MONTHYEARJAFP-99-0277, Monthly Operating Rept for Sept 1999 Fpr Ja FitzPatrick Nuclear Power Plant.With1999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 Fpr Ja FitzPatrick Nuclear Power Plant.With JAFP-99-0261, Monthly Operating Rept for Aug 1999 for Jafnpp.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Jafnpp.With JAFP-99-0236, Monthly Operating Rept for July 1999 for Ja FitzPatrick Npp. with1999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Ja FitzPatrick Npp. with JAFP-99-0211, Monthly Operating Rept for June 1999 for Ja FitzPatrick Nuclear Power Plant.With1999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Ja FitzPatrick Nuclear Power Plant.With JAFP-99-0181, Monthly Operating Rept for May 1999 for Jafnpp.With1999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Jafnpp.With JAFP-99-0166, Monthly Operating Rept for Apr 1999 for Ja FitzPatrick Nuclear Plant.With1999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Ja FitzPatrick Nuclear Plant.With JAFP-99-0142, Monthly Operating Rept for Mar 1999 for Ja FitzPatrick Nuclear Power Plant.With1999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Ja FitzPatrick Nuclear Power Plant.With JAFP-99-0092, Monthly Operating Rept for Feb 1999 for Ja FitzPatrick Nuclear Power Plant.With1999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Ja FitzPatrick Nuclear Power Plant.With JAFP-99-0011, Monthly Operating Rept for Dec 1998 for Ja FitzPatrick Nuclear Power Plant.With1998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Ja FitzPatrick Nuclear Power Plant.With JAFP-98-0396, Monthly Operating Rept for Nov 1998 for Ja FitzPatrick Npp. with1998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Ja FitzPatrick Npp. with JAFP-98-0360, Monthly Operating Rept for Oct 1998 for Ja FitzPatrick Nuclear Power Plant.With1998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Ja FitzPatrick Nuclear Power Plant.With JAFP-98-0322, Monthly Operating Rept for Sept 1998 for Ja Fitzpatrick Nuclear Power Plant.With1998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Ja Fitzpatrick Nuclear Power Plant.With ML20151X6891998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Ja FitzPatrick Nuclear Power Plant JAFP-98-0264, Monthly Operating Rept for July 1998 for Ja FitzPatrick Nuclear Plant1998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Ja FitzPatrick Nuclear Plant JAFP-98-0222, Monthly Operating Rept for June 1998 for Ja FitzPatrick Nuclear Power Plant1998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Ja FitzPatrick Nuclear Power Plant JAFP-98-0193, Monthly Operating Rept for May 1998 for Ja FitzPatrick Nuclear Plant1998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Ja FitzPatrick Nuclear Plant JAFP-98-0168, Monthly Operating Rept for Apr 1998 for Ja FitzPatrick Nuclear Power Plant1998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Ja FitzPatrick Nuclear Power Plant JAFP-98-0128, Monthly Operating Rept for Mar 1998 for Ja FitzPatrick Nuclear Power Plant1998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Ja FitzPatrick Nuclear Power Plant JAFP-98-0091, Monthly Operating Rept for Feb 1998 for JAFNPP1998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for JAFNPP JAFP-98-0058, Monthly Operating Rept for Jan 1998 for Ja FitzPatrick Nuclear Power Plant1998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Ja FitzPatrick Nuclear Power Plant JAFP-98-0009, Monthly Operating Rept for Dec 1997 for Ja FitzPatrick Nuclear Power Plant1997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Ja FitzPatrick Nuclear Power Plant JAFP-97-0474, Monthly Operating Rept for Nov 1997 for Ja FitzPatrick Nuclear Power Plant1997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for Ja FitzPatrick Nuclear Power Plant JAFP-97-0435, Monthly Operating Rept for Oct 1997 for Ja FitzPatrick Nuclear Power Plant1997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for Ja FitzPatrick Nuclear Power Plant JAFP-97-0375, Monthly Operating Rept for Sept 1997 for Ja FitzPatrick Nuclear Plant1997-09-30030 September 1997 Monthly Operating Rept for Sept 1997 for Ja FitzPatrick Nuclear Plant JAFP-97-0341, Monthly Operating Rept for Aug 1997 for Jfnpp1997-08-31031 August 1997 Monthly Operating Rept for Aug 1997 for Jfnpp JAFP-97-0297, Monthly Operating Rept for Jul 1997 for Ja FitzPatrick Nuclear Power Plant1997-07-31031 July 1997 Monthly Operating Rept for Jul 1997 for Ja FitzPatrick Nuclear Power Plant JAFP-97-0242, Monthly Operating Rept for June 1997 for Ja FitzPatrick Nuclear Power Plant1997-06-30030 June 1997 Monthly Operating Rept for June 1997 for Ja FitzPatrick Nuclear Power Plant JAFP-97-0203, Monthly Operating Rept for May 1997 for Ja FitzPatrick Npp1997-05-31031 May 1997 Monthly Operating Rept for May 1997 for Ja FitzPatrick Npp JAFP-97-0178, Monthly Operating Rept for Apr 1997 for Ja FitzPatrick Nuclear Power Plant1997-04-30030 April 1997 Monthly Operating Rept for Apr 1997 for Ja FitzPatrick Nuclear Power Plant JAFP-97-0126, Monthly Operating Rept for Mar 1997 for JAFNPP1997-03-31031 March 1997 Monthly Operating Rept for Mar 1997 for JAFNPP JAFP-97-0093, Monthly Operating Rept for Feb 1997 for James A. FitzPatrick Nuclear Power Plant1997-02-28028 February 1997 Monthly Operating Rept for Feb 1997 for James A. FitzPatrick Nuclear Power Plant JAFP-97-0056, Monthly Operating Rept for Jan 1997 for Ja FitzPatrick Nuclear Power Plant1997-01-31031 January 1997 Monthly Operating Rept for Jan 1997 for Ja FitzPatrick Nuclear Power Plant JAFP-97-0012, Monthly Operating Rept for Dec 1996 for Ja FitzPatrick Nuclear Power Plant1996-12-31031 December 1996 Monthly Operating Rept for Dec 1996 for Ja FitzPatrick Nuclear Power Plant JAFP-96-0476, Monthly Operating Rept for Nov 1996 for James A. FitzPatrick Nuclear Power Plant1996-11-30030 November 1996 Monthly Operating Rept for Nov 1996 for James A. FitzPatrick Nuclear Power Plant JAFP-96-0448, Monthly Operating Rept for Oct 1996 for Ja FitzPatrick Nuclear Power Plant1996-10-31031 October 1996 Monthly Operating Rept for Oct 1996 for Ja FitzPatrick Nuclear Power Plant JAFP-96-0401, Monthly Operating Rept for Sept 1996 for Jfnpp1996-09-30030 September 1996 Monthly Operating Rept for Sept 1996 for Jfnpp JAFP-96-0352, Monthly Operating Rept for Aug 1996 for Ja FitzPatrick Nuclear Power Plant1996-08-31031 August 1996 Monthly Operating Rept for Aug 1996 for Ja FitzPatrick Nuclear Power Plant JAFP-96-0300, Monthly Operating Rept for Jul 1996 for Ja FitzPatrick Nuclear Power Plant1996-07-31031 July 1996 Monthly Operating Rept for Jul 1996 for Ja FitzPatrick Nuclear Power Plant JAFP-96-0275, Monthly Operating Rept for June 1996 for Ja FitzPatrick Nuclear Power Plant1996-06-30030 June 1996 Monthly Operating Rept for June 1996 for Ja FitzPatrick Nuclear Power Plant JAFP-96-0240, Monthly Operating Rept for May 1996 for Ja FitzPatrick Nuclear Power Plant1996-05-31031 May 1996 Monthly Operating Rept for May 1996 for Ja FitzPatrick Nuclear Power Plant JAFP-96-0196, Monthly Operating Status Rept for Apr 1996 for Ja FitzPatrick Nuclear Power Plant1996-04-30030 April 1996 Monthly Operating Status Rept for Apr 1996 for Ja FitzPatrick Nuclear Power Plant JAFP-96-0156, Monthly Operating Rept for Mar 1996 for Ja FitzPatrick Nuclear Power Plant1996-03-31031 March 1996 Monthly Operating Rept for Mar 1996 for Ja FitzPatrick Nuclear Power Plant JAFP-96-0113, Monthly Operating Rept for Feb 1996 for Ja FitzPatrick Nuclear Power Plant1996-02-29029 February 1996 Monthly Operating Rept for Feb 1996 for Ja FitzPatrick Nuclear Power Plant JAFP-96-0066, Monthly Operating Rept for Jan 1996 for JAFNPP1996-01-31031 January 1996 Monthly Operating Rept for Jan 1996 for JAFNPP JAFP-96-0023, Monthly Operating Rept for Dec 1995 for Ja Fitzpatrick Nuclear Power Plant1995-12-31031 December 1995 Monthly Operating Rept for Dec 1995 for Ja Fitzpatrick Nuclear Power Plant JAFP-95-0535, Monthly Operating Rept for Nov 1995 for Jafnpp1995-11-30030 November 1995 Monthly Operating Rept for Nov 1995 for Jafnpp JAFP-95-0486, Monthly Operating Rept for Oct 1995 for Ja FitzPatrick Nuclear Plant1995-10-31031 October 1995 Monthly Operating Rept for Oct 1995 for Ja FitzPatrick Nuclear Plant JAFP-95-0444, Monthly Operating Rept for Sept 1995 for Ja FitzPatrick Nuclear Power Plant1995-09-30030 September 1995 Monthly Operating Rept for Sept 1995 for Ja FitzPatrick Nuclear Power Plant JAFP-95-0413, Monthly Operating Rept for Aug 1995 for Ja Fitzpatrick Nuclear Power Plant1995-08-31031 August 1995 Monthly Operating Rept for Aug 1995 for Ja Fitzpatrick Nuclear Power Plant JAFP-95-0372, Monthly Operating Rept for July 1995 for Ja FitzPatrick Nuclear Power Plant1995-07-31031 July 1995 Monthly Operating Rept for July 1995 for Ja FitzPatrick Nuclear Power Plant 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARJAFP-99-0277, Monthly Operating Rept for Sept 1999 Fpr Ja FitzPatrick Nuclear Power Plant.With1999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 Fpr Ja FitzPatrick Nuclear Power Plant.With ML20217A9931999-09-30030 September 1999 NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data JAFP-99-0261, Monthly Operating Rept for Aug 1999 for Jafnpp.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Jafnpp.With JAFP-99-0236, Monthly Operating Rept for July 1999 for Ja FitzPatrick Npp. with1999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Ja FitzPatrick Npp. with ML20216D9541999-07-28028 July 1999 Safety Evaluation Authorizing Proposed Alternatives for Second 10-year Interval Pursuant to 10CFR50.55a(a)(3)(ii) ML20196H8621999-06-30030 June 1999 NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data, June 1999 Rept JAFP-99-0211, Monthly Operating Rept for June 1999 for Ja FitzPatrick Nuclear Power Plant.With1999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Ja FitzPatrick Nuclear Power Plant.With JAFP-99-0175, Annual Summary of Changes,Tests & Experiments for 1997/1998. with1999-06-0202 June 1999 Annual Summary of Changes,Tests & Experiments for 1997/1998. with JAFP-99-0181, Monthly Operating Rept for May 1999 for Jafnpp.With1999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Jafnpp.With JAFP-99-0166, Monthly Operating Rept for Apr 1999 for Ja FitzPatrick Nuclear Plant.With1999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Ja FitzPatrick Nuclear Plant.With JAFP-99-0142, Monthly Operating Rept for Mar 1999 for Ja FitzPatrick Nuclear Power Plant.With1999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Ja FitzPatrick Nuclear Power Plant.With JAFP-99-0092, Monthly Operating Rept for Feb 1999 for Ja FitzPatrick Nuclear Power Plant.With1999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Ja FitzPatrick Nuclear Power Plant.With ML20207E9311999-02-26026 February 1999 Part 21 Rept Re Sprague Model TE1302 Aluminum Electrolytic Capacitors with Date Code of 9322H.Caused by Aluminum Electrolytic Capacitors.Affected Capacitors Replaced ML20202J0891999-02-0303 February 1999 Safety Evaluation Accepting Rev 2 of Third Interval Inservice Testing Program for Pumps & Valves for James a FitzPatrick Nuclear Power Plant ML20199M0891999-01-22022 January 1999 Part 21 Rept Re Failure of Square Root Converters.Caused by Failed Aluminum Electrolytic Capacitory Spargue Electric Co (Model Number TE1302 with Mfg Date Code 9322H).Sent Square Root Converters Back to Mfg,Barker Microfarads,Inc JAFP-99-0011, Monthly Operating Rept for Dec 1998 for Ja FitzPatrick Nuclear Power Plant.With1998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Ja FitzPatrick Nuclear Power Plant.With ML20198F9991998-12-0404 December 1998 Assessment of Licensing Basis for Use of Containment Overpressure Credit for Net Positive Suction Head Analyses Power Authority of State of New York,James a Fitzpatrick Nuclear Power Plant ML20196J3501998-12-0404 December 1998 SER Accepting License Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves JAFP-98-0396, Monthly Operating Rept for Nov 1998 for Ja FitzPatrick Npp. with1998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Ja FitzPatrick Npp. with ML20196F9251998-11-25025 November 1998 Safety Evaluation Re Thrid 10-year Interval Inservice Insp Program Relief Requests for Plant ML20195J7521998-11-18018 November 1998 Rev 7 to Jaf Colr ML20195K4211998-11-17017 November 1998 Safety Evaluation Authorizing Proposed Alternative in Relief Request VRR-05 Per 10CFR50.55a(a)(3)(i) & PRR-01,PRR-02R1, PRR-03,PRR-04,VRR-02,VRR-03 & VRR-04 Per 10CFR50.55a(a)(3)(ii) ML20195E1051998-11-13013 November 1998 Safety Evaluation Accepting Licensee Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power Operated Gate Valves, Issued 950817 ML20197G6221998-11-0606 November 1998 Non-proprietary Rev 7 to HI-971661, Licensing Rept for Reracking of Ja FitzPatrick Sfp ML20155H5321998-11-0303 November 1998 Safety Evaluation Authorizing Alternative to ASME Code Requirements for CRD Bolting ML20155H5801998-11-0303 November 1998 Safety Evaluation Authorizing Postponement of Beginning of Augmented Exam Requirements of 10CFR50.55a(g)(6)(ii)(A)(2) Re ASME Code,Section XI JAFP-98-0360, Monthly Operating Rept for Oct 1998 for Ja FitzPatrick Nuclear Power Plant.With1998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Ja FitzPatrick Nuclear Power Plant.With ML20155C2821998-10-30030 October 1998 Non-proprietary Rev 0 to GENE-187-30-1598 Np, CRD Bolting Flaw Evaluation for Ja FitzPatrick Nuclear Power Plant ML20154L6591998-10-14014 October 1998 Safety Evaluation Accepting Licensee Proposed Alternative to Snubber Visual Inservice Exam Intervals & Sampling Rates Requirements Contained in ASME Code,Section Xi,Subsection Iwf,Article IWF-5000 JAFP-98-0322, Monthly Operating Rept for Sept 1998 for Ja Fitzpatrick Nuclear Power Plant.With1998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Ja Fitzpatrick Nuclear Power Plant.With ML20153D2591998-09-21021 September 1998 SER Accepting Proposed Alternative Testing of Containment Following ECCS Suction Strainer Replacement ML20153B5611998-09-0101 September 1998 Rev 1 to JAF-SE-98-013, RHR & Core Spray Suppression Pool Suction Strainer Replacement ML20151X6891998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Ja FitzPatrick Nuclear Power Plant ML20237E8361998-08-25025 August 1998 Rev 6 to Colr ML20237E9471998-08-0808 August 1998 Rev 6 to Colr JAFP-98-0264, Monthly Operating Rept for July 1998 for Ja FitzPatrick Nuclear Plant1998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Ja FitzPatrick Nuclear Plant ML20236X5881998-07-29029 July 1998 Safety Evaluation Supporting Amend 245 to License DPR-59 ML20236V8181998-07-29029 July 1998 Safety Evaluation Accepting Request for Relief from Implementation of Requirements of 10CFR50.55a Related to Containment Repair & Replacement Activities for James a FitzPatrick Nuclear Power Plant ML20153B5781998-07-28028 July 1998 Rev 0 to JAF-SE-98-025, HPCI & RCIC Suppression Pool Suction Strainer Replacement ML20236X3831998-07-14014 July 1998 Rev 2 to JAF-RPT-MULTI-02671, Summary of Detailed Evaluation for NRC Generic Ltr 96-06 ML20154L9201998-07-10010 July 1998 SER Accepting Rev to Reactor Vessel Surveillance Capsule Withdrawal Schedule for James a Fitzpatrick Nuclear Power Plant JAFP-98-0222, Monthly Operating Rept for June 1998 for Ja FitzPatrick Nuclear Power Plant1998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Ja FitzPatrick Nuclear Power Plant JAFP-98-0193, Monthly Operating Rept for May 1998 for Ja FitzPatrick Nuclear Plant1998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Ja FitzPatrick Nuclear Plant ML20248F3531998-05-21021 May 1998 Part 21 Rept Re Electronic Equipment Repaired or Reworked by Integrated Resources,Inc from Approx 930101-980501.Caused by 1 Capacitor in Each Unit Being Installed W/Reverse Polarity. Policy of Second Checking All Capacitors Is Being Adopted JAFP-98-0168, Monthly Operating Rept for Apr 1998 for Ja FitzPatrick Nuclear Power Plant1998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Ja FitzPatrick Nuclear Power Plant JAFP-98-0128, Monthly Operating Rept for Mar 1998 for Ja FitzPatrick Nuclear Power Plant1998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Ja FitzPatrick Nuclear Power Plant ML20217A4631998-03-23023 March 1998 Safety Evaluation Accepting Use of Three Heats/Lots of Hot Rolled XM-19 Matl in Core Shroud Repair Assemblies Re Licenses DPR-16 & DPR-59,respectively JAFP-98-0091, Monthly Operating Rept for Feb 1998 for JAFNPP1998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for JAFNPP ML20202G9081998-02-0606 February 1998 Safety Evaluation Re Amend to License DPR-59 to Revise TS Tables 3.2-2 & 4.2-2 JAFP-98-0058, Monthly Operating Rept for Jan 1998 for Ja FitzPatrick Nuclear Power Plant1998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Ja FitzPatrick Nuclear Power Plant 1999-09-30
[Table view] |
Text
- __ - -. -
O OPERATING DATA REPORT POCKET NO. M2:
DATE MARCH 1901 CO',PLETED BY E- EUFELT TELEPilONE (315)3-2-3540 OPERATING STATUS Fit: Patrick N I"
- 1. Unit Name:
- 2. Reporting Per.io d:
510201-c10225 _
- 3. Licensed Thenna! Power (MWt)-
'3D
- 4. Nameplate Rating (Gross MWe): --
00'
- 5. Design Electrial Rating (Net MWe): !21
- 6. Stasimum Dependable Capacity (Gross MWe): 30 o10 '
- 7. Masimum Dependable Capacity (Net MWe):
- 8. If Changes Occur in C,pacity Ratings (Irems Number 3 Through 7) Since Last Report,Gise Rcasons:
NONE
- 9. Power Lesel To Which Restricted,If Any(Net MWe): P'F
- 10. Reasons For Restrictions,1f Any:
This Month Yr..to Date Cumulatise i1. Hours In Reporting Period $72 1U16 49032
- 12. Number Of Hours Reactor Was Critical OI2 1214 0 34120 S
- 13. Reactor Reserve Shutdown Hours 0 0 0 672 lle8., 33091.5
- 14. Hours Generator On-Line
- 15. Unit Resene Snutdown Hours 0 0 0
- 16. Cross Thermal Energy Generated (MWH) 1609464 2769168 66952762 17 Gross Electrical Energy Generated (MWH) 563620 068910 227o8420
- 18. Net Electrical Energy Generated (MWH) 546030 038270 22063 50
- 19. Unit Senice Factor 100.0% s39". 67.5%
- 20. Unis Asailability Factor 100.0% S3 9% 67.5%
21 Unit Capacity Factor (Using MDC Net) 100.3% 81. 8 ". 6 0 . 3 ".
- 22. Unit Capacity Factor (Using DER Net) 99.0% S 0 . 7 "._ 54.1%
- 23. Unit Forced Outage Rate O.05 16.1% 18.23 24 Shutdowns Scheduled Over Nest 6 Months (Type. Date.and Duration of Eacht:
- 25. If Shur Down At End Of Report Period. Estimated Date of Startup:
- 26. Un ts in Test Status (Prior to Commercial Operation): Forecast Achiesed INITIA L CRITICALITY ,
INITIAL ELECTRICITY COMM ERCIAL OPERATION 83.03330 g
AVER AGE DAILY UNIT POWER LEVEL 50-333 DOCKET NO.
3,IT JAFNPP DATE MARCH 1981 COMPLETED BY E. ZUFELT TELEPHONE (315) 342-3340j c
MONW FEBRU_ARY 1981 DAY AVERAGE DAIL'f POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (MWe Net) (MWe Net)
I 797 17 820 2
010 18 820 0 3 3 I, 4 822 20 820 5 821 2, 824 6 820 22 822
.7 822 23 021
- RM 24 820
, 822 25 821 10 021 26 023 II 655 27 821 12 820 23 322 13 822 2, -
34 823 3, _
15 823 3: .
16 771
SUMMARY
- The unit operated at approximately 98% of rated thermal power for this operating period.
Power was reduced on February 11, 1980 due to reactor water conductivity exceec ing . technical specification limits.
______._____._______._________.______...-_____________j
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NG. 50-333 UNIT N AME .1APNPP DATE M A R P!I 1081 _
COMPLETED BY M Z H PF Uf' REPORT MONT1g FEBRilARY 1981 TELEPHONE (315) 349-1840
- r. .
w E c t $E 3 yY3 Licensee E,
, . Cause & Corrective N. e . Date n; 5g i 2s& Event u7 {*3
- n. Actit r. to
$E E sN0 jig Report a
[U Psesent Recurrence 6
2 810211 F 0 0 4 81-019 ZZ ZZZZZZ Reduced power due to high reactor water' conductivity caused by operator error.
l 1
i e 2 3 4 F: Fen ted Reason: Method: Exhibit G Instrutiions S: Scheduled A Equipment Failure (Explain) 1 Manual foi Preparation of Data B. Maintenance of Test 2 Manual Scram. Entsy Sheets for Licensee C. Refueling 3 Automatic Scram. Event Repost (LER) FdeINUREG-D Regulatory Restriction 4 Other (Explain) 01611 E-Operator Tr.sining & License Examination F-Administrative 5 G Ope:ational Escor IExplain) Eshibit I Same Source ll Othe r (E xplain)
- w. -- _ _ - . _ - _ _
POWER AUTHORITY OF THE STATE OF NEW YORE JAMES A. FITZPATRICK NUCLEAR POWER PLANT NARRATIVE
SUMMARY
OF OPERATING EXPERIENCES FEBRUARY 1931 During this reporting period, the unit operated at approximately 98% rated thermal power. On February 11, 1981 power was reduced to approximately 650 MWe due to high reactor water conductivity caused by operator error. The conductivity decreased during the day and power was increased late in the afternoon.
On February 16, 1981, there was a slight reduction of power to extinguish a hydrogen combustion in the after condenser. It was accomplished successfully and the unit was returned to full power.
5 m
POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT -
SAFETY RELATED ELECTRICAL & MECHANICAL MAINTENANCE
SUMMARY
REPAIR DATE SYSTEM HOW DETECTED CAUSE OF MALFUNCTION ACTION TAKEN TC, PRECLUDE RECURRENCE T
2'/ fi/ 81 27 11756 OPS Leaking diaphragm Replaced diaphragm 10 B Drywell Sample Pump 2/12/81 76 117714 M AlllT Battery cell - low Replaced batteries 2 11 P-1 specific gravity 2/13/8] 76 10227 OPS Burnt lamp Replaced lamp 2 CP-SRP '
POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT MAINTENANCE
SUMMARY
FEBRilARY 1981, T&C WORK REQUEST # CAUSE OF RESULTS OF ACTION TAKEN REPAIR DATE SYSTEM D TECTED MALFUNCTION TO PRECLUDE TIME COMPONENT # MALFUNCTION RECURRENCE HOURS 12370 I&C N/A Original spare Repaired, teste .1 2/6/81 02 Spare FT was used to & returned to 12.0 replaco FT-ll0D n t.n c k 2/27/81 02 9666 ,
Computer point Tightened TE- 134 5 A OPS Unknown reads low computer input 2.0 card 2/6/81 02-3 117524 Switch touching DC ground on Adjusted 10.0 LIS-58A I&C magnet "A" battery switch 2/9/81 03 11693 Dirty contacts will not select Cleaned Select Matrix OPS contacts 1.0 2/19/81 03 11815 class broken Replaced glass IICU 06-39PI OPS Unknown & checked 9.0 en11bration 2/1".'81 03 11869 Palled IMP Replaced 7.0 SDVCM "D" OPS IInknown 3 10 coupling 2/19/81 07 1 02160 OPS tise Drifting Teued LPRM Ol-37A i _,at i a rac tori t y 20.0 2/18/81 07 11685 Adjusted as APRM 'T' OPS IInknown Palled ST-St. Der ISP-20 0.5 2/19/81 07 1_1703 Tested LPRM 20-37C OPS Use Detrting satisfactorily ?.0 2/19/81 07 117154 Tested LPRM 36-29B OPS Use Drifting satisfactorily 1. 0 2/18/81 07 11775 OPS Drift Setpoint Adjusted as APRM "E" < 2.5% g,e r ISP-20 1.0
POWER AUTHORITY OF THE STATE OF NEW YORK '
JAMES A. FITZPATRICK NUCLEAR POWER PLANT MAINTENANCE
SUMMARY
FEBRilARY 1981, T&C WORK REQUEST # CAUSE OF RESULTS OF ACTION TAKEN REPAIR DATE SYSTEM MALFUNCTION TO PRECLUDE TIME COMPONENT # MALFUNCTION RECURRENCE HOURS 2/18/81 07 11776 OPS Drift Setpoint Adjusted as APRM' T I~ < 2 5% per ISP-20 1.0 2/19/81 07 118114 I E C, Pin loose Repaired 0.5 li . V . Connector IIS O "C" SRM 2/19/81 07 118614 OPS Unknown Recorder reads Recorder APRM "F" high calibrated 9.0 2/19/81 07 11872 OPS Age Incorrect LPRM Replaced first RBM "B" display level multi- 8.0 plexer 2/19/81 07 11873 OPS Age Incorrect HBM Replaced first RBM "B" level reading level multi- 8.0 plexer 2/26/81 11 9660 OPS Air line Reads higher Replaced /
LT !5 4 partially than actual cleaned lines 1 11 . 0 plu med 2/6/81 13 12363 I&C Broken wire in Will not trip Repaired wire TS-89B switch ISP-10.1 1.0 4
nerrormed 2/18/81 17 10806 RES N/A Large di frerene. . Cleaned RM fS6 i A/B in readinga detector ISP- 18.0 17 norronmed 2/6/81 20 11728 OPS N/A Integrator ISP performed ,
FR-528 creeps round 6.0 qat 1 s ract.orv 2/6/81 23 6280 I&C N/A N/A Clean / 15.0 1
LS-71A/B 75A/B 4 calibrate 2/13/81 23 1182'/ OPS Unknown Will not provide Replaced 8.0 llPCI Controller full output controller .
D POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT MAINTENANCE
SUMMARY
FEBRUARY 1981, I&C CAUSE OF RESULTS OF ACTION TAKEN REPAIR WORK REQUEST # TECTED DATE SYSTEM MALFUNCTION MALFUNCTION COMPONENT # I CURRE URS 2/25/81 23 9659 OPS N/A check Tested 4,0 LT-201B readinga satisfactorily 2/25/81 23 12351 I&C Unknown Out or Cleaned LT
- LT-- 2 01 C performe<1 ISP ,6.0 2
tolerance readlnn 2/6/81 27 1_1_741 Indicates ISP performed 8.0 OpAz-101A OPS Age downscale 2/6/81 27 11752 Indicates Adjusted zero 2.0 02 Az-101A OPS Age high 2/23/81 27 10787 Repaired DW P flES Use/ age Check source drive 14.0 Monllarticulate
. or wt11 not drive 2/6/81 71 11669 OPS Leakage Low pressure Pressurized 4.0 X-104D in penetration 2/9/81 76 11121 OPS Drift Constant alarm Adjusted level TK-5 & 6 sw. itch 12.0
. s. g