MONTHYEARIR 07200032/20224012023-03-0909 March 2023 Public DAEC ISFSI - Independent Spent Fuel Storage Installation Security Inspection Report 07200032/2022401 IR 05000331/20220032022-12-13013 December 2022 NRC Inspection Report No. 05000331/2022003 (Drss) IR 05000331/20220022022-07-13013 July 2022 NRC Inspection Report Nos. 05000331/2022002(DNMS) and 07200032/2022002(DNMS) IR 05000331/20224012022-04-27027 April 2022 Decommissioning Security Inspection Report 05000331/2022401 IR 05000331/20220012022-03-0404 March 2022 Subject: NRC Inspection Report Nos. 05000331/2022001(DNMS) and 07200032/2022001(DNMS) IR 05000331/20210012022-01-25025 January 2022 NRC Inspection Report Nos. 05000331/2021001(DNMS); 07200032/2021001(DNMS); and 07200032/2021002(DNMS) - Duane Arnold Energy Center IR 05000331/20214022021-12-30030 December 2021 DAEC Decommissioning Reactor - Decommissioning Security Inspection Report 05000331/2021402 IR 05000331/20214012021-08-25025 August 2021 DAEC Decommissioning Reactor (Permanently Shut Down) and Independent Spent Fuel Storage Installation - Security Inspection Reports 05000331/2021401; and 07200032/2021401 IR 05000331/20200042021-02-12012 February 2021 Integrated Inspection Report 05000331/2020004 and 05000331/2020501 IR 05000331/20200102021-01-0707 January 2021 NRC Inspection Report No. 05000331/2020010(DNMS) - Duane Arnold Energy Center IR 05000331/20200032020-11-0606 November 2020 Integrated Inspection Report 05000331/2020003 and 07200032/2020001 IR 05000331/20200052020-09-0101 September 2020 Updated Inspection Plan for Duane Arnold Energy Center (Report 05000331/2020005) IR 05000331/20200022020-08-0404 August 2020 Integrated Inspection Report 05000331/2020002 IR 05000331/20204022020-07-14014 July 2020 Security Baseline Inspection Report 05000331/2020402 IR 05000331/20200012020-06-22022 June 2020 Reissue - Duane Arnold Energy Center - Integrated Inspection Report 05000331/2020001 IR 05000331/20204012020-06-10010 June 2020 Security Baseline Inspection Report 05000331/2020401 ML20132A2662020-05-11011 May 2020 Integrated Inspection Report 05000331/2020001 IR 05000331/20190062020-03-0303 March 2020 Annual Assessment Letter Duane Arnold Energy Center (Report 05000331/2019006) IR 05000331/20190042020-01-28028 January 2020 Integrated Inspection Report 05000331/2019004 IR 05000331/20190132019-12-11011 December 2019 Triennial Inspection of Evaluation of Changes, Tests and Experiments Baseline Inspection Report 05000331/2019013 IR 05000331/20190032019-11-12012 November 2019 Integrated Inspection Report 05000331/2019003 IR 05000331/20194112019-10-21021 October 2019 Dune Arnold Energy Center - NRC Baseline Inspection Report 05000331/2019411 IR 05000331/20190112019-10-0101 October 2019 NRC Inspection Report 05000331/2019011 IR 05000331/20190052019-08-28028 August 2019 Updated Inspection Plan for Duane Arnold Energy Center (Report 05000331/2019005) IR 05000331/20190022019-08-0101 August 2019 Integrated Inspection Report 05000331/2019002 IR 05000331/20193012019-06-18018 June 2019 NRC Initial License Examination Report 05000331/2019301 IR 05000331/20190012019-05-0303 May 2019 NRC Integrated Inspection Report 05000331/2019001 IR 07200032/20194012019-05-0202 May 2019 Independent Spent Fuel Storage Installation NRC Security Inspection Report 07200032/2019401 (DRS-G.Bonano) IR 05000331/20190102019-04-18018 April 2019 NRC Biennial Problem Identification and Resolution Inspection Report 05000331/2019010 IR 05000331/20194102019-04-16016 April 2019 NRC Security Baseline Inspection Report 05000331/2019410 (DRS-G.Bonano) IR 05000331/20180062019-03-0404 March 2019 Annual Assessment Letter for Duane Arnold Energy Center (Report 05000331/2018006) IR 05000331/20180042019-02-0707 February 2019 Errata - Duane Arnold Energy Center - NRC Integrated Inspection Report 05000331/2018004 ML19029A4432019-01-29029 January 2019 NRC Integrated Inspection Report 05000331/2018004 IR 05000331/20182012019-01-0808 January 2019 NRC Security Baseline Inspection Report 05000331/2018201 IR 05000331/20184142018-11-29029 November 2018 NRC Cyber Security Inspection Report 05000331/2018414 - Cover Letter (DRS-G.Hausman) IR 05000331/20180032018-10-24024 October 2018 NRC Integrated Inspection Report 05000331/2018003 IR 05000331/20184132018-10-11011 October 2018 NRC Security Baseline Inspection Report 05000331/2018413 (DRS-J.Kutlesa) IR 05000331/20180052018-08-28028 August 2018 Updated Inspection Plan for Duane Arnold Energy Center (Report 05000331/2018005) IR 05000331/20180022018-08-0303 August 2018 NRC Integrated Inspection Report 05000331/2018002 IR 05000331/20184122018-07-17017 July 2018 NRC Security Baseline Inspection Report 05000331/2018412 (DRS-G.Bonano) IR 05000331/20185032018-05-29029 May 2018 NRC Emergency Preparedness Inspection Report 05000331/2018503 (Gph) IR 05000331/20180012018-05-0404 May 2018 NRC Integrated Inspection Report 05000331/2018001 IR 05000331/20184112018-03-23023 March 2018 NRC Security Baseline Inspection Report 05000331/2018411 - (Cover Letter Only) IR 05000331/20180102018-03-16016 March 2018 NRC Triennial Fire Protection Inspection Report 05000331/2018010 (DRS-A.Dahbur) IR 05000331/20170062018-03-0202 March 2018 Annual Assessment Letter for Duane Arnold Energy Center (Report 05000331/2017006) IR 05000331/20184102018-02-26026 February 2018 NRC Material Control and Accounting Program Inspection Report 05000331/2018410 IR 05000331/20170042018-01-22022 January 2018 NRC Integrated Inspection Report 05000331/2017004; 07200032/2017001; and Emergency Preparedness Annual Inspection Report 05000331/2017501 ML18012A5482018-01-10010 January 2018 Notification of an NRC Triennial Heat Sink Performance Inspection and Request for Information; Inspection Report 05000331/2018001 (DRS-A.Dunlop) IR 05000331/20174072017-12-14014 December 2017 NRC Security Baseline Inspection Report 05000331/2017407 - Cover Letter Only (DRS-M.Ziolkowski) IR 05000331/20170102017-11-21021 November 2017 Ltr 11/21/17 Duane Arnold Energy Center - Request for Information for an NRC Design Bases Assurance Inspection (Program): Implementation of the Environmental Qualification Program; Inspection Report 05000331/2017010 (DRS-N.Feliz-Adorno) 2023-03-09
[Table view] Category:Letter
MONTHYEARML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status ML24249A1362024-09-0404 September 2024 EN 57304 - Westinghouse Electric Company, LLC, Final Report - No Embedded Files. Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 ML24163A0012024-08-0505 August 2024 LTR-24-0119-1-1 Response to Nh Letter Regarding Review of NextEras Emergency Preparedness Amendment Review ML24193A2432024-07-12012 July 2024 – Interim Audit Summary Report in Support of Review of License Amendment Requests Regarding Fleet Emergency Plan ML24149A2862024-06-12012 June 2024 NextEra Fleet - Proposed Alternative Frr 23-01 to Use ASME Code Case N-752-1, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems Section X1, Division 1 (EPID L-2023-LLR-0009) - Letter ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities NG-24-0004, 2023 Annual Radiological Environmental Operating Report2024-05-0808 May 2024 2023 Annual Radiological Environmental Operating Report NG-24-0003, Submittal of 2023 Annual Radioactive Material Release Report2024-04-24024 April 2024 Submittal of 2023 Annual Radioactive Material Release Report ML24072A0292024-03-29029 March 2024 Nextera Energy Duane Arnold, Llc. Exemption from Select Requirements of 10 CFR Part 73 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting) NG-24-0002, 2023 Annual Exposure Report - Form 5s2024-03-0606 March 2024 2023 Annual Exposure Report - Form 5s NG-24-0001, 2024 Annual Decommissioning and Spent Fuel Management Funding Status Report and Independent Spent Fuel Storage Installation (ISFSI) Decommissioning Financial Assurance Update2024-03-0606 March 2024 2024 Annual Decommissioning and Spent Fuel Management Funding Status Report and Independent Spent Fuel Storage Installation (ISFSI) Decommissioning Financial Assurance Update L-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2024-01-25025 January 2024 Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) NG-23-0010, Supplement to Duane Arnold Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule2023-12-0606 December 2023 Supplement to Duane Arnold Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule NG-23-0009, Part 73 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule2023-11-16016 November 2023 Part 73 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule ML23201A0872023-08-0303 August 2023 Audit Plan in Support of Review of License Amendment NG-23-0006, Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update2023-05-23023 May 2023 Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update ML23137A1672023-05-11011 May 2023 Submittal of 2022 Annual Radiological Environmental Operating Report NG-23-0004, 2022 Annual Radioactive Material Release Report2023-04-25025 April 2023 2022 Annual Radioactive Material Release Report NG-23-0003, 2022 Annual Exposure Report - Form 5s2023-04-21021 April 2023 2022 Annual Exposure Report - Form 5s NG-23-0001, 2023 Annual Decommissioning and Spent Fuel Management Funding Status Report2023-03-27027 March 2023 2023 Annual Decommissioning and Spent Fuel Management Funding Status Report NG-23-0002, 10 CFR 50.59 Report, Commitment Changes, 10 CFR 72.48 Report, Quality Assurance Program Changes, Technical Specification Basis Changes, and Revision of the DAEC Defueled Safety Analysis Report2023-03-27027 March 2023 10 CFR 50.59 Report, Commitment Changes, 10 CFR 72.48 Report, Quality Assurance Program Changes, Technical Specification Basis Changes, and Revision of the DAEC Defueled Safety Analysis Report L-2023-029, and Point Beach Units 1 and 2 Nuclear Property Insurance - 10 CFR 50.54(w)(3)2023-03-10010 March 2023 and Point Beach Units 1 and 2 Nuclear Property Insurance - 10 CFR 50.54(w)(3) ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities ML22339A0012022-12-22022 December 2022 Acceptance of Requested Licensing Action Amendment Request for Common Emergency Plan IR 05000331/20220032022-12-13013 December 2022 NRC Inspection Report No. 05000331/2022003 (Drss) ML22285A0072022-10-13013 October 2022 NRC Analysis of NextEra Energy Duane Arnold'S Decommissioning Funding Status Report, Docket No. 50-331 IR 05000331/20220022022-07-13013 July 2022 NRC Inspection Report Nos. 05000331/2022002(DNMS) and 07200032/2022002(DNMS) ML22090A1922022-05-26026 May 2022 Letter to B. Coffey, FPL from M. Doell - Duane Arnold Post Shutdown Activities Report Review Letter ML22132A2872022-05-24024 May 2022 ISFSI DQAP Approval Letter ML22111A0332022-05-20020 May 2022 Operating License Page Correction Letter to B. Coffey, Florida Power and Light, from M. Doell NG-22-0055, Revision to Duane Arnold Energy Center (DAEC) ISFSI-Only Emergency Plan2022-05-20020 May 2022 Revision to Duane Arnold Energy Center (DAEC) ISFSI-Only Emergency Plan ML22089A0492022-05-12012 May 2022 Sfmp Review Letter NG-22-0053, 2021 Annual Radiological Environmental Operating Report2022-05-0606 May 2022 2021 Annual Radiological Environmental Operating Report NG-22-0052, Regulatory Issue Summary 2000-11. NRC Emergency Telecommunications System, Statement of Intent to Implement the Proposed Voluntary Initiative2022-05-0404 May 2022 Regulatory Issue Summary 2000-11. NRC Emergency Telecommunications System, Statement of Intent to Implement the Proposed Voluntary Initiative IR 05000331/20224012022-04-27027 April 2022 Decommissioning Security Inspection Report 05000331/2022401 NG-22-0050, Revised Response to Request for Additional Information Relating to Decommissioning Quality Assurance Program, Revision 02022-04-26026 April 2022 Revised Response to Request for Additional Information Relating to Decommissioning Quality Assurance Program, Revision 0 NG-22-0049, 2021 Annual Radioactive Material Release Report2022-04-26026 April 2022 2021 Annual Radioactive Material Release Report ML22066A7632022-04-25025 April 2022 ISFSI-Only Emergency Plan License Amendment Approval L-2022-068, NextEra Energy Duane Arnold Quality Assurance Topical Report (FPL-3) Revision 22022-04-25025 April 2022 NextEra Energy Duane Arnold Quality Assurance Topical Report (FPL-3) Revision 2 NG-22-0035, Response to Request for Additional Information Relating to Decommissioning Quality Assurance Program. Revision 02022-04-13013 April 2022 Response to Request for Additional Information Relating to Decommissioning Quality Assurance Program. Revision 0 NG-22-0047, Registration of Independent Spent Fuel Installation Storage Cask and Notification of Permanent Removal of All Spent Fuel Assemblies from the Spent Fuel Pool2022-04-11011 April 2022 Registration of Independent Spent Fuel Installation Storage Cask and Notification of Permanent Removal of All Spent Fuel Assemblies from the Spent Fuel Pool NG-22-0042, Registration of Independent Spent Fuel Installation Storage Casks2022-04-0808 April 2022 Registration of Independent Spent Fuel Installation Storage Casks NG-22-0041, and Independent Spent Fuel Storage Installation, 2022 Annual Decommissioning and Spent Fuel Management Funding Status Report2022-03-31031 March 2022 and Independent Spent Fuel Storage Installation, 2022 Annual Decommissioning and Spent Fuel Management Funding Status Report NG-22-0030, Registration of Independent Spent Fuel Installation Storage Casks2022-03-23023 March 2022 Registration of Independent Spent Fuel Installation Storage Casks NG-22-0031, 2021 Annual Exposure Report - Form 5s2022-03-23023 March 2022 2021 Annual Exposure Report - Form 5s ML22080A1822022-03-22022 March 2022 Letter to B. Coffey from M. Doell - Duane Arnold ISFSI QAPD RAI Letter L-2022-012, Florida Power & Light Company Nuclear Property Insurance - 10 CFR 50.54(w)(3)2022-03-16016 March 2022 Florida Power & Light Company Nuclear Property Insurance - 10 CFR 50.54(w)(3) ML22059A7462022-03-10010 March 2022 ISFSI-Only Physical Security Plan License Amendment Approval NG-22-0025, Registration of Independent Spent Fuel Installation Storage Casks2022-03-0808 March 2022 Registration of Independent Spent Fuel Installation Storage Casks IR 05000331/20220012022-03-0404 March 2022 Subject: NRC Inspection Report Nos. 05000331/2022001(DNMS) and 07200032/2022001(DNMS) 2024-09-04
[Table view] |
Text
une 15, 2010
SUBJECT:
DUANE ARNOLD ENERGY CENTER BASELINE EMERGENCY PREPAREDNESS BIENNIAL EXERCISE INSPECTION REPORT 5000331/2010502(DRS)
Dear Mr. Costanzo:
On May 21, 2010, the U. S. Nuclear Regulatory Commission (NRC) completed a Baseline Emergency Preparedness Biennial Exercise inspection at your Duane Arnold Energy Center.
The enclosed report documents the inspection results, which were discussed on May 21, 2010, with D. Curtland and other members of your staff.
The inspection examined activities conducted under your license as they relate to safety and compliance with the Commissions rules and regulations and with the conditions of your license.
The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.
Based on the results of this inspection, no NRC-identified and no self-revealed findings of very low safety significance were identified.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA by Robert Jickling for/
Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-331 License No. DPR-49
Enclosure:
Inspection Report 05000331/2010502 w/Attachment: Supplemental Information
REGION III==
Docket No: 50-331 License No: DPR-49 Report No: 05000331/2010502(DRS)
Licensee: FPL Energy Duane Arnold, LLC Facility: Duane Arnold Energy Center Location: Palo, IA Dates: May 17 through 21, 2010 Inspectors: Robert Jickling, Senior Emergency Preparedness Inspector James McGhee, Senior Resident Inspector Charles Zoia, Operations Engineer Observers: Robert Kahler, NSIR Branch Chief Rhex Edwards, Reactor Engineer Approved by: Hironori Peterson, Chief Operations Branch Division of Reactor Safety Enclosure
SUMMARY OF FINDINGS
IR 05000331/2010502; 05/17/2010 - 05/21/2010; Duane Arnold Energy Center;
Baseline Emergency Preparedness Biennial Exercise Inspection.
This report covers a one week period of announced baseline inspection by two regional inspectors and one resident inspector. The significance of most findings is indicated by their color (Green, White, Yellow, Red) using Inspection Manual Chapter (IMC) 0609, Significance Determination Process (SDP). Findings for which the SDP does not apply may be Green or be assigned a severity level after NRC management review. The NRCs program for overseeing the safe operation of commercial nuclear power reactors is described in NUREG-1649,
Reactor Oversight Process, Revision 4, dated December 2006.
NRC-Identified
and Self-Revealed Findings
Cornerstone: Emergency Preparedness
No findings of significance were identified.
Licensee-Identified Violations
No violations of significance were identified.
REPORT DETAILS
REACTOR SAFETY
Cornerstone: Emergency Preparedness
1EP1 Exercise Evaluation
Main article: IP 71114.01
.1 Exercise Evaluation
a. Inspection Scope
The inspectors reviewed the May 19, 2010, biennial emergency preparedness exercises objectives and scenario to ensure that the exercise would acceptably test major elements of the licensees emergency plan and to verify that the exercises simulated problems provided an acceptable framework to support demonstration of the licensees capability to implement its plan. The inspectors also reviewed records of other drills and exercises conducted in 2008, 2009, and 2010, to verify that those drills scenarios were sufficiently different from the scenario used in the May 19, 2010 exercise.
The inspectors evaluated the licensees exercise performance, focusing on the risk significant activities of emergency classification, notification, and protective action decision making, implementation of accident mitigation strategies, and correction of past exercise weaknesses in the following emergency response facilities:
- Control Room Simulator (CRS);
- Emergency Operations Facility (EOF); and
- Joint Information Center (JIC)
The inspectors also assessed the licensees recognition of abnormal plant conditions, transfer of responsibilities between facilities, internal communications, interfaces with offsite officials, readiness of emergency facilities and related equipment, and overall implementation of the licensees emergency plan.
The inspectors attended post-exercise critiques in the CRS, TSC, EOF, and JIC to evaluate the licensees initial self-assessment of its exercise performance. The inspectors later met with the licensees lead exercise evaluators and managers to obtain the licensees findings and assessments of its exercise participants performances.
These self-assessments were then compared with the inspectors independent observations and assessments to assess the licensees ability to adequately critique its exercise performance. Documents reviewed are listed in the Attachment to this report.
This exercise evaluation inspection constituted one sample as defined in Inspection Procedure (IP) 71114.01-05.
b. Findings
No findings of significance were identified.
OTHER ACTIVITIES
4OA1 Performance Indicator (PI) Verification
.1 Drill/Exercise Performance
a. Inspection Scope
The inspectors sampled licensee submittals for the Drill/Exercise Performance PI for the period from the first quarter 2009 through first quarter 2010. To determine the accuracy of the PI data reported during those periods, PI definitions and guidance contained in the Nuclear Energy Institute (NEI) Document 99-02, Regulatory Assessment Performance Indicator Guideline, Revision 6, were used. The inspectors reviewed the licensees records associated with the performance indicator to verify that the licensee accurately reported the indicator in accordance with relevant procedures and the NEI guidance.
Specifically, the inspectors reviewed licensee records and processes including procedural guidance on assessing opportunities for the PI; assessments of PI opportunities during pre-designated control room simulator training sessions, and performance during other drills. Documents reviewed are listed in the Attachment to this report.
This inspection constituted one drill/exercise performance sample as defined in IP 71151-05.
b. Findings
No findings of significance were identified.
.2 Emergency Response Organization Drill Participation
a. Inspection Scope
The inspectors sampled licensee submittals for the Emergency Response Organization (ERO) Drill Participation PI for the period from the first quarter 2009 through first quarter 2010. To determine the accuracy of the PI data reported during those periods, PI definitions and guidance contained in the NEI Document 99-02, Regulatory Assessment Performance Indicator Guideline, Revision 6, were used.
The inspectors reviewed the licensees records associated with the PI to verify that the licensee accurately reported the indicator in accordance with relevant procedures and the NEI guidance. Specifically, the inspectors reviewed licensee records and processes including procedural guidance on assessing opportunities for the PI; performance during the 2009 and 2010 exercises and drills; and revisions of the roster of personnel assigned to key emergency response organization positions. Documents reviewed are listed in the Attachment to this report.
This inspection constituted one ERO drill participation sample as defined in IP 71151-05.
b. Findings
No findings of significance were identified.
.3 Alert and Notification System
a. Inspection Scope
The inspectors sampled licensee submittals for the Alert and Notification System (ANS)
PI for the period from the first quarter 2009 through first quarter 2010. To determine the accuracy of the PI data reported during those periods, PI definitions and guidance contained in the NEI Document 99-02, Regulatory Assessment Performance Indicator Guideline, Revision 6, were used. The inspectors reviewed the licensees records associated with the PI to verify that the licensee accurately reported the indicator in accordance with relevant procedures and the NEI guidance. Specifically, the inspectors reviewed licensee records and processes including procedural guidance on assessing opportunities for the PI and results of periodic scheduled ANS operability tests.
Documents reviewed are listed in the Attachment to this report.
This inspection constituted one alert and notification system sample as defined in IP 71151-05.
b. Findings
No findings of significance were identified.
4OA6 Management Meetings
.1 Exit Meeting Summary
On May 21, 2010, the inspectors presented the inspection results to Mr. D. Curtland, and other members of the licensee staff. The licensee acknowledged the issues presented.
The inspectors confirmed that none of the potential report input discussed was considered proprietary.
ATTACHMENT:
SUPPLEMENTAL INFORMATION
KEY POINTS OF CONTACT
Licensee
- D. Curtland, Plant Manager
- R. Anderson, Business Unit Manager
- S. Catron, Licensing Manager
- R. Cole, Performance Improvement Manager
- B. Eckes, Nuclear Oversight Manager
- S. Funk, Radiation Effluents Coordinator
- K. Furman, Safety Manager
- P. Hansen, NOMS Manager
- B. Kindred, Security Manager
- K. Kleinheinz, Engineering Director
- C. Moser, Technical Training Supervisor
- D. Mothena, Corporate Functional Area Emergency Preparedness Manager
- B. Murrell, Licensing Engineer Analyst
- B. Porter, Radiation Protection/Chemistry Manager
- G. Rushworth, Assistant Operations Manager
Nuclear Regulatory Commission
- R. Orlikowski, Senior Resident Inspector
- R. Baker, Resident Inspector
- R. Murray, Resident Inspector
LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED
Opened, Closed, and Discussed
None Attachment