Issue date | Title | Topic | |
---|---|---|---|
ML23317A073 | 13 November 2023 | Acceptance Review Determination - License Amendment Request Modification of TS SR 4.3.6.a | Surveillance Frequency Control Program |
ML23311A319 | 7 November 2023 | Relief Request Acceptance Review Results; Surry Unit 1 and 2 IST Alternative, V-1 RCS Cold Leg Check Valves | |
ML23172A075 | 21 June 2023 | Acceptance Review Determination LAR to Revise TSs for Reactor Core Safety Limits, Fuel Assemblies, and COLR Related to Framatome Gaia Fuel | Fuel cladding |
ML23145A005 | 25 May 2023 | Acceptance Review Determination Exemption to Use Framatome Gaia Fuel Assemblies Containing Fuel Rods Fabricated with M5 Fuel Rod Cladding | Exemption Request |
ML23134A001 | 9 May 2023 | NRC Email Acceptance - Kewaunee Solutions Exemption Request Regarding Decommissioning Trust Funds for Site Restoration Activities (Docket No. 50-305) | Exemption Request |
ML23030B847 | 10 March 2023 | Issuance of Amendment Nos. 309 and 309, License Amendment Request Regarding a 10-Day Allowed Outage Time for Opposite Unit Auxiliary Feedwater Cross-Connect Capability | Safe Shutdown High winds Probabilistic Risk Assessment FLEX Large early release frequency Maintenance Rule Program Power change GOTHIC |
ML23038A015 | 7 February 2023 | Acceptance Review Determination LAR to Revise the Applicability Term for RCS Heatup and Cooldown Pressure-Temperature Limitations Figures | |
ML23024A152 | 24 January 2023 | Acceptance Review Determination LAR to Supplement Burnup Credit of Criticality Safety Analysis | |
ML22342A100 | 7 December 2022 | Relief Request Acceptance Review Results; Surry ISI Alternative, Prz and SG Welds and Nozzles | |
ML22292A321 | 19 October 2022 | Acceptance Review Determination for Alternative Request for Containment RSS Pump Periodic Verification Testing Program | |
ML22224A144 | 11 August 2022 | Acceptance Email TS Change AFW Cross Connect AOT LAR | |
ML22202A047 | 25 July 2022 | Supplemental Information Needed for Acceptance of Requested Licensing Action Surry Technical Specification Change Auxiliary Feedwater Allowed Outage Time | Probabilistic Risk Assessment |
ML22200A103 | 19 July 2022 | Acceptance of Requested Licensing Action: Surry Risk-Informed Approach for Tornado Classification of the Fuel Handling Trolley Support Structure | |
ML22161B005 | 9 June 2022 | Acceptance Email TSTF 547 LAR | |
ML22123A081 | 3 May 2022 | Acceptance Review Determination for Proposed LAR for TS Change Applicable to TSTF-359, Increase Flexibility in Mode Restraints | |
ML22077A054 | 18 March 2022 | Change in Engineering Hours Estimate Surry Ph Buffer LAR Acceptance | |
ML21348A739 | 14 December 2021 | E-mail - Acceptance Review Determination Alternative Request IR-4-09 for Use Alternative Brazed Joint Assessment Methodology for Class 3 Moderate Energy Piping | |
ML21340A164 | 6 December 2021 | Acceptance of Requested Licensing Action Amendment | |
ML21309A015 | 9 November 2021 | Acceptance Review of Dominion Energy Kewaunee, Inc. - Energysolutions Submittal for Approving Decommissioning Quality Assurance Program (EPID L-2021-DP3-0000) | |
ML21147A298 | 27 May 2021 | Correction to Projected Review Completion Date, ASME Section XI Inservice Inspection Program Relief Requests, Limited Coverage Examinations, Third Period, 3rd 10-year Inservice Inspection Interval (EPID L-2020-LLR-0081 to LLR-0088) | |
ML21084A004 | 25 March 2021 | 3/25/2021 E-mail, Acceptance Review Determination, Proposed License Amendment Request to Revise Shutdown Bank TS Requirements and Add Alternate Control Rod Position Monitoring Requirements | |
ML21012A044 | 12 January 2021 | 1/12/2021 E-mail Acceptance Review Determination, Alternative Requests RR-05-04 and IR-4-02 | VT-2 |
ML21011A283 | 11 January 2021 | 1/11/2021 E-mail, Acceptance Review Determination, LAR Proposed License Amendment Request to Revise Reactor Core Safety Limit to Reflect WCAP-17642-P-A, Revision 1 | |
ML20357A028 | 21 December 2020 | E-mail, Acceptance Review Determination, LAR Proposed License Amendment Request Measurement Uncertainty Recapture Power Uprate | |
ML20350B827 | 15 December 2020 | (12/15/2020) E-mail from R. Guzman to S. Sinha - Acceptance Review Determination Proposed LAR to Revise MPS2 TSs for Steam Generator Inspection Frequency | |
ML20337A269 | 2 December 2020 | 12/2/20 E-mail, Acceptance Review Determination, LAR Addition of Analytical Methodology to the Core Operating Limits Report for a Large Break Loss of Coolant Accident (LBLOCA) | |
ML20325A376 | 20 November 2020 | (11/20/2020) E-mail from R. Guzman to S. Sinha - Acceptance Review, Unacceptable with Opportunity to Supplement Proposed LAR to Revise MPS2 TSs for Steam Generator Inspection Frequency | |
ML20287A337 | 13 October 2020 | Acceptance Review Determination: ASME Section XI Inservice Inspection Program Relief Requests for Limited Coverage Examinations, Third Period, 4th 10-year Inservice Inspection Interval (EPID L-2020-LLR-0129 and LLR-0130) | |
ML20281A622 | 30 September 2020 | Acceptance of SLR Application | |
ML20224A070 | 11 August 2020 | Acceptance Review Determination (E-mail Dated 8/11/2020) Alternative Request RR-05-06 Insepection Interval Extension for SG Pressure-Retaining Welds and Full-Penetration Welded Nozzles | |
ML20198M374 | 16 July 2020 | Acceptance Review Determination: ASME Section XI Inservice Inspection Program Relief Requests for Limited Coverage Examinations, Third Period, 3rd 10-year Inservice Inspection Interval (EPID L-2020-LLR-0081 to LLR=0088) | |
ML20142A468 | 21 May 2020 | Acceptance Review Determination (E-mail Dated 5/21/2020) Proposed Technical Specification Change to Battery Surveillance Requirements | |
ML20092K957 | 1 April 2020 | Acceptance Review Determination (E-mail Dated 4/1/2020) LAR to Revise Technical Specification Table 3.3-11, Accident Monitoring Instrumentation | |
ML20079M675 | 19 March 2020 | Acceptance Review Determination (E-mail Dated 3/19/2020) ASME Section XI Inservice Inspection Program Relief Requests for Limited Coverage Examinations (EPID L-2020-LLR-0027 to LLR-0032) | |
ML20079M477 | 19 March 2020 | Acceptance Review Determination (E-mail Dated 3/19/2020) ASME Section XI Inservice Inspection Program Relief Requests for Limited Coverage Examinations (EPID L-2020-LLR-0024 to LLR-0026) | |
ML20021A378 | 21 January 2020 | Acceptance Review Determination (E-mail 1/21/2020) LAR to Revise TS 6.25 | |
ML20021A377 | 21 January 2020 | Acceptance Review Determination (E-mail 1/21/2020) Alternative Request RR-05-05 | |
ML19304B154 | 31 October 2019 | Acceptance Review Determination (E-mail 10/31/19) Extension of TS 3.8.1.1 Allowed Outage Time | Reserve Station Service Transformer Offsite Circuit |
ML19295C834 | 22 October 2019 | Acceptance Review Determination (E-mail 10/22/19) Alternative Request RR-05-03 Extension of ASME Code Case N-770-2 RCP Nozzle DM Butt Welds | |
ML19277B908 | 7 October 2019 | Supplemental Information Needed for Acceptance of Requested Licensing Action Extension of Technical Specification 3.8.1.1, A.C. Sources - Operating, Allowed Outage Time | Reserve Station Service Transformer FLEX Offsite Circuit |
ML19249B597 | 6 September 2019 | Acceptance Review Determination (E-mail 9/6/19) LAR to Revise Integrated Leak Rate Test | |
ML19249B548 | 6 September 2019 | Acceptance Review Determination (E-mail 9/6/19) - Revised TS Limits for Primary and Secondary Coolant Activity | |
ML19126A326 | 6 May 2019 | Acceptance Review Determination (E-mail 5/6/19) Proposed Alternative Request IR-4-01, Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography | |
ML19126A325 | 6 May 2019 | Acceptance Review Determination (E-mail 5/6/19) Proposed Alternative Requests RR-05-02, Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography | |
ML19126A323 | 6 May 2019 | Acceptance Review Determination (E-mail 5/6/19) Proposed Alternative Request RR-05-01, VT-2 Pressure Testing Requirements for the Lower Portion of the RPV | VT-2 |
ML19122A303 | 2 May 2019 | Acceptance Review Determination (e-mail 5/2/19) License Amendment Request to Revise Technical Specifications to Adopt TSTF-522 | Surveillance Frequency Control Program |
ML19087A069 | 28 March 2019 | Acceptance Review Determination (E-mail 3/28/19) Proposed Alternative Request IR-3-39 | |
ML19058A862 | 27 February 2019 | Acceptance Review Determination (E-mail 2/27/19), LAR Proposed Adoption of 10 CFR 50.69, Risk-Informed Categorization and Treatment of SSCs for Nuclear Power Plants | |
ML19036A902 | 5 February 2019 | Acceptance of Amendment Request Revising Emergency Action Level Schemes | |
ML18320A236 | 3 December 2018 | Acceptance Scheduling and Opportunity for Hearing Letter - v3 | Aging Management License Renewal Subsequent License Renewal |