April 20, 2005 LICENSEE:
Exelon Generation Company, LLC FACILITY:
Byron Station, Unit 1
SUBJECT:
SUMMARY
OF MARCH 21, 2005, MEETING WITH EXELON NUCLEAR REGARDING THE PERFORMANCE OF THE 1C LOOP STOP ISOLATION VALVE AT BYRON STATION, UNIT 1 (TAC NO. MC6312)
On March 21, 2005, a Category 1 public meeting was held between the Nuclear Regulatory Commission (NRC) and representatives of Exelon Nuclear, the licensee for Byron Station, Unit 1 at the NRC Region III offices in Lisle, Illinois. The purpose of the meeting was to exchange information with the NRC regarding the licensees decision to postpone maintenance on a cold leg loop stop isolation valve (LSIV). A list of attendees is provided as Enclosure 1.
The licensee presented information (see Enclosure 2) that included: the chronology of the decision to postpone the maintenance, the performance history of the valve, industry experience with this type of valve, analyses performed, and future plans for monitoring and inspection. The licensee also included several photographs of LSIV components and markups.
The potential degraded condition of the IC LSIV was brought to the attention of the NRC through a petition for enforcement action submitted on March 2, 2005, under 10 CFR 2.206.
Information obtained at the meeting on the condition of the valve and the potential for it to generate loose parts which could find their way into the reactor coolant system, was used by the NRC in its deliberations to determine whether immediate actions needed to be taken prior to the unit restarting from the current refueling outage as requested by the petitioner. The remaining issues discussed in the 2.206 petition will be evaluated through the 2.206 petition process.
Please direct any inquiries to Donna Skay at 301-415-1322 or George Dick at 301-415-3019.
/RA/
George F. Dick, Senior Project Manager, Section 2 Project Directorate III-2 Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. STN 50-454
Enclosures:
- 1. List of Attendees
- 2. Licensee Handouts cc w/encls: See next page
April 20, 2005 LICENSEE:
Exelon Generation Company, LLC FACILITY:
Byron Station, Unit 1
SUBJECT:
SUMMARY
OF MARCH 21, 2005, MEETING WITH EXELON NUCLEAR REGARDING THE PERFORMANCE OF THE 1C LOOP STOP ISOLATION VALVE AT BYRON STATION, UNIT 1 (TAC NO. MC6312)
On March 21, 2005, a Category 1 public meeting was held between the Nuclear Regulatory Commission (NRC) and representatives of Exelon Nuclear, the licensee for Byron Station, Unit 1 at the NRC Region III offices in Lisle, Illinois. The purpose of the meeting was to exchange information with the NRC regarding the licensees decision to postpone maintenance on a cold leg loop stop isolation valve (LSIV). A list of attendees is provided as Enclosure 1.
The licensee presented information (see Enclosure 2) that included: the chronology of the decision to postpone the maintenance, the performance history of the valve, industry experience with this type of valve, analyses performed, and future plans for monitoring and inspection. The licensee also included several photographs of LSIV components and markups.
The potential degraded condition of the IC LSIV was brought to the attention of the NRC through a petition for enforcement action submitted on March 2, 2005, under 10 CFR 2.206.
Information obtained at the meeting on the condition of the valve and the potential for it to generate loose parts which could find their way into the reactor coolant system, was used by the NRC in its deliberations to determine whether immediate actions needed to be taken prior to the unit restarting from the current refueling outage as requested by the petitioner. The remaining issues discussed in the 2.206 petition will be evaluated through the 2.206 petition process.
Please direct any inquiries to Donna Skay at 301-415-1322 or George Dick at 301-415-3019.
/RA/
George F. Dick, Senior Project Manager, Section 2 Project Directorate III-2 Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. STN 50-454
Enclosures:
- 1. List of Attendees
- 2. Licensee Handouts cc w/encls: See next page DISTRIBUTION PUBLIC RidsNrrACRS RidsNrrDlpm [TMarsh,JLyons]
FAkstulewicz PDI-1 R/F RidsNrrDlpmLpdiii2 RidsNrrLAPCoates TMensah FOrr GRoach,RIII DKernRIII RidsNrrPMGDick CMiller,RgI RidsNrrOgcRp JDixon-Herrity,RIV RidsRgn3Mailcenter RidsNrrPMKJabbour JSchiffgens RidsNrrDipmlrob RidsNrrLASLittle RidsNrrPMDSkay DPassehl,RIII AMohseni RidsNrrDlpmLpdiii RSkokowski DTerao TScarborough,RIII SCollins,RI AStone,RIII MSatorius,RIII RidsNrrDlpmLpdi1 AGarmoe,RIII RidsNrrDlpmLpdi UShoop BQuigley SBrock, OGC Package No.: ML051170104 Accession No.: ML050820530 : ML050810513 OFFICE PDI-1/PM PDIII-2/LA PDIII-2/SC NAME GDick PCoates GSuh DATE 04/19/05 4/19/05 4/20/05 OFFICIAL RECORD COPY
Byron/Braidwood Stations cc:
Dwain W. Alexander, Project Manager Westinghouse Electric Corporation Energy Systems Business Unit Post Office Box 355 Pittsburgh, PA 15230-0355 Joseph Gallo Gallo & Ross 1025 Connecticut Ave., NW, Suite 1014 Washington, DC 20036 Howard A. Learner Environmental Law and Policy Center of the Midwest 35 East Wacker Dr., Suite 1300 Chicago, IL 60601-2110 U.S. Nuclear Regulatory Commission Byron Resident Inspectors Office 4448 N. German Church Road Byron, IL 61010-9750 Regional Administrator, Region III U.S. Nuclear Regulatory Commission 801 Warrenville Road Lisle, IL 60532-4351 Ms. Lorraine Creek RR 1, Box 182 Manteno, IL 60950 Chairman, Ogle County Board Post Office Box 357 Oregon, IL 61061 Mrs. Phillip B. Johnson 1907 Stratford Lane Rockford, IL 61107 George L. Edgar Morgan, Lewis and Bockius 1800 M Street, NW Washington, DC 20036-5869 Attorney General 500 S. Second Street Springfield, IL 62701 Illinois Emergency Management Agency Division of Disaster Assistance &
Preparedness 110 East Adams Street Springfield, IL 62701-1109 Byron Station Plant Manager Exelon Generation Company, LLC 4450 N. German Church Road Byron, IL 61010-9794 Site Vice President - Byron Exelon Generation Company, LLC 4450 N. German Church Road Byron, IL 61010-9794 U.S. Nuclear Regulatory Commission Braidwood Resident Inspectors Office 35100 S. Rt. 53, Suite 79 Braceville, IL 60407 Chairman Will County Board of Supervisors Will County Board Courthouse Joliet, IL 60434 Braidwood Station Plant Manager Exelon Generation Company, LLC 35100 S. Rt. 53, Suite 84 Braceville, IL 60407-9619 Ms. Bridget Little Rorem Appleseed Coordinator 117 N. Linden Street Essex, IL 60935 Mr. Barry Quigley 3512 Louisiana Rockford, IL 61108
Byron/Braidwood Stations cc:
Document Control Desk - Licensing Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Site Vice President - Braidwood Exelon Generation Company, LLC 35100 S. Rt. 53, Suite 84 Braceville, IL 60407-9619 Senior Vice President - Nuclear Services Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Vice President of Operations - Mid-West Pressurized Water Reactors Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Director - Licensing and Regulatory Affairs Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Regulatory Assurance Manager - Braidwood Exelon Generation Company, LLC 35100 S. Rt. 53, Suite 84 Braceville, IL 60407-9619 Regulatory Assurance Manager - Byron Exelon Generation Company, LLC 4450 N. German Church Road Byron, IL 61010-9794 Associate General Counsel Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Vice President - Licensing and Regulatory Affairs Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Manager Licensing - Braidwood, Byron and LaSalle Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 MEETING BETWEEN NRC AND EXELON NUCLEAR ATTENDANCE LIST MARCH 21, 2005 NRC D. Skay, NRR T. Scarbrough, NRR D. Terao, NRR J. Lyons, NRR R. Skokowski, Region III A. Stone, Region III D. Passehl, Region III M. Satorius, Region III A. Garmoe, Region III G. Roach, Region III A. Mohseni, NRR (by phone)
G. Suh, NRR (by phone)
S. Brock, OGC (by phone)
F. Orr, NRR (by phone)
U. Shoop, OEDO (by phone)
G. Dick, NRR (by phone)
F. Akstulewicz, NRR (by phone)
OTHERS A. Settles, Illinois Bureau of Nuclear Safety B. Quigley, self LICENSEE B. Smith, Exelon P. Shier, Exelon T. Fluck, Exelon J. Bauer, Exelon K. Jury, Exelon J. Benjamin, Exelon B. Adams, Exelon W. Grundmann, Exelon S. Kuczynski, Exelon D. Chrzanowski, Exelon T. Matty, Westinghouse