January 19, 2006

SUBJECT:

MEETING WITH ENERGY NORTHWEST FACILITY: Columbia Generating Station DOCKET: 50-397 DATE AND TIME: February 3, 2006 8:00 a.m.

LOCATION: U.S. Nuclear Regulatory Commission Training Conference Room Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-4005 PURPOSE: This is a public meeting between the NRC and Energy Northwest to discuss issues at the Columbia Generating Station. The issues to be discussed include lessons learned from licensee's review of the handling of service water pump shaft coupling failures at the facility, planned corrective actions from the review, and long term plans to ensure service water pump reliability and other equipment reliability at the facility.

CATEGORY 1: Members of the public are invited to observe the meeting and will have the opportunity to communicate with the NRC after the business portion of the meeting, but before the meeting is adjourned.

The NRC provides reasonable accommodation to individuals with disabilities where appropriate. If you need a reasonable accommodation to participate in this meeting, or need this meeting notice or the transcript or other information from the meeting in another format (e.g., braille, large print), please notify the NRC's meeting contact listed below. Determinations on requests for reasonable accommodation will be made on a case-by-case basis.

A telecommunications bridge will be available for the public.

Callers will dial (800) 952-9677 to access the bridge for the meeting between the NRC and Energy Northwest .

Energy Northwest PARTICIPANTS: NRC B. Mallett, Regional Administrator, Region IV D. Chamberlain, Director, Division of Reactor Safety (DRS)

A. Howell, Director, Division of Reactor Projects (DRP)

T. Vegel, Deputy Director, DRP C. Johnson, Chief, Project Branch A, DRP J. Clark, Chief, Engineering Branch 1 L. Smith, Chief, Engineering Branch 2 Z. Dunham, Senior Resident Inspector, DRP R. Cohen, Resident Inspector, DRP T. Farnholtz, Senior Project Engineer, DRP M. Brown, Project Engineer, DRP LICENSEE D. Atkinson, Vice President, Nuclear Generation S. Oxenford, Vice President, Technical Services A. Khanpour, General Manager, Engineering S. Boynton, Manager, Systems Engineering D. Coleman, Manager, Regulatory Programs G. Cullen, Supervisor, Licensing MEETING CONTACT: Claude E. Johnson, NRC, RIV 817/860-8148 CEJ@nrc.gov cc:

J. V. Parrish (Mail Drop 1023)

Chief Executive Officer Energy Northwest P.O. Box 968 Richland, WA 99352-0968 W. Scott Oxenford (Mail Drop PE04)

Vice President, Technical Services Energy Northwest P.O. Box 968 Richland, WA 99352-0968 Albert E. Mouncer (Mail Drop PE01)

Vice President, Corporate Services/

General Counsel/CFO Energy Northwest P.O. Box 968 Richland, WA 99352-0968

Energy Northwest Chairman Energy Facility Site Evaluation Council P.O. Box 43172 Olympia, WA 98504-3172 Douglas W. Coleman (Mail Drop PE20)

Manager, Regulatory Programs Energy Northwest P.O. Box 968 Richland, WA 99352-0968 Gregory V. Cullen (Mail Drop PE20)

Supervisor, Licensing Energy Northwest P.O. Box 968 Richland, WA 99352-0968 Chairman Benton County Board of Commissioners P.O. Box 190 Prosser, WA 99350-0190 Dale K. Atkinson (Mail Drop PE08)

Vice President, Nuclear Generation Energy Northwest P.O. Box 968 Richland, WA 99352-0968 Cheryl M. Whitcomb (Mail Drop PE03)

Vice President, Organizational Performance & Staffing/CKO Energy Northwest P.O. Box 968 Richland, WA 99352-0968 William A. Horin, Esq.

Winston & Strawn 1700 K Street, NW Washington, DC 20006-3817 Matt Steuerwalt Executive Policy Division Office of the Governor P.O. Box 43113 Olympia, WA 98504-3113

Energy Northwest Lynn Albin, Radiation Physicist Washington State Department of Health P.O. Box 7827 Olympia, WA 98504-7827

Energy Northwest E-Mail To:

( ) NRC Attendees OEWEB S. Bogle (for predecisional enf. or regulatory conferences)

PMNS Mtg Announcement Coordinator BWS B. Sheron, ADPT OEMAIL D/OE EJB1 E. Benner JLD Jennifer Dixon-Herrity, RIV EDO Coordinator BJB Project Manager, NRR ZKD Senior Resident Inspector FPB P. Bonnett VLD V. Dricks, PAO WAM W. Maier, RSLO GMV M. Vasquez, ES CJG, JAK RA Secretaries LAO, DLF, MJS DRP Secretaries NLH, LMB, JLH2 DRS Secretaries CMS, AMT, BST1 DNMS Secretaries JLP J. Pellet, IRMB LPL P. Longdo, Receptionist AMM Ann Mattila, Security Advisor SUNSI Review Completed: CEJ ADAMS: / Yes G No Initials: __CEJ_

/ Publicly Available G Non-Publicly Available G Sensitive / Non-Sensitive R:_REACTORS/_COL/2006/CGS MN 2-3-06.wpd RIV:SPE:DRP/A PAO RSLO D:DRS DD:DRP TRFarnholtz VDricks WMaier DDChamberlain AXVegel

/RA/ /RA/ AVegel for /RA/ /RA/

1/18/06 1/18/06 1/19/06 1/19/06 1/19/06 C:DRP/A CEJohnson

/RA/

1/19/06 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax