ML111520549
| ML111520549 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 06/01/2011 |
| From: | NRC Region 4 |
| To: | |
| References | |
| Download: ML111520549 (3) | |
Text
June 1, 2011
SUBJECT:
OPEN HOUSE WITH MEMBERS OF THE PUBLIC FACILITY:
Columbia Generating Station DOCKET:
50-397 DATE AND TIME:
June 21, 2011 6:00 p.m. - 7:30 p.m.
LOCATION:
Energy Northwests Business Service Center 3000 George Washington Way Richland, Washington 99352 PURPOSE:
The purpose of this open house is for members of the community to meet individually with NRC staff members to discuss the end-of-cycle results for Columbia Generating Station for the period of January 1 through December 31, 2010. The NRC will also be present to discuss the Region IV License Renewal Safety Inspection results documented in Inspection Report 05000397/2010007 [ML103540496].
CATEGORY 3:
This is a category 3 meeting. The public is invited to fully participate in this open house. The meeting is specifically designed to ensure maximum interaction with the NRC Staff.
The NRC provides reasonable accommodation to individuals with disabilities where appropriate. If you need a reasonable accommodation to participate in this open house, or need this meeting notice or the transcript or other information from the meeting in another format (e.g. Braille, large print), please notify the NRCs meeting contact listed below. Determinations on request for reasonable accommodation will be made on a case-by-case basis.
PARTICIPANTS:
NRC Wayne Walker, Chief, Reactor Projects Branch A Ronald Cohen, Senior Resident Inspector Greg Pick, Senior Reactor Inspector UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 612 EAST LAMAR BLVD, SUITE 400 ARLINGTON, TEXAS 76011-4125
Energy Northwest LICENSEE Mark Reddemann, Chief Executive Officer Brad Sawatzke, Vice President Nuclear Generation/Chief Nuclear Officer Bruce MacKissock, Plant Manager Greg Cullen, Recovery Manager Don Gregoire, Manager, Regulatory Affairs MEETING CONTACT:
David Proulx, Senior Project Engineer Project Branch A (817) 276-6561 David.Proulx@nrc.gov To receive a summary of this meeting and begin receiving other plant-specific e-mail distributions, you must subscribe to the Operating Reactor Correspondence electronic distribution for this plant via http://www.nrc.gov/public-involve/listserver/plants-by-region.html.
Once subscribed, if you wish to discontinue receiving electronic distribution, you may unsubscribe at any time by visiting the same web address above.
cc: Distribution via ListServ
Energy Northwest Electronic Distribution:
PMNS Resource, Mtg Announcement Coordinator Elmo Collins, RA Art Howell, DRA Kriss Kennedy, D:DRP Troy Pruett, DD:DRP Anton Vegel, D:DRS Mark Haire, C:DRS/OB Sue Bogle (OEWEB Resource)
Stephanie Bush-Goddard, RIV/ETA OEMAIL, D/OE Amy Powell, OCA Jenny Weil, Congressional Affairs Officer mortensengk@INPO.org Mohan Thadani, Project Manager, NRR Wayne Walker, Branch Chief, PB/A David Proulx, Senior Project Engineer, PB/A Ron Cohen, Senior Resident Inspector Mahdi Hays, Resident Inspector Victor Dricks, Region IV PAO Lara Uselding, Region IV PAO Bill Maier, Region IV RSLO Karla Fuller, Region IV RC Nick Taylor, Region IV ACES Crystal Myers, Site Administrative Assistant Phil Longdo, Receptionist Ann Mattila, Security Advisor R:\\ _Reactors\\EOC2010\\CGS EOC MN 06212011.docx SUNSI Rev Compl.
Yes No ADAMS Yes No Reviewer Initials WW Publicly Avail Yes No Sensitive Yes No Sens. Type Initials WW RIV/SPE:DRP PAO RSLO C:DRS/PSB2 C:DRP/A DProulx VLDricks WAMaier NOKeefe WWalker
/RA/
/RA/
/RA/
/RA/
/RA/
6/1/11 6/1/11 6/1/11 6/1/11 6/1/11 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax