Category:Deficiency Correspondence (per 10CFR50.55e and Part 21)
MONTHYEARML22075A2192021-11-29029 November 2021 10CFR21 Reporting of Defects and Non-Compliance - Engine Systems, Inc. Report No. 10CFR21-0133, Rev. 0 - Swing Check Valve, P/N ESl50359 ML20296A2762020-10-0606 October 2020 Lake Engineering Co. - Third Interim Notification Per 10 CFR Part 21 - Degraded Snubber SF1154 Hydraulic Fluid Batch No. 17BLVS293 ML19346H8732019-12-12012 December 2019 Westinghouse Electric Company - Notification of the Potential Existence of Defect Pursuant to 10 CFR Part 21 ML19317D0932019-10-25025 October 2019 Engine Systems, Inc., 10CFR21 Reporting of Defects and Non-Compliance - Engine Systems, Inc. Report No. 10 CFR21-0127, Rev. 0, Emd Fuel Injectors - Seized Plunger and Bushing ML19029A1552018-12-27027 December 2018 10 CFR21 Reporting of Defects and Non-Compliance - Engine Systems, Inc. Report No. 10CFR21-0123, Rev. 1 ML18353A4282018-11-30030 November 2018 Engine Systems, Inc., 10CFR21-0123, Rev. 0, for a 10CFR21 Reportable Condition on Emd Fuel and Soakback Pumps ML18302A2282018-10-19019 October 2018 Itt Enidine - USNRC 10CFR Part 21 Notification ML18243A5112018-08-28028 August 2018 Curtiss-Wright Nuclear Division - Senasys Selector Switch P/N 910CMC-5240X, Part 21 Notification ML18159A0392018-06-0606 June 2018 National Technical Systems (Nts) - Potential Part 21 on Dedicated Items Not Available for Pmi Testing (NUPIC) ULNRC-06393, 10 CFR Part 21 Written Notification Regarding Cameron Barton Model 752B Differential Pressure Transmitters2017-10-31031 October 2017 10 CFR Part 21 Written Notification Regarding Cameron Barton Model 752B Differential Pressure Transmitters ML17160A3022017-06-0101 June 2017 Part 21 - Interim Notification of a Potential Defect on a Printed Circuit Board ML17104A2882017-04-13013 April 2017 Emerson Process Management, LLC - Fisher Information Notice, (FIN) 2017-02 ML17081A4532017-03-20020 March 2017 Part 21 - Plastic Jar Dedication Sampling ML17075A2782017-02-28028 February 2017 Part 21 - Potential Transducer Component Defect ML17026A4122016-12-0505 December 2016 Valcor Engineering Corp. - Part 21 - Non-Conforming Cover Machining on Solenoid Valve ML16174A3952016-06-21021 June 2016 Fisher Information Notice, (FIN) 2016-05 - Insufficient Valve Cage Hardfacing ML16127A5952016-05-0404 May 2016 Rotork Controls Inc. Part 21 Notification Concerning V12 (Pt No. N69-921) and K5 (N69-838 & N69-926) Safety Related Micro Switches ML15243A1742015-08-25025 August 2015 Part 21 Furmanite Nuclear Grade Leak Seal Material FSC-N-1B ML15188A0662015-06-25025 June 2015 Part 21 Report - Deviation in Nozzle Modeling Internal Reports ML14365A0592014-12-23023 December 2014 Part 21 Notification - Baldor AC Motors with Potential Bearing End Cap Alignment Issues ML14335A2952014-11-13013 November 2014 Interim 10 CFR Part 21 Report Regarding Submodules CA20-03 and CA20-07A Nonconformances for V. C. Summer Unit 2, AP1000 Project ML14255A0172014-08-27027 August 2014 Interim 10 CFR Part 21 Report Regarding Submodule and Embedment Deviations for V. C. Summer Unit 2 AP1000 Project ML14210A0102014-07-23023 July 2014 Part 21 - Unseating of Valve Spring on Scram Solenoid Pilot Valve ML14204A7072014-07-23023 July 2014 Completed Evaluation of Part 21 Potentially Reportable Condition Notification: Unseating of Valve Spring on SSPV ML14112A4812014-04-15015 April 2014 Letter from James Thigpen Nuclear Nonconformance Event Number 50017 ML14090A4322014-03-27027 March 2014 Interim Report - 10CFR 21 Evaluation Regarding Potential Deficiencies in Seismic Qualifications for PV-62 ML14090A4332014-03-27027 March 2014 Interim Report- 10CFR 21 Evaluation Regarding Potential Deficiencies in Justification of Use of Prorate Spring in PV-62 ML14079A0272014-03-13013 March 2014 Part 21 - Unseating of Valve Spring on Scram Solenoid Pilot Valve ML14069A4672014-02-26026 February 2014 Part 21 Report Involving a Potential Manufacturing Defect in Replacement Masterpact Cradles ML13246A0872013-08-23023 August 2013 Nuclear Nonconformance Event Number 49302 - 10CFR21 Notification ML13165A3422013-06-12012 June 2013 60-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers ML13094A1772013-03-18018 March 2013 Notice to the U.S. Nuclear Regulatory Commission of a Possible Deviation or Defect in Nuclear Qualified High Efficiency Particulate Air Filters Manufactured by Aaf ML13044A0752013-02-0808 February 2013 Part 21 - Completed Evaluation for Potential Error in Main Steam Line High Flow Calculational Methodology ML12347A3082012-12-12012 December 2012 Part 21 60-Day Interim Report Notification: Error in Main Steam Line High Flow Calculational Methodology ML12283A2462012-09-28028 September 2012 Part 21 - Fairbanks Morse Opposed Piston EDG Oil Pump Leak ML12319A0122012-09-27027 September 2012 Error in Main Steam Line High Flow Calculational Methodology ML12158A4472012-06-0606 June 2012 Part 21 60-Day Interim Report Notification - Closufailure of CRD Collet Retainer Tube/Outer Tube Weld ML12094A3712012-04-0202 April 2012 Part 21 Report - Rosemount Pressure Transmitters with Nonzero Based Calibrations ML12066A1182012-03-0202 March 2012 Part 21 Report - Rosemount Pressure Transmitters with Nonzero Based Calibrations ML12097A3162012-03-0202 March 2012 Part 21 Report - Rosemont Pressure Tranmitters Out of Tolerance Condition ML1127000672011-09-26026 September 2011 GE-Hitachi Part 21 Reportable Condition Notification: Failure to Include Seismic Input in Channel-Control Blade Interference Customer Guidance ML1025202192010-09-0303 September 2010 Part 21 - Failure to Include Seismic Input in Reactor Control Blade Customer Guidance ML1018907392010-07-0101 July 2010 Part 21 Report Concerning Failure of Turbine Overspeed Reset Control Valve Diaphragm ML0923900432009-08-25025 August 2009 Notification of Potential Part 21 Report Due to Radiation Monitor Defect ML0907611882009-03-11011 March 2009 Part 21 Notification - Defective Hk and K-Line Circuit Breaker Tension Springs ML0701704602007-01-0808 January 2007 10CFR21 for FMEA and Pre-installation Setup of Woodward Digital Reference Unit (Dru); Fairbanks Morse Engine Reporting Id# 06-05 ML0602502602006-01-12012 January 2006 Attachment to 10CFR21 for Woodward Dru Fm Id# 06-01 ML0511602412005-04-14014 April 2005 Thermo Electron Svioc, SV18C and SV28C Series Recorders ML0327507562003-09-30030 September 2003 Part 21 Report Regarding the Failure of the Eaton Cutler-Hammer Freedom Series Heater Pack Due to a Possible Defect in the Weld Which Joins the Screw Terminal to the Heater Coil ML0232901622002-11-18018 November 2002 Final Report, Stability Option III: Possible Successive Confirmation Count Resets - Not Reportable 2021-11-29
[Table view] |
Text
FAIRBANKS MORSE 701 White Avenue Beloit, Wisconsin 53511 Tel: 608.364.8132 Fax: 608.364.8480 Dominic.Dedolph@fairbanksmorse.com January 8, 2007 Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555
Subject:
1 0CFR21 for FMEA and Pre-installation Setup of Woodward Digital Reference Unit (DRU);
Fairbanks Morse Engine reporting ID# 06-05 As a follow up to SCE&G verbal notification (EN # 43031), dated 12/5/06 and written notification (Docket 50/395), dated12/22/06, Fairbanks Morse Engine has performed an evaluation and has determined a potential safety hazard exists due to an unevaluated failure mode for one of the engine speed control components, the Digital Reference Unit (DRU). The FM PIN for the DRU is 12998236 (Woodward P/N 9903-439).
This condition was found during pre-installation testing of a DRU by SCE&G. FME has received no reports of this problem occurring with any installed equipment at any nuclear (or commercial) plant with FME provided equipment.
An FMEA generated by FME and provided to SCE&G did not consider the following:
- 1) Loss of power to the DRU only without simultaneous loss of power to the electronic speed control module 2301A. The result would be a speed command below rated.
- 2) Loss of power to the DRU without simultaneous loss of power to the electronic speed control module 2301A and subsequent regaining power. The result would be a speed command to the low speed setting (below rated).
Because these two conditions were not considered in the FMEA, FM generated a pre-installation setup procedure that only considered set-up adjustments in the powered configuration.
FM has subsequently determined that the above detrimental conditions can be eliminated with a modified pre-installation setup procedure.
The utilities that FM has supplied DRU's, FMEA and setup procedures to include the following:
Utility Site Ameren Callaway Constellation Calvert Cliffs Detroit Edison Fermi First Energy BV-2 FP&L Seabrook FP&L Duane Arnold SCE&G VC Summer WCNOC Wolf Creek The above utilities are being provided this same notification as well as an updated FMEA and pre-installation setup procedure which corrects the failure mode reported by SCE&G on December 22, 2006.
Sincerely, Dominic Dedolph Manager, Quality Assurance an EnPro Industries company