Notice of Meeting with Energy Northwest to Discuss Issues at the Columbia Generating Station. the Specific Issue the Licensee Requested to Discuss Include Overall Human Performance IssuesML053350352 |
Person / Time |
---|
Site: |
Columbia |
---|
Issue date: |
12/01/2005 |
---|
From: |
Clay Johnson NRC Region 4 |
---|
To: |
|
---|
References |
---|
Download: ML053350352 (5) |
|
|
---|
Category:Meeting Notice
MONTHYEARPMNS20240699, Presentation to the City Council of Richland, Washington of the Nuclear Regulatory Commissions 2023 Annual Assessment of Safety Performance at the Columbia Generating Station2024-05-28028 May 2024 Presentation to the City Council of Richland, Washington of the Nuclear Regulatory Commissions 2023 Annual Assessment of Safety Performance at the Columbia Generating Station PMNS20240266, Partially Closed Preapplication Meeting with Energy Northwest to Discuss a Future Amendment Request to Approve an Extended Power Uprate and Maximum Extended Load Line Limit Analysis Plus for the Columbia Generating Station (L-2024-LRM-02024-02-28028 February 2024 Partially Closed Preapplication Meeting with Energy Northwest to Discuss a Future Amendment Request to Approve an Extended Power Uprate and Maximum Extended Load Line Limit Analysis Plus for the Columbia Generating Station (L-2024-LRM-0006) ML23264A1422023-09-21021 September 2023 Presubmittal Teleconference with Energy Northwest Regarding Proposed Request for U.S. Nuclear Regulatory Commission Approval to Revise the Emergency Plan in Its Entirety for Columbia Generating Station PMNS20230360, Public Open House to Discuss the Nuclear Regulatory Commissions (NRC) 2022 Annual Assessment of Safety Performance at Columbia Generating Station2023-04-0303 April 2023 Public Open House to Discuss the Nuclear Regulatory Commissions (NRC) 2022 Annual Assessment of Safety Performance at Columbia Generating Station ML23090A1652023-03-31031 March 2023 2023 CGS Public Meeting Notice PMNS20220467, Public Webinar to Discuss the Nuclear Regulatory Commissions 2021 Annual Assessment of Safety Performance at Region IV Plants2022-05-0303 May 2022 Public Webinar to Discuss the Nuclear Regulatory Commissions 2021 Annual Assessment of Safety Performance at Region IV Plants ML22040A3522022-02-15015 February 2022 Notice of Public Meeting to Discuss Safety Significance of Preliminary Finding of Low to Moderate Safety Significance and Associated Apparent Violations of NRC Requirements ML21280A1332021-10-0707 October 2021 Pre-Application Teleconference with Energy Northwest to Discuss Planned License Amendment Requests for Columbia Generating Station (EPID L--2021-LRM-0102) PMNS20210563, Public Webinar to Discuss the NRCs 2020 Annual Assessment of Safety Performance at Arkansas Nuclear One, Columbia, Comanche Peak, Cooper, Diablo Canyon, Palo Verde, River Bend Station, South Texas Project, Waterford, and Wolf Creek2021-04-29029 April 2021 Public Webinar to Discuss the NRCs 2020 Annual Assessment of Safety Performance at Arkansas Nuclear One, Columbia, Comanche Peak, Cooper, Diablo Canyon, Palo Verde, River Bend Station, South Texas Project, Waterford, and Wolf Creek ML21084A1392021-03-25025 March 2021 Pre-Application Teleconference with Energy Northwest to Discuss a Planned License Amendment Request for Columbia Generating Station ML20276A3302020-10-0202 October 2020 Presubmittal Teleconference with Energy Northwest Regarding Proposed COVID-19 Related Biennial Emergency Preparedness Exercise Exemption Request for Columbia Generating Station ML20170B1872020-06-19019 June 2020 Public Webinar to Discuss the Nrc'S Assessment of Safety Performance at Region IV Plants for 2019 ML17037B8502017-02-0606 February 2017 08/21/1975 Notice of Meeting with Architect Engineers of Mark II Owners to Discuss Load Combinations and Analytical Techniques for Determining Stresses in Mechanical Components and Structures of Mark II Containments ML16132A5122016-05-16016 May 2016 Notice Of Closed Meeting With USACE, NRC And Energy Northwest To Discuss Flood Analysis Associated With Columbia Generating Station ML15183A0752015-07-0202 July 2015 Open House July 21, 2015 ML15153A2252015-06-0202 June 2015 Meeting Notice with Columbia Generating Station to Discuss an Apparent Violation Identified at Columbia Generating Station Concerning the Failure of Emergency Plan Implementing Procedures to Implement Requirements of the Columbia.. ML14149A1012014-06-0202 June 2014 Notice of Forthcoming Closed Meeting to Discuss Dam Failure Analysis for Columbia Generating Station ML14101A0822014-04-10010 April 2014 Notice of Meeting with Energy Northwest to Discuss Nuclear Regulatory Commission'S Assessment of Safety Performance at the Columbia Generating Station During Calendar Year 2013 ML13303C0002013-10-30030 October 2013 12/2/2013 Notice of Public Meeting with Energy Northwest to Discuss Initiatives and Progress Associated with Improving Human Performance at the Columbia Generating Station ML13134A1322013-05-14014 May 2013 Meeting Notice with NRC & Energy Northwest to Present and Discuss the Performance and Annual Assessment Results for Columbia Generating Station for the Period of January 1 Though December 31, 2012 ML12278A1212012-10-0404 October 2012 Notice of Pre-licensing Meeting to Discuss Future License Amendment Request to Address Impacts of Remediation Activities Undertaken by Department of Energy in the Owner-Controlled Area at Columbia Generating Station ML12264A4812012-09-20020 September 2012 Notice of Public Meeting with Energy Northwest to Discuss Licensee Initiatives and Progress in Improving Human Performance ML12249A0672012-09-0505 September 2012 Notice of Public Meeting with Energy Northwest'S Columbia Generating Station to Discuss Three Inspection Findings Associated with the Site Emergency Preparedness Program ML1135502462011-12-21021 December 2011 1/9/2011 - Public Meeting with Energy Northwest to Provide Columbia Generating Station an Opportunity to Discuss Their Performance Improvement Initiatives ML11238A1202011-09-0707 September 2011 Notice of Forthcoming Meeting to Discuss the D-SEIS for the Lr of Columbia Generating Station ML1117305512011-06-21021 June 2011 Notice of Forthcoming Pre-Licensing Meeting with Energy Northwest to Discuss Proposed Power Range Neutron Monitoring System/Arts/Mellla License Amendment Request for Columbia Generating Station ML1115205492011-06-0101 June 2011 Notice of Public Meeting with Energy Northwest to Discuss the End-of-Cycle Results for Columbia Generating Station for the Period of January 1 Through December 31, 2010 ML1106805872011-03-0909 March 2011 Notice of Public Meeting with Energy Northwest to Discuss Performance Improvement Initiatives and Introduce Management Team ML1100300742010-12-14014 December 2010 Correction to Forthcoming Pre-Licensing Meeting with Energy Northwest(Tac No. ME5129), to Discuss Proposed Installation of a Digital Power Range Neutron Monitoring System, Average Power Range Monitor/Rod Block Monitor/Technical Specificatio ML1034003172010-12-14014 December 2010 Notice of Forthcoming Pre-application Meeting on 1/18/2011 with Energy Northwest to Discuss Proposed Power Range Neutron Monitoring System/Arts/Mellla License Amendment Request ML1019300832010-07-12012 July 2010 Notice of Meeting with Energy Northwest, Columbia Generating Station to Discuss the Acceptance Review and Request for Supplemental Information Regarding the Licensee'S Application Dated 05/11/10 to Install a Digital Neutron Monitoring Syste ML1008104032010-03-25025 March 2010 04/06/2010 Notice of Forthcoming Meeting to Discuss the License Renewal Process and Environmental Scoping for Columbia Generating Station License Renewal Application Review ML1003511792010-02-0404 February 2010 Notice of Public Meeting with Energy Northwest to Discuss Performance and Improvement Initiatives ML0935700732009-12-23023 December 2009 Notice of Conference Call with Energy Northwest to Discuss Columbia Generating Station'S Planned Emergency Action Level Changes ML0926705872009-10-0101 October 2009 Notice of Meeting with Energy Northwest to Discuss Pre-licensing Activities Associated with Proposed Department of Energy Remediation of the 618-11 Burial Grounds for the Columbia Generating Station ML0914606382009-05-26026 May 2009 Public Meeting Notice to Discuss Performance Results of Columbia Generating Station for the Period of January 1 Through December 31, 2008 ML0814403912008-05-20020 May 2008 Notice of End-of-Cycle Public Meeting with Energy Northwest to Present and Discuss Performance Results of the Columbia Generating Station for the Period of January 1 Through December 31, 2007 ML0810300162008-04-11011 April 2008 Meeting with Energy Northwest ML0710205182007-04-12012 April 2007 Notice of End-of-Cycle Public Meeting Between the NRC and Energy Northwest to Present and Discuss Performance Results of the Columbia Generating Station for the Period of January 1 Through December 31, 2006 ML0713300012007-04-0202 April 2007 Notice of Upcoming Meeting for Columbia Generating Station, to Discuss Results of Annual Assessment Associated with the 2006 Inspections and Performance Indicators ML0627501962006-10-0202 October 2006 Notice of Regulatory Conference with Energy Northwest to Discuss Three Apparent Violations Involving the Intrusion Detection System ML0615100302006-05-30030 May 2006 Notice of Public Meeting with Energy Northwest Columbia Generating Station ML0613105062006-05-11011 May 2006 Notice of Meeting with Energy Northwest Columbia Generating Station end-of-cycle Performance Assessment ML0601905742006-01-19019 January 2006 Notice of Meeting with Energy Northwest ML0533503522005-12-0101 December 2005 Notice of Meeting with Energy Northwest to Discuss Issues at the Columbia Generating Station. the Specific Issue the Licensee Requested to Discuss Include Overall Human Performance Issues ML0532504282005-11-21021 November 2005 12/6-7/05 Notice of Meeting with Energy Northwest to Conduct a Working - Level Discussion Related to the Schedule and Approach of the Alternative Source Term Amendment for Columbia Generating Station ML0532504432005-11-21021 November 2005 12/8/05 Notice of Columbia Generating Meeting with Energy Northwest to Discuss Information Related to Diesel Generating Allowed Completion Time ML0506000272005-03-0101 March 2005 Notice of Meeting with Energy Northwest (Columbia Generating Station) to Discuss RAI Questions Provided by NRC for the Proposed TS Application License Amendment for Diesel Generator Completion Time Extension at Columbia Generating Station ML0426704182004-09-23023 September 2004 Notice of Meeting with Columbia Generating Station to Discuss Operational Issues Related to Reactor Scrams in July and August 2004 ML0418403962004-07-0202 July 2004 Forthcoming Meeting with Licensees to Discuss Operator Licensing Program Policies and Recent Revisions 2024-05-28
[Table view] Category:Memoranda
MONTHYEARML24297A6392024-10-30030 October 2024 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV ML24177A1892024-06-28028 June 2024 Summary of Information Meeting with Question and Answer Session to Discuss the 2023 Annual Assessment of Safety Performance at Columbia Generating Station ML23156A2822023-06-0505 June 2023 Summary of Meeting with Q & a Session to Discuss the 2022 Annual Assessment of Safety Performance at CGS ML22349A2002022-12-0101 December 2022 NRR E-mail Capture - (External_Sender) Energy Northwest Columbia Generating Station 2022 Priority Pollutant Discharge Monitoring Report ML22147A0932022-06-0606 June 2022 2021 Annual Assessment Public Meeting Summary ML22034A3932022-02-16016 February 2022 Calendar Year 2021 Security Baseline Completion Memo ML21140A3892021-05-24024 May 2021 Riv Column 1 EOC 2020 Public Meeting Summary ML20322A0362020-11-19019 November 2020 Summary of October 19, 2020, Presubmittal Teleconference with Energy Northwest Regarding Proposed COVID-19 Related Biennial Emergency Preparedness Exercise Exemption Request for Columbia Generating Station ML19053A2922019-02-20020 February 2019 Memorandum to File from P. Longmire Decommissioning Funding Plans for Columbia Generating Station ML15191A2892018-10-17017 October 2018 Response to Task Interface Agreement 2014-08 - Columbia Generating Station - Assessment of the Design and Licensing Bases for the Tower Makeup System (CAC No. MF4630; EPID L-2014-LRA-0002) ML18173A0082018-06-20020 June 2018 Cancelling Numerous Inspection Report Numbers ML16117A5552017-11-0303 November 2017 Response to Task Interface Agreement 2014-07, Columbia Generating Station Design and Licensing Basis for Containment Nitrogen Inerting System and Emergency Diesel Generator Fresh Air Intakes ML17037B8502017-02-0606 February 2017 08/21/1975 Notice of Meeting with Architect Engineers of Mark II Owners to Discuss Load Combinations and Analytical Techniques for Determining Stresses in Mechanical Components and Structures of Mark II Containments ML16230A2512016-08-0404 August 2016 Energy Northwest - Response to Volume 13- Emergency Preparedness Procedures ML16132A5122016-05-16016 May 2016 Notice Of Closed Meeting With USACE, NRC And Energy Northwest To Discuss Flood Analysis Associated With Columbia Generating Station ML16088A2052016-03-28028 March 2016 Enclosure 1 - (72.30 DFP Reviews to Be Completed 2015) - Memo T Bowers from s Ruffin, Technial Assistance Requests - Review 2015 Tri-Annual Decommissioning Funding Plans for Multiple Independent Spent Fuel Storage Installations ML16088A2042016-03-28028 March 2016 Memo T Bowers from s Ruffin, Technical Assistance Requests - Review 2015 Tri-Annual Decommissioning Funding Plans for Multiple Independent Spent Fuel Storage Installations W/ Encl 2 (Template) ML15173A2732015-06-30030 June 2015 Summary of June 4, 2015, Category 1 Public Meeting with Energy Northwest to Discussion Columbia Generating Station Seismic Hazard Reevaluation Associated with Implementation of Japan Lessons-Learned Near-Term Task Force Recommendation 2.1, ML14149A1012014-06-0202 June 2014 Notice of Forthcoming Closed Meeting to Discuss Dam Failure Analysis for Columbia Generating Station ML14148A3392014-05-30030 May 2014 G20130776/LTR-13-0866 - Memorandum to File and Transcript of 4/30/2014 Petition Review Board Conference Call with Charles Johnson, Oregon & Washington Physicians for Social Responsibility; 2.206 Petition Seismic Hazards at Columbia ML14050A3502014-02-25025 February 2014 G20130776/LTR-13-0866 - Memorandum to File and Transcript of 2/4/2014 Petition Review Board Conference Call with Charles Johnson, Oregon & Washington Physicians for Social Responsibility; 2.206 Petition Seismic Hazards at Columbia ML14087A1642013-12-12012 December 2013 Cooling Water Intake Screen NMFS Consultation No. (I/NWR/2011/05286) ML14091A2182013-12-12012 December 2013 Cooling Water Intake Screen NMFS Consultation No. (I/NWR/2011/05286) ML13309A0802013-12-11011 December 2013 Memorandum to File: Transcript for 10 CFR 2.206 Petition from Beyond Nuclear (Et Al) Regarding General Electric Mark I and Mark II Boiling-Water Reactors ML13098A0642013-04-10010 April 2013 Memorandum to File, Verbal Authorization on 4/6/2013 of Relief Request ISI3-13, Temporary Non-Code Repair of Reactor Water Cleanup System Piping to Prevent Reactor Shutdown Until Start of Refueling Outage 21 ML13071A4702013-02-28028 February 2013 Response to NRC Order EA-12-051-Overall Integrated Plan for Reliable Spent Fuel Pool Instrumentation ML12278A1212012-10-0404 October 2012 Notice of Pre-licensing Meeting to Discuss Future License Amendment Request to Address Impacts of Remediation Activities Undertaken by Department of Energy in the Owner-Controlled Area at Columbia Generating Station ML12102A2382012-06-13013 June 2012 Memo Conclusion of Informal Section 7 Consultation with U.S. Fish and Wildlife Service for Columbia Generating Station and Section 7 Consultation Report ML12157A2722012-06-11011 June 2012 5/31/2012 Summary of Telephone Conference with Licensees Regarding Near Term Task Force Recommendation 2.1 Seismic Reevaluations - Diablo Canyon, 1 and 2, San Onofre, Units 2 and 3, Columbia Generating Station, and Palo Verde, Units 1, 2, a ML13255A1152012-05-18018 May 2012 E-mail from B. Balsam, NRR to S. Uttal, OGC FW: Section 7 Memo ML13255A1132012-05-18018 May 2012 Memo from J. Susco, NRR to B. Holian, NRR and M. Galloway, NRR on Section 7 Consultants That Extend Beyond the Nrc'S Issuance of Renewed Operating License and ESA Section 7(D) Findings ML13255A1122012-05-17017 May 2012 Email from B. Balsam, NRR to L. Subin, OGC Et Al., on Section 7 Memo ML12101A3952012-05-0404 May 2012 Conclusion of Efh Consultation for Columbia Generating Station and Efh Consultation Report ML12058A4962012-02-27027 February 2012 License Renewal Application ML11350A0562011-12-21021 December 2011 12/15/11, Summary of Telephone Conference Call Held Between the U.S. Nuclear Regulatory Commission and Energy Northwest, Concerning the Metal Fatigue and Operating Experience Open Items in the Columbia License Renewal Safety Evaluation Repo ML11348A0142011-12-16016 December 2011 Summary of Telephone Conference Call Held on 12/06/11, Between the U.S. Nuclear Regulatory Commission and Energy Northwest, Concerning the Metal Fatigue and Operating Experience Open Items in the Columbia License Renewal SER with Open Items ML11336A1502011-12-12012 December 2011 Summary of Telephone Conference Call Held on November 14, 2011, Between the U.S. Nuclear Regulatory Commission and Energy Northwest, Concerning the Metal Fatigue Open Item in the Columbia License Renewal Safety Evaluation Report with Open I ML11339A0872011-12-12012 December 2011 Summary of Telephone Conference Call Held on November 28, 2011, Between the U.S. Nuclear Regulatory Commission and Energy Northwest, Concerning the Upper Shelf Energy Open Item in the Columbia License Renewal Safety Evaluation Report with O ML11291A0792011-11-0101 November 2011 09/27/2011 Summary of Public Meetings Conducted to Discuss the Dseis Related to the Review of the Columbia Generating Station License Renewal Application (Tac No. ME3121) ML11273A0662011-10-0404 October 2011 Summary of the Telephone Conference Call Held on September 29, 2011, Concerning the Inspection Report Pertaining to the Columbia Generating Station, License Renewal Application ML11238A1582011-09-14014 September 2011 8/25/11 - Summary of Telephone Conference Call Between NRC and Energy Northwest Concerning Drais Pertaining to the SAMA Review of the Columbia Generating Station License Renewal Application ML11238A1202011-09-0707 September 2011 Notice of Forthcoming Meeting to Discuss the D-SEIS for the Lr of Columbia Generating Station ML11242A0942011-08-30030 August 2011 Advisory Committee on Reactor Safeguards Review of the Columbia Generating Station, License Renewal Application - Safety Evaluation Report with Open Items ML1117305512011-06-21021 June 2011 Notice of Forthcoming Pre-Licensing Meeting with Energy Northwest to Discuss Proposed Power Range Neutron Monitoring System/Arts/Mellla License Amendment Request for Columbia Generating Station ML1108714952011-04-0505 April 2011 Summary of Telephone Conference Call Held on March 23, 2011, Between NRC and Energy Northwest, Concerning the RAI Pertaining to the Columbia Generating Station, LRA (Tac No. ME3058) ML1106704962011-03-28028 March 2011 Summary of Telephone Conference Call Held on 2/28/11 Btw the USNRC and Energy Northwest Concerning Draft Requests for Additional Information Pertaining to the SAMA Review of the Columbia Generating Station License Renewal Application ML1102007102011-02-0303 February 2011 01/11/11 Summary of Telephone Conference Call Held Between the U.S. Nuclear Regulatory Commission and Energy Northwest Concerning the Request for Additional Information Pertaining to the Columbia Generating Station, License Renewal Applicat ML1101405882011-01-31031 January 2011 01/12/11 Summary of Telephone Conference Call Held Between NRC and Energy Northwest, Concerning the Responses to RAI Pertaining to the Columbia Generating Station. License Renewal Application ML1100604382011-01-13013 January 2011 Summary of Telephone Conference Call Held on 1/5/11, Between NRC and Energy Northwesy, Concerning the RAI Pertaining to the Columbia Generating Station License Renewal Application (Tac No. ME3058) ML1100500182011-01-0606 January 2011 Summary of Telephone Conference Call Held on January 3, 2011, Between the NRC and Energy Northwest, Concerning the Request for Additional Information Pertaining to the Columbia Generating Station, License Renewal Application (TAC Number ME3 2024-06-28
[Table view] |
Text
December 1, 2005
SUBJECT:
MEETING WITH ENERGY NORTHWEST FACILITY: Columbia Generating Station DOCKET: 50-397 DATE AND TIME: December 15, 2005 1:30 P.M.
LOCATION: U.S. Nuclear Regulatory Commission Training Conference Room Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-4005 PURPOSE: This is a public meeting between the NRC and Energy Northwest to discuss issues at the Columbia Generating Station. The specific issue the licensee requested to discuss include overall human performance issues. As requested by the NRC, additional issues to be discussed include the Service Water Pump 1B and Station Batteries.
CATEGORY 1: Members of the public are invited to observe the meeting and will have the opportunity to communicate with the NRC after the business portion of the meeting, but before the meeting is adjourned.
PARTICIPANTS: NRC B. Mallett, Regional Administrator, Region IV P. Gwynn, Deputy Regional Administrator, Region IV D. Chamberlain, Director, Division of Reactor Safety (DRS)
T. Vegel, Deputy Director, Division of Reactor Projects (DRP)
R. Caniano, Deputy Director, DRS C. Johnson, Chief, Project Branch A, DRP T. Gody, Chief, Operations Branch, DRS C. Paulk, Acting Branch Chief, EB1, DRS Z. Dunham, Senior Resident Inspector, DRP M. Brown, Project Engineer, DRP
Energy Northwest UTILITY D. Atkinson, Vice President, Nuclear Generation C. Whitcomb, Vice President, Organizational Performance / CKO S. Belcher, Manager, Operations D. Coleman, Manager, Regulatory Programs G. Cullen, Supervisor, Regulatory Programs MEETING CONTACT: Claude E. Johnson, NRC, RIV 817/860-8148 CEJ@nrc.gov
Energy Northwest cc:
J. V. Parrish (Mail Drop 1023)
Chief Executive Officer Energy Northwest P.O. Box 968 Richland, WA 99352-0968 W. Scott Oxenford (Mail Drop PE04)
Vice President, Technical Services Energy Northwest P.O. Box 968 Richland, WA 99352-0968 Albert E. Mouncer (Mail Drop PE01)
Vice President, Corporate Services/
General Counsel/CFO Energy Northwest P.O. Box 968 Richland, WA 99352-0968 Chairman Energy Facility Site Evaluation Council P.O. Box 43172 Olympia, WA 98504-3172 Douglas W. Coleman (Mail Drop PE20)
Manager, Regulatory Programs Energy Northwest P.O. Box 968 Richland, WA 99352-0968 Gregory V. Cullen (Mail Drop PE20)
Supervisor, Licensing Energy Northwest P.O. Box 968 Richland, WA 99352-0968 Chairman Benton County Board of Commissioners P.O. Box 190 Prosser, WA 99350-0190 Dale K. Atkinson (Mail Drop PE08)
Vice President, Nuclear Generation Energy Northwest P.O. Box 968 Richland, WA 99352-0968
Energy Northwest Cheryl M. Whitcomb (Mail Drop PE03)
Vice President, Organizational Performance & Staffing/CKO Energy Northwest P.O. Box 968 Richland, WA 99352-0968 William A. Horin, Esq.
Winston & Strawn 1700 K Street, NW Washington, DC 20006-3817 Matt Steuerwalt Executive Policy Division Office of the Governor P.O. Box 43113 Olympia, WA 98504-3113 Lynn Albin, Radiation Physicist Washington State Department of Health P.O. Box 7827 Olympia, WA 98504-7827
Energy Northwest E-Mail To:
( ) NRC Attendees OEWEB S. Bogle (for predecisional enf. or regulatory conferences)
PMNS Mtg Announcement Coordinator BWS B. Sheron, ADPT OEMAIL D/OE EJB1 E. Benner JLD Jennifer Dixon-Herrity, RIV EDO Coordinator BJB Project Manager, NRR ZKD Senior Resident Inspector FPB P. Bonnett VLD V. Dricks, PAO WAM W. Maier, RSLO GMV M. Vasquez, ES CJG, JAK RA Secretaries LAO, DLF, MJS DRP Secretaries NLH, LMB, JLH2 DRS Secretaries CMS, AMT, BST1 DNMS Secretaries JLP J. Pellet, IRMB LPL P. Longdo, Receptionist AMM Ann Mattila, Security Advisor SISP Review Completed: _ CEJ ADAMS: / Yes G No Initials: ___CEJ___
/ Publicly Available G Non-Publicly Available G Sensitive / Non-Sensitive R:_REACTORS\_COL\2005\CGS12-15-05MN-DRP.wpd RIV:SPE:DRP/A C:DRP/A PAO RSLO TRFarnholtz CEJohnson VDricks WMaier
/RA/ /RA/ CGordon for CGordon for 11/29/05 11/29/05 11/29/05 11/29/05 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax