ML071020518

From kanterella
Revision as of 13:52, 7 December 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Notice of End-of-Cycle Public Meeting Between the NRC and Energy Northwest to Present and Discuss Performance Results of the Columbia Generating Station for the Period of January 1 Through December 31, 2006
ML071020518
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 04/12/2007
From:
NRC Region 4
To:
References
Download: ML071020518 (4)


Text

April 12, 2007

SUBJECT:

MEETING WITH ENERGY NORTHWEST FACILITY: Columbia Generating Station DOCKETS: 50-397 DATE AND TIME: May 1, 2007 6 p.m.

LOCATION: Energy Northwest's Business Services Center 3000 George Washington Way Richland, WA 99352 PURPOSE: This is the end-of-cycle public meeting between the NRC and Energy Northwest to present and discuss performance results of the Columbia Generating Station for the period of January 1 through December 31, 2006. The annual assessment letter for the Columbia Generating Sation can be found at:

www.nrc.gov/NRR/OVERSIGHT/ASSESS/LETTERS/wnp_2006q4.pdf CATEGORY 1: Members of the public are invited to observe the meeting and will have the opportunity to communicate with the NRC after the business portion of the meeting, but before the meeting is adjourned.

The NRC provides reasonable accommodation to individuals with disabilities where appropriate. If you need a reasonable accommodation to participate in this meeting, or need this meeting notice or the transcript or other information from the meeting in another format (e.g., braille, large print), please notify the NRC's meeting contact listed below.

Determinations on requests for reasonable accommodation will be made on a case-by-case basis.

PARTICIPANTS: NRC A. Vegel, Deputy Director, Division of Reactor Projects (DRP) Region IV C. Johnson, Chief, Project Branch A, DRP Z. Dunham, Senior Resident Inspector, DRP R. Cohen, Resident Inspector

Entergy Northwest UTILITY V. Parrish, Chief Executive Officer D. Atkinson, Vice President, Nuclear Generation S. Oxenford, Vice President, Technical Services C. Whitcomb, Vice President, Organizational Performance and Staffing T. Lynch, Plant General Manager A. Khanpour, General Manager, Engineering MEETING CONTACT: Claude E. Johnson, NRC, RIV 817/860-8148 CEJ1@nrc.gov cc:

J. V. Parrish (Mail Drop 1023)

Chief Executive Officer Energy Northwest P.O. Box 968 Richland, WA 99352-0968 Chairman Energy Facility Site Evaluation Council P.O. Box 43172 Olympia, WA 98504-3172 Douglas W. Coleman (Mail Drop PE20)

Manager, Regulatory Programs Energy Northwest P.O. Box 968 Richland, WA 99352-0968 Chairman Benton County Board of Commissioners P.O. Box 190 Prosser, WA 99350-0190 William A. Horin, Esq.

Winston & Strawn 1700 K Street, NW Washington, DC 20006-3817 Matt Steuerwalt Executive Policy Division Office of the Governor P.O. Box 43113 Olympia, WA 98504-3113

Entergy Northwest Lynn Albin, Radiation Physicist Washington State Department of Health P.O. Box 7827 Olympia, WA 98504-7827 Technical Services Branch Chief FEMA Region X 130 228th Street S.W.

Bothell, WA 98201-9796 Assistant Director Nuclear Safety and Energy Siting Division Oregon Department of Energy 625 Marion Street NE Salem, OR 97301-3742 Special Hazards Program Manager Washington Emergency Management Division 127 W. Clark Street Pasco, WA 99301

Energy Northwest E-Mail To:

( ) NRC Attendees PMNS Mtg Announcement Coordinator BWS B. Sheron, ADPT OEMAIL D/OE JET3 J. Thorp DGC D. Cullison, RIV EDO Coordinator BJB B. Benney, Project Manager, NRR ZKD Z. Dunham, Senior Resident Inspector FPB P. Bonnett VLD V. Dricks, PAO WAM W. Maier, RSLO GMV M. Vasquez, ES LAO, JAK RA Secretaries AMT, MJS DRP Secretaries LMB, LAR, TEK DRS Secretaries CMS, BST1, SCG1 DNMS Secretaries JLP J. Pellet, IRMB LPL P. Longdo, Receptionist AMM A. Mattila, Security Advisor SUNSI Review Completed: __TRF___ ADAMS: : YesG No Initials: __TRF__

Publicly Available G Non-Publicly Available G Sensitive : Non-Sensitive R:\_REACTORS\EOC and Midcycle\EOC Meeting Notices\Held in 2007\CGS 5-1-07MN-EOC RIV:SPE:DRP/A PAO RSLO TRFarnholtz:mjs VDricks WMaier

/RA/ /RA/ /RA/

4/12/07 4/12/07 4/12/07 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax