Letter Sequence Acceptance Review |
---|
|
|
MONTHYEARML0924303382009-08-28028 August 2009 Removal of Mixed Vane Grid Spacing Restriction in Appendix B to Fleet Report Dom-NAF-2-Evaluation of 4X4 DNB Test of 15X15 Vantage + with Ifms Using Vipre-D/WRB-1 Project stage: Request ML0930206912009-10-29029 October 2009 Request for Supplemental Information for Acceptance Review of Dominion Topical Report Re. Mixing Vane Grid Spacing Restriction Project stage: Acceptance Review ML0933103302009-11-20020 November 2009 Removal of Mixing Vane Grid Spacing Restriction in Appendix B to Fleet Report DOM-NAF-2- Supplemental Information Project stage: Request ML0934304152009-12-0808 December 2009 Submittals Re. Dominion - Mixing Vane Grid Spacing Restriction Found Acceptable for Review Project stage: Other ML0934504082009-12-23023 December 2009 Millstone Power Station, Units 2 & 3, North Anna Power Station, Units 1 &2, Surry Power Station Units 1 & 2 - Withholding of Information Determined to Be Proprietary Project stage: Other ML1016200342010-06-21021 June 2010 Approval to Remove Mixing Vane Grid Restriction in Appendix B of Dominion Fleet Topical Report DOM-NAF-2-A Project stage: Other 2009-12-23
[Table View] |
Request for Supplemental Information for Acceptance Review of Dominion Topical Report Re. Mixing Vane Grid Spacing RestrictionML093020691 |
Person / Time |
---|
Site: |
Millstone, Kewaunee, Surry, North Anna |
---|
Issue date: |
10/29/2009 |
---|
From: |
Tam P Plant Licensing Branch III |
---|
To: |
Breene T, Gadzala J, Sly C Dominion Energy Co |
---|
References |
---|
TAC ME2321, TAC ME2322, TAC ME2323, TAC ME2324, TAC ME2325, TAC ME2326, TAC ME2327, FOIA/PA-2011-0115 |
Download: ML093020691 (2) |
|
|
---|
Category:E-Mail
MONTHYEARML24032A4702024-02-0101 February 2024 Change in Estimated Review Schedule Revision to TS Design Features Section to Remove the Nine Mile Point Unit 3 Nuclear Project, LLC ML24030A0672024-01-26026 January 2024 Email EA Fonsi Notice to Kewaunee Solutions for Exemptions on Site Restoration Activities ML24024A0202024-01-24024 January 2024 Correction to Safety Evaluation Associated Wit Amendment No. 288 - Revision to Applicability Term for RCS Heat-Up and Cooldown Pressure-Temperature Limitations Figures ML24024A2452024-01-24024 January 2024 1/24/2024 E-mail from R.Guzman to S.Sinha - Acknowledgement of Error in SE for Amendment No. 288 - Revision to Applicability Term for RCS Heatup and Cooldown Pressure-Temperature Limitations Figures ML23320A1122024-01-18018 January 2024 NRC to Fws, Concurrence with Endangered Species Act Determinations for North Anna Power Station, Units 1 and 2, Subsequent License Renewal, Issuance of Draft Supplemental Environmental Impact Statement, and Opportunity for Public Comment ML23355A2722023-12-21021 December 2023 NRR E-mail Capture - Schedule Revision for Emergency Preparedness Staff Augmentation Times License Amendment Request ML23326A0132023-11-22022 November 2023 Acceptance Review Determination LAR to Support Implementation of Framatome Gaia Fuel ML23318A0952023-11-14014 November 2023 Request for Additional Information (E-mail Dated 11/14/2023) LAR to Revise TSs Related to Framatome Gaia Fuel ML23317A0732023-11-13013 November 2023 Acceptance Review Determination - License Amendment Request Modification of TS SR 4.3.6.a ML23318A1172023-11-13013 November 2023 NRR E-mail Capture - Formal Issuance of RAIs for North Anna Technical Support Center (TSC) License Amendment Request (LAR) (L-2023-LLA-0006) ML23312A2962023-11-0808 November 2023 Email - Surry Relief Request Acceptance Review Results; Surry Unit 1 and 2 IST P-3 P-4 Pumps ML23312A2022023-11-0808 November 2023 Relief Request Acceptance Review Results; IST Impracticality P-1 P-2 RHR Containment Pumps ML23297A2312023-10-24024 October 2023 E-mail to File - Summary of September 13, 2023, Meeting with Dominion to Discuss Proposed LAR to Support Cycle Reloads Using Framatome Gaia Fuel ML23283A3262023-10-10010 October 2023 Update Acceptance Review Status Surry TS Change Apply RG 1.97, Rev 3 Instrumentation to Lhsi ML23265A2302023-09-22022 September 2023 Acceptance Review Determination - License Amendment Request Revision to TS Design Features Section to Remove the Nine Mile Point Unit 3 Nuclear Project, LLC ML23268A4362023-09-21021 September 2023 Extension Date Approval for Request for Additional Information for Exemptions on Site Restoration Activities ML23257A2092023-09-14014 September 2023 NRR E-mail Capture - Formal Issuance of 2nd Round RAIs for Surry Units 1&2 and North Anna Units 1&2 Emergency Plans LAR ML23255A2772023-09-12012 September 2023 Acceptance of Requested Licensing Action: Surry TS Change, Lhsi Indication and Instrumentation ML23258A0552023-08-31031 August 2023 Setup of Online Reference Portal and Audit Plan for the NRC Staff'S Review of LAR to Use Framatome Small Break and Realistic Large Break LOCA Methodologies (08/31/2023 e-mail) ML23243A9862023-08-31031 August 2023 NRR E-mail Capture - Draft RAIs for EP Staff Augmentation Times LAR (L-2022-LLA-0166) ML23219A1602023-08-0707 August 2023 003 Radiation Safety Baseline Inspection Information Request ML23199A2832023-07-18018 July 2023 Request for Additional Information (E-mail Dated 7/18/2023) LAR to Revise the Pressure-Temperature Limits ML23193A9552023-07-12012 July 2023 NRR E-mail Capture - Acceptance Review for VC Summer and Surry Relief Request (L-2023-LLR-0029) ML23187A1122023-07-0606 July 2023 TSC Relocation LAR RAIs ML23172A0752023-06-21021 June 2023 Acceptance Review Determination LAR to Revise TSs for Reactor Core Safety Limits, Fuel Assemblies, and COLR Related to Framatome Gaia Fuel ML23171B0522023-06-20020 June 2023 NRR E-mail Capture - RAI for Review of Appendix F to DOM-NAF-2-P (Redacted) ML23145A0052023-05-25025 May 2023 Acceptance Review Determination Exemption to Use Framatome Gaia Fuel Assemblies Containing Fuel Rods Fabricated with M5 Fuel Rod Cladding ML23145A0042023-05-25025 May 2023 Acceptance Review Determination LAR to Use Framatome Small Break and Realistic Large Break LOCA Methodologies ML23134A0012023-05-0909 May 2023 NRC Email Acceptance - Kewaunee Solutions Exemption Request Regarding Decommissioning Trust Funds for Site Restoration Activities (Docket No. 50-305) ML23129A0672023-05-0505 May 2023 NRC Email Acceptance - Kewaunee Solutions Exemption Request for Low-Level Radioactive Waste Transport Change from 20 to 45 Days Acknowledgement ML23115A3022023-04-24024 April 2023 4/24/2023 E-mail from R.Guzman to S.Sinha - Acknowledgement of Error in Issuance of Amendments Adoption of TSTF-359, Increase Flexibility in Mode Restraints ML23107A2212023-04-10010 April 2023 Amendment Turbine Building Wind Load Basis Reclassification License Amendment Request - State Consultation No Comment ML23100A0032023-04-0404 April 2023 Solutions - Acknowledgement Email Regarding Exemption Regarding Decommissioning Trust Funds for Site Restoration Activities (Docket No 50-305) ML23094A1442023-03-31031 March 2023 Solutions - Acknowledgement Email Regarding Exemption for Low-Level Radioactive Waste Transport within 20 Days (Docket No. 50-305) ML23089A1882023-03-29029 March 2023 Request for Additional Information (E-mail Dated 3/29/2023) Spring 2022 Steam Generator Tube Inspection Report ML23075A0232023-03-15015 March 2023 NRR E-mail Capture - RAI - License Amend Req (LAR) to Revise Tech Spec (Ts) 3.6.8 Limiting Condition for Operation to Remove Refueling Water Chemical Addition Tank and Replace the Containment Sump Buffer North Anna, 1 and 2 (L-2022-LLA-0162 ML23068A0242023-03-0808 March 2023 RAI Issuance Fuel Handling Trolley LAR ML23067A2162023-03-0707 March 2023 NRR E-mail Capture - RAI for North Anna, 1 & 2, Surry 1 & 2, Millstone, 2 & 3, Request for Approval of App. F Fleet Report DOM-NAF-2-P, Qual of the Framatome ORFEO-GAIA and ORFEO-NMGRID CHF Correlations in the Dominion VIPRE-D Computer Code ML23060A0932023-03-0101 March 2023 NRR E-mail Capture - Formal Issuance of RAIs for Surry/North Anna Emergency Plans LAR ML23059A2282023-02-28028 February 2023 NRR E-mail Capture - Draft RAIs for Containment Buffer Change to Natb (L-2022-LLA-0162) ML23054A2412023-02-23023 February 2023 NRR E-mail Capture - Formal Issuance of RAIs for Surry Turbine Building Tornado Reclassification ML23039A1712023-02-0808 February 2023 NRR E-mail Capture - Acceptance Review for Technical Support Center (TSC) Relocation (L-2023-LLA-0006) ML23038A0152023-02-0707 February 2023 Acceptance Review Determination LAR to Revise the Applicability Term for RCS Heatup and Cooldown Pressure-Temperature Limitations Figures ML23024A1522023-01-24024 January 2023 Acceptance Review Determination LAR to Supplement Burnup Credit of Criticality Safety Analysis ML23018A0352023-01-17017 January 2023 NRR E-mail Capture - Acceptance Review for Fleet Report Re Appendix F of DOM-NAF-2-P (L-2022-LLT-0003) ML23018A1642023-01-17017 January 2023 Formal Issuance of RAIs for Surry ISI Alternative for SG Welds, 30 Day Calendar Response Period (Email) ML22354A0352022-12-19019 December 2022 Acceptance Email TSC Relocations LAR 2024-02-01
[Table view] |
Text
Accession No. ML093020691 From: Tam, Peter Sent: Thursday, October 29, 2009 9:13 AM To: 'Craig D Sly'; 'Jack Gadzala'; 'Thomas Breene (thomas.l.breene@dom.com)'
Cc: Attard, Anthony; Sanders, Carleen; Sreenivas, V; Cotton, Karen; Pascarelli, Robert
Subject:
Dominion Topical Rport re. Mixing Vane Grid Spacing Restriction (TAC ME2321-ME2327)
Attachments: ML0924303380.pdf Craig:
I do not have the e-mail address of the contact identified in the attached report. Please forward this e-mail to him for me. Thanks.
We are evaluating the subject submittal (ADAMS Accession No. ML092430338) for acceptance review per NRR Office Instruction LIC-109, Rev. 1. Our reviewer, Tony Attard, found that it is lacking in technical contents. Specifically, its technical/safety evaluation section is missing completely.
Please contact me ASAP (by e-mail or phone, 301-415-1451) to set up a conference call to discuss timely remedial actions.
This e-mail does not formally convey an NRC staff position, and does not formally request for information. Any subsequent action will depend on what will be agreed upon by participants in the proposed conference call.
Peter S. Tam, Senior Project Manager Plant Licensing Branch III-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Tel. 301-415-1451 E-mail Properties Mail Envelope Properties (0A64B42AAA8FD4418CE1EB5240A6FED102BDCE21FF)
Subject:
Dominion Topical Rport re. Mixing Vane Grid Spacing Restriction (TAC ME2321-ME2327)
Sent Date: 10/29/2009 9:13:07 AM Received Date: 10/29/2009 9:13:00 AM From: Tam, Peter
Created By: Peter.Tam@nrc.gov Recipients:
craig.d.sly@dom.com ('Craig D Sly')
Tracking Status: None jack.gadzala@dom.com ('Jack Gadzala')
Tracking Status: None thomas.l.breene@dom.com ('Thomas Breene (thomas.l.breene@dom.com)')
Tracking Status: None Anthony.Attard@nrc.gov (Attard, Anthony)
Tracking Status: None Carleen.Sanders@nrc.gov (Sanders, Carleen)
Tracking Status: None V.Sreenivas@nrc.gov (Sreenivas, V)
Tracking Status: None Karen.Cotton@nrc.gov (Cotton, Karen)
Tracking Status: None Robert.Pascarelli@nrc.gov (Pascarelli, Robert)
Tracking Status: None Post Office:
HQCLSTR02.nrc.gov Files Size Date & Time MESSAGE 454668 10/29/2009 ML0924303380.pdf 446096 Options Expiration Date:
Priority: olImportanceNormal ReplyRequested: False Return Notification: False Sensitivity: olNormal Recipients received: