MONTHYEARML17142A0252016-10-19019 October 2016 Letter to P. Baldauf Review of the Draft Environmental Assessment and Finding of No Significant Impact for the Oyster Creek Independent Spent Fuel Storage Installation Decommissioning Funding Plan (ML16294A071-RLSO) Project stage: Draft Approval 2016-10-19
[Table View] |
|
---|
Category:Letter
MONTHYEARML23342A1162024-01-0909 January 2024 Independent Spent Fuel Storage Installation Security Inspection Plan L-23-019, Proof of Financial Protection 10 CFR 140.152023-12-18018 December 2023 Proof of Financial Protection 10 CFR 140.15 IR 05000219/20230022023-11-0909 November 2023 EA-23-076 Oyster Creek Nuclear Generating Station - Notice of Violation and Proposed Imposition of Civil Penalty - $43,750 - NRC Inspection Report No. 05000219/2023002 ML23286A1552023-10-13013 October 2023 Defueled Safety Analysis Report (DSAR) ML23249A1212023-09-0606 September 2023 NRC Inspection Report 05000219/2023002, Apparent Violation (EA-23-076) ML23242A1162023-08-30030 August 2023 Biennial 10 CFR 50.59 and 10 CFR 72.48 Change Summary Report January 1, 2021 Through December 31, 2022 ML23214A2472023-08-22022 August 2023 NRC Inspection Report 05000219/2023002 IR 05000219/20230012023-05-31031 May 2023 NRC Inspection Report No. 05000219/2023001 IR 07200015/20234012023-05-16016 May 2023 NRC Independent Spent Fuel Storage Installation Security Inspection Report 07200015/2023401 ML23114A0912023-04-24024 April 2023 Annual Radioactive Effluent Release Report for 2022 ML23114A0872023-04-24024 April 2023 Annual Radioactive Environmental Operating Report for 2022 L-23-004, HDI Annual Occupational Radiation Exposure Data Reports - 20222023-04-24024 April 2023 HDI Annual Occupational Radiation Exposure Data Reports - 2022 L-23-003, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-31031 March 2023 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations ML23088A0382023-03-29029 March 2023 Stations 1, 2, & 3, Palisades Nuclear Plant, and Big Rock Point - Nuclear Onsite Property Damage Insurance ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities IR 05000219/20220022023-02-0909 February 2023 NRC Inspection Report No. 05000219/2022002 ML23031A3012023-02-0808 February 2023 Discontinuation of Radiological Effluent Monitoring Location in the Sewerage System ML23033A5052023-02-0202 February 2023 First Use Notification of NRC Approved Cask RT-100 ML23025A0112023-01-24024 January 2023 LLRW Late Shipment Investigation Report Per 10 CFR 20, Appendix G ML22347A2732022-12-21021 December 2022 Independent Spent Fuel Storage Installation Security Inspection Plan Dated December 21, 2022 ML22297A1432022-12-15015 December 2022 Part 20 App G Exemption Letter L-22-042, Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.152022-12-14014 December 2022 Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.15 IR 07200015/20224012022-12-0606 December 2022 NRC Independent Spent Fuel Storage Installation Security Inspection Report 07200015/2022401 (Letter & Enclosure 1) ML22280A0762022-11-0202 November 2022 Us NRC Analysis of Holtec Decommissioning Internationals Funding Status Report for Oyster Creek, Indian Point and Pilgrim Nuclear Power Station ML22276A1762022-10-24024 October 2022 Decommissioning International Proposed Revisions to the Quality Assurance Program Approval Forms for Radioactive Material Packages ML22286A1402022-10-13013 October 2022 NRC Confirmatory Order EA-21-041 IR 05000219/20220012022-08-11011 August 2022 NRC Inspection Report 05000219/2022001 ML22215A1772022-08-0303 August 2022 Decommissioning International (HDI) Proposed Revisions to the Quality Assurance Program Approval Forms for Radioactive Material Packages ML22214A1732022-08-0202 August 2022 Request for Exemption from 10 CFR 20, Appendix G, Section Iii.E ML22207B8382022-07-26026 July 2022 NRC Confirmatory Order EA-21-041 ML22130A6882022-05-10010 May 2022 Late LLRW Shipment Investigation Report Pursuant to 10 CFR 20, Appendix G L-22-026, Occupational Radiation Exposure Data Report - 20212022-04-29029 April 2022 Occupational Radiation Exposure Data Report - 2021 ML22118A6122022-04-28028 April 2022 Annual Radioactive Environmental Operating Report for 2021 ML22118A5822022-04-28028 April 2022 Annual Radioactive Effluent Release Report for 2021 ML22091A1062022-04-0101 April 2022 Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) L-22-022, and Indian Point Nuclear Generating Stations 1, 2, & 3 - Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations - Holtec.2022-03-25025 March 2022 and Indian Point Nuclear Generating Stations 1, 2, & 3 - Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations - Holtec. ML22069A3762022-03-10010 March 2022 Late LLRW Shipment Investigation Report Pursuant to 10 CFR 20, Appendix G ML22032A0582022-03-0808 March 2022 EA-21-139; EA-150: Oyster Creek Nuclear Generating Station - NRC Investigation Report Nos.. 1-2021-002 & 1-2021-014 ML22060A2202022-03-0202 March 2022 NRC Office of Investigations Case No. 1-2021-009 ML22049B2452022-02-19019 February 2022 Late Low Level Radwaste Shipment Report Pursuant to 10 CFR 20 Appendix G IR 05000219/20214022022-01-26026 January 2022 EA-21-041: Confirmatory Order Related to Oyster Greek Nuclear Generating Station - NRC Investigation Report I-2020-007; NRC Inspection Report Nos. 05000219/2021402 & 07200015/2021401 ML22025A3422022-01-25025 January 2022 and Big Rock Point - Changes to Site Organization ML22025A2182022-01-25025 January 2022 Late LLRW Shipments Investigation Report Pursuant to 10 CFR 20, Appendix G ML22021B5512022-01-21021 January 2022 Compensatory Measures Not Implemented Per Site'S Physical Security Plan Due to Multiplexer (Mux) Power Supply Failure L-21-134, and Indian Point Nuclear Generating Stations 1, 2, & 3 - Report on Status of Decommissioning Funding for Independent Spent Fuel Storage Installations2021-12-17017 December 2021 and Indian Point Nuclear Generating Stations 1, 2, & 3 - Report on Status of Decommissioning Funding for Independent Spent Fuel Storage Installations ML21349A5192021-12-15015 December 2021 Commitment Change Summary Report ML21285A1912021-11-30030 November 2021 Nrc'S Analysis of Holtec Decommissioning International'S Decommissioning Funding Status Report for Oyster Creek Nuclear Generating Station and Pilgrim Nuclear Power Station, Docket Nos 50-219 and 50-293 IR 05000219/20210032021-11-16016 November 2021 NRC Inspection Report No. 05000219/2021003 L-21-118, Changes to Signature Authority & Addressee for Holtec Decommissioning International, LLC Correspondence Re to Oyster Creek Nuclear Generating Station, Pilgrim Nuclear Power Station, Indian Point Nuclear Generating Units 1, 2, 3, & Palisades2021-11-0909 November 2021 Changes to Signature Authority & Addressee for Holtec Decommissioning International, LLC Correspondence Re to Oyster Creek Nuclear Generating Station, Pilgrim Nuclear Power Station, Indian Point Nuclear Generating Units 1, 2, 3, & Palisades IR 05000219/20214042021-08-26026 August 2021 NRC Independent Spent Fuel Storage Security Inspection Report No. 07200015/2021402 and Security Decommissioning Inspection Report 05000219/2021404 - (Public) 2024-01-09
[Table view] |
Text
PRE-DECISIONAL INFORMATION. THIS INFORMATION IS LIMITED TO USE BY THE NEW JERSEY DEPT. OF ENVIRONMENTAL PROTECTION. THIS INFORMATION SHALL NOT BE DISCLOSED WITHOUT PRIOR NRC PERMISSION.
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 October 19, 2016 Paul Baldauf, Director Division of Environmental Safety & Health Dept. of Environmental Protection P.O. Box 420 Trenton, NJ 08625-0420
SUBJECT:
REVIEW OF THE DRAFT ENVIRONMENTAL ASSESSMENT AND FINDING OF NO SIGNIFICANT IMPACT FOR THE OYSTER CREEK INDEPENDENT SPENT FUEL STORAGE INSTALLATION DECOMMISSIONING FUNDING PLAN
Dear Mr. Baldauf:
By letters dated December 17, 2012, and March 31, 2015, Exelon Generation Company, LLC (EGC) submitted decommissioning funding plans (DFP) for the Oyster Creek Independent Spent Fuel Storage Installation (ISFSI), located in New Jersey, for U.S. Nuclear Regulatory Commission (NRC) staff review and approval.
The NRC regulations at Title 10 of the Code of Federal Regulations (10 CFR) Part 72, Licensing Requirements for the Independent Storage of Spent Nuclear Fuel, High-Level Radioactive Waste, and Reactor-Related Greater than Class C Waste, govern the storage of spent nuclear fuel (spent fuel) generated at commercial nuclear power reactors licensed by the NRC. Spent fuel that has been removed from the reactors spent fuel pool is typically stored at a nuclear power plants ISFSI.
The NRC requires its licensees to plan for the eventual decommissioning of their licensed facilities prior to license termination. On June 17, 2011, the NRC published a final rule amending its decommissioning planning regulations (76 Federal Register (FR) 35512). The final rule amended the NRC regulation, 10 CFR 72.30, which concerns financial assurance and decommissioning for ISFSIs. This regulation now requires each holder of, or applicant for, a license under 10 CFR Part 72 to submit, for NRC review and approval, a DFP. The purpose of the DFP is to demonstrate the licensees financial assurance, i.e., that funds will be available to decommission the ISFSI. The NRC staff is reviewing the information submitted by EGC Specifically, the NRC must determine whether EGC DFP contains the information required by 10 CFR 72.30(b) and 10 CFR 72.30(c) Tri-Annual Update and whether EGC has provided reasonable assurance that funds will be available to decommission the ISFSI.
The EGC ISFSI DFP is publicly available in the NRCs Agencywide Documents Access and Management System (ADAMS) accessible at http://www.nrc.gov/reading-rm/adams.html.
PRE-DECISIONAL INFORMATION. THIS INFORMATION IS LIMITED TO USE BY THE NEW JERSEY DEPT. OF ENVIRONMENTAL PROTECTION. THIS INFORMATION SHALL NOT BE DISCLOSED WITHOUT PRIOR NRC PERMISSION.
PRE-DECISIONAL INFORMATION. THIS INFORMATION IS LIMITED TO USE BY THE NEW JERSEY DEPT. OF ENVIRONMENTAL PROTECTION. THIS INFORMATION SHALL NOT BE DISCLOSED WITHOUT PRIOR NRC PERMISSION.
P. Baldauf The ADAMS accession number for the application package is ML12353A488 for the 2012 submittal and ML15090A537 for the 2015 submittal.
In accordance with 10 CFR Part 51, the NRC regulations that implement the National Environmental Policy Act of 1969, as amended, the agency has prepared a draft environmental assessment (EA) for the proposed action (enclosed). We are providing your office with the opportunity to review the draft EA and comment on environmental issues prior to the public issuance and publication of the EA. We request that distribution and use of the enclosed draft EA be limited only to those staff involved in the review and comment process.
Please submit any comments within 30 days of the receipt of this letter to the U.S. Nuclear Regulatory Commission, Document Control Desk, ATTN: John McKirgan, Mail Stop:
TWFN 4B-34, U.S. Nuclear Regulatory Commission, Washington, DC 20555. If you have any questions, please contact Mr. Richard Baum of my staff by telephone at 301-415-0018, or by e-mail at richard.baum@nrc.gov. The NRC staff will consider your timely comments and will revise the EA, as appropriate, before its final issuance and publication. Thank you for your assistance.
Sincerely,
/RA/
John McKirgan, Chief Spent Fuel Licensing Branch Division of Spent Fuel Management Office of Nuclear Material Safety and Safeguards Docket No.: 72-15 CAC No.: L24794
Enclosure:
Draft Environmental Assessment PRE-DECISIONAL INFORMATION. THIS INFORMATION IS LIMITED TO USE BY THE NEW JERSEY DEPT. OF ENVIRONMENTAL PROTECTION. THIS INFORMATION SHALL NOT BE DISCLOSED WITHOUT PRIOR NRC PERMISSION.
PRE-DECISIONAL INFORMATION. THIS INFORMATION IS LIMITED TO USE BY THE NEW JERSEY DEPT. OF ENVIRONMENTAL PROTECTION. THIS INFORMATION SHALL NOT BE DISCLOSED WITHOUT PRIOR NRC PERMISSION.
P. Baldauf The ADAMS accession number for the application package is ML12353A488 for the 2012 submittal and ML15090A537 for the 2015 submittal.
In accordance with 10 CFR Part 51, the NRC regulations that implement the National Environmental Policy Act of 1969, as amended, the agency has prepared a draft environmental assessment (EA) for the proposed action (enclosed). We are providing your office with the opportunity to review the draft EA and comment on environmental issues prior to the public issuance and publication of the EA. We request that distribution and use of the enclosed draft EA be limited only to those staff involved in the review and comment process.
Please submit any comments within 30 days of the receipt of this letter to the U.S. Nuclear Regulatory Commission, Document Control Desk, ATTN: John McKirgan, Mail Stop:
TWFN 4B-34, U.S. Nuclear Regulatory Commission, Washington, DC 20555. If you have any questions, please contact Mr. Richard Baum of my staff by telephone at 301-415-0018, or by e-mail at richard.baum@nrc.gov. The NRC staff will consider your timely comments and will revise the EA, as appropriate, before its final issuance and publication. Thank you for your assistance.
Sincerely,
/RA/
John McKirgan, Chief Spent Fuel Licensing Branch Division of Spent Fuel Management Office of Nuclear Material Safety and Safeguards Docket No.: 72-15 CAC No.: L24794
Enclosure:
Draft Environmental Assessment G:SFST\72.30 Decommissioning Funding Plans\2015 Submission Part 70.30 (c)\Oyster Creek DFP Consultation Letter to State.docx G:SFST\72.30 Decommissioning Funding Plans\2015 Submission Part 70.30 (c)\Oyster Creek Draft EA for Consultation.docx ADAMS Pkg. Accession No.: ML16294A069 Letter: ML16294A071
Enclosure:
ML16294A075 OFC DSFM DSFM DSFM NAME RBaum WWheatley JMcKirgan DATE 09/21/16 09/22/16 10/19/16 C = COVER E = COVER & ENCLOSURE N = NO COPY OFFICIAL RECORD COPY PRE-DECISIONAL INFORMATION. THIS INFORMATION IS LIMITED TO USE BY THE NEW JERSEY DEPT. OF ENVIRONMENTAL PROTECTION. THIS INFORMATION SHALL NOT BE DISCLOSED WITHOUT PRIOR NRC PERMISSION.