MONTHYEAR05000269/LER-2022-001-01, Ultrasonic Examination Indication Identifies Degraded Reactor Coolant System Pressure Boundary2024-11-0707 November 2024 Ultrasonic Examination Indication Identifies Degraded Reactor Coolant System Pressure Boundary ML24305A1492024-11-0404 November 2024 Review of the Fall 2023 Steam Generator Tube Inspection Report (O2R31) IR 05000269/20240032024-10-31031 October 2024 Integrated Inspection Report 05000269/2024003 and 05000270/2024003 and 05000287/2024003 (2) ML24255A3322024-10-16016 October 2024 SLRA - Revised SE Letter ML24297A6172024-10-11011 October 2024 PCA Letter to NRC Oconee Hurricane Helene ML24269A0912024-10-0909 October 2024 Request for Withholding Information from Public Disclosure IR 05000269/20240052024-08-26026 August 2024 Updated Inspection Plan for Oconee Nuclear Station, Units 1, 2 and 3 (Report 05000269/2024005, 05000270/2024005, and 05000287-2024005) ML24145A1782024-08-26026 August 2024 Issuance of Amendment Nos. 430, 432, and 431, to TS 5.5.2, Containment Leakage Rate Testing Program for a one-time Extension of the Type a Leak Rate Test Frequency ML24220A1092024-08-0808 August 2024 – Operator Licensing Examination Approval 05000269/2024301, 05000270/2024301, and 05000287/2024301 05000287/LER-2024-001, Procedure Deficiency Results in Inadvertent Automatic Feedwater Isolation and Automatic Emergency Feedwater Actuation2024-08-0202 August 2024 Procedure Deficiency Results in Inadvertent Automatic Feedwater Isolation and Automatic Emergency Feedwater Actuation IR 05000269/20240022024-07-25025 July 2024 Integrated Inspection Report 05000269/2024002 and 05000270/2024002 and 05000287/2024002 ML24192A1312024-07-15015 July 2024 Licensed Operator Positive Fitness-For-Duty Test ML24183A0972024-07-12012 July 2024 ISFSI; Catawba 1, 2 & ISFSI; McGuire 1, 2 & ISFSI; Oconee 1, 2, 3 & ISFSI; Shearon Harris 1; H. B. Robinson 2 & ISFSI; and Radioactive Package Shipping Under 10 CFR 71 (71-266 & 71-345) – Review of QA Program Changes EPID L-2024-LLQ-0002 ML24183A2352024-06-29029 June 2024 Update 3 to Interim Report Regarding a Potential Defect with Schneider Electric Medium Voltage Vr Type Circuit Breaker Part Number V5D4133Y000 ML24179A1102024-06-27027 June 2024 Submittal of Updated Final Safety Analysis Report Revision 30, Technical Specifications Bases Revisions, Selected Licensee Commitment Revisions, 10 CFR 50.59 Evaluation Summary Report, and 10 CFR 54.37 Update, and Notification ML24141A0482024-05-17017 May 2024 EN 56958_1 Ametek Solidstate Controls, Inc IR 05000269/20240012024-05-0303 May 2024 Integrated Inspection Report 05000269/2024001, 05000270/2024001 and 05000287/2024001 IR 05000269/20244022024-04-24024 April 2024 Security Baseline Inspection Report 05000269/2024402 and 05000270/2024402 and 05000287/2024402 ML24108A0792024-04-16016 April 2024 EN 57079 Paragon Energy Solutions Email Forwarding Part 21 Interim Report Re Potential Defect with Schneider Electric Medium Voltage Vr Type Circuit Breaker Part Number V5D4133Y000 IR 05000269/20244012024-03-28028 March 2024 – Security Baseline Inspection Report 05000269-2024401 and 05000270-2024401 and 05000287-2024401 ML24088A3052024-03-25025 March 2024 Fws to NRC, Agreement with Nlaa Determination for Tricolored Bat for Oconee Lr 05000270/LER-2023-001, Inappropriate Procedural Guidance for Planned Online Maintenance Results in Event or Condition That Could Have Prevented Fulfillment of a Safety Function Licensee2024-02-29029 February 2024 Inappropriate Procedural Guidance for Planned Online Maintenance Results in Event or Condition That Could Have Prevented Fulfillment of a Safety Function Licensee 05000287/LER-2023-002, Passive Containment Isolation Device Inoperability Results in Operation or Condition Prohibited by Technical Specifications2024-02-29029 February 2024 Passive Containment Isolation Device Inoperability Results in Operation or Condition Prohibited by Technical Specifications IR 05000269/20230062024-02-28028 February 2024 Annual Assessment Letter for Oconee Nuclear Station Units 1, 2 and 3 - (NRC Inspection Report 05000269/2023006, 05000270/2023006, and 05000287/2023006) ML24030A0052024-02-16016 February 2024 Ltr. to Brian Harris, Chief, Catawba Indian Nation; Re., Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A3062024-02-16016 February 2024 Ltr. to Michell Hicks, Principal Chief Eastern Band of Cherokee Re Oconee Nuclear Station Units 1,2, and 3 Section 106 ML24045A2952024-02-16016 February 2024 Ltr. to Chuck Hoskin, Jr, Principal Chief Cherokee Nation Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A2972024-02-16016 February 2024 Ltr. to Dexter Sharp Chief Piedmont American Indian Assoc Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A3012024-02-16016 February 2024 Ltr. to Harold Hatcher Chief the Waccamaw Indian People Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A3032024-02-16016 February 2024 Ltr. to John Creel Chief Edisto Natchez-Kusso Tribe of Sc Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A3082024-02-16016 February 2024 Ltr. to Ralph Oxendine Chief Sumter Tribe of Cheraw Indians Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A3042024-02-16016 February 2024 Ltr. to Lisa M. Collins Chief the Wassamasaw Tribe of Varnertown Indians Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A3022024-02-16016 February 2024 Ltr. to Joe Bunch United Keetoowah Band of Cherokee Indians in Ok Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A3072024-02-16016 February 2024 Ltr. to Pete Parr Chief Pee Dee Indian Tribe Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A3052024-02-16016 February 2024 Ltr. to Louis Chavis Chief Beaver Creek Indians Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A2942024-02-16016 February 2024 Ltr. to Carolyn Chavis Bolton Chief Pee Dee Indian Nation of Upper Sc Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A2992024-02-16016 February 2024 Ltr. to Eric Pratt Chief the Santee Indian Organization Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A2962024-02-16016 February 2024 Ltr. to David Hill Principal Chief Muscogee Creek Nation Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 IR 05000269/20230042024-02-13013 February 2024 Integrated Inspection Report 05000269/2023004, 05000270/2023004, and 05000287/2023004; and Inspection Report 07200040/2023001 ML24019A1442024-02-13013 February 2024 Letter to Reid Nelson, Executive Director, Achp; Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24030A5212024-02-13013 February 2024 Letter to Elizabeth Johnson, Director, SHPO; Re Oconee Nuclear Stations Units 1, 2, and 3 Section 106 ML24011A1482024-02-13013 February 2024 Letter to Steven M. Snider-Oconee Nuclear Sta, Unites 1,2 & 3 Notice of Avail of the Draft Site-Specific Supp. 2, 2nd Renewal to the Generic EIS for Lic. Renew of Nuclear Plants ML24011A1532024-02-13013 February 2024 Letter to Tracy Watson EPA-Oconee Nuclear Sta, Unites 1, 2 & 3 Notice of Avail of the Draft Site-Specific Supp. 2, 2nd Renewal to the Generic EIS for Lic. Renew of Nuclear Plants ML23304A1422024-02-0101 February 2024 Issuance of Environmental Scoping Summary Report Associated with the U.S. Nuclear Regulatory Commission Staff’S Review of the Oconee Nuclear Station, Units 1, 2, & 3, Subsequent License Renewal Application ML24005A2492024-01-24024 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting) IR 05000269/20243012024-01-11011 January 2024 Notification of Licensed Operator Initial Examination 05000269/2024301, 05000270/2024301, and 05000287/2024301 ML23331A7982023-12-14014 December 2023 Review of the Fall 2022 Steam Generator Tube Inspection Report (01R32) ML23262A9672023-12-13013 December 2023 Alternative to Use RR-22-0174, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems Section XI, Division 1 ML23317A3462023-11-14014 November 2023 Duke Fleet - Correction Letter to License Amendment Nos. 312 & 340 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000269/20230032023-11-14014 November 2023 Integrated Inspection Report 05000269/2023003, 05000270/2023003, and 05000287/2023003; and IR 07200040/2023001; and Exercise of Enforcement Discretion 2024-08-08
[Table view] Category:License-Operator Examination Report
MONTHYEARIR 05000269/20213012021-07-0606 July 2021 NRC Operator License Examination Report 05000269/2021301, 05000270/2021301, and 05000287/2021301 ML19108A2352019-04-18018 April 2019 301 Exam Report IR 05000269/20183012018-07-13013 July 2018 NRC Operator License Examination Report 05000269/2018301, 05000270/2018301, and 05000287/2018301 IR 05000269/20163022017-01-27027 January 2017 NRC Operator License Examination Report 05000269/2016302, 05000270/2016302, and 05000287/2016302 IR 05000269/20153022016-02-0202 February 2016 NRC Operator License Examination Report 05000269/2015302, 05000270/2015302, and 05000287/2015302 IR 05000269/20153012015-07-21021 July 2015 Er 05000269/2015301, 05000270/2015301, and 05000287/2015301; June 8-11, 2015 & June 17, 2015; Oconee Nuclear Station, Units 1, 2, and 3; Operator License Examinations IR 05000269/20143022015-02-0909 February 2015 Er 05000269/2014302, 05000270/2014302, and 05000287/2014302; December 8-11, 2014 & December 17, 2014; Oconee Nuclear Station, Units 1, 2, and 3; Operator License Examinations ML15015A6942015-01-14014 January 2015 Notification of Licensed Operator Initial Examination, 05000269/2015301, 05000270/2015301 and 05000287/2015301 IR 05000269/20133012013-08-0101 August 2013 Er 05000269-13-301; 05000270-13-301; 05000287/2013301; Operating Test June 10 - 12, 2013 & Written Exam July 11, 2013; Oconee Nuclear Station, Units 1, 2, and 3; Operator License Examinations ML12221A3912012-08-0606 August 2012 Duke Energy - Response to NRC Regulatory Issue Summary 2012-07 Preparation and Scheduling of Operator Licensing Examinations IR 05000269/20113022011-11-21021 November 2011 Er 05000269-11-302; 05000270-11-302; 05000287-11-302; Operating Test 10/17/2011 - 10/20/2011 & Written Exam 10/26/2011; Oconee Nuclear Station, Units 1, 2, and 3 Operator License Examinations IR 05000270/20103012010-05-13013 May 2010 Er 05000296/10-301, 05000270/10-301, 05000287/10-301 on 03/29/10 - 04/02/10 for Oconee, ML1013306092010-05-13013 May 2010 Er 05000296/10-301, 05000270/10-301, 05000287/10-301 on 03/29/10 - 04/02/10 for Oconee, IR 05000269/20083012008-04-22022 April 2008 Operator Licensing Initial Retake Examination Report 05000269-08-301, 05000270-08-301 and 05000287-08-301 on 03/20/08 for Oconee Nuclear Station - IR 05000269/20073012007-05-0101 May 2007 Operator Initial Examination - 05000269-07-301; 05000270-07-301 & 05000287-07-301 IR 05000269/20063012006-08-0202 August 2006 IR 05000269-06-301, 05000270-06-301 & 05000287-06-301; Duke Energy Corporation; 06/19-28-2006 & 06/30/2006; Oconee Nuclear Station ML0527602732005-09-21021 September 2005 Duke Power - Response to NRC Regulatory Issue Summary 2005-19 Preparation and Scheduling of Operator Licensing Examinations ML0220502652002-07-16016 July 2002 Response to NRC Regulatory Issue Summary 2002-09, Supplement Preparation and Scheduling of Operator Licensing Examinations 2021-07-06
[Table view] |
Text
ust 2, 2006
SUBJECT:
OCONEE NUCLEAR STATION - NRC EXAMINATION REPORT 05000269/2006301, 05000270/2006301, AND 05000287/2006301
Dear Mr. Hamilton:
During the period June 19 - 28, 2006, the Nuclear Regulatory Commission (NRC) administered operating examinations to employees of your company who had applied for licenses to operate the Oconee Nuclear Power Station. At the conclusion of the examination, the examiners discussed the examination questions and preliminary findings with those members of your staff identified in the enclosed report. The written examination was administered by your staff on June 30, 2006.
Four Reactor Operator (RO) and six Senior Reactor Operator (SRO) applicants passed both the written examination and operating test. Two SRO applicants failed the written examination.
There were no post examination comments submitted. A Simulation Facility Report is included in this report as Enclosure 2.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Should you have any questions concerning this letter, please contact me at (404) 562-4647.
Sincerely,
/RA/
James H. Moorman, III, Chief Operations Branch Division of Reactor Safety Docket Nos.: 50-269, 50-270, 50-287 License Nos.: DPR-38, DPR-47, DPR-55
Enclosures:
(See next page)
DEC 2 Enclosures: 1. Report Details 2. Simulation Facility Report
REGION II==
Docket Nos.: 50-269, 50-270, 50-287 License Nos.: DPR-38, DPR-47, DPR-55 Report No.: 05000269/2006301, 05000270/2006301, 05000287/2006301 Licensee: Duke Energy Corporation Facility: Oconee Nuclear Station Location: 7800 Rochester Highway Seneca, SC 29672 Dates: Operating Tests - June 19-28, 2006 Written Examination - June 30, 2006 Examiners: M. Bates, Chief, Senior Operations Examiner R. Aiello, Senior Operations Engineer S. Rose, Senior Operations Engineer Approved by: James H. Moorman, III, Chief Operations Branch Division of Reactor Safety Enclosure 1
SUMMARY OF FINDINGS ER 05000269/2006301, 05000270/2006301, 05000287/2006301; 6/19-28/2006,6/30/2006; Oconee Nuclear Station; Licensed Operator Examinations.
The NRC examiners conducted operator licensing initial examinations in accordance with the guidance in NUREG-1021, Revision 9, Operator Licensing Examination Standards for Power Reactors. This examination implemented the operator licensing requirements of 10 CFR
§55.41, §55.43, and §55.45.
The NRC administered the operating tests during the period of June 19 - 28, 2006. Members of the Oconee Nuclear Station training staff administered the written examination on June 30, 2006. The written examinations were developed by the NRC, and the operating tests were developed by the Oconee Nuclear Station training staff.
Four Reactor Operators (RO) and six Senior Reactor Operators (SRO) passed both the operating test and written examination. Two SRO applicants failed the written examination overall, and one of these two applicants also failed the SRO portion of that examination.
Each applicant who passed the operating test and written examination with an overall score greater than 82% and SRO-only score greater than 74%, as applicable, was issued an operator license commensurate with the level of examination administered. Four SRO applicants passed the operating test, but passed the written examination with overall scores between 80% and 82%. Each of these applicants was issued a letter stating that they passed the examination and issuance of their license has been delayed pending any written examination appeals that may impact the licensing decision for their application.
There were no post examination comments.
No findings of significance were identified.
Report Details 4. OTHER ACTIVITIES 4OA5 Operator Licensing Initial Examinations a. Inspection Scope The NRC developed the written examinations and the licensee developed the operating tests in accordance with NUREG-1021, Operator Licensing Examination Standards for Power Reactors, Revision 9. The NRC examination team reviewed the proposed examinations. Examination changes agreed upon between the NRC and the licensee were made according to NUREG-1021 and incorporated into the final version of the examination materials.
The examiners reviewed the licensees examination security measures while preparing and administering the examinations to ensure examination security and integrity complied with 10 CFR 55.49, Integrity of examinations and tests.
The examiners evaluated four RO and eight SRO applicants who were being assessed under the guidelines specified in NUREG-1021. The examiners administered the operating tests during the period of June 19-28, 2006. Members of the Oconee Nuclear Station training staff administered the written examination on June 30, 2006. The evaluations of the applicants and review of documentation were performed to determine if the applicants, who applied for licenses to operate the Oconee Nuclear Station, met requirements specified in 10 CFR 55, Operators Licenses.
b. Findings No findings of significance were identified.
The NRC determined that the licensees examination submittal for the operating test was within the range of acceptability expected for a proposed examination.
Four Reactor Operators (RO) and six Senior Reactor Operators (SRO) passed both the operating test and written examination. Two SRO applicants failed the written examination overall, and one of these two applicants also failed the SRO portion of that examination. Each applicant who passed the operating test and written examination with an overall score greater than 82% and SRO-only score greater than 74%, as applicable, was issued an operator license commensurate with the level of examination administered. Four SRO applicants passed the operating test, but passed the written examination with overall scores between 80% and 82%. Each of these applicants was issued a letter stating that they passed the examination and issuance of their license has been delayed pending any written examination appeals that may impact the licensing decision for their application.
The combined RO and SRO written examinations, with knowledge and abilities (K/As),
question references/answers and examination references, may be accessed in the ADAMS system (ADAMS Accession Numbers ML062010367 and ML062010364).
The examination team observed generic weaknesses during the dynamic simulator portion of the operating test. These weaknesses were related to diagnosing a sheared shaft on a high pressure injection pump and diagnosing a failed open pressurizer power operated relief valve. Copies of all individual examination reports were sent to the facility Training Manager for evaluation and determination of appropriate remedial training.
4OA6 Meetings Exit Meeting Summary On June 29, 2006, the examination team discussed generic issues with Mr. Dave Baxter and members of his staff. The inspectors asked the licensee whether any materials examined during the inspection should be considered proprietary. No proprietary information was identified.
PARTIAL LIST OF PERSONS CONTACTED Licensee personnel D. Baxter, Station Manager N. Constance, Operations Training Manager J. Collins, Operations Shift Manager J. Steely, Initial Training Supervisor R. Robinson, Operations J. Weast, Regulatory Compliance J. Smith, Regulatory Compliance C. Gray, Regulatory Compliance K. Schaaf, Training Instructor NRC personnel D. Rich, Senior Resident Inspector
SIMULATOR FIDELITY REPORT Facility Licensee: Oconee Nuclear Station Facility Docket Nos.: 05000269/05000270/05000287 Operating Tests Administered: June 19 - 28, 2006 This form is to be used only to report observations. These observations do not constitute audit or inspection findings and, without further verification and review in accordance with IP 71111.11, are not indicative of noncompliance with 10 CFR 55.46. No licensee action is required in response to these observations.
No simulator fidelity or configuration items were identified.