Conee Nuclear Station, Units 1, 2, and 3 Exemption from 10 CFR 50, Appendix J Requirements for Air Lock Leakage Testing (TAC Nos. MA6868, MA6869, and MA6870)
ML003670061
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 12/23/1999
From: Labarge D
NRC/NRR/DLPM/LPD2
To: Mccollum W
Duke Energy Corp
References
TAC MA6868, TAC MA6869, TAC MA6870
Download: ML003670061 (3)


Text

December

==

23,

==

1999

==

Mr.

==

W.

==

R.

==

McCollum,

==

Jr.

==

Vice

==

President,

==

Oconee

==

Site

==

Duke

==

Energy

==

Corporation

==

P.

==

0.

==

Box

==

1439

==

Seneca,

==

SC

==

29679

==

SUBJECT:

==

OCONEE

==

NUCLEAR

==

STATION,

==

UNITS

==

1,

==

2,

==

AND

==

3

==

RE:

==

EXEMPTION

==

FROM

==

10

==

CFR

==

50,

==

APPENDIX

==

J

==

REQUIREMENTS

==

FOR

==

AIR

==

LOCK

==

LEAKAGE

==

TESTING

==

(TAC

==

NOS.

==

MA6868,

==

MA6869,

==

AND

==

MA6870)

==

==Dear

==

Mr.

==

McCollum:==

==

The

==

Commission

==

has

==

approved

==

the

==

enclosed

==

exemption

==

from

==

certain

==

requirements

==

of

==

Title

==

10

==

of

==

the

==

Code

==

of

==

FederalRegulations

==

(CFR),

==

10

==

CFR

==

Part

==

50,

==

Appendix

==

J,

==

Section

==

III.D.2(b)(ii),

==

pursuant

==

to

==

10

==

CFR

==

Part

==

50.12.

==

This

==

action

==

is

==

in

==

response

==

to

==

your

==

application

==

dated

==

October

==

5,

==

1999,

==

to

==

allow

==

performance

==

of

==

a

==

containment

==

air

==

lock

==

door

==

seal

==

leak

==

test

==

in

==

lieu

==

of

==

a

==

full

==

pressure

==

test

==

at

==

the

==

Oconee

==

Nuclear

==

Station,

==

Units

==

1,

==

2,

==

and

==

3.

==

The

==

exemption

==

allows

==

a

==

pressure

==

test

==

of

==

the

==

containment

==

air

==

lock

==

seals

==

to

==

fulfill

==

the

==

air

==

lock

==

testing

==

requirements

==

specified

==

in

==

10

==

CFR

==

Part

==

50,

==

Appendix

==

J,

==

Section

==

III.D.2(b)(ii)

==

providing

==

that

==

no

==

work

==

is

==

performed

==

on

==

the

==

containment

==

air

==

locks

==

that

==

could

==

affect

==

air

==

lock

==

sealing

==

capability

==

during

==

periods

==

covered

==

by

==

the

==

requirement.

==

A

==

copy

==

of

==

the

==

exemption

==

has

==

been

==

forwarded

==

to

==

the

==

Office

==

of

==

the

==

Federal

==

Register

==

for

==

publication.

==

Sincerely,

==

Original

==

signed

==

by:

==

David

==

E.

==

LaBarge,

==

Senior

==

Project

==

Manager,

==

Section

==

1

==

Project

==

Directorate

==

II

==

Division

==

of

==

Licensing

==

Project

==

Management

==

Office

==

of

==

Nuclear

==

Reactor

==

Regulation

==

Docket

==

Nos.

==

50-269,

==

50-270,

==

and

==

50-287

==

Distribution:

==

HBerkow

==

OGC

==

Docket

==

File

==

DLaBarge

==

GHill

==

(6)

==

Enclosure:

==

Exemption

==

PUBLIC

==

MBoyle

==

ACRS

==

PD

==

11-2

==

Rdg.

==

CHawes

==

cc

==

w/encl:

==

See

==

next

==

page

==

COgle,

==

RII

==

Document

==

Name:

==

G:\PDII-1\OCONEE\EXE

==

A6868.WPD

==

To

==

receive

==

a

==

copy

==

of

==

this

==

document,

==

indicate

==

in

==

the

==

box:

==

"C"=

==

Copy

==

without

==

attachment/enclosure

==

"E"=

==

Copy

==

with

==

attachment/enclosure

==

"N"

==

=

==

No

==

copy

==

OFFICE

==

PM

==

IIP

==

L

==

LA:PDII/S1

==

IOLB

==

I

==

LB

==

SC:PDII/S1lj

==

NAME

==

D

==

/?J*99e:

==

(L{

==

CHawes

==

R**ECORDCOchP

==

DATE

==

/4A

==

,

==

tEs

==

[?"/-I,/gg/99-

==

,ZI9

==

JOIA

==

Ip1,*0199

==

L"

==

OFFICIAL

==

RECORD

==

COPY

==

".-'v

==

40fkfCR

==

,,3G.*'pgREGUq,,

==

UNITED

==

STATES

==

_-

==

  • NUCLEAR

==

REGULATORY

==

COMMISSION

==

WASHINGTON,

==

D.C.

==

20555-0001

==

S*

==

-December

==

23,

==

1999

==

Mr.

==

W.

==

R.

==

McCollum,

==

Jr.

==

Vice

==

President,

==

Oconee

==

Site

==

Duke

==

Energy

==

Corporation

==

P.

==

0.

==

Box

==

1439

==

Seneca,

==

SC

==

29679

==

SUBJECT:

==

OCONEE

==

NUCLEAR

==

STATION,

==

UNITS

==

1,

==

2,

==

AND

==

3

==

RE:

==

EXEMPTION

==

FROM

==

10

==

CFR

==

50,

==

APPENDIX

==

J

==

REQUIREMENTS

==

FOR

==

AIR

==

LOCK

==

LEAKAGE

==

TESTING

==

(TAC

==

NOS.

==

MA6868,

==

MA6869,

==

AND

==

MA6870)

==

==Dear

==

Mr.

==

McCollum:==

==

The

==

Commission

==

has

==

approved

==

the

==

enclosed

==

exemption

==

from

==

certain

==

requirements

==

of

==

Title

==

10

==

of

==

the

==

Code

==

of

==

FederalRegulations

==

(CFR),

==

10

==

CFR

==

Part

==

50,

==

Appendix

==

J,

==

Section

==

III.D.2(b)(ii),

==

pursuant

==

to

==

10

==

CFR

==

Part

==

50.12.

==

This

==

action

==

is

==

in

==

response

==

to

==

your

==

application

==

dated

==

October

==

5,

==

1999,

==

to

==

allow

==

performance

==

of

==

a

==

containment

==

air

==

lock

==

door

==

seal

==

leak

==

test

==

in

==

lieu

==

of

==

a

==

full

==

pressure

==

test

==

at

==

the

==

Oconee

==

Nuclear

==

Station,

==

Units

==

1,

==

2,

==

and

==

3.

==

The

==

exemption

==

allows

==

a

==

pressure

==

test

==

of

==

the

==

containment

==

air

==

lock

==

seals

==

to

==

fulfill

==

the

==

air

==

lock

==

testing

==

requirements

==

specified

==

in

==

10

==

CFR

==

Part

==

50,

==

Appendix

==

J,

==

Section

==

III.D.2(b)(ii)

==

providing

==

that

==

no

==

work

==

is

==

performed

==

on

==

the

==

containment

==

air

==

locks

==

that

==

could

==

affect

==

air

==

lock

==

sealing

==

capability

==

during

==

periods

==

covered

==

by

==

the

==

requirement.

==

A

==

copy

==

of

==

the

==

exemption

==

has

==

been

==

forwarded

==

to

==

the

==

Office

==

of

==

the

==

Federal

==

Register

==

for

==

publication.

==

Since

==

David

==

E.

==

LaBarge,

==

Senior

==

Project

==

Manager,

==

Section

==

1

==

Project

==

Directorate

==

II

==

Division

==

of

==

Licensing

==

Project

==

Management

==

Office

==

of

==

Nuclear

==

Reactor

==

Regulation

==

Docket

==

Nos.

==

50-269,

==

50-270,

==

and

==

50-287

==

Enclosure:

==

Exemption

==

cc

==

w/encl:

==

See

==

next

==

page

==

Oconee

==

Nuclear

==

Station

==

cc:

==

Ms.

==

Lisa

==

F.

==

Vaughn

==

Mr.

==

L.

==

E.

==

Nicholson

==

Legal

==

Department

==

(PBO5E)

==

Compliance

==

Manager

==

Duke

==

Energy

==

Corporation

==

Duke

==

Energy

==

Corporation

==

422

==

South

==

Church

==

Street

==

Oconee

==

Nuclear

==

Site

==

Charlotte,

==

North

==

Carolina

==

28201-1006

==

7800

==

Rochester

==

Highway

==

Seneca,

==

South

==

Carolina

==

29672

==

Anne

==

W.

==

Cottingham,

==

Esquire

==

Winston

==

and

==

Strawn

==

Ms.

==

Karen

==

E.

==

Long

==

1400

==

L

==

Street,

==

NW

==

Assistant

==

Attorney

==

General

==

Washington,

==

DC

==

20005

==

North

==

Carolina

==

Department

==

of

==

Justice

==

Mr.

==

Rick

==

N.

==

Edwards

==

P.

==

0.

==

Box

==

629

==

Framatome

==

Technologies

==

Raleigh,

==

North

==

Carolina

==

27602

==

Suite

==

525

==

1700

==

Rockville

==

Pike

==

L.

==

A.

==

Keller

==

Rockville,

==

Maryland

==

20852-1631

==

Manager

==

-

==

Nuclear

==

Regulatory

==

Licensing

==

Manager,

==

LIS

==

Duke

==

Energy

==

Corporation

==

NUS

==

Corporation

==

526

==

South

==

Church

==

Street

==

2650

==

McCormick

==

Drive,

==

3rd

==

Floor

==

Charlotte,

==

North

==

Carolina

==

28201-1006

==

Clearwater,

==

Florida

==

34619-1035

==

Mr.

==

Richard

==

M.

==

Fry,

==

Director

==

Senior

==

Resident

==

Inspector

==

Division

==

of

==

Radiation

==

Protection

==

U.

==

S.

==

Nuclear

==

Regulatory

==

North

==

Carolina

==

Department

==

of

==

Commission

==

Environment,

==

Health,

==

and

==

7812B

==

Rochester

==

Highway

==

Natural

==

Resources

==

Seneca,

==

South

==

Carolina

==

29672

==

3825

==

Barrett

==

Drive

==

Raleigh,

==

North

==

Carolina

==

27609-7721

==

Virgil

==

R.

==

Autry,

==

Director

==

Division

==

of

==

Radioactive

==

Waste

==

Management

==

Mr.

==

Steven

==

P.

==

Shaver

==

Bureau

==

of

==

Land

==

and

==

Waste

==

Management

==

Senior

==

Sales

==

Engineer

==

Department

==

of

==

Health

==

and

==

Environmental

==

Westinghouse

==

Electric

==

Company

==

Control

==

5929

==

Carnegie

==

Blvd.

==

2600

==

Bull

==

Street

==

Suite

==

500

==

Columbia,

==

South

==

Carolina

==

29201-1708

==

Charlotte,

==

North

==

Carolina

==

28209

==

7590-01

==

-P

==

UNITED

==

STATES

==

OF

==

AMERICA

==

NUCLEAR

==

REGULATORY

==

COMMISSION

==

In

==

the

==

Matter

==

of

==

)

==

)

==

DUKE

==

ENERGY

==

CORPORATION

==

)

==

Docket

==

Nos.

==

50-269,

==

50-270,

==

and

==

50-287

==

)

==

(Oconee

==

Nuclear

==

Station,

==

Units

==

1,

==

2,

==

and

==

3))

==

EXEMPTION

==

I.

==

The

==

Duke

==

Energy

==

Corporation

==

(Duke/the

==

licensee)

==

is

==

the

==

holder

==

of

==

Facility

==

Operating

==

License

==

Nos.

==

DPR-38,

==

DPR-47,

==

and

==

DPR-55,

==

that

==

authorize

==

operation

==

of

==

the

==

Oconee

==

Nuclear

==

Station,

==

Units

==

1,

==

2,

==

and

==

3

==

(Oconee),

==

respectively.

==

The

==

licenses

==

provide,

==

among

==

other

==

things,

==

that

==

the

==

facilities

==

are

==

subject

==

to

==

all

==

rules,

==

regulations,

==

and

==

orders

==

of

==

the

==

U.S.

==

Nuclear

==

Regulatory

==

Commission

==

(the

==

Commission)

==

now

==

or

==

hereafter

==

in

==

effect.

==

The

==

facilities

==

consist

==

of

==

three

==

pressurized

==

water

==

reactors

==

located

==

on

==

Duke's

==

Oconee

==

site

==

in

==

Seneca,

==

Oconee

==

County,

==

South

==

Carolina.

==

II.

==

Title

==

10

==

of

==

the

==

Code

==

of

==

FederalRegulations

==

(10

==

CFR)

==

Part

==

50,

==

Appendix

==

J,

==

contains

==

the

==

following

==

requirements:

==

==

a.

==

Section

==

IlI.D.2(b)(i)

==

requires

==

that

==

air

==

locks

==

be

==

tested

==

prior

==

to

==

initial

==

fuel

==

loading

==

and

==

at

==

6-month

==

intervals

==

thereafter

==

at

==

an

==

internal

==

pressure

==

not

==

less

==

than

==

Pa

==

(the

==

calculated

==

peak

==

containment

==

internal

==

pressure

==

related

==

to

==

the

==

design

==

basis

==

accident).

==

==

b.

==

Section

==

III.D.2(b)(ii)

==

requires

==

that

==

air

==

locks

==

opened

==

during

==

periods

==

when

==

containment

==

integrity

==

is

==

not

==

required

==

shall

==

be

==

tested

==

at

==

the

==

end

==

of

==

such

==

periods

==

at

==

Pa'

==

==

c.

==

Section

==

llI.D.2(b)(iii)

==

requires

==

that

==

air

==

locks

==

opened

==

during

==

periods

==

when

==

containment

==

integrity

==

is

==

required

==

shall

==

be

==

tested

==

within

==

3

==

days

==

after

==

being

==

opened.

==

For

==

air

==

locks

==

opened

==

more

==

frequently

==

than

==

once

==

every

==

3

==

days,

==

the

==

air

==

lock

==

shall

==

be

==

tested

==

at

==

least

==

once

==

every

==

3

==

days

==

during

==

the

==

period

==

of

==

frequent

==

openings.

==

For

==

air

==

lock

==

doors

==

having

==

testable

==

seals,

==

testing

==

the

==

seals

==

fulfills

==

the

==

3-day

==

test

==

requirement.

==

Ill.

==

The

==

proposed

==

action

==

is

==

in

==

accordance

==

with

==

the

==

licensee's

==

application

==

for

==

exemption

==

contained

==

in

==

a

==

submittal

==

dated

==

October

==

5,

==

1999.

==

Whenever

==

the

==

plant

==

is

==

in

==

cold

==

shutdown

==

(Mode

==

5)

==

or

==

refueling

==

(Mode

==

6),

==

containment

==

integrity

==

is

==

not

==

required.

==

However,

==

if

==

an

==

airlock

==

is

==

opened

==

when

==

in

==

Modes

==

5

==

or

==

6

==

(which

==

is

==

usually

==

the

==

case),

==

10

==

CFR

==

50,

==

Appendix

==

J,

==

Section

==

Ill.D.2(b)(ii)

==

requires

==

that

==

an

==

overall

==

air

==

lock

==

leakage

==

test

==

at

==

not

==

less

==

than

==

Pa

==

be

==

performed

==

before

==

plant

==

heatup

==

and

==

startup

==

(i.e.,

==

before

==

Mode

==

4

==

is

==

entered).

==

The

==

licensee

==

has

==

requested

==

an

==

exemption

==

that

==

would

==

allow

==

this

==

test

==

requirement

==

to

==

be

==

met

==

by

==

performing

==

an

==

air

==

lock

==

door

==

seal

==

leakage

==

test

==

per

==

10

==

CFR

==

50,

==

Appendix

==

J,

==

Section

==

III.D.(b)(iii)

==

during

==

plant

==

startup

==

prior

==

to

==

entering

==

Mode

==

4

==

if

==

no

==

maintenance

==

has

==

been

==

performed

==

on

==

the

==

air

==

lock

==

that

==

could

==

affect

==

its

==

sealing

==

capability.

==

If

==

maintenance

==

has

==

been

==

performed

==

that

==

could

==

affect

==

its

==

sealing

==

capability,

==

an

==

overall

==

air

==

lock

==

leakage

==

test

==

per

==

10

==

CFR

==

50,

==

Appendix

==

J,

==

Section

==

III.D.2(b)(ii)

==

would

==

be

==

necessary

==

prior

==

to

==

establishing

==

containment

==

integrity.

==

The

==

existing

==

air

==

lock

==

doors

==

are

==

designed

==

so

==

that

==

the

==

air

==

lock

==

pressure

==

test

==

can

==

only

==

be

==

performed

==

after

==

a

==

strongback

==

(structural

==

bracing)

==

has

==

been

==

installed

==

on

==

the

==

inner

==

door,

==

since

==

the

==

pressure

==

used

==

to

==

perform

==

the

==

test

==

is

==

opposite

==

that

==

of

==

accident

==

pressure

==

and

==

would

==

tend

==

to

==

unseat

==

the

==

door.

==

Performing

==

the

==

full

==

air

==

lock

==

test

==

in

==

accordance

==

with

==

the

==

present

==

requirements

==

takes

==

approximately

==

12

==

hours,

==

since

==

it

==

requires

==

installation

==

of

==

the

==

strongback,

==

performing

==

the

==

test,

==

and

==

removing

==

the

==

strongback.

==

During

==

the

==

test,

==

access

==

through

==

the

==

air

==

lock

==

is

==

prohibited,

==

which,

==

therefore,

==

requires

==

evacuation

==

of

==

personnel

==

from

==

the

==

containment

==

or

==

the

==

personnel

==

must

==

remain

==

inside

==

the

==

containment

==

during

==

the

==

test

==

until

==

Mode

==

4

==

is

==

reached.

==

The

==

licensee

==

has

==

determined

==

that

==

pressurizing

==

the

==

volume

==

between

==

the

==

seals

==

to

==

60

==

pounds

==

per

==

square

==

inch

==

gauge

==

pressure

==

after

==

each

==

opening,

==

and

==

prior

==

to

==

establishing

==

containment

==

integrity,

==

provides

==

the

==

necessary

==

surveillance

==

to

==

ensure

==

the

==

sealing

==

capability

==

of

==

the

==

door

==

seals.

==

If

==

the

==

periodic

==

6-month

==

test

==

of

==

10

==

CFR

==

50,

==

Appendix

==

J,

==

Section

==

III.D.(b)(i)

==

and

==

the

==

test

==

required

==

by

==

10

==

CFR

==

50,

==

Appendix

==

J,

==

Section

==

III.D.(b)(iii)

==

are

==

current,

==

no

==

maintenance

==

has

==

been

==

performed

==

on

==

the

==

air

==

lock

==

that

==

could

==

affect

==

its

==

sealing

==

capability,

==

and

==

the

==

air

==

lock

==

is

==

properly

==

sealed

==

as

==

determined

==

by

==

the

==

seal

==

test,

==

there

==

is

==

no

==

reason

==

to

==

expect

==

that

==

the

==

air

==

lock

==

will

==

leak

==

just

==

because

==

it

==

has

==

been

==

opened

==

in

==

Modes

==

5

==

or

==

6.

==

Therefore,

==

there

==

is

==

no

==

impact

==

on

==

plant

==

operation

==

or

==

safety.

==

In

==

addition,

==

due

==

to

==

the

==

design

==

of

==

the

==

air

==

lock,

==

the

==

6-month

==

test

==

should

==

detect

==

air

==

lock

==

deterioration.

==

IV.

==

Pursuant

==

to

==

10

==

CFR

==

50.12,

==

the

==

Commission

==

may,

==

upon

==

application

==

by

==

any

==

interested

==

person

==

or

==

upon

==

its

==

own

==

initiative,

==

grant

==

exemptions

==

from

==

the

==

requirements

==

of

==

10

==

CFR

==

Part

==

50,

==

when

==

(1)

==

the

==

exemptions

==

are

==

authorized

==

by

==

law,

==

will

==

not

==

present

==

an

==

undue

==

risk

==

to

==

public

==

health

==

or

==

safety,

==

and

==

are

==

consistent

==

with

==

the

==

common

==

defense

==

and

==

security;

==

and

==

(2)

==

when

==

special

==

circumstances

==

are

==

present.

==

This

==

is

==

also

==

consistent

==

with

==

the

==

determination

==

that

==

the

==

staff

==

has

==

reached

==

for

==

other

==

licensees

==

under

==

similar

==

conditions

==

based

==

on

==

the

==

same

==

considerations.

==

Accordingly,

==

the

==

staff

==

concludes

==

that

==

the

==

licensee's

==

proposed

==

approach

==

of

==

substituting

==

the

==

3-day

==

seal

==

leakage

==

test

==

requirements

==

of

==

10

==

CFR

==

50,

==

Appendix

==

J,

==

Section

==

IIl.D.(b)(iii)

==

for

==

the

==

full

==

pressure

==

test

==

of

==

10

==

CFR

==

50,

==

Appendix

==

J,

==

Section

==

III.D.(b)(ii)

==

is

==

acceptable

==

when

==

no

==

maintenance

==

that

==

could

==

affect

==

the

==

sealing

==

capability

==

has

==

been

==

performed

==

on

==

the

==

air

==

lock.

==

Whenever

==

maintenance

==

that

==

could

==

affect

==

the

==

sealing

==

capability

==

has

==

been

==

performed

==

on

==

the

==

air

==

lock,

==

the

==

full

==

pressure

==

test

==

requirements

==

of

==

10

==

CFR

==

50,

==

Appendix

==

J,

==

Section

==

III.D.(b)(ii)

==

must

==

still

==

be

==

met.

==

Therefore,

==

the

==

staff

==

concludes

==

that

==

requesting

==

the

==

exemption

==

under

==

the

==

special

==

circumstances

==

of

==

10

==

CFR

==

50.12(a)(2)(ii)

==

is

==

appropriate

==

and

==

that

==

application

==

of

==

the

==

regulation

==

is

==

not

==

necessary

==

to

==

serve

==

the

==

underlying

==

purpose

==

of

==

the

==

rule.

==

The

==

underlying

==

purpose

==

of

==

the

==

rule

==

is

==

to

==

ensure

==

that:

==

(a)

==

leakage

==

through

==

the

==

primary

==

containment,

==

and

==

systems

==

and

==

components

==

penetrating

==

the

==

primary

==

containment,

==

does

==

not

==

exceed

==

the

==

allowable

==

leakage

==

rate

==

values

==

specified

==

in

==

the

==

Technical

==

Specifications

==

or

==

associated

==

Bases;

==

and

==

(b)

==

periodic

==

surveillance

==

of

==

containment

==

penetrations

==

and

==

isolation

==

valves,

==

and

==

systems

==

and

==

components

==

penetrating

==

the

==

containment,

==

is

==

performed

==

so

==

that

==

proper

==

maintenance

==

and

==

repairs

==

are

==

made

==

during

==

the

==

service

==

life

==

of

==

the

==

containment.

==

V.

==

Accordingly,

==

the

==

Commission

==

has

==

determined

==

that,

==

pursuant

==

to

==

10

==

CFR

==

50.12(a),

==

the

==

exemption

==

is

==

authorized

==

by

==

law,

==

will

==

not

==

endanger

==

life

==

or

==

property

==

or

==

common

==

defense

==

and

==

security,

==

and

==

is,

==

otherwise,

==

in

==

the

==

public

==

interest.

==

Therefore,

==

the

==

Commission

==

hereby

==

grants

==

Duke

==

an

==

exemption

==

from

==

the

==

requirements

==

of

==

10

==

CFR

==

Part

==

50,

==

Appendix

==

J,

==

Section

==

III.D.2(b)(ii)

==

for

==

containment

==

air

==

lock

==

tests

==

as

==

described

==

above,

==

for

==

the

==

Oconee

==

Nuclear

==

Station,

==

Units

==

1,

==

2,

==

and

==

3.

==

Pursuant

==

to

==

10

==

CFR

==

51.32,

==

the

==

Commission

==

has

==

determined

==

that

==

the

==

granting

==

of

==

this

==

exemption

==

will

==

not

==

result

==

in

==

any

==

significant

==

effect

==

on

==

the

==

quality

==

of

==

the

==

human

==

environment

==

64

==

FR

==

70072)

==

This

==

exemption

==

is

==

effective

==

upon

==

issuance.

==

FOR

==

THE

==

NUCLEAR

==

REGULATORY

==

COMMISSION

==

Original

==

signed

==

by:

==

John

==

A.

==

Zwolinski,

==

Director

==

Division

==

of

==

Licensing

==

Project

==

Management

==

Office

==

of

==

Nuclear

==

Reactor

==

Regulation

==

Dated

==

at

==

Rockville,

==

Maryland,

==

this

==

23rd

==

day

==

of

==

December

==

1999.

==

Document

==

Name:

==

G:\PDII-1\OCONEE\EXE

==

A6868.WPD

==

To

==

receive

==

a

==

copy

==

of

==

this

==

document,

==

indicate

==

in

==

the

==

box:

==

"C"

==

=

==

Copy

==

without

==

attachment/enclosure

==

"E"

==

=

==

Copy

==

with

==

attachment/enclosure

==

"N"

==

=

==

No

==

copy

==

  • See

==

parallel

==

pn~urrence

==

OFFICE

==

PDII-1

==

P,

==

PDII-1/LA

==

IB

==

A

==

NAME

==

DLg9

==

cn

==

57Hawes

==

-

==

,jW*fe

==

,

==

WB

==

.

==

$//

==

/99

==

an

==

Ii

==

L2

==

?

==

'/

==

9

==

9

==

,i

==

/

==

'

==

/9

==

9

==

/C4'/

==

/

==

,J.?

==

.

==

/99

==

DA

==

T

==

E

==

/9

==

OFFICE

==

OGC

==

10

==

I

==

SC:PDII/S41

==

D:

==

D:

==

'

==

NAME

==

[&/7ivrT,2

==

REmch

==

H

==

eNK6

==

JZI!6Wl

==

DATE

==

)!

==

9/99

==

1

==

Z./l

==

0./99

==

1J/0J

==

/99

==

I'*./

==

)499

==

OFFICIAL

==

RECORD

==

COPY

==

Pursuant

==

to

==

10

==

CFR

==

51.32,

==

the

==

Commission

==

has

==

determined

==

that

==

the

==

granting

==

of

==

this

==

exemption

==

will

==

not

==

result

==

in

==

any

==

significant

==

effect

==

on

==

the

==

quality

==

of

==

the

==

human

==

environment

==

(64

==

FR

==

70072

==

).

==

This

==

exemption

==

is

==

effective

==

upon

==

issuance.

==

FOR

==

THE

==

NUCLEAR

==

REGULATORY

==

COMMISSION

==

John

==

A.

==

Zwolinski,

==

Director

==

Division

==

of

==

Licensing

==

Project

==

Management

==

Office

==

of

==

Nuclear

==

Reactor

==

Regulation

==

Dated

==

at

==

Rockville,

==

Maryland,

==

this

==

23rd

==

day

==

of

==

December

==

1999.