 Issue dateTitleTopic
ML23317A07313 November 2023Acceptance Review Determination - License Amendment Request Modification of TS SR 4.3.6.aSurveillance Frequency Control Program
ML23311A3197 November 2023Relief Request Acceptance Review Results; Surry Unit 1 and 2 IST Alternative, V-1 RCS Cold Leg Check Valves
ML23172A07521 June 2023Acceptance Review Determination LAR to Revise TSs for Reactor Core Safety Limits, Fuel Assemblies, and COLR Related to Framatome Gaia FuelFuel cladding
ML23145A00525 May 2023Acceptance Review Determination Exemption to Use Framatome Gaia Fuel Assemblies Containing Fuel Rods Fabricated with M5 Fuel Rod CladdingExemption Request
ML23134A0019 May 2023NRC Email Acceptance - Kewaunee Solutions Exemption Request Regarding Decommissioning Trust Funds for Site Restoration Activities (Docket No. 50-305)Exemption Request
ML23030B84710 March 2023Issuance of Amendment Nos. 309 and 309, License Amendment Request Regarding a 10-Day Allowed Outage Time for Opposite Unit Auxiliary Feedwater Cross-Connect CapabilitySafe Shutdown
High winds
Probabilistic Risk Assessment
FLEX
Large early release frequency
Maintenance Rule Program
Power change
GOTHIC
ML23038A0157 February 2023Acceptance Review Determination LAR to Revise the Applicability Term for RCS Heatup and Cooldown Pressure-Temperature Limitations Figures
ML23024A15224 January 2023Acceptance Review Determination LAR to Supplement Burnup Credit of Criticality Safety Analysis
ML22342A1007 December 2022Relief Request Acceptance Review Results; Surry ISI Alternative, Prz and SG Welds and Nozzles
ML22292A32119 October 2022Acceptance Review Determination for Alternative Request for Containment RSS Pump Periodic Verification Testing Program
ML22224A14411 August 2022Acceptance Email TS Change AFW Cross Connect AOT LAR
ML22202A04725 July 2022Supplemental Information Needed for Acceptance of Requested Licensing Action Surry Technical Specification Change Auxiliary Feedwater Allowed Outage TimeProbabilistic Risk Assessment
ML22200A10319 July 2022Acceptance of Requested Licensing Action: Surry Risk-Informed Approach for Tornado Classification of the Fuel Handling Trolley Support Structure
ML22161B0059 June 2022Acceptance Email TSTF 547 LAR
ML22123A0813 May 2022Acceptance Review Determination for Proposed LAR for TS Change Applicable to TSTF-359, Increase Flexibility in Mode Restraints
ML22077A05418 March 2022Change in Engineering Hours Estimate Surry Ph Buffer LAR Acceptance
ML21348A73914 December 2021E-mail - Acceptance Review Determination Alternative Request IR-4-09 for Use Alternative Brazed Joint Assessment Methodology for Class 3 Moderate Energy Piping
ML21340A1646 December 2021Acceptance of Requested Licensing Action Amendment
ML21309A0159 November 2021Acceptance Review of Dominion Energy Kewaunee, Inc. - Energysolutions Submittal for Approving Decommissioning Quality Assurance Program (EPID L-2021-DP3-0000)
ML21147A29827 May 2021Correction to Projected Review Completion Date, ASME Section XI Inservice Inspection Program Relief Requests, Limited Coverage Examinations, Third Period, 3rd 10-year Inservice Inspection Interval (EPID L-2020-LLR-0081 to LLR-0088)
ML21084A00425 March 20213/25/2021 E-mail, Acceptance Review Determination, Proposed License Amendment Request to Revise Shutdown Bank TS Requirements and Add Alternate Control Rod Position Monitoring Requirements
ML21012A04412 January 20211/12/2021 E-mail Acceptance Review Determination, Alternative Requests RR-05-04 and IR-4-02VT-2
ML21011A28311 January 20211/11/2021 E-mail, Acceptance Review Determination, LAR Proposed License Amendment Request to Revise Reactor Core Safety Limit to Reflect WCAP-17642-P-A, Revision 1
ML20357A02821 December 2020E-mail, Acceptance Review Determination, LAR Proposed License Amendment Request Measurement Uncertainty Recapture Power Uprate
ML20350B82715 December 2020(12/15/2020) E-mail from R. Guzman to S. Sinha - Acceptance Review Determination Proposed LAR to Revise MPS2 TSs for Steam Generator Inspection Frequency
ML20337A2692 December 202012/2/20 E-mail, Acceptance Review Determination, LAR Addition of Analytical Methodology to the Core Operating Limits Report for a Large Break Loss of Coolant Accident (LBLOCA)
ML20325A37620 November 2020(11/20/2020) E-mail from R. Guzman to S. Sinha - Acceptance Review, Unacceptable with Opportunity to Supplement Proposed LAR to Revise MPS2 TSs for Steam Generator Inspection Frequency
ML20287A33713 October 2020Acceptance Review Determination: ASME Section XI Inservice Inspection Program Relief Requests for Limited Coverage Examinations, Third Period, 4th 10-year Inservice Inspection Interval (EPID L-2020-LLR-0129 and LLR-0130)
ML20281A62230 September 2020Acceptance of SLR Application
ML20224A07011 August 2020Acceptance Review Determination (E-mail Dated 8/11/2020) Alternative Request RR-05-06 Insepection Interval Extension for SG Pressure-Retaining Welds and Full-Penetration Welded Nozzles
ML20198M37416 July 2020Acceptance Review Determination: ASME Section XI Inservice Inspection Program Relief Requests for Limited Coverage Examinations, Third Period, 3rd 10-year Inservice Inspection Interval (EPID L-2020-LLR-0081 to LLR=0088)
ML20142A46821 May 2020Acceptance Review Determination (E-mail Dated 5/21/2020) Proposed Technical Specification Change to Battery Surveillance Requirements
ML20092K9571 April 2020Acceptance Review Determination (E-mail Dated 4/1/2020) LAR to Revise Technical Specification Table 3.3-11, Accident Monitoring Instrumentation
ML20079M67519 March 2020Acceptance Review Determination (E-mail Dated 3/19/2020) ASME Section XI Inservice Inspection Program Relief Requests for Limited Coverage Examinations (EPID L-2020-LLR-0027 to LLR-0032)
ML20079M47719 March 2020Acceptance Review Determination (E-mail Dated 3/19/2020) ASME Section XI Inservice Inspection Program Relief Requests for Limited Coverage Examinations (EPID L-2020-LLR-0024 to LLR-0026)
ML20021A37821 January 2020Acceptance Review Determination (E-mail 1/21/2020) LAR to Revise TS 6.25
ML20021A37721 January 2020Acceptance Review Determination (E-mail 1/21/2020) Alternative Request RR-05-05
ML19304B15431 October 2019Acceptance Review Determination (E-mail 10/31/19) Extension of TS 3.8.1.1 Allowed Outage TimeReserve Station Service Transformer
Offsite Circuit
ML19295C83422 October 2019Acceptance Review Determination (E-mail 10/22/19) Alternative Request RR-05-03 Extension of ASME Code Case N-770-2 RCP Nozzle DM Butt Welds
ML19277B9087 October 2019Supplemental Information Needed for Acceptance of Requested Licensing Action Extension of Technical Specification 3.8.1.1, A.C. Sources - Operating, Allowed Outage TimeReserve Station Service Transformer
FLEX
Offsite Circuit
ML19249B5976 September 2019Acceptance Review Determination (E-mail 9/6/19) LAR to Revise Integrated Leak Rate Test
ML19249B5486 September 2019Acceptance Review Determination (E-mail 9/6/19) - Revised TS Limits for Primary and Secondary Coolant Activity
ML19126A3266 May 2019Acceptance Review Determination (E-mail 5/6/19) Proposed Alternative Request IR-4-01, Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography
ML19126A3256 May 2019Acceptance Review Determination (E-mail 5/6/19) Proposed Alternative Requests RR-05-02, Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography
ML19126A3236 May 2019Acceptance Review Determination (E-mail 5/6/19) Proposed Alternative Request RR-05-01, VT-2 Pressure Testing Requirements for the Lower Portion of the RPVVT-2
ML19122A3032 May 2019Acceptance Review Determination (e-mail 5/2/19) License Amendment Request to Revise Technical Specifications to Adopt TSTF-522Surveillance Frequency Control Program
ML19087A06928 March 2019Acceptance Review Determination (E-mail 3/28/19) Proposed Alternative Request IR-3-39
ML19058A86227 February 2019Acceptance Review Determination (E-mail 2/27/19), LAR Proposed Adoption of 10 CFR 50.69, Risk-Informed Categorization and Treatment of SSCs for Nuclear Power Plants
ML19036A9025 February 2019Acceptance of Amendment Request Revising Emergency Action Level Schemes
ML18320A2363 December 2018Acceptance Scheduling and Opportunity for Hearing Letter - v3Aging Management