IR 05000409/2010001

From kanterella
Revision as of 17:11, 13 November 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
IR 05000409-10-001(DNMS) on 05/11/10 - 05/11/10 for La Crosse Boiling Water Reactor
ML101610756
Person / Time
Site: La Crosse File:Dairyland Power Cooperative icon.png
Issue date: 06/08/2010
From: Christine Lipa
Division of Nuclear Materials Safety III
To: Berg W
Dairyland Power Cooperative
References
IR-10-001
Download: ML101610756 (10)


Text

une 8, 2010

SUBJECT:

NRC INSPECTION REPORT 050-00409/10-01(DNMS) - LA CROSSE BOILING WATER REACTOR

Dear Mr. Berg:

On May 12, 2010, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at the permanently shutdown La Crosse Boiling Water Reactor (LACBWR) facility. The purpose of the inspection was to determine whether decommissioning activities were conducted safely and in accordance with NRC requirements. At the conclusion of the inspection on May 12, 2010, the NRC inspector discussed the results with members of your staff.

The inspection consisted of an examination of activities at the facility as they relate to safety and compliance with the Commissions rules and regulations. Areas examined during the inspection included facility management and control, radiological safety, and spent fuel safety. Within these areas, the inspection consisted of a selective examination of procedures and representative records, field observations of activities in progress, and interviews with personnel.

Based on the results of this inspection, the NRC did not identify any violations.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosures will be available electronically for public inspection in the NRC Public Document Room or from the NRC's Agencywide Documents Access and Management System (ADAMS),

accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html. We will gladly discuss any questions you have concerning this inspection.

Sincerely,

/RA/

Christine A. Lipa, Chief Materials Control, ISFSI, and Decommissioning Branch Docket No. 050-00409 License No. DPR-45 Enclosure:

Inspection Report 050-00409/10-01(DNMS)

cc w/encl: M. Brasel, Plant Manager B. D. Burks, P.E., Director, Bureau of Field Operations J. Mettner, Chairman, Wisconsin Public Service Commission Spark Burmaster, Coulee Region Energy Coalition State Liaison Officer Chief, Radiation Protection Section WI Department of Health and Social Services, Division of Health