Letter Sequence Other |
---|
|
|
MONTHYEARML0924303382009-08-28028 August 2009 Removal of Mixed Vane Grid Spacing Restriction in Appendix B to Fleet Report Dom-NAF-2-Evaluation of 4X4 DNB Test of 15X15 Vantage + with Ifms Using Vipre-D/WRB-1 Project stage: Request ML0930206912009-10-29029 October 2009 Request for Supplemental Information for Acceptance Review of Dominion Topical Report Re. Mixing Vane Grid Spacing Restriction Project stage: Acceptance Review ML0933103302009-11-20020 November 2009 Removal of Mixing Vane Grid Spacing Restriction in Appendix B to Fleet Report DOM-NAF-2- Supplemental Information Project stage: Request ML0934304152009-12-0808 December 2009 Submittals Re. Dominion - Mixing Vane Grid Spacing Restriction Found Acceptable for Review Project stage: Other ML0934504082009-12-23023 December 2009 Millstone Power Station, Units 2 & 3, North Anna Power Station, Units 1 &2, Surry Power Station Units 1 & 2 - Withholding of Information Determined to Be Proprietary Project stage: Other ML1016200342010-06-21021 June 2010 Approval to Remove Mixing Vane Grid Restriction in Appendix B of Dominion Fleet Topical Report DOM-NAF-2-A Project stage: Other 2009-12-23
[Table View] |
Submittals Re. Dominion - Mixing Vane Grid Spacing Restriction Found Acceptable for ReviewML093430415 |
Person / Time |
---|
Site: |
Millstone, Kewaunee, Surry, North Anna ![Dominion icon.png](/w/images/b/b0/Dominion_icon.png) |
---|
Issue date: |
12/08/2009 |
---|
From: |
Tam P Plant Licensing Branch III |
---|
To: |
Geoffrey Miller Dominion Energy Co |
---|
Tam P |
References |
---|
TAC ME2321, TAC ME2322, TAC ME2323, TAC ME2324, TAC ME2325, TAC ME2326, TAC ME2327, FOIA/PA-2011-0115 |
Download: ML093430415 (2) |
|
|
---|
Category:Acceptance Review Letter
MONTHYEARML23317A0732023-11-13013 November 2023 Acceptance Review Determination - License Amendment Request Modification of TS SR 4.3.6.a ML23311A3192023-11-0707 November 2023 Relief Request Acceptance Review Results; Surry Unit 1 and 2 IST Alternative, V-1 RCS Cold Leg Check Valves ML23172A0752023-06-21021 June 2023 Acceptance Review Determination LAR to Revise TSs for Reactor Core Safety Limits, Fuel Assemblies, and COLR Related to Framatome Gaia Fuel ML23145A0052023-05-25025 May 2023 Acceptance Review Determination Exemption to Use Framatome Gaia Fuel Assemblies Containing Fuel Rods Fabricated with M5 Fuel Rod Cladding ML23134A0012023-05-0909 May 2023 NRC Email Acceptance - Kewaunee Solutions Exemption Request Regarding Decommissioning Trust Funds for Site Restoration Activities (Docket No. 50-305) ML23030B8472023-03-10010 March 2023 Issuance of Amendment Nos. 309 and 309, License Amendment Request Regarding a 10-Day Allowed Outage Time for Opposite Unit Auxiliary Feedwater Cross-Connect Capability ML23038A0152023-02-0707 February 2023 Acceptance Review Determination LAR to Revise the Applicability Term for RCS Heatup and Cooldown Pressure-Temperature Limitations Figures ML23024A1522023-01-24024 January 2023 Acceptance Review Determination LAR to Supplement Burnup Credit of Criticality Safety Analysis ML22342A1002022-12-0707 December 2022 Relief Request Acceptance Review Results; Surry ISI Alternative, Prz and SG Welds and Nozzles ML22292A3212022-10-19019 October 2022 Acceptance Review Determination for Alternative Request for Containment RSS Pump Periodic Verification Testing Program ML22224A1442022-08-11011 August 2022 Acceptance Email TS Change AFW Cross Connect AOT LAR ML22202A0472022-07-25025 July 2022 Supplemental Information Needed for Acceptance of Requested Licensing Action Surry Technical Specification Change Auxiliary Feedwater Allowed Outage Time ML22200A1032022-07-19019 July 2022 Acceptance of Requested Licensing Action: Surry Risk-Informed Approach for Tornado Classification of the Fuel Handling Trolley Support Structure ML22161B0052022-06-0909 June 2022 Acceptance Email TSTF 547 LAR ML22123A0812022-05-0303 May 2022 Acceptance Review Determination for Proposed LAR for TS Change Applicable to TSTF-359, Increase Flexibility in Mode Restraints ML22077A0542022-03-18018 March 2022 Change in Engineering Hours Estimate Surry Ph Buffer LAR Acceptance ML21348A7392021-12-14014 December 2021 E-mail - Acceptance Review Determination Alternative Request IR-4-09 for Use Alternative Brazed Joint Assessment Methodology for Class 3 Moderate Energy Piping ML21340A1642021-12-0606 December 2021 Acceptance of Requested Licensing Action Amendment ML21309A0152021-11-0909 November 2021 Acceptance Review of Dominion Energy Kewaunee, Inc. - Energysolutions Submittal for Approving Decommissioning Quality Assurance Program (EPID L-2021-DP3-0000) ML21147A2982021-05-27027 May 2021 Correction to Projected Review Completion Date, ASME Section XI Inservice Inspection Program Relief Requests, Limited Coverage Examinations, Third Period, 3rd 10-year Inservice Inspection Interval (EPID L-2020-LLR-0081 to LLR-0088) ML21084A0042021-03-25025 March 2021 3/25/2021 E-mail, Acceptance Review Determination, Proposed License Amendment Request to Revise Shutdown Bank TS Requirements and Add Alternate Control Rod Position Monitoring Requirements ML21012A0442021-01-12012 January 2021 1/12/2021 E-mail Acceptance Review Determination, Alternative Requests RR-05-04 and IR-4-02 ML21011A2832021-01-11011 January 2021 1/11/2021 E-mail, Acceptance Review Determination, LAR Proposed License Amendment Request to Revise Reactor Core Safety Limit to Reflect WCAP-17642-P-A, Revision 1 ML20357A0282020-12-21021 December 2020 E-mail, Acceptance Review Determination, LAR Proposed License Amendment Request Measurement Uncertainty Recapture Power Uprate ML20350B8272020-12-15015 December 2020 (12/15/2020) E-mail from R. Guzman to S. Sinha - Acceptance Review Determination Proposed LAR to Revise MPS2 TSs for Steam Generator Inspection Frequency ML20337A2692020-12-0202 December 2020 12/2/20 E-mail, Acceptance Review Determination, LAR Addition of Analytical Methodology to the Core Operating Limits Report for a Large Break Loss of Coolant Accident (LBLOCA) ML20325A3762020-11-20020 November 2020 (11/20/2020) E-mail from R. Guzman to S. Sinha - Acceptance Review, Unacceptable with Opportunity to Supplement Proposed LAR to Revise MPS2 TSs for Steam Generator Inspection Frequency ML20287A3372020-10-13013 October 2020 Acceptance Review Determination: ASME Section XI Inservice Inspection Program Relief Requests for Limited Coverage Examinations, Third Period, 4th 10-year Inservice Inspection Interval (EPID L-2020-LLR-0129 and LLR-0130) ML20281A6222020-09-30030 September 2020 Acceptance of SLR Application ML20224A0702020-08-11011 August 2020 Acceptance Review Determination (E-mail Dated 8/11/2020) Alternative Request RR-05-06 Insepection Interval Extension for SG Pressure-Retaining Welds and Full-Penetration Welded Nozzles ML20198M3742020-07-16016 July 2020 Acceptance Review Determination: ASME Section XI Inservice Inspection Program Relief Requests for Limited Coverage Examinations, Third Period, 3rd 10-year Inservice Inspection Interval (EPID L-2020-LLR-0081 to LLR=0088) ML20142A4682020-05-21021 May 2020 Acceptance Review Determination (E-mail Dated 5/21/2020) Proposed Technical Specification Change to Battery Surveillance Requirements ML20092K9572020-04-0101 April 2020 Acceptance Review Determination (E-mail Dated 4/1/2020) LAR to Revise Technical Specification Table 3.3-11, Accident Monitoring Instrumentation ML20079M6752020-03-19019 March 2020 Acceptance Review Determination (E-mail Dated 3/19/2020) ASME Section XI Inservice Inspection Program Relief Requests for Limited Coverage Examinations (EPID L-2020-LLR-0027 to LLR-0032) ML20079M4772020-03-19019 March 2020 Acceptance Review Determination (E-mail Dated 3/19/2020) ASME Section XI Inservice Inspection Program Relief Requests for Limited Coverage Examinations (EPID L-2020-LLR-0024 to LLR-0026) ML20021A3782020-01-21021 January 2020 Acceptance Review Determination (E-mail 1/21/2020) LAR to Revise TS 6.25 ML20021A3772020-01-21021 January 2020 Acceptance Review Determination (E-mail 1/21/2020) Alternative Request RR-05-05 ML19304B1542019-10-31031 October 2019 Acceptance Review Determination (E-mail 10/31/19) Extension of TS 3.8.1.1 Allowed Outage Time ML19295C8342019-10-22022 October 2019 Acceptance Review Determination (E-mail 10/22/19) Alternative Request RR-05-03 Extension of ASME Code Case N-770-2 RCP Nozzle DM Butt Welds ML19277B9082019-10-0707 October 2019 Supplemental Information Needed for Acceptance of Requested Licensing Action Extension of Technical Specification 3.8.1.1, A.C. Sources - Operating, Allowed Outage Time ML19249B5972019-09-0606 September 2019 Acceptance Review Determination (E-mail 9/6/19) LAR to Revise Integrated Leak Rate Test ML19249B5482019-09-0606 September 2019 Acceptance Review Determination (E-mail 9/6/19) - Revised TS Limits for Primary and Secondary Coolant Activity ML19126A3262019-05-0606 May 2019 Acceptance Review Determination (E-mail 5/6/19) Proposed Alternative Request IR-4-01, Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography ML19126A3252019-05-0606 May 2019 Acceptance Review Determination (E-mail 5/6/19) Proposed Alternative Requests RR-05-02, Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography ML19126A3232019-05-0606 May 2019 Acceptance Review Determination (E-mail 5/6/19) Proposed Alternative Request RR-05-01, VT-2 Pressure Testing Requirements for the Lower Portion of the RPV ML19122A3032019-05-0202 May 2019 Acceptance Review Determination (e-mail 5/2/19) License Amendment Request to Revise Technical Specifications to Adopt TSTF-522 ML19087A0692019-03-28028 March 2019 Acceptance Review Determination (E-mail 3/28/19) Proposed Alternative Request IR-3-39 ML19058A8622019-02-27027 February 2019 Acceptance Review Determination (E-mail 2/27/19), LAR Proposed Adoption of 10 CFR 50.69, Risk-Informed Categorization and Treatment of SSCs for Nuclear Power Plants ML19036A9022019-02-0505 February 2019 Acceptance of Amendment Request Revising Emergency Action Level Schemes ML18320A2362018-12-0303 December 2018 Acceptance Scheduling and Opportunity for Hearing Letter - v3 2023-06-21
[Table view] Category:E-Mail
MONTHYEARML24032A4702024-02-0101 February 2024 Change in Estimated Review Schedule Revision to TS Design Features Section to Remove the Nine Mile Point Unit 3 Nuclear Project, LLC ML24030A0672024-01-26026 January 2024 Email EA Fonsi Notice to Kewaunee Solutions for Exemptions on Site Restoration Activities ML24024A0202024-01-24024 January 2024 Correction to Safety Evaluation Associated Wit Amendment No. 288 - Revision to Applicability Term for RCS Heat-Up and Cooldown Pressure-Temperature Limitations Figures ML24024A2452024-01-24024 January 2024 1/24/2024 E-mail from R.Guzman to S.Sinha - Acknowledgement of Error in SE for Amendment No. 288 - Revision to Applicability Term for RCS Heatup and Cooldown Pressure-Temperature Limitations Figures ML23320A1122024-01-18018 January 2024 NRC to Fws, Concurrence with Endangered Species Act Determinations for North Anna Power Station, Units 1 and 2, Subsequent License Renewal, Issuance of Draft Supplemental Environmental Impact Statement, and Opportunity for Public Comment ML23355A2722023-12-21021 December 2023 NRR E-mail Capture - Schedule Revision for Emergency Preparedness Staff Augmentation Times License Amendment Request ML23326A0132023-11-22022 November 2023 Acceptance Review Determination LAR to Support Implementation of Framatome Gaia Fuel ML23318A0952023-11-14014 November 2023 Request for Additional Information (E-mail Dated 11/14/2023) LAR to Revise TSs Related to Framatome Gaia Fuel ML23317A0732023-11-13013 November 2023 Acceptance Review Determination - License Amendment Request Modification of TS SR 4.3.6.a ML23318A1172023-11-13013 November 2023 NRR E-mail Capture - Formal Issuance of RAIs for North Anna Technical Support Center (TSC) License Amendment Request (LAR) (L-2023-LLA-0006) ML23312A2962023-11-0808 November 2023 Email - Surry Relief Request Acceptance Review Results; Surry Unit 1 and 2 IST P-3 P-4 Pumps ML23312A2022023-11-0808 November 2023 Relief Request Acceptance Review Results; IST Impracticality P-1 P-2 RHR Containment Pumps ML23297A2312023-10-24024 October 2023 E-mail to File - Summary of September 13, 2023, Meeting with Dominion to Discuss Proposed LAR to Support Cycle Reloads Using Framatome Gaia Fuel ML23283A3262023-10-10010 October 2023 Update Acceptance Review Status Surry TS Change Apply RG 1.97, Rev 3 Instrumentation to Lhsi ML23265A2302023-09-22022 September 2023 Acceptance Review Determination - License Amendment Request Revision to TS Design Features Section to Remove the Nine Mile Point Unit 3 Nuclear Project, LLC ML23268A4362023-09-21021 September 2023 Extension Date Approval for Request for Additional Information for Exemptions on Site Restoration Activities ML23257A2092023-09-14014 September 2023 NRR E-mail Capture - Formal Issuance of 2nd Round RAIs for Surry Units 1&2 and North Anna Units 1&2 Emergency Plans LAR ML23255A2772023-09-12012 September 2023 Acceptance of Requested Licensing Action: Surry TS Change, Lhsi Indication and Instrumentation ML23258A0552023-08-31031 August 2023 Setup of Online Reference Portal and Audit Plan for the NRC Staff'S Review of LAR to Use Framatome Small Break and Realistic Large Break LOCA Methodologies (08/31/2023 e-mail) ML23243A9862023-08-31031 August 2023 NRR E-mail Capture - Draft RAIs for EP Staff Augmentation Times LAR (L-2022-LLA-0166) ML23219A1602023-08-0707 August 2023 003 Radiation Safety Baseline Inspection Information Request ML23199A2832023-07-18018 July 2023 Request for Additional Information (E-mail Dated 7/18/2023) LAR to Revise the Pressure-Temperature Limits ML23193A9552023-07-12012 July 2023 NRR E-mail Capture - Acceptance Review for VC Summer and Surry Relief Request (L-2023-LLR-0029) ML23187A1122023-07-0606 July 2023 TSC Relocation LAR RAIs ML23172A0752023-06-21021 June 2023 Acceptance Review Determination LAR to Revise TSs for Reactor Core Safety Limits, Fuel Assemblies, and COLR Related to Framatome Gaia Fuel ML23171B0522023-06-20020 June 2023 NRR E-mail Capture - RAI for Review of Appendix F to DOM-NAF-2-P (Redacted) ML23145A0052023-05-25025 May 2023 Acceptance Review Determination Exemption to Use Framatome Gaia Fuel Assemblies Containing Fuel Rods Fabricated with M5 Fuel Rod Cladding ML23145A0042023-05-25025 May 2023 Acceptance Review Determination LAR to Use Framatome Small Break and Realistic Large Break LOCA Methodologies ML23134A0012023-05-0909 May 2023 NRC Email Acceptance - Kewaunee Solutions Exemption Request Regarding Decommissioning Trust Funds for Site Restoration Activities (Docket No. 50-305) ML23129A0672023-05-0505 May 2023 NRC Email Acceptance - Kewaunee Solutions Exemption Request for Low-Level Radioactive Waste Transport Change from 20 to 45 Days Acknowledgement ML23115A3022023-04-24024 April 2023 4/24/2023 E-mail from R.Guzman to S.Sinha - Acknowledgement of Error in Issuance of Amendments Adoption of TSTF-359, Increase Flexibility in Mode Restraints ML23107A2212023-04-10010 April 2023 Amendment Turbine Building Wind Load Basis Reclassification License Amendment Request - State Consultation No Comment ML23100A0032023-04-0404 April 2023 Solutions - Acknowledgement Email Regarding Exemption Regarding Decommissioning Trust Funds for Site Restoration Activities (Docket No 50-305) ML23094A1442023-03-31031 March 2023 Solutions - Acknowledgement Email Regarding Exemption for Low-Level Radioactive Waste Transport within 20 Days (Docket No. 50-305) ML23089A1882023-03-29029 March 2023 Request for Additional Information (E-mail Dated 3/29/2023) Spring 2022 Steam Generator Tube Inspection Report ML23075A0232023-03-15015 March 2023 NRR E-mail Capture - RAI - License Amend Req (LAR) to Revise Tech Spec (Ts) 3.6.8 Limiting Condition for Operation to Remove Refueling Water Chemical Addition Tank and Replace the Containment Sump Buffer North Anna, 1 and 2 (L-2022-LLA-0162 ML23068A0242023-03-0808 March 2023 RAI Issuance Fuel Handling Trolley LAR ML23067A2162023-03-0707 March 2023 NRR E-mail Capture - RAI for North Anna, 1 & 2, Surry 1 & 2, Millstone, 2 & 3, Request for Approval of App. F Fleet Report DOM-NAF-2-P, Qual of the Framatome ORFEO-GAIA and ORFEO-NMGRID CHF Correlations in the Dominion VIPRE-D Computer Code ML23060A0932023-03-0101 March 2023 NRR E-mail Capture - Formal Issuance of RAIs for Surry/North Anna Emergency Plans LAR ML23059A2282023-02-28028 February 2023 NRR E-mail Capture - Draft RAIs for Containment Buffer Change to Natb (L-2022-LLA-0162) ML23054A2412023-02-23023 February 2023 NRR E-mail Capture - Formal Issuance of RAIs for Surry Turbine Building Tornado Reclassification ML23039A1712023-02-0808 February 2023 NRR E-mail Capture - Acceptance Review for Technical Support Center (TSC) Relocation (L-2023-LLA-0006) ML23038A0152023-02-0707 February 2023 Acceptance Review Determination LAR to Revise the Applicability Term for RCS Heatup and Cooldown Pressure-Temperature Limitations Figures ML23024A1522023-01-24024 January 2023 Acceptance Review Determination LAR to Supplement Burnup Credit of Criticality Safety Analysis ML23018A0352023-01-17017 January 2023 NRR E-mail Capture - Acceptance Review for Fleet Report Re Appendix F of DOM-NAF-2-P (L-2022-LLT-0003) ML23018A1642023-01-17017 January 2023 Formal Issuance of RAIs for Surry ISI Alternative for SG Welds, 30 Day Calendar Response Period (Email) ML22354A0352022-12-19019 December 2022 Acceptance Email TSC Relocations LAR 2024-02-01
[Table view] |
Text
Accession No. ML093430415 From: Tam, Peter Sent: Tuesday, December 08, 2009 6:57 PM To: 'Gary D Miller'; Craig D Sly; 'Jack Gadzala'; Thomas Breene (thomas.l.breene@dom.com)
Cc: Sanders, Carleen; Cotton, Karen; Attard, Anthony; Pascarelli, Robert; Feintuch, Karl; Sreenivas, V
Subject:
Dominion - Mixing Vane Grid Spacing Restriction submittals (TAC ME2321, 2, 3, 4, 5, 6, and 7)
Gary:
On 8/28/09 Dominion submitted a request to remove restrictions on the subject issue for Kewaunee, Millstone, North Anna, and Surry. The submittal was supplemented by a Dominion letter on 11/20/2009. Our review of the the two submittals is covered by the above seven TAC numbers.
We have completed acceptance review per NRR Office Instruction LIC-109 and found the submittals acceptable for review. If you have any questions, please contact me or the other NRC project managers for Dominion plants.
Peter S. Tam, Senior Project Manager Plant Licensing Branch III-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Tel. 301-415-1451 E-mail Properties Mail Envelope Properties (0A64B42AAA8FD4418CE1EB5240A6FED10818C9CD4F)
Subject:
Dominion - Mixing Vane Grid Spacing Restriction submittals (TAC ME2321, 2, 3, 4, 5, 6, and 7)
Sent Date: 12/08/2009 6:57:18 PM Received Date: 12/08/2009 6:57:00 PM From: Tam, Peter Created By: Peter.Tam@nrc.gov Recipients:
gary.d.miller@dom.com ('Gary D Miller')
Tracking Status: None craig.d.sly@dom.com (Craig D Sly)
Tracking Status: None jack.gadzala@dom.com ('Jack Gadzala')
Tracking Status: None thomas.l.breene@dom.com (Thomas Breene (thomas.l.breene@dom.com))
Tracking Status: None Carleen.Sanders@nrc.gov (Sanders, Carleen)
Tracking Status: None Karen.Cotton@nrc.gov (Cotton, Karen)
Tracking Status: None Anthony.Attard@nrc.gov (Attard, Anthony)
Tracking Status: None Robert.Pascarelli@nrc.gov (Pascarelli, Robert)
Tracking Status: None Karl.Feintuch@nrc.gov (Feintuch, Karl)
Tracking Status: None V.Sreenivas@nrc.gov (Sreenivas, V)
Tracking Status: None Post Office:
HQCLSTR02.nrc.gov Files Size Date & Time MESSAGE 18489 12/08/2009 Options Expiration Date: