MONTHYEARML0506802552005-03-0202 March 2005 G20050160 - Barry Quigley Ltr Re 2.206 - Byron Station/1C RCS Cold Leg Loop Stop Isolation Valve Project stage: Request ML0516701922005-03-18018 March 2005 E-mail, Byron #2 Project stage: Request ML0516605342005-03-18018 March 2005 E-mail Re Byron Lsiv Drawing Project stage: Request ML0516605412005-03-18018 March 2005 E-mail Re Byron #3 Project stage: Request ML0516605272005-03-18018 March 2005 E-mail from Chrzanowski to NRC, Documents 2, 7 and 8 (Attached) Project stage: Request ML0516605292005-03-18018 March 2005 E-mail from Chrzanowski to NRC, Byron Lsv Info 1 Project stage: Request ML0516605442005-03-19019 March 2005 Fwd: 1C Lsiv Data Project stage: Request ML0508205302005-04-20020 April 2005 Summary of Meeting with Exelon Nuclear Regarding the Performance of the 1C Loop Stop Isolation Valve at Byron Station, Unit 1 Project stage: Meeting ML0509701182005-05-0404 May 2005 RAI, 1C Loop Stop Isolation Valve Project stage: RAI RS-05-070, Response to Request for Additional Information Regarding the Plant Loop Stop Isolation Valve2005-05-27027 May 2005 Response to Request for Additional Information Regarding the Plant Loop Stop Isolation Valve Project stage: Response to RAI ML0519403522005-07-29029 July 2005 G20050160 - Barry Quigley Ltr 2.206 Proposed Director'S Decision Regarding Loop Stop Isolation Valve - Byron Station, Unit 1 Project stage: Other ML0519401792005-08-0101 August 2005 G20050160 - Christopher M. Crane Ltr. 2.206 Draft Director'S Decision Regarding Loop Stop Isolation Valve - Byron Station, Unit 1 Project stage: Draft Other ML0525002412005-08-12012 August 2005 Comments on Proposed Director'S Decision by Exelon Regarding 2.206 Petition Re Byron Station Project stage: Request ML0525002442005-08-14014 August 2005 Comments by Barry Qugley Re Proposed Director'S Decision on 2.206 Petition for Byron Station Project stage: Request ML0528602852005-10-19019 October 2005 G20050160 - Herbert N. Berkow, Memo to Address Comments on Proposed Director'S Decision Regarding Byron Station, Unit 1 LOOP Stop Isolation Valve 2.209 Petition Project stage: Request ML0529400912005-11-0808 November 2005 G20050160 - Director'S Decision Under 10 CFR 2.206 in the Matter of Exelon Generation Company, LLC, Byron Station, Unit 1 LOOP Stop Isolation Valve Project stage: Other ML0528601592005-11-0808 November 2005 G20050160 - Barry Quigley Ltr Re. Byron 2.206 Petition Regarding Station/1C RCS Cold Leg Loop Stop Isolation Valve Project stage: Other 2005-04-20
[Table View] |
Similar Documents at Byron |
---|
Category:Meeting Summary
MONTHYEARML24009A0552024-01-24024 January 2024 Summary of January 8, 2024, Presubmittal Meeting Between the U.S. Nuclear Regulatory Commission and Constellation Energy Generation, LLC, Regarding Removal of the Power Distribution Monitoring System from Technical Specifications ML24018A1772024-01-19019 January 2024 Summary of August 30, 2023, Presubmittal Meeting Between the U.S. Nuclear Regulatory Commission and Constellation Energy Generation, LLC, Regarding Relaxation of Inspection Requirements for the Head Penetration P-75 Flaw ML23362A0042024-01-0202 January 2024 Documentation of Cancelled September 1, 2023, Presubmittal Meeting Between the NRC and Constellation Energy Generation, LLC, Regarding 6-Month Extension of Certain Reactor Pressure Vessel Weld Inspections ML23352A3822023-12-19019 December 2023 Summary of December 11, 2023, Presubmittal Meeting Between the U.S. Nuclear Regulatory Commission and Constellation Energy Generation, LLC, Regarding Deletion of Technical Specification 5.6.5.b.5 ML23320A2472023-11-17017 November 2023 Constellation - Summary of November 14, 2023, Public Pre-Application Meeting with Constellation Energy Generation, LLC on Adoption of TSTF-591 ML23263B1062023-09-22022 September 2023 R. E. Ginna Nuclear Power Plant - Constellation - Pre-Application Amse 9/18/2023 Meeting Summary ML23164A2112023-06-14014 June 2023 Summary of the June 1, 2023, Public Outreach to Discuss the NRC 2022 End-of-Cycle Plant Performance Assessment of Braidwood Station, Units 1 and 2; and Byron Station, Units 1 and 2 ML23129A0202023-05-30030 May 2023 Summary of March 22, 2023, Closed Meeting with Constellation Energy Generation, LLC, to Discuss a Future License Amendment Request That Allows Byron Station and Braidwood Station to Utilize a New Citicality Analysis for the Spent Fuel Pools ML23055A0352023-03-24024 March 2023 Summary of February 23, 2023, with Constellation Energy Generation, LLC on Proposed Changes to Emergency Plans to Revise Emergency Action Levels ML23033A6662023-02-0909 February 2023 Summary of Public Meeting with Constellation Energy Generation, LLC (Constellation) to Discuss Its Request for Alternatives for Certain Steam Generator Weld Inspections for Calvert Cliffs 1 & 2, Byron 1 & 2, Braidwood 1 & 2, and Ginna ML22264A1992022-11-14014 November 2022 Summary of August 22, 2022, Meeting Between the U.S. Nuclear Regulatory Commission and Constellation Energy Generation, LLC, Regarding Performance Monitoring of Steam Generator Welds (Epids L-2022-LRR-0074, 0076, 0079, 0091, 0092, 0093 and ML22305A5992022-11-10010 November 2022 Summary of Closed Presubmittal Meeting Between the U. S. Nuclear Regulatory Commission and Constellation Energy Generation, LLC, Regarding Transition to Framatome Fuel ML22159A2232022-06-0909 June 2022 Summary of the June 2, 2022, Public Outreach to Discuss the NRC 2021 End of Cycle Plant Performance Assessment of Braidwood Station, Units 1 and 2, and Byron Station, Units 1 and 2 ML22115A2122022-05-12012 May 2022 Summary of April 11, 2022, Meeting Between the U.S. NRC and Constellation Energy Generation, LLC, Regarding a Future Amendment to Place One High Burnup Lead Test Assembly Into the Byron, Unit 2, Reactor ML22111A3362022-05-0909 May 2022 Summary of April 7, 2022, Meeting Between the NRC and Constellation Energy Generation, LLC, Regarding Performance Monitoring of Pressurizer Welds (Epids L-2022-LRR-0035 and 0036) ML22111A2852022-05-0909 May 2022 Summary of April 4, 2022, Meeting Between the U.S. NRC and Constellation Energy Generation, LLC, Regarding Performance Monitoring of Pressurizer Welds (EPIDs L-2022-LLR-0035/36) ML21333A1532021-11-30030 November 2021 Summary of November 16, 2021, Meeting with Exelon Generation Company, LLC Regarding a Planned Request for an Alternative to Extend the Inservice Inspection Interval ML21237A0412021-08-30030 August 2021 Summary of the July 27, 2021, Meeting with Exelon Generation Company, LLC Regarding a Planned Request to Use Case OMN-28, ML21176A0822021-07-0606 July 2021 June 15, 2021, Summary of Meeting with Exelon Generation Company, LLC Vessel Nozzle Repair Related to a Planned Request for an Alternative Related to Reactor Pressure ML21139A1852021-06-22022 June 2021 Summary of Meeting with Exelon Generation Company, LLC Regarding Its Requested Alternative to Eliminate Certain Documentation Requirements for the Replacement of Pressure Retaining Bolting ML21167A2152021-06-16016 June 2021 June 8, 2021, Summary of the Public Outreach to Discuss the NRC 2020 End-Of-Cycle Plant Performance Assessment of Braidwood Station, Units 1 and 2; and Byron Station, Units 1 and 2 ML21147A4262021-06-0303 June 2021 Summary of May 12, 2021, Meeting with Exelon Generation Company, Llc, Related to a Planned License Amendment to Modify the Ultimate Heat Sink Technical Specifications ML21033A6582021-02-0404 February 2021 Summary of October 13, 2020, Presubmittal Meeting Between the U. S. Nuclear Regulatory Commission and Exelon Generation Company, LLC Regarding Post Shutdown Emergency Plan Staffing to Support the Planned Early Closures ML21011A2822021-01-21021 January 2021 Summary of January 6, 2021, Presubmittal Meeting Between the NRC and Exelon Generation Company, LLC Regarding Licensing Activities to Support the Planned Early Closures of Byron, Unit Nos. 1 and 2 and Dresden, Units 2 and 3 ML20351A2832020-12-18018 December 2020 Summary of Meeting with Exelon Generation Company, LLC Regarding a Planned Request for an Exemption to Reduce the Frequency of Updates to Its Inservice Testing and Inspection Programs ML20342A3522020-12-10010 December 2020 Summary of November 13, 2020, Meeting with Exelon Generation Company, LLC Regarding a Planned Request for an Alterantive to Certain Documentation Requirements for the Replacement of Pressure Retaining Bolting (EPID-L-2020-LRM-0102) ML20323A0332020-12-0101 December 2020 Summary of November 4, 2020, Meeting with Exelon Generation Company, LLC Regarding a Planned Request for an Alternative to Reduce the Frequency of Updates to Its Inservice Testing and Inspection Programs ML20280A2482020-10-0707 October 2020 Summary of September 22, 2020, Presubmittal Meeting Between the NRC and Exelon Generation Company LLC Regarding Licensing Activities to Support the Planned Early Closures of Byron, Units 1 and 2 and Dresden, Units 2 and 3 ML20171A3812020-08-12012 August 2020 (COVID-19) Presubmittal Meeting Summary - Byron Unit 2 LAR - One-Time Extension of Steam Generator Tube Inspections ML20218A5302020-08-0505 August 2020 July 14, 2020, Summary of the Public Webinar to Discuss the NRC 2019 End-of-Cycle Plant Performance Assessment of Braidwood Station, Units 1 and 2; and Byron Station, Units 1 and 2 ML19326A3152019-12-0303 December 2019 Summary of November 18, 2019, Meeting with Exelon Generation Company, LLC Regarding a Planned Request for an Alternative to Supplemental Valve Position Indication Testing Requirements ML19326C3582019-12-0303 December 2019 Summary of November 20, 2019, Meeting with Exelon Generation Company, LLC Regarding a Planned Request to Revise the Quality Assurance Program ML19162A0272019-06-21021 June 2019 Summary of June 4, 2019, Meeting with Exelon Generation Company, LLC Regarding a Planned Request to Extend the Test Interval for Safety Relief Valves ML20108F0902019-04-20020 April 2019 April 15, 2020, Meeting Summary with Exelon Generation Company, LLC Regarding Planned Request to Defer Submittal of Owner'S Activity Report (Braidwood 2,Byron 2,Calvert Cliffs 1, LaSalle 1, Limerick 1, Nine Mile Point 2, Quad 2, R. E. Ginna ML19036A8832019-02-0707 February 2019 Summary of Meeting with Exelon Generation Company, LLC Regarding a Planned Request to Use ASME Code Case N-879 ML18354B1712019-01-0202 January 2019 Summary of December 19, 2018, Meeting with Exelon Generation Company, LLC Regarding the Use of Boiling Water Reactor Vessel and Internals Project Guidelines ML18325A1712018-11-28028 November 2018 Summary of Meeting with Exelon Generation Company, LLC Regarding Planned Fleet License Amendment Request to Revise Technical Specifications for High Radiation Areas ML18297A1722018-10-26026 October 2018 Summary of Meeting with Exelon Generation Company, LLC Regarding Planned License Amendment Request to Adopt TSTF-427 ML18225A3042018-08-16016 August 2018 Summary of August 8, 2018, Meeting with Exelon Generation Company, LLC, on a Future Relief Request to Extend the Post Peening Follow-Up Inspections for Certain Reactor Pressure Vessel Head Penetrations ML18120A1772018-05-0101 May 2018 Summary of Meeting with Exelon Generation Company, LLC Regarding Draft Guidance for Emergency Response Organization Staffing ML18113A7052018-04-23023 April 2018 Summary of Open House to Discuss the 2017 End-of-Cycle Plant Performance Assessment of Byron Station ML18113A6592018-04-23023 April 2018 Summary of Open House to Discuss the 2017 End-of-Cycle Plant Performance Assessment of Palisades Nuclear Plant ML18065A8362018-03-0707 March 2018 Summary of February 27, 2018, Meeting with Exelon Generation Company, LLC Planned Fleet License Amendment Request to Relocate Staff Qualification Requirements from TSs to the Quality Assurance Topical Report ML18058A5232018-03-0101 March 2018 Summary of February 26, 2018, Meeting with Exelon Generation Company, LLC Regarding Proposed Alternative to the Main Steam Isolation Valve Testing Requirements ML17347B1022017-12-14014 December 2017 Summary of Meeting with Exelon Generation Company, LLC on Its Planned Fleet License Amendment Request to Revise the Minimum Staffing Requirements for Emergency Response ML17296B1282017-11-0202 November 2017 Summary of Partially Closed Meeting to Discuss Exelon Lead Test Assembly Program for Byron Unit 2 of the Westinghouse Encore Accident Tolerant Fuel Product ML17184A0092017-07-10010 July 2017 Summary of June 29, 2017, Meeting with Exelon Generation Company, LLC, on Proposed Changes to Emergency Plans to Revise Emergency Action Levels (CAC Nos. MF9779-MF9801) ML17164A0512017-06-15015 June 2017 Summary of May 25, 2017, Meeting with Exelon Generation Company, LLC, on a Future License Amendment Request to Add Mitigating Actions to Technical Specifications with Two Control Room Ventilation Temperature Control System Trains Inoperable ML17074A2562017-03-27027 March 2017 Summary of March 6, 2017, Closed Meeting with Exelon Generation Company, LLC, on a Future Exemption Request to Please Lead Test Assemblies in the Braidwood Reactor ML17066A0502017-03-13013 March 2017 Summary of Meeting with Meeting with Samuel Miranda to Discuss November 15, 2016, Petition 2024-01-24
[Table view] |
Text
April 20, 2005 LICENSEE: Exelon Generation Company, LLC FACILITY: Byron Station, Unit 1
SUBJECT:
SUMMARY
OF MARCH 21, 2005, MEETING WITH EXELON NUCLEAR REGARDING THE PERFORMANCE OF THE 1C LOOP STOP ISOLATION VALVE AT BYRON STATION, UNIT 1 (TAC NO. MC6312)
On March 21, 2005, a Category 1 public meeting was held between the Nuclear Regulatory Commission (NRC) and representatives of Exelon Nuclear, the licensee for Byron Station, Unit 1 at the NRC Region III offices in Lisle, Illinois. The purpose of the meeting was to exchange information with the NRC regarding the licensees decision to postpone maintenance on a cold leg loop stop isolation valve (LSIV). A list of attendees is provided as Enclosure 1.
The licensee presented information (see Enclosure 2) that included: the chronology of the decision to postpone the maintenance, the performance history of the valve, industry experience with this type of valve, analyses performed, and future plans for monitoring and inspection. The licensee also included several photographs of LSIV components and markups.
The potential degraded condition of the IC LSIV was brought to the attention of the NRC through a petition for enforcement action submitted on March 2, 2005, under 10 CFR 2.206.
Information obtained at the meeting on the condition of the valve and the potential for it to generate loose parts which could find their way into the reactor coolant system, was used by the NRC in its deliberations to determine whether immediate actions needed to be taken prior to the unit restarting from the current refueling outage as requested by the petitioner. The remaining issues discussed in the 2.206 petition will be evaluated through the 2.206 petition process.
Please direct any inquiries to Donna Skay at 301-415-1322 or George Dick at 301-415-3019.
/RA/
George F. Dick, Senior Project Manager, Section 2 Project Directorate III-2 Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. STN 50-454
Enclosures:
- 1. List of Attendees
- 2. Licensee Handouts cc w/encls: See next page
April 20, 2005 LICENSEE: Exelon Generation Company, LLC FACILITY: Byron Station, Unit 1
SUBJECT:
SUMMARY
OF MARCH 21, 2005, MEETING WITH EXELON NUCLEAR REGARDING THE PERFORMANCE OF THE 1C LOOP STOP ISOLATION VALVE AT BYRON STATION, UNIT 1 (TAC NO. MC6312)
On March 21, 2005, a Category 1 public meeting was held between the Nuclear Regulatory Commission (NRC) and representatives of Exelon Nuclear, the licensee for Byron Station, Unit 1 at the NRC Region III offices in Lisle, Illinois. The purpose of the meeting was to exchange information with the NRC regarding the licensees decision to postpone maintenance on a cold leg loop stop isolation valve (LSIV). A list of attendees is provided as Enclosure 1.
The licensee presented information (see Enclosure 2) that included: the chronology of the decision to postpone the maintenance, the performance history of the valve, industry experience with this type of valve, analyses performed, and future plans for monitoring and inspection. The licensee also included several photographs of LSIV components and markups.
The potential degraded condition of the IC LSIV was brought to the attention of the NRC through a petition for enforcement action submitted on March 2, 2005, under 10 CFR 2.206.
Information obtained at the meeting on the condition of the valve and the potential for it to generate loose parts which could find their way into the reactor coolant system, was used by the NRC in its deliberations to determine whether immediate actions needed to be taken prior to the unit restarting from the current refueling outage as requested by the petitioner. The remaining issues discussed in the 2.206 petition will be evaluated through the 2.206 petition process.
Please direct any inquiries to Donna Skay at 301-415-1322 or George Dick at 301-415-3019.
/RA/
George F. Dick, Senior Project Manager, Section 2 Project Directorate III-2 Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. STN 50-454
Enclosures:
- 1. List of Attendees
- 2. Licensee Handouts cc w/encls: See next page DISTRIBUTION PUBLIC RidsNrrACRS RidsNrrDlpm [TMarsh,JLyons] FAkstulewicz PDI-1 R/F RidsNrrDlpmLpdiii2 RidsNrrLAPCoates TMensah FOrr GRoach,RIII DKernRIII RidsNrrPMGDick CMiller,RgI RidsNrrOgcRp JDixon-Herrity,RIV RidsRgn3Mailcenter RidsNrrPMKJabbour JSchiffgens RidsNrrDipmlrob RidsNrrLASLittle RidsNrrPMDSkay DPassehl,RIII AMohseni RidsNrrDlpmLpdiii RSkokowski DTerao TScarborough,RIII SCollins,RI AStone,RIII MSatorius,RIII RidsNrrDlpmLpdi1 AGarmoe,RIII RidsNrrDlpmLpdi UShoop BQuigley SBrock, OGC Package No.: ML051170104 Accession No.: ML050820530 Enclosure 2: ML050810513 OFFICE PDI-1/PM PDIII-2/LA PDIII-2/SC NAME GDick PCoates GSuh DATE 04/19/05 4/19/05 4/20/05 OFFICIAL RECORD COPY
Byron/Braidwood Stations cc:
Dwain W. Alexander, Project Manager Attorney General Westinghouse Electric Corporation 500 S. Second Street Energy Systems Business Unit Springfield, IL 62701 Post Office Box 355 Pittsburgh, PA 15230-0355 Illinois Emergency Management Agency Joseph Gallo Division of Disaster Assistance &
Gallo & Ross Preparedness 1025 Connecticut Ave., NW, Suite 1014 110 East Adams Street Washington, DC 20036 Springfield, IL 62701-1109 Howard A. Learner Byron Station Plant Manager Environmental Law and Policy Exelon Generation Company, LLC Center of the Midwest 4450 N. German Church Road 35 East Wacker Dr., Suite 1300 Byron, IL 61010-9794 Chicago, IL 60601-2110 Site Vice President - Byron U.S. Nuclear Regulatory Commission Exelon Generation Company, LLC Byron Resident Inspectors Office 4450 N. German Church Road 4448 N. German Church Road Byron, IL 61010-9794 Byron, IL 61010-9750 U.S. Nuclear Regulatory Commission Regional Administrator, Region III Braidwood Resident Inspectors Office U.S. Nuclear Regulatory Commission 35100 S. Rt. 53, Suite 79 801 Warrenville Road Braceville, IL 60407 Lisle, IL 60532-4351 Chairman Ms. Lorraine Creek Will County Board of Supervisors RR 1, Box 182 Will County Board Courthouse Manteno, IL 60950 Joliet, IL 60434 Chairman, Ogle County Board Braidwood Station Plant Manager Post Office Box 357 Exelon Generation Company, LLC Oregon, IL 61061 35100 S. Rt. 53, Suite 84 Braceville, IL 60407-9619 Mrs. Phillip B. Johnson 1907 Stratford Lane Ms. Bridget Little Rorem Rockford, IL 61107 Appleseed Coordinator 117 N. Linden Street George L. Edgar Essex, IL 60935 Morgan, Lewis and Bockius 1800 M Street, NW Mr. Barry Quigley Washington, DC 20036-5869 3512 Louisiana Rockford, IL 61108
Byron/Braidwood Stations cc:
Document Control Desk - Licensing Manager Licensing - Braidwood, Byron Exelon Generation Company, LLC and LaSalle 4300 Winfield Road Exelon Generation Company, LLC Warrenville, IL 60555 4300 Winfield Road Warrenville, IL 60555 Site Vice President - Braidwood Exelon Generation Company, LLC 35100 S. Rt. 53, Suite 84 Braceville, IL 60407-9619 Senior Vice President - Nuclear Services Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Vice President of Operations - Mid-West Pressurized Water Reactors Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Director - Licensing and Regulatory Affairs Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Regulatory Assurance Manager - Braidwood Exelon Generation Company, LLC 35100 S. Rt. 53, Suite 84 Braceville, IL 60407-9619 Regulatory Assurance Manager - Byron Exelon Generation Company, LLC 4450 N. German Church Road Byron, IL 61010-9794 Associate General Counsel Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Vice President - Licensing and Regulatory Affairs Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555
MEETING BETWEEN NRC AND EXELON NUCLEAR ATTENDANCE LIST MARCH 21, 2005 NRC LICENSEE D. Skay, NRR B. Smith, Exelon T. Scarbrough, NRR P. Shier, Exelon D. Terao, NRR T. Fluck, Exelon J. Lyons, NRR J. Bauer, Exelon R. Skokowski, Region III K. Jury, Exelon A. Stone, Region III J. Benjamin, Exelon D. Passehl, Region III B. Adams, Exelon M. Satorius, Region III W. Grundmann, Exelon A. Garmoe, Region III S. Kuczynski, Exelon G. Roach, Region III D. Chrzanowski, Exelon A. Mohseni, NRR (by phone) T. Matty, Westinghouse G. Suh, NRR (by phone)
S. Brock, OGC (by phone)
F. Orr, NRR (by phone)
U. Shoop, OEDO (by phone)
G. Dick, NRR (by phone)
F. Akstulewicz, NRR (by phone)
OTHERS A. Settles, Illinois Bureau of Nuclear Safety B. Quigley, self Enclosure 1