ML12318A397

From kanterella
Revision as of 17:05, 5 December 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

NRR E-mail Capture - Acceptance Review of Braidwood Station, Units 1 and 2, Relief Request Associated with the Third 10-Year Inservice Inspection Program Interval (TAC Nos. ME9748 and ME9749
ML12318A397
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 11/13/2012
From: Joel Wiebe
Plant Licensing Branch III
To: Bauer J
Exelon Corp
References
TAC ME9748, TAC ME9749
Download: ML12318A397 (3)


Text

NRR-PMDAPEm Resource From: Wiebe, Joel Sent: Tuesday, November 13, 2012 10:49 AM To: Joseph Bauer

Subject:

Acceptance Review of Braidwood Station, Units 1 and 2, Relief Request Associated with the Third 10-Year Inservice Inspection Program Interval (TAC Nos. ME9748 and ME9749 Attachments: image001.jpg By letter dated October 8, 2012, Exelon Generation Company, LLC (Exelon) submitted a relief request for Braidwood Station, Units 1 and 2. The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this relief request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.

If you have any questions, please contact me at 301-415-6606.

Joel S. Wiebe, Sr. Project Manager Plant Licensing Branch III-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation 1

Hearing Identifier: NRR_PMDA Email Number: 530 Mail Envelope Properties (Joel.Wiebe@nrc.gov20121113104800)

Subject:

Acceptance Review of Braidwood Station, Units 1 and 2, Relief Request Associated with the Third 10-Year Inservice Inspection Program Interval (TAC Nos. ME9748 and ME9749 Sent Date: 11/13/2012 10:48:35 AM Received Date: 11/13/2012 10:48:00 AM From: Wiebe, Joel Created By: Joel.Wiebe@nrc.gov Recipients:

"Joseph Bauer" <Joseph.Bauer@exeloncorp.com>

Tracking Status: None Post Office:

Files Size Date & Time MESSAGE 1710 11/13/2012 10:48:00 AM image001.jpg 11907 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received: