MONTHYEARML0506802552005-03-0202 March 2005 G20050160 - Barry Quigley Ltr Re 2.206 - Byron Station/1C RCS Cold Leg Loop Stop Isolation Valve Project stage: Request ML0516701922005-03-18018 March 2005 E-mail, Byron #2 Project stage: Request ML0516605342005-03-18018 March 2005 E-mail Re Byron Lsiv Drawing Project stage: Request ML0516605412005-03-18018 March 2005 E-mail Re Byron #3 Project stage: Request ML0516605272005-03-18018 March 2005 E-mail from Chrzanowski to NRC, Documents 2, 7 and 8 (Attached) Project stage: Request ML0516605292005-03-18018 March 2005 E-mail from Chrzanowski to NRC, Byron Lsv Info 1 Project stage: Request ML0516605442005-03-19019 March 2005 Fwd: 1C Lsiv Data Project stage: Request ML0508205302005-04-20020 April 2005 Summary of Meeting with Exelon Nuclear Regarding the Performance of the 1C Loop Stop Isolation Valve at Byron Station, Unit 1 Project stage: Meeting ML0509701182005-05-0404 May 2005 RAI, 1C Loop Stop Isolation Valve Project stage: RAI RS-05-070, Response to Request for Additional Information Regarding the Plant Loop Stop Isolation Valve2005-05-27027 May 2005 Response to Request for Additional Information Regarding the Plant Loop Stop Isolation Valve Project stage: Response to RAI ML0519403522005-07-29029 July 2005 G20050160 - Barry Quigley Ltr 2.206 Proposed Director'S Decision Regarding Loop Stop Isolation Valve - Byron Station, Unit 1 Project stage: Other ML0519401792005-08-0101 August 2005 G20050160 - Christopher M. Crane Ltr. 2.206 Draft Director'S Decision Regarding Loop Stop Isolation Valve - Byron Station, Unit 1 Project stage: Draft Other ML0525002412005-08-12012 August 2005 Comments on Proposed Director'S Decision by Exelon Regarding 2.206 Petition Re Byron Station Project stage: Request ML0525002442005-08-14014 August 2005 Comments by Barry Qugley Re Proposed Director'S Decision on 2.206 Petition for Byron Station Project stage: Request ML0528602852005-10-19019 October 2005 G20050160 - Herbert N. Berkow, Memo to Address Comments on Proposed Director'S Decision Regarding Byron Station, Unit 1 LOOP Stop Isolation Valve 2.209 Petition Project stage: Request ML0529400912005-11-0808 November 2005 G20050160 - Director'S Decision Under 10 CFR 2.206 in the Matter of Exelon Generation Company, LLC, Byron Station, Unit 1 LOOP Stop Isolation Valve Project stage: Other ML0528601592005-11-0808 November 2005 G20050160 - Barry Quigley Ltr Re. Byron 2.206 Petition Regarding Station/1C RCS Cold Leg Loop Stop Isolation Valve Project stage: Other 2005-04-20
[Table View] |
Similar Documents at Byron |
---|
Category:E-Mail
MONTHYEARML24298A0202024-10-24024 October 2024 NRR E-mail Capture - Braidwood Station, Units 1 and 2, Byron Station, Units 1 and 2, Relief Request I4R-19 and I4-26, Associated with the Fourth and Fifth Inservice Inspection Intervals ML24282A7042024-10-0808 October 2024 NRR E-mail Capture - Acceptance Reviews of Relief Requests Associated with the Fifth Inservice Inspection Interval at Byron and Braidwood Stations ML24250A1062024-09-0606 September 2024 NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC - Fleet Request - Proposed Alternative to Utilize Code Case OMN-32 (L-2024-LLR-0030) ML24197A0162024-07-12012 July 2024 NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC - Fleet Request - License Amendment Request to Adopt TSTF-591 ML24180A0042024-06-28028 June 2024 NRR E-mail Capture - Acceptance Review for Braidwood and Byron - Request for Exemption from 10 CFR 50.46 and Appendix K (L-2024-LLE-0019) ML24180A0032024-06-28028 June 2024 NRR E-mail Capture - NRC Acceptance Review of Byron/Braidwood Amendment for Transition to Framatome Gaia Fuel (L-2024-LLA-0072) ML24306A0072024-06-26026 June 2024 NRR E-mail Capture - Verbal Relief for Byron, Unit 2, Three Specific Air-operated Valves in the Essential Service Water System (L-2024-LLR-0042) ML24176A0182024-06-20020 June 2024 NRR E-mail Capture - NRC Acceptance Review of Byron/Braidwood Amendment to Remove Extraneous Detail Related to Beacon ML24170A3912024-06-18018 June 2024 NRR E-mail Capture - Revision of Estimated Hours to Complete Review of Byron/Braidwood Amendment to Revise TS 3.7.15, 3.7.16, and 4.3.1 (L-2023-LLA-0136) ML24141A2452024-05-20020 May 2024 NRR E-mail Capture - NRC Acceptance Review of Byron/Braidwood Amendment to Delete Technical Specification 5.6.5.b.5 (L-2024-LLA-0055) ML24131A0612024-05-10010 May 2024 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Proposed Alternative to Utilize Code Case OMN-32 (L-2024-LLR-0030) ML24122B5072024-05-0101 May 2024 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of License Amendment Request to Adopt TSTF-591, Revision 0 ML24053A3382024-02-22022 February 2024 NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC - Fleet Request - Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds (L-2023-LLR-0062) ML23317A2012023-11-22022 November 2023 (External_Sender) Supplement - Byron Security Rule Exemption Request – ISFSI Docket No. Reference ML23321A2012023-11-17017 November 2023 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds (L-2023-LLR-0062) ML23311A1682023-11-0707 November 2023 NRR E-mail Capture - Constellation - Fleet Request - Acceptance of Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections (L-2023-LLR-0053 and L-2023-LLR-005 ML23311A1692023-11-0707 November 2023 NRR E-mail Capture - Constellation - Fleet Request - Acceptance of Proposed Alternative for Examinations of Exam Categories B-B, B-D, and C-A SG Pressure Retaining Welds and Full Penetration Welded Nozzles (L-2023-LLR-0055 and L-2023-LLR-00 ML23305A2992023-11-0101 November 2023 NRR E-mail Capture - NRC Acceptance Review of Byron, Unit 2, Relief Request I4R-24 ML23304A0202023-10-30030 October 2023 NRR E-mail Capture - Final RCI - Constellation Energy Generation, LLC - Byron 1 & 2 - Exemption from Security Rule (L-2023-LLE-0027) ML23272A0602023-09-29029 September 2023 NRR E-mail Capture - NRC Acceptance Review of Byron, Unit 1, Relief Request I4R-25 ML23187A0092023-07-0606 July 2023 NRR E-mail Capture - NRC Acceptance Review of Byron and Braidwood Request to Adopt TSTF-370 ML23069A0332023-03-0606 March 2023 Email to K. Lueshen Byron and Braidwood Commitment 10 - Request for Additional Information Set 1 ML23115A2412023-01-20020 January 2023 NRR E-mail Capture - Preliminary RAIs Related to L-2022-LLA-0131 - Byron, Unit 2, Reinsertion of an Accident Tolerant Fuel Lead Test Assembly ML22354A2622022-12-20020 December 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Request to Use Certain Provisions of the 2019 Edition of the ASME BPV Code, Section XI ML22284A1022022-10-0606 October 2022 NRR E-mail Capture - NRC Acceptance Review for Byron, Unit 2, License Amendment Request (LAR) to Reinsert an Accident Tolerant Fuel (ATF) Lead Test Assembly (LTA) (L-2022-LLA-0131) ML22255A0132022-09-0909 September 2022 NRR E-mail Capture - NRC Acceptance Review of Braidwood, Byron, Calvert Cliffs, Ginna - License Amendment Request to Adopt TSTF-577 ML22200A0782022-07-19019 July 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request to Use Honeywell Mururoa V4F1 R Supplied Air Suits ML22189A0602022-07-0707 July 2022 NRR E-mail Capture - Draft RAI for Byron/Braidwood TSTF-501 ML22136A2722022-05-16016 May 2022 NRR E-mail Capture - NRC Acceptance Review of Braidwood and Byron Adoption of TSTF-501 ML22129A0132022-05-0606 May 2022 NRR E-mail Capture - Draft RAIs for Requests for Alternatives I4R-17, I4R-23, ISI-05-018, I6R-10 ML22271A0772022-05-0606 May 2022 NRR E-mail Capture - Final RAIs 9.1.2021 Constellation Relief Request ML22116A0242022-04-25025 April 2022 NRR E-mail Capture - NRC Acceptance Review of Braidwood, Byron, and Ginna Request to Adopt TSTF-246 ML22105A0722022-04-15015 April 2022 NRR E-mail Capture - Braidwood/Byron Verbal Authorization for Proposed Alternative I4R-15/I4R-21 ML22091A0852022-04-0101 April 2022 NRR E-mail Capture - Braidwood and Byron - Final RAI Regarding Proposed Alternative for Various Pressurizer Welds (EPID L-2021-LLR-0035 and 0036) ML22088A1562022-03-0202 March 2022 NRR E-mail Capture - Byron, Braidwood, Calvert Cliffs, and Ginna - Non-acceptance of Application to Revise Technical Specifications 5.6.5.b, the Core Operating Limits Report (COLR) ML22091A0842022-02-24024 February 2022 NRR E-mail Capture - Braidwood and Byron - Withdrawal of Draft RAI Regarding Proposed Alternative for Various Pressurizer Welds (EPID L-2021-LLR-0035 and 0036) ML22041B5362022-02-10010 February 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Request for Additional Information Regarding Fleet License Amendment Request to Adopt TSTF-541 ML23089A0152022-01-0505 January 2022 NRR E-mail Capture - NRC Acceptance Review of Byron - Proposed Alternative for Examinations of Categories B-B, B-D, and C-A SG Welds and Nozzles ML21301A0672021-10-28028 October 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Acceptance of License Amendment Request to Adopt TSTF-541 ML21272A1492021-09-29029 September 2021 NRR E-mail Capture - NRC Acceptance Review of Braidwood and Byron - Proposed Alternative for Examinations of Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections ML21256A1902021-09-10010 September 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21252A0042021-08-26026 August 2021 NRR E-mail Capture - NRC Acceptance Review - Braidwood/Byron/Clinton - Adoption of TSTF-273, Safety Function Determination Program Clarifications ML21215A3502021-08-0303 August 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Acceptance of License Amendment Request to Adopt TSTF-554 ML21203A3112021-07-21021 July 2021 NRR E-mail Capture - Final Byron Permanently Defueled Technical Specifications (PDTS) - Second Round RAI ML21189A1602021-07-0808 July 2021 NRR E-mail Capture - Request for Additional Information - Braidwood, Byron, and Ginna - Amendment to Address the Issues in Westinghouse NSALs ML21189A1612021-07-0808 July 2021 NRR E-mail Capture - Second Round Request for Additional Information - Byron Permanently Defueled Technical Specification Amendment ML21154A0172021-06-0202 June 2021 NRR E-mail Capture - Acceptance Review of Byron - Proposed Alternative for Exam of Pzr Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Shell Welds ML21154A0132021-05-28028 May 2021 NRR E-mail Capture - Extension of Comment Period for the Exelon Generation Company, LLC License Transfer Application ML21154A0142021-05-28028 May 2021 NRR E-mail Capture - Extension of Comment Period for the Exelon Generation Company, LLC License Transfer Application ML21154A0112021-05-28028 May 2021 NRR E-mail Capture - Extension of Comment Period for the Exelon Generation Company, LLC License Transfer Application 2024-09-06
[Table view] |
Text
EDO Principal Correspondence Control FROM: DUE: 04/06/05 EDO CONTROL: G20050160 DOC DT: 03/02/05 FINAL REPLY:
Barry Quigley Rockford, Illinois TO:
Reyes, EDO FOR SIGNATURE OF - ** GRN ** CRC NO:
Dyer, NRR DESC: ROUTING:
2.206 - Byron Station/IC RCS Cold Leg Loop Stop Reyes Isolation Valve Virgilio Kane Merschoff Silber Dean DATE: 03/07/05 Burns Congel, OE ASSIGNED TO: CONTACT: Caputo, OI Caldwell, RIII NRR Dyer Cyr, OGC Skay, NRR SPECIAL INSTRUCTIONS OR REMARKS: Goldberg, OGC lzqLIoQ £ QboLooQ1 -- etl~s: a0-1
March 2, 2005
Dear Mr. Reyes,
This is a request for enforcement action (under 10CFR2.206) against Exelon Nuclear's Byron Station for failure to comply with 10CFR50 Appendix B, Criterion XVI.
Specifically, the 1C RCS Cold Leg Loop Stop Isolation valve (lRC8002C) has been broken for at least 6 years and has not been repaired.
The Byron Reactor Coolant System is equipped with Motor Operated Loop Stop Isolation Valves. These are sometimes difficult to close to the point of protective features of the motor actuating. Our current practice is to reopen the valve and keep attempting to close it until it goes all the way closed. The failure mechanism is metal-to-metal contact between the valve disc and a misaligned valve guide. A repair is available.
We are currently in refueling outage BIR13. Plans had been made for the last year to implement the repair; a high cost, high dose job. Two days before the outage, our senior management got together and started "sharpshooting" the schedule in an attempt to reduce dose. It was decided that if the valve closed without too much trouble, the repair would be pulled from the outage. This morning, the first closing attempt resulted in the protective feature actuating. However on the second attempt the valve closed completely and the repair for this outage cancelled.
I have several concerns:
- 1. The cultural aspect of accepting actuation of a protective function,
- 2. Failure to correct a longstanding equipment issue,
- 3. The excessive emphasis on dose reduction is compromising plant safety. To the uninitiated dose reduction sounds noble, in our case it is allowing the valve to continue to grind metal to metal, leaving debris in the RCS.
- 4. I would like to point out that a significant portion of the site executives' (and my) bonus is tied to meeting aggressive dose goals. This is similar to Davis-Besse where dose prevented adequate head inspections and focus on monetary bonuses by executives caused other major issues. Note that the Institute of Nuclear Power Operations sets these dose goals, so this may be an industry concern.
Due to the small time window available to repair this valve, I am requesting immediate NRC action.
Respectfully, Barry Quigley 3512 Louisiana Rockford, IL 61108 815-397-3392 815-222-4745 EDO -- G20050160
..- :-- I l c:\temD\AWVI00001.TMP F- -- I-- ----
i Page 1 Mail Envelope Properties (4226373A.562:13: 58722)
Subject:
Exelon 2.206 Petition Creation Date: 3/2/05 4:59PM From: <barry.quigleygexeloncorp.qom>
Created By: barry.quigley(exeloncorp.com Recipients nrc.gov owf4 o.OWFNDO SDW2 (Sandra Walker)
Post Office Route owf4po.OWFNDO nrc.gov Files Size Date & Time MESSAGE 1184 03/02/05 04:59PM Exelon 2.206 Petition.doc 23040 Mime.822 34671 Options Expiration Date: None-Priority: Standard Reply Requested: No Return Notification: None Concealed
Subject:
No Security: Standard