Catawba Nuclear Station Admin JPM A.2 May 2014 NRC Initial License Exam Admin JPM A.2 RO RO A.2 Page 1 of 6
Catawba Nuclear Station Admin JPM A.2 May 2014 NRC Initial License Exam JOB PERFORMANCE MEASURE Task: Develop Removal from Service for A KR (Recirculated Cooling Water Pump)
Alternate Path: No Facility JPM #: New K/A Rating(s): Generic 2.2.13 (4.1/4.3) Knowledge of tagging and clearance procedures.
CFR: 41.10 / 45.13 Task Standard: Component removal from service positions and sequence are listed on 3.3, in accordance with the general guidelines of SOMP 02-01, (Safety Tagging and Configuration Control), and the Examiner Answer Key for SOMP 02-01, Attachment 13.3, (Blank R&R Enclosures - Removal or Removal Addendum).
Preferred Evaluation Location: Preferred Evaluation Method:
Classroom __X__ In-Plant __ __ Perform ___X___ Simulate______
Procedure
References:
SOMP 02-01 (Safety Tagging And Configuration Control), Revision 017 Validation Time: 15 Minutes Time Critical: No
=================================================================
Applicant: Name____________________ Docket#______________ Time Start: _________
Time Finish: ________
Performance Ratings:
SAT ______ UNSAT ______ Question Grade ______ Performance Time: ________
Examiner: _________________________ _______________________________/___________
NAME SIGNATURE DATE
=================================================================
COMMENTS RO A.2 Page 2 of 6
Catawba Nuclear Station Admin JPM A.2 May 2014 NRC Initial License Exam Tools/Equipment/Procedures Needed:
Blank copy of SOMP 02-01, Attachment 13.3 (Blank R&R Enclosures), pages 1-3 CN-1600-01.00 (Flow Diagram of the KR System)
CN-1703-03.02 (1SLXC One Line Diagram)
SOMP 02-01, (Safety Tagging and Configuration Control)
READ TO APPLICANT DIRECTION TO APPLICANT:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
The A KR Pump has been secured in accordance with OP/0/B/6400/004 (Recirculated Cooling Water) and is to be tagged out for removal and inspection of 1KR-4 (A KR Pump Discharge Check Valve). ST2 is not available.
INITIATING CUE:
The Unit Supervisor has directed you to use the attached drawings CN-1600-01.00 (Flow Diagram of the KR System) and CN-1703-03.02 (1SLXC One Line Diagram) in order to develop the removal from service enclosure for 1KR-4 inspection, in accordance with SOMP 02-01. You are to complete SOMP 02-01, Attachment 13.3 by listing the component, removal position, and sequence number in the appropriate blanks on the form.
RO A.2 Page 3 of 6
Catawba Nuclear Station Admin JPM A.2 May 2014 NRC Initial License Exam Component Information Sheet EXAMINER NOTE: The following list is for Examiner information ONLY. Do NOT provide this list to applicant.
1SLXC-5B (A KR Pump Motor) 1KR-5 (A KR Pump Disch) 1KR-1 (A KR Pump Suction) 1KR-3 (A KR Discharge Drain) 1KR-263 (A KR Pump Suction Drain) 1KR-282 (A KR Pump Suction Line Vent )
1KR-2 (A KR Pump Vent) 1KR-4 (A KR Pump Disch Check)
RO A.2 Page 4 of 6
Catawba Nuclear Station Admin JPM A.2 May 2014 NRC Initial License Exam START TIME: ______
EXAMINER NOTE: Provide the following to the applicant:
Initiating Cue.
A copy of drawing CN-1600-01.00 (Flow Diagram of the KR System) and CN-1703-03.02 (1SLXC One Line Diagram).
When applicant demonstrates ability to locate SOMP 02-01, provide a copy of SOMP 02-01, pages 1 through 29.
A blank copy of SOMP 02-01, Attachment 13.3, (Blank R&R Enclosures), all 3 pages.
CRITICAL EXAMINER NOTE: Answer Key is the attached SOMP 02-01, Attachment STEPS 13.3 (completed in RED ink). Also, see the KEY for explanation of Critical Steps aspect.
___ SAT
___ UNSAT STANDARD: Applicant lists correct removal positions in a sequence in accordance with SOMP 02-01 general guidelines:
COMMENTS:
This JPM is complete.
STOP TIME: ________
RO A.2 Page 5 of 6
Catawba Nuclear Station Admin JPM A.2 May 2014 NRC Initial License Exam APPLICANT CUE SHEET (To Be Returned To Examiner Upon Completion Of Task)
INITIAL CONDITIONS:
The A KR Pump has been secured in accordance with OP/0/B/6400/004 (Recirculated Cooling Water) and is to be tagged out for removal and inspection of 1KR-4 (A KR Pump Discharge Check Valve). ST2 is not available.
INITIATING CUE:
The Unit Supervisor has directed you to use the attached drawings CN-1600-01.00 (Flow Diagram of the KR System) and CN-1703-03.02 (1SLXC One Line Diagram), develop the removal from service enclosure for 1KR-4 inspection, in accordance with SOMP 02-01. You are to complete SOMP 02-01, Attachment 13.3 by listing the component, removal position, and sequence number in the appropriate blanks on the form.
RO A.2.... Page 7 of 7
KEY KEY KEY KEY KEY KEY KEY Attachment 13.3 SOMP 02-01 Blank R & R Enclosures Page 1 of 3 Removal or Removal Addendum Station: Catawba Dept: OPS Page ____ of _____ Tagout ID:
Enclosure Type:
Unit #
Enclosure Name:
System: KR (Recirculated Cooling Water)
Reason: Inspect 1KR-4 (A KR Pump Disch Check)
Remarks:
EC Number:
Prepared by: at: Reviewed By: at:
Cross Disciplinary: at:
Approved By: at:
Rev By:
Technical Specifications / SLC Determination by:
Risk Evaluation By: SSF Degrade Reported By:
Containment Closure/Integrity Evaluation By: Fire Impairment By:
Pre-Job Briefing Given By:
Control Room Supervisor Acknowledge: In Progress Procedure and Tagout Review:
____________________________ Date/Time _______/____
1.47 Panel Reviewed By: (CNS ONLY) Unit 1 Unit 2 N/A OAC Points Removed From Service By: Unit 1 Unit 2 Unit 3 Control Room Logs Updated By: Unit 1 Unit 2 Unit 3 Safety Tag Program Updated By:
KEY KEY KEY KEY KEY KEY KEY Attachment 13.3 SOMP 02-01 Blank R & R Enclosures Page 2 of 3 Enclosure Execution Section Enclosure Execution Start Date / Time: ____________________ / _____________________
Seq# 1 Equip Tag: Position: Placed By:
RACKED OUT 1SLXC-5B Red Tag ID Equipment
Description:
As Found: CV By:
XXXXX A KR Pump Motor Location: LBL: IV By:
Seq#: 2 Equip Tag: Position: Placed By:
CLOSED 1KR-5 Red Tag ID Equipment
Description:
As Found: CV By:
XXXXX A KR Pump Disch Location: LBL: IV By:
Seq#: 2 Equip Tag: Position: Placed By:
CLOSED 1KR-1 Red Tag ID Equipment
Description:
As Found: CV By:
XXXXX A KR Pump Suction Location: LBL: IV By:
Seq#: 3 Equip Tag: Position: Placed By:
OPEN 1KR-3 Red Tag ID Equipment
Description:
As Found: CV By:
Note 1 A KR Pump Disch Drain Location: LBL: IV By:
Seq#: 3 Equip Tag: Position: Placed By:
OPEN 1KR-263 Red Tag ID Equipment
Description:
As Found: CV By:
Note 1 A KR Pump Suction Drain Location: LBL: IV By:
Enclosure Execution Completion Date / Time: ____________________ / _____________________
Attachment 13.3 SOMP 02-01 Blank R & R Enclosures Page 2 of 3 Enclosure Execution Section Enclosure Execution Start Date / Time: ____________________ / _____________________
Seq# 4 Equip Tag: Position: Placed By:
OPEN 1KR-282 Red Tag ID Equipment
Description:
As Found: CV By:
Note 1 A KR Pump Suction Line Vent Location: LBL: IV By:
Seq#: 4 Equip Tag: Position: Placed By:
OPEN 1KR-2 Red Tag ID Equipment
Description:
As Found: CV By:
Note 1 A KR Pump Vent Location: LBL: IV By:
Seq#: 5 Equip Tag: Position: Placed By:
VAR 1KR-4 Red Tag ID Equipment
Description:
As Found: CV By:
No Tag A KR Pump Disch Check Location: LBL: IV By:
Enclosure Execution Completion Date / Time: ____________________ / _____________________
Note 1 One vent or drain valve should be assigned a red tag per the requirements of SOMP 02-01.
CRITICAL STEPS: Seq. # steps 1 through 4 only are critical in order to complete required steps for tagout of component. See Note 1 which explains that only one vent or drain is adequate for assignment of a red tag.
EXAMINER NOTE: Page 3 of 3 of Attachment 13.3 is titled, "Partial Restoration or Restoration Enclosure," and is NOT required for this JPM KEY.
Catawba Nuclear Station Admin JPM A.1-1 May 2014 NRC Initial License Exam Admin JPM A.1-1 RO / SRO PAGE 1 OF 8
Catawba Nuclear Station Admin JPM A.1-1 May 2014 NRC Initial License Exam EVALUATION SHEET Task: Determine License Status Active / Inactive Alternate Path: None.
Facility JPM #: None.
Safety Function:
Title:
K/A 2.1.1 Knowledge of conduct of operations requirements Rating(s): 3.8 / 4.2 CFR: 41.10 / 45.13 Preferred Evaluation Location: Preferred Evaluation Method:
Simulator Room X Perform X Simulate
References:
NSD 512 Maintenance of RO/SRO Licenses Task Standard: Applicant determines the correct status of each of the three Reactor Operator licenses. Operator A and C are active, Operator B is inactive.
Validation Time: 10 minutes Time Critical: Yes No X
===============================================================
Applicant: Time Start: ________
NAME Docket # Time Finish: ________
Performance Rating: SAT ____ UNSAT ____ Performance Time ___
Examiner: _____________________________ _____________________________/________
NAME SIGNATURE DATE
===============================================================
COMMENTS PAGE 2 OF 8
Catawba Nuclear Station Admin JPM A.1-1 May 2014 NRC Initial License Exam READ TO APPLICANT DIRECTION TO APPLICANT:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
- 1. Three Reactor Operators have the following history:
- 2. All three have off-shift assignments at the plant, are current in License Operator Requalification Training, and have had a medical examination in the past 2 years.
- 3. None of the 3 has worked any shift since 12/01/14.
- 4. Active/Inactive status and time on shift since October 1, 2014 is as follows for each of the Reactor Operators:
Operator A License was active on October 1, 2014.
10/02/14 Worked 0700-1900 shift as Unit 1 OATC.
10/03/14 Worked 0700-1900 shift as Unit 1 OATC.
10/04/14 Worked 0700-1900 shift as Containment Closure Coordinator.
10/05/14 Worked 0700-1900 shift as Unit 1 BOP.
10/06/14 Worked 0700-1900 shift as Unit 1 BOP.
11/14/14 Worked 1900-0700 shift as Unit 1 OATC.
11/17/14 Worked 1900-0700 shift as Containment Closure Coordinator.
Operator B License was active on October 1, 2014.
10/01/14 Worked 0700-1900 shift as Unit 1 OATC.
10/02/14 Worked 0700-1900 shift in the Tagging Office.
10/03/14 Worked 0700-1900 shift as Containment Closure Coordinator.
10/05/14 Worked 0700-1900 shift as Unit 1 OATC.
10/14/14 Worked 1900-0700 shift as Unit 1 OATC.
11/02/14 Worked 0700-1900 shift in the Tagging Office.
Operator C License was inactive on October 1, 2014.
10/5/14 thru 10/09/14 worked 40 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br /> under the direction of the Unit 1 OATC and completed all requirements for license reactivation.
11/12/14 Worked 0700-1900 shift as Unit 1 OATC.
11/13/14 Worked 0700-1900 shift as Unit 1 OATC.
11/15/14 Worked 0700-1900 shift as Unit 1 OATC.
11/16/14 Worked 1900-0700 shift as Unit 1 OATC.
11/21/14 Worked 1900-0700 shift as Unit 1 OATC.
PAGE 3 OF 8
Catawba Nuclear Station Admin JPM A.1-1 May 2014 NRC Initial License Exam INITIATING CUES:
- 1. You are to determine if each of the Reactor Operators is eligible to work the Unit 1 OATC position on the 0700 - 1900 shift on January 31, 2015. Record your answer in the blanks below (yes or no).
Operator A .
Operator B .
Operator C .
PAGE 4 OF 8
Catawba Nuclear Station Admin JPM A.1-1 May 2014 NRC Initial License Exam START TIME: _______
STEP 1: Determine the Active / Inactive status of Operator A license. CRITICAL STEP STANDARD: ___ SAT Candidate determines the license is Active because the operator ___ UNSAT worked the required 5 complete twelve hour shifts in a qualifying license position during the previous quarter.
This step is critical to ensure that the individual is qualified to stand license duties in the control room.
COMMENTS:
STEP 2: Determine the Active / Inactive status of Operator B license. CRITICAL STEP STANDARD: ___ SAT Candidate determines the license is Inactive because the operator did ___ UNSAT not work the required 5 complete twelve hour shifts in a qualifying license position during the previous quarter.
This step is critical to preclude a non qualified individual from fulfilling license duties in the control room.
COMMENTS:
PAGE 5 OF 8
Catawba Nuclear Station Admin JPM A.1-1 May 2014 NRC Initial License Exam STEP 3: Determine the Active / Inactive status of Operator C license. CRITICAL STEP STANDARD:
___ SAT Candidate determines the license is Active because the license was reactivated in the previous quarter and that the required 5 complete ___ UNSAT twelve hour shifts in a qualifying license position during the quarter have also been completed.
This step is critical to ensure that the individual is qualified to stand license duties in the control room.
COMMENTS:
END OF TASK STOP TIME ________
PAGE 6 OF 8
APPLICANT CUE SHEET (RETURN TO EXAMINER UPON COMPLETION OF TASK) 2014 NRC Initial License Exam RO/SRO Admin JPM A.1-1 DIRECTION TO APPLICANT:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
- 1. Three Reactor Operators have the following history:
- 2. All three have off-shift assignments at the plant, are current in License Operator Requalification Training, and have had a medical examination in the past 2 years.
- 3. None of the 3 has worked any shift since 12/01/14.
- 4. Active/Inactive status and time on shift since October 1, 2014 is as follows for each of the Reactor Operators:
Operator A License was active on October 1, 2014.
10/02/14 Worked 0700-1900 shift as Unit 1 OATC.
10/03/14 Worked 0700-1900 shift as Unit 1 OATC.
10/04/14 Worked 0700-1900 shift as Containment Closure Coordinator.
10/05/14 Worked 0700-1900 shift as Unit 1 BOP.
10/06/14 Worked 0700-1900 shift as Unit 1 BOP.
11/14/14 Worked 1900-0700 shift as Unit 1 OATC.
11/17/14 Worked 1900-0700 shift as Containment Closure Coordinator.
Operator B License was active on October 1, 2014.
10/01/14 Worked 0700-1900 shift as Unit 1 OATC.
10/02/14 Worked 0700-1900 shift in the Tagging Office.
10/03/14 Worked 0700-1900 shift as Containment Closure Coordinator.
10/05/14 Worked 0700-1900 shift as Unit 1 OATC.
10/14/14 Worked 1900-0700 shift as Unit 1 OATC.
11/02/14 Worked 0700-1900 shift in the Tagging Office.
Operator C License was inactive on October 1, 2014.
10/5/14 thru 10/09/14 worked 40 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br /> under the direction of the Unit 1 OATC and completed all requirements for license reactivation.
11/12/14 Worked 0700-1900 shift as Unit 1 OATC.
11/13/14 Worked 0700-1900 shift as Unit 1 OATC.
11/15/14 Worked 0700-1900 shift as Unit 1 OATC.
11/16/14 Worked 1900-0700 shift as Unit 1 OATC.
11/21/14 Worked 1900-0700 shift as Unit 1 OATC.
APPLICANT CUE SHEET (RETURN TO EXAMINER UPON COMPLETION OF TASK) 2014 NRC Initial License Exam RO/SRO Admin JPM A.1-1 INITIATING CUES:
- 1. You are to determine if each of the Reactor Operators is eligible to work the Unit 1 OATC position on the 0700 - 1900 shift on January 31, 2015. Record your answer in the blanks below (yes or no).
Operator A .
Operator B .
Operator C .
Catawba Nuclear Station Admin JPM A.1-2 May 2014 NRC Initial License Exam Admin JPM A.1-2 RO / SRO PAGE 1 OF 10
Catawba Nuclear Station Admin JPM A.1-2 May 2014 NRC Initial License Exam EVALUATION SHEET Task: Calculate Boric Acid and Water for Addition to FWST Alternate Path: None.
Facility JPM #: FW-001 Safety Function: N/A
Title:
K/A G2.1.25 Ability to interpret reference materials, such as graphs, curves, tables, etc.
Rating(s): 3.9 / 4.2 CFR: 41.10 / 43.5 / 45.12 Preferred Evaluation Location: Preferred Evaluation Method:
Simulator Room X Perform X Simulate
References:
OP/1/A/6200/014 (Refueling Water System), Enclosure 4.4 (FWST Makeup from Blender), Rev. 087 Task Standard: Determines acid required is 2416 gallons (+ 10), and that water required is 2719 gallons (+ 10).
Validation Time: 15 minutes Time Critical: Yes No X
===============================================================
Applicant: Time Start: ________
NAME Docket # Time Finish: ________
Performance Rating: SAT ____ UNSAT ____ Performance Time ___
Examiner: _____________________________ _____________________________/________
NAME SIGNATURE DATE
===============================================================
COMMENTS PAGE 2 OF 10
Catawba Nuclear Station Admin JPM A.1-2 May 2014 NRC Initial License Exam READ TO APPLICANT DIRECTION TO APPLICANT:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
Unit 1 is in Mode 1.
FWST 100% level = 395,000 gals BAT = 7500 ppmB RMWST = 4 ppmB FWST level is currently at 95.2% at 2790 ppmB.
INITIATING CUES:
The CRS directs you to determine the amount of Boric Acid and Water to add to bring the level up to 96.5% and 2800 ppmB per OP/1/A/6200/014 (Refueling Water System) Enclosure 4.4 (FWST Makeup from Blender) steps 3.3 and 3.4.
IV is waived for this JPM.
Examiner Note: Provide the applicant with a copy of OP/1/A/6200/014 Enclosure 4.4 completed up through step 3.2.
PAGE 3 OF 10
Catawba Nuclear Station Admin JPM A.1-2 May 2014 NRC Initial License Exam START TIME: _______
STEP 3.3.1: Initial volume of FWST _______ = Vi. CRITICAL STEP STANDARD: ___ SAT Applicant determines initial volume = 376,040 gallons (395,000 X .952). ___ UNSAT This step is critical to ensure accurate result for final calculation and determination of volume of water and acid needed.
COMMENTS:
STEP 3.3.2: Final volume of FWST after makeup _________ = V FW. CRITICAL STEP STANDARD: ___ SAT Applicant determines final volume = 381,175 gallons (395,000 X .965). ___ UNSAT This step is critical to ensure accurate result for final calculation and determination of volume of water and acid needed.
COMMENTS:
PAGE 4 OF 10
Catawba Nuclear Station Admin JPM A.1-2 May 2014 NRC Initial License Exam STEP 3.3.3: Compute the total gallons of makeup water to be added to CRITICAL the FWST ___________ = Vf. STEP Vf = VFW - Vi ___ SAT STANDARD: ___ UNSAT Applicant determines total makeup needed = 5,135 gallons.
This step is critical to ensure accurate result for final calculation and determination of volume of water and acid needed.
Examiner Note: 5,135 determined by subtracting 376,040 from 381,175.
COMMENTS:
STEP 3.3.4: Initial boron concentration of water in the FWST _________
= Ci.
STANDARD:
Applicant determines initial concentration of 2790 ppmB from Initial Conditions.
COMMENTS:
PAGE 5 OF 10
Catawba Nuclear Station Admin JPM A.1-2 May 2014 NRC Initial License Exam STEP 3.3.5: Solve for the desired makeup water boron concentration, Cf. CRITICAL STEP Cf = CFW VFW - Ci Vi Cf = __________
Vf ___ SAT STANDARD: ___ UNSAT Applicant determines desired concentration of makeup water is 3532 ppmB (+5).
This step is critical to ensure accurate result for final calculation and determination of volume of water and acid needed.
COMMENTS:
2800 X (381,175) - 2790 x (376,040) = 3,532 (Added by PGC) 5,135 STEP 3.4.1: Boron concentration of water in BAT _________ = C1.
___ SAT STANDARD:
___ UNSAT Applicant determines BAT concentration = 7500 ppmB from Initial Conditions.
COMMENTS:
PAGE 6 OF 10
Catawba Nuclear Station Admin JPM A.1-2 May 2014 NRC Initial License Exam STEP 3.4.2: Boron concentration of water in RMWST _________ = C2.
___ SAT STANDARD:
___ UNSAT Applicant determines RMWST concentration = 4 ppmB from Initial Conditions.
COMMENTS:
STEP 3.4.3: Total gallons of makeup water to be added to FWST
_________ = Vf from Step 3.3.3. ___ SAT
___ UNSAT STANDARD:
Applicant determines total makeup = 5,135 gallons.
COMMENTS:
PAGE 7 OF 10
Catawba Nuclear Station Admin JPM A.1-2 May 2014 NRC Initial License Exam STEP 3.4.4: Solve for the amount of boric acid to be added (V 1) using Cf CRITICAL obtained in Step 3.3.5. STEP V1 = Vf (Cf - C2) V1 = ___________ ___ SAT C1 - C2
___ UNSAT STANDARD:
Applicant determines acid required = 2,416 gallons (+ 10).
This step is critical to ensure accurate addition of required acid.
COMMENTS:
5,135 (3,532 - 4) = 2,416.79 (Added by PGC) 7,500 - 4 STEP 3.4.5: If V1 is negative, contact the OWPM Staff for instruction on adjusting the boron concentration in the FWST.
___ SAT STANDARD: ___ UNSAT Applicant determines that this step does not apply.
COMMENTS:
PAGE 8 OF 10
Catawba Nuclear Station Admin JPM A.1-2 May 2014 NRC Initial License Exam STEP 3.4.6: Solve for the amount of RMWST water to be added (V2). CRITICAL STEP V2 = V f - V1 V2 = _________ gal.
___ SAT STANDARD:
___ UNSAT Applicant determines water added = 2,719 gallons (+ 10).
This step is critical to ensure adequate addition of water to FWST such that adequate boron concentration is maintained.
COMMENTS:
END OF TASK STOP TIME ________
PAGE 9 OF 10
APPLICANT CUE SHEET (RETURN TO EXAMINER UPON COMPLETION OF TASK) 2014 NRC Initial License Exam RO/SRO Admin JPM A.1-2 DIRECTION TO APPLICANT:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
Unit 1 is in Mode 1.
FWST 100% level = 395,000 gals BAT = 7500 ppmB RMWST = 4 ppmB FWST level is currently at 95.2% at 2790 ppmB.
INITIATING CUES:
The CRS directs you to determine the amount of Boric Acid and Water to add to bring the level up to 96.5% and 2800 ppmB per OP/1/A/6200/014 (Refueling Water System) Enclosure 4.4 (FWST Makeup from Blender) steps 3.3 and 3.4.
IV is waived for this JPM.
Catawba Nuclear Station Admin JPM A.3 May 2014 NRC Initial License Exam Admin JPM A.3 RO / SRO PAGE 1 OF 13
Catawba Nuclear Station Admin JPM A.3 May 2014 NRC Initial License Exam DATA SHEET Task: Calculate Low Pressure Service Water Discharge flow for a liquid radioactive release.
Alternate Path: N/A Facility JPM #: 2010 NRC Initial License Exam SRO-D Admin.
Safety Function: N/A K/A 2.3.11 Ability to control radiation releases Importance: 3.8 / 4.3 CFR: 41.11 / 43.4 / 45.10 Preferred Evaluation Location: Preferred Evaluation Method:
Simulator Classroom X Perform X Simulate
References:
PT/0/A/4250/011 (RL Temperature And Discharge Flow Determination) rev 050 Task Standard: Applicant obtains needed data, correctly calculates total discharge flow, and determines that the liquid waste release can NOT continue.
Validation Time: 15 minutes Time Critical: Yes No X Applicant: Time Start: __________
NAME___________________________ Docket #_______________ Time Finish: __________
Performance Rating: Performance Time _____
SAT ____ UNSAT ____
Examiner: _____________________________ _____________________________/________
NAME SIGNATURE DATE
===============================================================
COMMENTS PAGE 2 OF 13
PAGE 3 0F 13 Catawba Nuclear Station Admin JPM A.3 May 2014 NRC Initial License Exam READ TO APPLICANT DIRECTION TO APPLICANT:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
- 1. Unit 1 is currently performing a liquid waste release from the Monitor Tank Building.
- 2. Low Pressure Service Water (RL) Flow transmitter 0RLP5080 (RL Disch Flow) and OAC points C1P0903 and C2P0903 (RL Line A Disch Flow-Hourly Average) are INOPERABLE and have been removed from service.
- 3. The RN system is aligned to the RL discharge header.
- 4. Units 1 and 2 are both at 100% power.
INITIATING CUES:
You are directed to calculate the total RL discharge flow using Enclosure 13.2 (Total Discharge Flow Calculation Sheet) of PT/0/A/4250/011 and determine if adequate flow exists to continue the release per the LWR currently in progress. Record your answer in the spaces below.
Total RL Discharge Flow GPM.
Adequate Flow Exists .
Yes/No EXAMINER NOTE:
After reading initiating cue, provide applicant with a copy of PT/0/A/4250/011 marked up as follows:
Step 12.1 signed off.
Enclosure 13.1 signed off up to Step 1.1.4.3 for performing Enclosure 13.2 Also provide a copy of the LWR permit report.
PAGE 3 OF 13
Catawba Nuclear Station Admin JPM A.3 May 2014 NRC Initial License Exam STEP / STANDARD SAT /
UNSAT START TIME: _______
STEP 1: 1.1.2 Perform the following calculations to obtain Total Discharge CRITICAL Head: STEP RL Disch Pressure = 0RLP5030 + 3.9 psi ___ SAT RL Disch Pressure = __66__ + 3.9 psi = _69.9_ psig ___ UNSAT Lake Elevation = __569__ 0RNP7380 (Lake Wylie Level) or obtained from hydro central per Step 1.1.4.2 of Enclosure 13.1
(_69.9_ psig x 2.311ft/psig) + (571.75 - _569_ft) =
_164.3_ft RL Disch Pressure Lake Elev Total Disch Head STANDARD:
Applicant calculates RL Discharge pressure as 164.3 ft. (Acceptable range: 163 - 165 ft. based on accounting for rounding and truncation.)
This step is critical because improper entry affects the calculation for Total RL Discharge Flow.
EXAMINER NOTE: Step 1.1.1 is N/A because ORLP5030 indicator IS available.
COMMENTS:
PAGE 4 0F 13
Catawba Nuclear Station Admin JPM A.3 May 2014 NRC Initial License Exam STEP / STANDARD SAT /
UNSAT STEP 2: 1.1.3 Using Total Discharge Head from Step 1.1.2 obtain the RL CRITICAL Pump Flow value using one of the following: STEP Enclosure 13.7 (RL Pumps Head / Capacity Table) ___ SAT OR ___UNSAT OAC Databook in "Secondary Systems Databook Calcs" using "RL Total Discharge Head vs. RL Pump Flow Rate" STANDARD:
Applicant determines that RL Pump Flow per Enclosure 13.7 is 38,354 GPM.
EXAMINER NOTE: Range of 37,405 - 39,219 GPM is acceptable.
This step is critical because improper entry affects the calculation for Total RL Discharge Flow.
COMMENTS:
PAGE 5 0F 13
Catawba Nuclear Station Admin JPM A.3 May 2014 NRC Initial License Exam STEP / STANDARD SAT /
UNSAT STEP 3: 1.1.4 Once RL Pump Flow value is obtained, calculate Total RL CRITICAL Supply based on number of RL pumps in operation: STEP
___38354___ X __ __1_______ = _____38354_____
RL Pump Flow # of pumps in op. Total RL Supply (A) ___ SAT STANDARD: ___ UNSAT Applicant calculates Total RL Supply to be 38,354 GPM.
EXAMINER NOTE: Range carried forward is 37,405 to 39,219 GPM.
This step is critical because improper entry affects the calculation for Total RL Discharge Flow.
COMMENTS:
STEP 4: 1.1.5 Enter Total RL supply (A) value in Step 1.4. CRITICAL STEP STANDARD:
___ SAT Applicant enters value calculated for Total RL Supply in blank (A) on page 3 of 3 of Enclosure 13.2. ___ UNSAT EXAMINER NOTE: Steps 1.2.1 and 1.2.2 are not applicable per initiating cue.
This step is critical because improper entry affects the calculation for Total RL Discharge Flow.
COMMENTS:
PAGE 6 0F 13
Catawba Nuclear Station Admin JPM A.3 May 2014 NRC Initial License Exam STEP / STANDARD SAT /
UNSAT STEP 5: 1.2.3 IF either C1P5854 (RN Train A Calculated Total Flow) OR CRITICAL C1P5855 (RN Train B Calculated Total Flow) is NOT STEP available, perform the following to obtain total RN flow:
___ SAT 1.2.3.1 Calculate RN Pump Train A flow:
____0_____ + ____0_____ = _____0____gpm ___ UNSAT 1RNP7520 + 2RNP7520 = RN Pump Train A flow 1.2.3.2 Calculate RN Pump Train B flow:
__17,000__ + ___0____ = _ 17,000__gpm 1RNP7510 + 2RNP7510 = RN Pump Train B flow STANDARD:
Applicant calculates total RN flow to be 17,000 GPM.
This step is critical because improper entry affects the calculation for Total RL Discharge Flow.
COMMENTS:
STEP 6: 1.2.4 Perform the following calculations to obtain Total RN Flow: CRITICAL STEP
_________0________ + _____17,000_______ = _17,000_gpm (B)
RN Pump Train A Flow + RN Pump Train B Flow = Total RN Flow ___ SAT STANDARD: ___ UNSAT Applicant calculates total RN flow to be 17,000 GPM.
This step is critical because improper entry affects the calculation for Total RL Discharge Flow.
COMMENTS:
PAGE 7 0F 13
Catawba Nuclear Station Admin JPM A.3 May 2014 NRC Initial License Exam STEP / STANDARD SAT /
UNSAT STEP 7: 1.2.5 Enter Total RN Flow (B) in Step 1.4. CRITICAL STEP STANDARD:
___ SAT Applicant enters Total RN Flow calculated in previous step in blank (B) on page 3 of 3. ___ UNSAT EXAMINER NOTE: Steps 1.3.1 and 1.3.2 are not applicable per data sheet.
This step is critical because improper entry affects the calculation for Total RL Discharge Flow.
COMMENTS:
STEP 8: 1.3.3 Calculate Cooling Tower Total Evaporation as follows: CRITICAL STEP 13,500 + 14,000 = 27,500 gpm (C)
(C1P5853) (C2P5853) Total Evaporation ___ SAT STANDARD: ___ UNSAT Applicant calculates Total Cooling Tower Evaporation to be 27,500 GPM and enters this value in blank (C) of step 1.4.
This step is critical because improper entry affects the calculation for Total RL Discharge Flow.
COMMENTS:
PAGE 8 0F 13
Catawba Nuclear Station Admin JPM A.3 May 2014 NRC Initial License Exam STEP / STANDARD SAT /
UNSAT STEP 9: 1.4 Perform the following calculation to obtain Total RL Disch CRITICAL Flow: STEP 38354 + 17,000 - 27,500 = 27,854 gpm ___ SAT (A) (B) (C)
___ UNSAT STANDARD:
Applicant calculates Total RL discharge flow to be 27,854 gpm.
EXAMINER NOTE: Calculation range carried forward would be 26,905 to 28,719 GPM.
This step is critical to ensure that enough RL flow exists to dilute the liquid waste release that is in progress.
COMMENTS:
PAGE 9 0F 13
Catawba Nuclear Station Admin JPM A.3 May 2014 NRC Initial License Exam STEP / STANDARD SAT /
UNSAT CRITICAL STEP
___ SAT
___ UNSAT STEP 10: 1.5 Apply dilution safety factor to obtain Total RL Discharge flow from the Calculated Total RL Discharge Flow from Step 1.4 as follows:
(27,854 gpm) X 0.65 = 18,105 gpm STANDARD:
Applicant calculates Total RL Discharge flow to be 18,105 GPM.
EXAMINER NOTE: Calculation range carried forward would be 17,488 to 18,667 GPM.
This step is critical to ensure that enough RL flow exists to dilute the liquid waste release that is in progress.
COMMENTS:
PAGE 10 0F 13
Catawba Nuclear Station Admin JPM A.3 May 2014 NRC Initial License Exam STEP / STANDARD SAT /
UNSAT STEP 11 Determination of adequate RL flow. CRITICAL STEP STANDARD:
___ SAT Applicant determines that Total RL Discharge Flow is LESS than the "Minimum RL Flow interlock setpoint for radionuclides (gpm)" required ___ UNSAT by and listed on the Liquid Waste Release Permit Report, and that the release may NOT continue.
This step is critical for ensuring termination of a release with inadequate dilution flow.
EXAMINER NOTE:
The Liquid Waste release Permit Report requires at least 27,600 gpm RL flow in order for the release to continue. If the applicant does NOT apply the dilution safety factor (listed in STEP 10 of this JPM), it will appear that adequate RL flow DOES exist (27,854 gpm). But with the required dilution safety factor, RL flow can only be calculated as 18,105 gpm: inadequate for the release to continue.
COMMENTS:
END OF TASK STOP TIME ________
PAGE 11 0F 13
APPLICANT CUE SHEET (RETURN TO EXAMINER UPON COMPLETION OF TASK)
READ TO APPLICANT DIRECTION TO APPLICANT:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
- 1. Unit 1 is currently performing a liquid waste release from the Monitor Tank Building.
- 2. Low Pressure Service Water (RL) Flow transmitter 0RLP5080 (RL Disch Flow) and OAC points C1P0903 and C2P0903 (RL Line A Disch Flow-Hourly Average) are INOPERABLE and have been removed from service.
- 3. The RN system is aligned to the RL discharge header.
- 4. Units 1 and 2 are both at 100% power.
INITIATING CUES:
You are directed to calculate the total RL discharge flow using Enclosure 13.2 (Total Discharge Flow Calculation Sheet) of PT/0/A/4250/011 and determine if adequate flow exists to continue the release per the LWR currently in progress. Record your answer in the spaces below.
Total RL Discharge Flow GPM.
Adequate Flow Exists .
Yes/No Admin JPM A.3
APPLICANT CUE SHEET (RETURN TO EXAMINER UPON COMPLETION OF TASK)
Unit 1 and Unit 2 Data Sheet for 1030 Unit 1 Cooling Tower Evaporation (PID C1P5853) - 13,500 GPM Unit 2 Cooling Tower Evaporation (PID C2P5853) - 14,000 GPM Low Pressure Service Water (RL) Status RL pump A only is in service.
RL Header Pressure (0RLP5030) - 66 PSIG Lake Wylie Level (0RNP7380) - 569 Feet Nuclear Service Water (RN) Status 1B RN pump is in service OAC points C1P5854, C1P5855, and C1P5856 are removed from service RN Pump Train A flow (1RNP7520) - 0 GPM RN Pump Train A flow (2RNP7520) - 0 GPM RN Pump Train B flow (1RNP7510) - 17,000 GPM RN Pump Train B Flow (2RNP7510) - 0 GPM Admin JPM A.3
Catawba Nuclear Station Admin JPM A.2 May 2014 NRC Initial License Exam Admin JPM A.2 SRO SRO A.2 Page 1 of 7
Catawba Nuclear Station Admin JPM A.2 May 2014 NRC Initial License Exam JOB PERFORMANCE MEASURE Task: Develop Removal from Service 1EBC (Vital Battery)
Alternate Path: No Facility JPM #: New K/A Rating(s): Generic 2.2.13 (4.1/4.3) Knowledge of tagging and clearance procedures.
CFR: 41.10 / 45.13 Task Standard: Component removal from service positions and sequence are listed on 3.3, in accordance with the general guidelines of SOMP 02-01, (Safety Tagging and Configuration Control), and the Examiner Answer Key for SOMP 02-01, Attachment 13.3, (Blank R&R Enclosures - Removal or Removal Addendum).
Preferred Evaluation Location: Preferred Evaluation Method:
Classroom __X__ In-Plant __ __ Perform ___X___ Simulate______
Procedure
References:
SOMP 02-01 (Safety Tagging And Configuration Control), Revision 017 Validation Time: 15 Minutes Time Critical: No
=================================================================
Applicant: Name____________________ Docket#______________ Time Start: _________
Time Finish: ________
Performance Ratings:
SAT ______ UNSAT ______ Question Grade ______ Performance Time: ________
Examiner: _________________________ _______________________________/___________
NAME SIGNATURE DATE
=================================================================
COMMENTS SRO A.2 Page 2 of 7
Catawba Nuclear Station Admin JPM A.2 May 2014 NRC Initial License Exam Tools/Equipment/Procedures Needed:
Blank copy of SOMP 02-01, Attachment 13.3 (Blank R&R Enclosures), pages 1-3 CN-1705-01.01 (125 VDC Vital Instrumentation and Control)
SOMP 02-01, (Safety Tagging and Configuration Control)
READ TO APPLICANT DIRECTION TO APPLICANT:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
Vital Battery 1EBC has been removed from service per OP/1/A/6350/008 and needs to be tagged for cell replacement. ST2 is not available.
INITIATING CUE:
The Unit Supervisor has directed you to use the attached drawing CN-1705-01.01 (125 VDC Vital Instrumentation and Control) in order to develop the removal from service enclosure for 1EBC in accordance with SOMP 02-01. You are to complete SOMP 02-01, Attachment 13.3 by listing the component, removal position, and sequence number in the appropriate blanks on the form. Appropriate Tech. Spec entries have been made by the WCC SRO.
SRO A.2 Page 3 of 7
Catawba Nuclear Station Admin JPM A.2 May 2014 NRC Initial License Exam Component Information Sheet EXAMINER NOTE: The following list is for Examiner information ONLY. Do NOT provide this list to applicant.
1EDC-F02A (Battery 1EBC)
RO/SRO A.2 Page 4 of 7
Catawba Nuclear Station Admin JPM A.2 May 2014 NRC Initial License Exam START TIME: ______
EXAMINER NOTE: Provide the following:
Initiating Cue.
A copy of drawing CN-1705-01.01 (125 VDC Vital Instrumentation and Control).
When applicant demonstrates ability to locate SOMP 02-01, provide a copy of SOMP 02-01, pages 1 through 29.
A blank copy of SOMP 02-01, Attachment 13.3, (Blank R&R Enclosures), all 3 pages.
CRITICAL EXAMINER NOTE: Answer Key is the attached SOMP 02-01, Attachment STEP 13.3 (completed in RED ink).
___ SAT STANDARD: Applicant lists correct removal positions in a sequence in
___ UNSAT accordance with SOMP 02-01 general guidelines.
COMMENTS:
This JPM is complete.
STOP TIME: ________
SRO A.2 Page 5 of 7
Catawba Nuclear Station Admin JPM A.2 May 2014 NRC Initial License Exam APPLICANT CUE SHEET (To Be Returned To Examiner Upon Completion Of Task)
INITIAL CONDITIONS:
Vital Battery 1EBC has been removed from service per OP/1/A/6350/008 and needs to be tagged for cell replacement. ST2 is not available.
INITIATING CUE:
The Unit Supervisor has directed you to use the attached drawing CN-1705-01.01 (125 VDC Vital Instrumentation and Control) in order to develop the removal from service enclosure for 1EBC in accordance with SOMP 02-01. You are to complete SOMP 02-01, Attachment 13.3 by listing the component, removal position, and sequence number in the appropriate blanks on the form. Appropriate Tech. Spec entries have been made by the WCC SRO.
SRO A.2.... Page 7 of 7
Catawba Nuclear Station Admin JPM A.2 May 2014 NRC Initial License Exam Subsequently:
After 1EBC is tagged, 1EDA-F03B (1EDA Tie Breaker to 1EDC) trips open due to breaker failure. You are to determine how this changes the initial Tech Spec entry assuming the breaker cannot be re-closed and the battery cannot be returned to service. List LCO and Condition.
SRO A.2.... Page 7 of 7
KEY KEY KEY KEY KEY KEY KEY Attachment 13.3 SOMP 02-01 Blank R & R Enclosures Page 1 of 3 Removal or Removal Addendum Station: Catawba Dept: OPS Page ____ of _____ Tagout ID:
Enclosure Type:
Unit # 1 Enclosure Name:
System: EPL (125 VDC Vital I&C Power)
Reason: 1EBC Cell Replacement Remarks:
EC Number:
Prepared by: at: Reviewed By: at:
Cross Disciplinary: at:
Approved By: at:
Rev By:
Technical Specifications / SLC Determination by:
Risk Evaluation By: SSF Degrade Reported By:
Containment Closure/Integrity Evaluation By: Fire Impairment By:
Pre-Job Briefing Given By:
Control Room Supervisor Acknowledge: InProgress Procedure and Tagout Review:
____________________________ Date/Time _______/____
1.47 Panel Reviewed By: (CNS ONLY) Unit 1 Unit 2 N/A OAC Points Removed From Service By: Unit 1 Unit 2 Unit 3 Control Room Logs Updated By: Unit 1 Unit 2 Unit 3 Safety Tag Program Updated By:
KEY KEY KEY KEY KEY KEY KEY Attachment 13.3 SOMP 02-01 Blank R & R Enclosures Page 2 of 3 Enclosure Execution Section Enclosure Execution Start Date / Time: ____________________ / _____________________
Seq# 1 Equip Tag: Postion: Placed By:
OFF 1EDC-F02A Red Tag ID Equipment
Description:
As Found: CV By:
XXXXX Battery 1EBC Location: LBL: IV By:
Enclosure Execution Completion Date / Time: ____________________ / _____________________
EXAMINER NOTE: Page 3 of 3 of Attachment 13.3 is titled, "Partial Restoration or Restoration Enclosure," and is NOT required for this JPM KEY.
Subsequent: Initial T.S. entry will be LCO 3.8.4 (DC Sources-Operating) Condition A due to one channel being inoperable. This condition requires bus tie breakers to be closed.
Failure of the Tie Breaker will require entry into Condition B.
Catawba Nuclear Station Admin JPM A.4 May 2014 NRC Initial License Exam Admin JPM A.4 SRO PAGE 1 OF 6
Catawba Nuclear Station Admin JPM A.4 May 2014 NRC Initial License Exam EVALUATION SHEET Task: Determine guidance for Protective Action Recommendations per RP-05 (General Emergency)
Alternate Path: None.
Facility JPM #: SEP-098 Safety Function:
Title:
K/A 2.4.44 Knowledge of emergency plan protective action recommendations.
Rating(s): 2.4 / 4.4 CFR: 41.10 / 41.12 / 43.5 / 45.11 Preferred Evaluation Location: Preferred Evaluation Method:
Simulator Room X Perform X Simulate
References:
RP/0/A/5000/005 (General Emergency), Rev. 050 Task Standard: Applicant recommends that Zones C2, D2, E2, and F2 be evacuated.
Validation Time: 15 minutes Time Critical: Yes No X
===============================================================
Applicant: Time Start: ________
NAME Docket # Time Finish: ________
Performance Rating: SAT ____ UNSAT ____ Performance Time ___
Examiner: _____________________________ _____________________________/________
NAME SIGNATURE DATE
===============================================================
COMMENTS PAGE 2 OF 6
Catawba Nuclear Station Admin JPM A.4 May 2014 NRC Initial License Exam READ TO APPLICANT DIRECTION TO APPLICANT:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
- 1. A General Emergency has been declared.
- 2. Immediate Protective Action Recommendations have been made with the wind direction 58 degrees, and wind speed being 4 MPH, to evacuate zones A0, A1, B1, C1, D1, E1, F1 and to shelter in place zones A2, A3, B2, C2, D2, E2, F2, and F3.
- 3. It has been 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> since the Unit shutdown.
- 4. New data has shown the wind speed to be 4 MPH (OAC Pt C1P0250), Wind direction 58 degrees (from National Weather Service), EMF 53A reading 623 R/Hr and EMF 53B reading 632 R/Hr.
INITIATING CUES:
- 1. You are to perform step 3.3 of RP/0/A/5000/005 (General Emergency) and determine if any Protective Actions need to be updated.
- 2. If needed, the EOF will evaluate evacuation times per Encl. 4.4.
Additional recommendations (if any) .
EXAMINER NOTE: After reading initiating cue, provide applicant with a copy of RP/0/A/5000/005 completed through step 3.2.
PAGE 3 OF 6
Catawba Nuclear Station Admin JPM A.4 May 2014 NRC Initial License Exam START TIME: _______
STEP 1: 3.3 Evaluate specific plant conditions, off-site dose projections, ___ SAT field monitoring team data, and assess need to update Protective Action Recommendations made to states and ___ UNSAT counties in previous notification. Refer to:
- Enclosure 4.3, page 1 of 3, Guidance for Protective Actions, Protective Action Recommendation Flowchart
- Enclosure 4.4, Evacuation Time Estimates for Catawba Plume Exposure EPZ STANDARD:
Applicant refers to Enclosure 4.3 to determine actions.
COMMENTS:
STEP 2: (Encl. 4.3) 1. Use flowchart to determine if large fission product CRITICAL inventory is greater than gap activity. STEP STANDARD: ___ SAT Applicant determines from flowchart that large fission product inventory ___ UNSAT is greater than gap activity.
This step is critical to ensure that an upgrade in PARs is realized and that needed zones get evacuated.
COMMENTS:
PAGE 4 OF 6
Catawba Nuclear Station Admin JPM A.4 May 2014 NRC Initial License Exam STEP 3: (Encl 4.3) 2. Make recommendation. CRITICAL STEP STANDARD:
___ SAT Applicant determines that zones C2, D2, E2, and F2 should be evacuated. ___ UNSAT This step is critical to ensure the health and safety of the public is maintained and that proper zones are evacuated.
COMMENTS:
STEP 4: (Encl 4.3) Applicant continues through the remainder of the ___ SAT flowchart.
___ UNSAT STANDARD:
Applicant determines that no further recommendations will be made for the rest of the flowchart.
COMMENTS:
END OF TASK STOP TIME ________
PAGE 5 OF 6
APPLICANT CUE SHEET (RETURN TO EXAMINER UPON COMPLETION OF TASK)
DIRECTION TO APPLICANT:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
- 1. A General Emergency has been declared.
- 2. Immediate Protective Action Recommendations have been made with the wind direction 58 degrees, and wind speed being 4 MPH, to evacuate zones A0, A1, B1, C1, D1, E1, F1 and to shelter in place zones A2, A3, B2, C2, D2, E2, F2, and F3.
- 3. It has been 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> since the Unit shutdown.
- 4. New data has shown the wind speed to be 4 MPH (OAC Pt C1P0250), Wind direction 58 degrees (from National Weather Service), EMF 53A reading 623 R/Hr and EMF 53B reading 632 R/Hr.
INITIATING CUES:
- 1. You are to perform step 3.3 of RP/0/A/5000/005 (General Emergency) and determine if any Protective Actions need to be updated.
- 2. If needed, the EOF will evaluate evacuation times per Encl. 4.4.
Additional recommendations (if any) .