Meeting Notice with NRC & Energy Northwest to Present and Discuss the Performance and Annual Assessment Results for Columbia Generating Station for the Period of January 1 Though December 31, 2012
ML13134A132
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 05/14/2013
From:
NRC/RGN-IV/DRP/RPB-A
To:
Walker W
References
Download: ML13134A132 (3)


Text

U N IT E D S TA TE S N U C LE AR R E GU LA TOR Y C OM MI S S I ON R E G IO N I V 1600 EAST LAMAR BLVD AR L I NG TO N , TE X AS 7 60 1 1 - 4511 May 14, 2013

SUBJECT:

PUBLIC MEETING WITH ENERGY NORTHWEST FACILITY: Columbia Generating Station DOCKET: 50-397 DATE & TIME: Tuesday, June 04, 2013 5:30 p.m. to 7:00 p.m. (PDT)

LOCATION: Energy Northwest 3000 George Washington Way Walkley Room Richland, WA 99352 PURPOSE: This is the end-of-cycle public meeting between the NRC and Energy Northwest to present and discuss the performance and annual assessment results for Columbia Generating Station for the period of January 1 though December 31, 2012.

CATEGORY 1: This is a Category 1 Meeting. The public is invited to observe this meeting and will have an opportunity to communicate with the NRC after the business portion of the meeting, but before the meeting is adjourned.

The NRC provides reasonable accommodation to individuals with disabilities where appropriate. If you need a reasonable accommodation to participate in this meeting, or need this meeting notice or the transcript or other information from the meeting in another format (e.g., Braille, large print), please notify the NRC's meeting contact listed below. Determinations on requests for reasonable accommodation will be made on a case-by-case basis.

PARTICIPANTS: NRC Kriss Kennedy, Director, Division of Reactor Projects, Region IV Wayne Walker, Chief, Project Branch A, Division of Reactor Projects, Region IV Jeremy Groom, Senior Resident Inspector, Columbia Generating Station

Public Meeting with Energy Northwest PARTICIPANTS: Licensee Mark E. Reddemann, Chief Executive Officer Donald Gregoire, Manager, Regulatory Affairs MEETING CONTACT: Wayne Walker, Branch Chief Project Branch A (817) 200-1148 Wayne.Walker@nrc.gov The Nuclear Regulatory Commission provides reasonable accommodations to individuals with disabilities where appropriate. If you need a reasonable accommodation to participate in this meeting, or need this meeting notice or the transcript of other information from the meeting in another format (e.g. Braille or large print), please notify the Nuclear Regulatory Commissions meeting contact listed above. Determinations on requests for reasonable accommodation will be made on a case-by-case basis.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosures will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRCs Agency wide Documents Access and Management System (ADAMS). ADAMS is accessible from the Public Electronic Reading Room page of the NRCs public web site at:

http://www.nrc.gov/readingrm/adams.html.

To receive a summary of future meetings and other plant-specific e-mail distributions, you must subscribe to the Operating Reactor Correspondence electronic distribution for this plant via http://www.nrc.gov/public-involve/listserver/plants-by-region.html. Once subscribed, if you wish to discontinue receiving electronic distribution, you may unsubscribe at any time by visiting the same web address above.

Public Meeting with Energy Northwest Electronic distribution by RIV:

Public Meeting Notice System (PMNS Resource@nrc.gov)

Regional Administrator (Art.Howell@nrc.gov)

Deputy Regional Administrator (Robert.Lewis@nrc.gov)

DRP Director (Kriss.Kennedy@nrc.gov)

Acting DRP Deputy Director (Michael.Scott@nrc.gov)

DRS Director (Tom.Blount@nrc.gov)

Acting DRS Deputy Director (Jeff.Clark@nrc.gov)

Senior Resident Inspector (Jeremy.Groom@nrc.gov)

Resident Inspector (Mahdi.Hayes@nrc.gov)

Branch Chief, DRP/A (Wayne.Walker@nrc.gov)

Project Engineer, DRP/A (Matt.Young@nrc.gov)

Site Administrative Assistant (Crystal.Myers@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Public Affairs Officer (Lara.Uselding@nrc.gov)

Project Manager (Fred.Lyon@nrc.gov)

Branch Chief, DRS/TSB (Ray.Kellar@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

ACES (R4Enforcement.Resource@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Technical Support Assistant (Loretta.Williams@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

RIV/ETA: OEDO (Doug.Huyck@nrc.gov)

R:\_Reactors\CGS\2013\CGS Meeting Notice 6-4-13.pdf ADAMS: No Yes SUNSI Review Complete Reviewer Initials: WW Publicly Available Non-Sensitive Non-publicly Available Sensitive PE:DRP/A PAO RSLO C:DRP/A EDUribe VDricks WMaier WWalker

/RA/ /RA/LUselding for /RA/JCook for /RA/

5/9/13 5/9/13 5/10/13 5/10/13 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax