contention 26 (Stud Bolts).Prof Qualifications Encl ML20009E4351981-07-20020 July 1981 Transcript of Gw Oprea & Jh Goldberg Testimonies on Technical Qualifications & Tx Public Interest Research Group Addl Contention 31.Corporate Nuclear Organization Chart Encl ML20009E3481981-07-20020 July 1981 Transcript of G Martin Testimony on Behalf of Util on Mccorkle Contention 9 Re Chlorine Monitoring.Prof Qualifications Encl ML20009E3451981-07-20020 July 1981 Transcript of G Martin Testimony on Behalf of Util Re Doherty Contention 40,10CFR100 Releases.Prof Qualifications Encl ML20009E3431981-07-20020 July 1981 Transcript of Rc Iotti Testimony on Behalf of Util on Bishop Contention 6 & ASLB Question 12 Re Shell Oil Co 6-inch Liquid Petroleum Gas Pipeline ML20009E3171981-07-20020 July 1981 Transcript of Jc Elliott,Tc Cheng,Md Weingart,Pa Ranzau & Cg Robertson 810720 Testimony on Tx Public Research Interest Group (Prig) Addl Contention 53,ASLB Questions 4B & 4A & Pirg Contentions 28 & 52.W/prof Qualifications ML20009E3211981-07-20020 July 1981 Transcript of SA Hucilk & Jj Boseman Testimonies on Doherty Contention 17,RL Huang Testimony on Tx Public Research Interest Group Addl Contention 41 & Jn Bailey Testimony on Doherty Contention 42.Prof Qualifications Encl ML20009E3111981-07-20020 July 1981 Transcript of MR Lane 810720 Testimony Re Doherty Contention 41 (Reactor Water Level Indicators).Prof Qualifications Encl ML19347F5361981-05-11011 May 1981 Testimony of DG Tees Re Doherty Contention 47,turbine Missiles.Related Correspondence ML19347F5391981-05-11011 May 1981 Testimony of Fj Meyer Re Doherty Contention 30, Interconnection/Grid Stability.Prof Qualifications & Certificate of Svc Encl.Related Correspondence ML19347F5201981-05-11011 May 1981 Testimony of DC Papone Re Board Question 6,ability of Applicant to Demonstrate Compliance w/10CFR50,App A.Prof Qualifications Encl.Related Correspondence ML19347F5241981-05-11011 May 1981 Testimony of RA Clarke & Jf Montalbano Re Doherty Contention 10,diesel Generator Reliability.Prof Qualifications Encl. Related Correspondence ML19347F5271981-05-11011 May 1981 Testimony of Rc Iotti & Ws Carnes Re Doherty Contention 47, Turbine Missiles.Prof Qualifications Encl.Related Correspondence ML19347F5291981-05-11011 May 1981 Testimony of Ma Ross Re Doherty Contention 48,control Rod Drive Return Line.Prof Qualifications Encl.Related Correspondence ML19347F5301981-05-11011 May 1981 Testimony of Cw Dillman Re Doherty Contention 6, Recirculation Pump Overspeed.Prof Qualifications Encl. Related Correspondence ML19347F5311981-05-11011 May 1981 Testimony of Mf Alesky Re Doherty Contention 50,jet Pump Beams.Prof Qualifications Encl.Related Correspondence ML19347F5341981-05-11011 May 1981 Testimony of s Ranganath Re Tx Pirg Contention 39,Generic Task A-11,fracture Toughness.Prof Qualifications Encl. Related Correspondence ML19347F5351981-05-11011 May 1981 Testimony of Rl Baron Re Tx Pirg Addl Contention 21, Occupational Exposure.Prof Qualifications Encl.Related Correspondence ML19347F5321981-05-11011 May 1981 Testimony of Jf Montalbano & FP Barbieri Re Tx Pirg Contention 12,cable Fires.Prof Qualifications Encl.Related Correspondence ML19347F5371981-05-11011 May 1981 Testimony of Ma Ross Re Board Question 8,Seismic Category 1 Control Rods.Prof Qualifications Encl.Related Correspondence ML19347F5221981-05-11011 May 1981 Testimony of MD Weingart & F Barbieri Re Tx Pirg Addl Contention 10 & Mccorkle Contention 30,charcoal Adsorber Fires.Prof Qualifications Encl.Related Correspondence ML19347F5151981-05-11011 May 1981 Testimony of R Williams & N Horton Re Doherty Contentions 14 & 25,on Main Steam Line Radiation Monitor & Fuel Failure/ Flow Blockage,Respectively.Prof Qualifications Encl.Related Correspondence ML20003G6781981-04-20020 April 1981 Testimony on Tx Pirg Addl Contention 26 Re Computer Code Error.Prof Qualifications & Certificate of Svc Encl ML20003G6711981-04-20020 April 1981 Testimony on Behalf of Util Re Doherty Contentions 3,39 & 20(a) Re Fuel Specific Enthalpy,Fuel Swelling & Gap Conductance,Respectively.Prof Qualifications Encl ML20003G6751981-04-20020 April 1981 Testimony on Behalf of Util on Tx Pirg Contention 6 (Mccorkle Contention XI) Re Aircraft Hazards.Prof Qualifications Encl ML20003G6761981-04-20020 April 1981 Testimony on Behalf of Util on Doherty Contention 9 Re Containment Buckling.Prof Qualifications Encl ML20003G6771981-04-20020 April 1981 Testimony on Behalf of Util on Doherty Contention 27 Re Reactor Pedestal.Prof Qualifications Encl ML20003G6741981-04-20020 April 1981 Testimony on Behalf of Util on Bishop Contentions 4,5,7,9 & 10 Re Tx Electric Svc Co 24-inch Natural Gas Pipeline & Pipelines Crossing Brazos River Upstream from Facility.Prof Qualifications Encl ML20003G6731981-04-20020 April 1981 Testimony on Behalf of Util on Doherty Contention 7 Re LPCI Cold Slug.Prof Qualifications Encl ML19345H1121981-04-20020 April 1981 Testimony Supporting Doherty Contention 3 on Inadequacy of Design Safety Limit of Applicant Fuel Rods.Prof Qualifications & Certificate of Svc Encl ML20003B2381981-02-0606 February 1981 Errata Sheet for L Perl Testimony,Page 12,Line 13 & Table 9. Certificate of Svc Encl ML20003A2101981-01-27027 January 1981 Errata Sheet to s Michaelson Testimony.Certificate of Svc Encl ML19343B8481980-12-18018 December 1980 Testimony on Behalf of Util Re Bishop Contention 1 Concerning Population Projections ML19340D1401980-12-18018 December 1980 Testimony Re Tx Pirg Contention 1(f) Re Population Risks. Pp 1-8 ML19343B8451980-12-18018 December 1980 Testimony on Behalf of Util Re Hinderstein Contention 5 Concerning Coastal Sites ML19343B8491980-12-18018 December 1980 Testimony on Behalf of Util Re Hinderstein Contention 5 Concerning Coastal Site.Tera Corp Coastal Site Comparison Rept, Encl ML19343B8391980-12-18018 December 1980 Testimony on Behalf of Util Re Tx Pirg Contention 5 Concerning Solid Waste Combustion ML19343B8471980-12-18018 December 1980 Testimony on Behalf of Util Re Tx Pirg Contention 1 Concerning South Texas Project 3 Versus Allens Creek 1. Analysis of Prime Farmland Soils Encl ML19343B8461980-12-18018 December 1980 Testimony on Behalf of Util Re Hinderstein Contention 5 Concerning Coastal Sites ML19343B8441980-12-18018 December 1980 Testimony on Behalf of Util Re Tx Pirg Contention 1 Re South Texas Project 3 Versus Allens Creek Site.Listing of Cost Savings Encl 1982-03-26
[Table view] |
Text
__
- July 20, 1981 8 NDEC, ej t ,,o y e I y <; x
~~
f:{ \ \
l g.g ;;;1c.. UNITED STATES OF AMERICA n;_ g g, ;gg .
J E;0ET3 SEay1CgQLEAR REGULATORY COMMISSION _
2 BEFORE THE ATOMIC SAFETY AND LICENSING BOARD 6 7 Tj y &
4 In the Matter of S S ~
5 HOUSTON LIG;ITING & POWER COMPANY S Docket No. SO -,
S W' Q' '.
6 (Allens Creek Nuclear Generating S U .
^
Station, Unit 1) S i6 '
$@o' v
7
$ OI "
,,3 g DIRECT TESTIMONY OF CLOIN G. ROBERTSO O g# /?
ON DOHERTY CONTENTION 8 AND DOARD QUESTIO . 9 9
Q.
RE ATWS Please state your name and position.
W Tr 10 11 A. My name is Cloin G. Robertson. I am the Manager 12 f Nuclear Licensing for Houston Lighting & Power Company 13 (HL&P).
Q. Please describe your professional experience and 14 educational background.
15 A. MY Professional experience and educational back-16 ground are explained in Attachment CGR-1, 17 Q. Mr. Robertson, in your capacity as Manager of 18 Nucicar Licensing are you responsible for assuring that g
the design of the Allens Creek Nuclear Generating Station, complies with all applicable regulatory requirements?
A. Yes I am.
22 Q. What is your understanding as to the current NRC 23 24 position on ATWS? %g II 8107230070 81C720 PDR ADOCK 05000466 T PDR
1 A. The steps that have been taken by the NRC to 2 address ATWS are thoroughly described in Volume 4 of 3 NUREG-0460. The NUREG lists several groupings of design 4 changes that have been proposed in order to mitigate the 5 consequences of ATWS. Under the NRC's currently proposed 6 rule on ATWS (SECY-80-409) the design changes designated 7
as Alternate 3A in Vol. 4 of NUREG-0460 would be required
~
3 for the Allens Creek plant.
9 0 What design changes are necessary in order to in rp rate Alternate 3A fnto the design of Allens Creek?
10 A. The design details are fully described in 11 NUREG-04 60. To summarize, Alternative 3A requires incor-12 p ration of: (1) an alternative rod injection system (ARI) ;
3 (2) recirculation pump trip (RPT) ; (3) an automated standby liquid control system (SLCS) ; (4) logic changes to reduce vessel isolation events and permit feedwater runback; (5) modi-fication of scram discharge volume to reduce common mode failure potential of the single scram discharge volume; 18 and (6) provisions for the rapid closure of containment 19 isolation valves in the event of fuel failure.
20 Q. In Board Question 3 the Board has inquired as 21 to whether HL&P intends to comply with the NRC require-22 ments regarding ATNS. Can you address this question?
23 A. "Zes. In Appendix K of the PSAR, HL&P committed to 24 d _
1 incorporate any design modifications that may be required by 2 the staff to resolve the ATWS issue, as stated at page 15-3 2 of Supplement No. 2 to the Allens Creek Safety Evaluation 4 Report. At the construction permit stage HL&P is designing 5 the Allens Creek plant to accomodate the alternatives as 9
6 described in NUREG-0460, Vol. 4.
7 Q. Referring specifically to Mr. Doherty's conten-8 tion, is it true that the Allens Creek plant will have only 9
a manually operated SCRAM System as backup to an automatic 10 SCRAM initiation.
A. Not necessarily. The ARI is a redundant backup 11 i system for the prompt scram system. ARI has automatic 12 n a n, and it has completely independent circuitry. The 13 SLCS is also a redundant system and it functions automatically.
4
( Q. What changes to the design relative to AIWS have 5
already been instituted or programmed for Allens Creek?
A. The recirculation pump trip and an identified procedural package will be developed by HL&P operations l personnel prior to plant operation.
Q. Are dasign features other than the recirculation 20 pump trip and procedural package required at this time?
! 21 l A. No. The RPT and procedural package are being used 22 by NRC at the current time as the ATWS requirements for 23 issuing new operating lic;nses with the caveat that additional 24 l
l l
1
I design features may be required later.
2 Q. Does the Allen Creek design currently include all 3 identified NRC requirements?
4 A. Yes. The design meets current requirements and 5 provisions are being made to accomodate additional features 6 if necessary. Again I would emphasize that HL&P is committed 7 to including such design features as are necessary to resolve 8 the long-standing ATWS issue. .
9 10 11 12 13 14 15 16 17 18 19 1
20 21 22 l
l 23 l 24 1
l . _ . . _ . .
o Attachment CGR-1 Cloin G. Robertson I received a Bachelor of Science Degree from the U.S. Military Academy at West Point in 1958. I received a Master of Science in Nuclear Engineering from MIT in 1965, and I received a Nuclear Engineer Degree from MIT in 1967.
From 1967.to 1973 I was employed as an engineer C at the KAPL Division of General Electric Company where I performed safety analyses and core thermal / hydraulic analyses on the reactors for the Nimitz class attack carriers. I also performed loss-of-coolant accident analvses of reactor systems, conducted safe guard analyses for SIG fuel loading and fuel storage operations, conducted shielding analyses for protection of personnel and equipment, reviewed and approved operating, maintenance, start-up and test procedures for the AIG reactor system, and conducted protective system analyses including control rod injection and high-pressure and high-power transients. As an engineer at GE I also worked on the AIG thermal hydraulic design and analysis that included analyzing fuel and cladding temperature distribu-tions, design of the emergency core cooling system, analysis of control rod cooling water flow flow rates and other core structural members, and performance of water hammer analyses of core and reactor vessel loadings.
From 1973 through 1974 I was employed by the New York Atomic Energy Council as a nuclear facility specialist where I represented the State of New York in licensing proceedings relating to the issuance of construction permits and operating licenses permits for nuclear facilities in the State of New York. I also provided a technical evaluation for the New York State Emergency Plan for Fixed Nuclear Facilities and represented the State of New York on a state and federal siting committee relative to the NRC early site review regulations.
From May 1974 to March 1977 I worked for the New i
York State Energy Research and Development Authority as l a Siting Program Manager. In this capacity.I was responsible for management of the state-wide environmental and technical qualifications prcgram to identify and evaluate sites for major new electrical generation stations. In this regard I directed site studies for nuclear and fossil generating stations and also directed the Authority's interest in the West Valley reprocessing plant and waste burial facility.
From March 1977 to March 1981 I was employed by the Stone & Webster Engineering Corporation. From March 1977 to January 1978 I was a Senior Licensing Engineer in the Licensing Division with responsibility to coordinate the i preparation of Licensing Division technical guidelines. I was the licensing engineer for James A. FitzPatrick, Surry Units 1 and 2, Maine Yankee, Connecticut Yankee, and Millstone plants relative to work by the Operation Services Division.
From January 1978 through November 1980 I was Supervisor of the Engineered Safeguards Group. I supervised 20 to 30 engineers with responsibility for the analysis and functional design of Stone & Webster nuclear power plant containments and safety systems. This work included the design and analyses activities associated with containment pressure and temperature response during accident conditions. It also included system design and analysis responsibility for safety injection systems, containment spray systems, auxiliary feedwater systems, containment atmosphere cooling systems, containment leakage monitoring systems, and re-activity control systems. I was also responsible for the performance of analyses regarding the effects resulting from postulated pipe breaks inside and outside containment.
Such analyses included combustible gas control inside containment, ph control inside containment, equipment temp-erature and pressure environmental qualification requirements, containment subcompartment asymmetric pressure transients, containment pressure and temperature transients resulting from postulated pipe breaks, NPSH requirements, and require-ments for heat removal from spent fuel storage pools.
From November 1980 until March 1981 I was Super-l visor of the Engineered Safety Systems and Analysis Group.
! My responsibilities were basically the same as in my prior capacity as Supervisor of the Engineered Safeguards Group.
However, during this time I did work on development of analysis capabilities with respect to degraded core conditions and I coordinated the Stone & Webster work with respect to l the NRC rule making related to reactor safety.
I joined Houston & Lighting Company in March of 1981 as the Manager of Nuclear Licensing. In this capacity I am responsible for all licensing activities for the Allens Creek and South Texas Project nuclear plants.
I
-~. -. __ - - . - . .~. .-,