MONTHYEARML0914104732009-05-21021 May 2009 Acceptance Review Email, Revise Technical Specification (TS) 3.7.2, Main Steam Isolation Valves (Msivs), and TS 3.3.2, ESFAS Instrumentation, and Add New TS 3.7.19, Secondary System Isolation Valves (Ssivs) Project stage: Acceptance Review ML1011210252010-05-28028 May 2010 Issuance of Amendment No. 197, Revise Technical Specification (TS) 3.7.2, Main Steam Isolation Valves (Msivs), and TS 3.3.2, ESFAS Instrumentation, and Add New TS 3.7.19, Secondary System Isolation Valves (Ssivs) Project stage: Approval ML1019401172010-06-0808 June 2010 New TS 3.7.19 as Received in Amendment No. 197 Project stage: Other ML1019401082010-06-0808 June 2010 New TS 3.7.19 as Received in Amendment No. 197 Project stage: Other ML1019502102010-07-22022 July 2010 Correction of Technical Specification Pages 3.7-45 and 3.7-46, Issued with Amendment No. 197, Which Revised Technical Specifications 3.3.2 and 3.7.2, and Added a New Technical Specification Project stage: Approval 2010-05-28
[Table View] |
|
---|
Category:Letter
MONTHYEARIR 05000483/20240032024-10-23023 October 2024 Integrated Inspection Report 05000483/2024003 IR 05000483/20240132024-10-21021 October 2024 Design Basis Assurance Inspection (Programs) Inspection Report 05000483/2024013 IR 05000483/20244012024-10-0909 October 2024 Material Control and Accounting Program Inspection Report 05000483/2024401 Public ULNRC-06901, Concurrent Inoperability of Control Room Air Conditioning System Train and Opposite Train Emergency Diesel Generator Results in Condition Prohibited by Technical Specifications Limiting (Letter)2024-10-0101 October 2024 Concurrent Inoperability of Control Room Air Conditioning System Train and Opposite Train Emergency Diesel Generator Results in Condition Prohibited by Technical Specifications Limiting (Letter) ML24247A3042024-09-11011 September 2024 Regulatory Audit Questions for License Renewal Commitments 34 and 35 (EPID L-2024-LRO-0009) - Non-Proprietary IR 05000483/20244032024-08-28028 August 2024 Security Baseline Inspection 05000483-2024-403 IR 05000483/20240052024-08-14014 August 2024 Updated Inspection Plan for Callaway Plant (Report 05000483/2024005) IR 05000483/20253012024-08-0505 August 2024 Notification of NRC Initial Operator Licensing Examination 05000483/2025301 ML24212A2822024-08-0202 August 2024 Regulatory Audit Summary Concerning Review of Request No. C3R-01 for Proposed Alternative to ASME Code, Section XI Requirements for Containment Building Inspections IR 05000483/20240022024-07-18018 July 2024 And Independent Spent Fuel Storage Installation Integrated Inspection Report 05000483/2024002 and 07201045/2024001 ML24185A1032024-07-16016 July 2024 2024 Biennial Problem Identification and Resolution Inspection Report ULNRC-06892, Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Canister HGMPC00062024-06-26026 June 2024 Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Canister HGMPC0006 ULNRC-06891, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC00052024-06-26026 June 2024 Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC0005 ULNRC-06886, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC00042024-06-12012 June 2024 Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC0004 ULNRC-06885, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC00032024-06-12012 June 2024 Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC0003 ULNRC-06884, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC00022024-06-12012 June 2024 Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC0002 ML24144A0492024-06-11011 June 2024 Requests for Relief from ASME OM Code Pump and Valve Testing Requirements for Fifth 120-Month Inservice Testing Interval ULNRC-06880, Application to Revise Technical Specifications to Adopt Tstf-569, Rev. 2, Revise Response Time Testing Definition (LDCN 24-0008)2024-06-0606 June 2024 Application to Revise Technical Specifications to Adopt Tstf-569, Rev. 2, Revise Response Time Testing Definition (LDCN 24-0008) ML24178A1132024-06-0606 June 2024 Ameren Missouris Intent to Adopt Revision 1 to Amendment 0 of Certificate of Compliance No. 1040 as Applicable to the ISFSI at the Callaway Plant Site ML24143A1632024-05-23023 May 2024 Independent Spent Fuel Storage Installation Registration of Dry Spent Storage Canister HGMPC0001 ULNRC-06882, Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Canister HGMPC00122024-05-16016 May 2024 Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Canister HGMPC0012 ML24137A2342024-05-16016 May 2024 Independent Spent Fuel Storage Installation - Registration of Dry Spent Fuel Storage Canister HGMPC0011 ML24122A1502024-05-0707 May 2024 Audit Plan to Support Review of Steam Generator License Renewal Response to Commitment Nos 34 and 35 ULNRC-06877, Final Safety Analysis Report Revision OL-27 and Technical Specification Bases Revision 252024-05-0606 May 2024 Final Safety Analysis Report Revision OL-27 and Technical Specification Bases Revision 25 IR 05000483/20244022024-05-0606 May 2024 Security Baseline Inspection Report 05000483/2024402 (Full Report) IR 05000483/20240112024-05-0101 May 2024 NRC Post-Approval Site Inspection for License Renewal (Phase 2) Report 05000483/2024011 ULNRC-06856, CFR 50.59 and 10 CFR 72.48 Summary Report2024-05-0101 May 2024 CFR 50.59 and 10 CFR 72.48 Summary Report ML24122A1132024-04-30030 April 2024 Submittal of Callaway, Unit 1, 2023 Annual Radioactive Effluent Release Report ULNRC-06869, Submittal of Callaway, Unit 1, 2023 Annual Radiological Environmental Operating Report2024-04-30030 April 2024 Submittal of Callaway, Unit 1, 2023 Annual Radiological Environmental Operating Report ULNRC-06876, Registration of Dry Spent Fuel Storage Canister HGMPC00102024-04-25025 April 2024 Registration of Dry Spent Fuel Storage Canister HGMPC0010 ULNRC-06872, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC00082024-04-17017 April 2024 Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC0008 ULNRC-06871, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC00072024-04-17017 April 2024 Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC0007 ULNRC-06866, Submittal of Cycle 26 Commitment Change Summary Report2024-04-17017 April 2024 Submittal of Cycle 26 Commitment Change Summary Report ML24108A1082024-04-17017 April 2024 Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Canister HGMPC0009 IR 05000483/20240012024-04-16016 April 2024 Integrated Inspection Report 05000483/2024001 IR 05000483/20244042024-04-0909 April 2024 Cyber Security Inspection Report 05000483/2024404 ML24088A3212024-04-0101 April 2024 Notification of Commercial Grade Dedication Inspection (05000483/2024013) and Request for Information ML24086A5132024-03-26026 March 2024 CFR 50.46 Annual Report Regarding ECCS Evaluation Model Revisions ULNRC-06863, Submittal of Annual Exposure Report for 20232024-03-20020 March 2024 Submittal of Annual Exposure Report for 2023 ML24079A1622024-03-19019 March 2024 Re Nuclear Property Insurance Reporting ML24066A1932024-03-0707 March 2024 2024 Callaway Plant Notification of Biennial Problem Identification and Resolution Inspection and Request for Information ULNRC-06852, Owners Activity Reports (OAR-1 Forms) for Cycle/Refuel 262024-03-0505 March 2024 Owners Activity Reports (OAR-1 Forms) for Cycle/Refuel 26 IR 05000483/20230062024-02-28028 February 2024 Annual Assessment Letter for Callaway Plant Report 05000483/2023006 ML24052A3662024-02-26026 February 2024 Regulatory Audit Plan in Support of Proposed Alternative to ASME Code, Section XI Requirements for Containment Building Inspections ULNRC-06858, Completion of License Renewal Activities Prior to Entering the Period of Extended Operation2024-02-21021 February 2024 Completion of License Renewal Activities Prior to Entering the Period of Extended Operation IR 05000483/20230022024-02-21021 February 2024 Amended Integrated Inspection Report 05000483/2023002 ML24036A1712024-02-20020 February 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0079 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ULNRC-06853, Submittal of 2023 Fitness for Duty Performance Data Per Per 10 CFR 26.7172024-01-29029 January 2024 Submittal of 2023 Fitness for Duty Performance Data Per Per 10 CFR 26.717 IR 05000483/20230042024-01-19019 January 2024 – Integrated Inspection Report 05000483/2023004 ML24008A0552024-01-19019 January 2024 Acceptance of Requested Licensing Action - Proposed Alternative to the Requirements of the ASME Code (EPID L-2023-LLR- 0061) 2024-09-11
[Table view] Category:Technical Specifications
MONTHYEARML23353A1712024-01-18018 January 2024 Issuance of Amendment No. 237 to Clarify Support System Requirements for the Residual Heat Removal System and Control Room Air Conditioning System Under Technical Specifications 3.4.8, 3.7.11, and 3.9.6 ML23347A1212024-01-11011 January 2024 Issuance of Amendment No. 236 to Adopt TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Volume Values to Licensee Control EPID L-2023-LLA-0046) ML23228A0252023-09-25025 September 2023 Issuance of Amendment No. 234 to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test Frequencies ML23166B0882023-09-20020 September 2023 Issuance of Amendment No. 233 for Adoption of Alternative Source Term and Revision of Technical Specifications ML23052A0462023-02-21021 February 2023 Enclosure 4 - Revised Technical Specifications (Retyped Version) ML23052A0452023-02-21021 February 2023 Enclosure 3 - Revised Technical Specifications (Red Line Version) ML23067A1682022-12-29029 December 2022 Technical Specifications, Chapter 4, Design Features ML23067A1592022-12-29029 December 2022 Technical Specifications, Chapter 3, Limiting Condition for Operation (LCO) and Surveillance Requirement (SR) Applicability ML23067A1602022-12-29029 December 2022 Technical Specifications, Chapter 3.6, Containment Systems ML23067A1612022-12-29029 December 2022 Technical Specifications, Chapter 1, Use and Application ML23067A1632022-12-29029 December 2022 Technical Specifications, Chapter 2, Safety Limits (Sls) ML23067A1642022-12-29029 December 2022 Technical Specifications, Chapter 5, Administrative Controls ML23067A1662022-12-29029 December 2022 Technical Specifications, Table of Contents ML23067A1672022-12-29029 December 2022 Technical Specifications, List of Effective Pages ML23067A1692022-12-29029 December 2022 Technical Specifications, Chapter 3.4, Reactor Coolant System ML23067A1702022-12-29029 December 2022 Technical Specifications, Chapter 3.9, Refueling Operations ML23067A1572022-12-29029 December 2022 Technical Specifications, Chapter 3.3, Instrumentation ML23067A1712022-12-29029 December 2022 Technical Specifications, Chapter 3.2, Power Distribution Limits ML23067A1562022-12-29029 December 2022 Technical Specifications, Chapter 3.7, Plant Systems ML23067A1622022-12-29029 December 2022 Technical Specifications, Chapter 3.1, Reactivity Control Systems ML23067A1582022-12-29029 December 2022 Technical Specifications, Chapter 3.5, Emergency Core Cooling Systems (ECCS) ML23067A1652022-12-29029 December 2022 Technical Specifications, Chapter 3.8, Electrical Power System ML22301A0072022-12-0202 December 2022 Issuance of Amendment No. 229 to Revise Technical Specifications to Adopt TSTF-505, Revision 2, and TSTF-439, Revision 2 ML22334A2572022-11-30030 November 2022 Proposed Technical Specification TOC Page (Markup) ML22334A2582022-11-30030 November 2022 Proposed Technical Specification TOC Page (Clean Page) ML22334A2592022-11-30030 November 2022 Revised Technical Specification Pages (Markup) ML22334A2602022-11-30030 November 2022 Revised Technical Specification Pages (Clean Pages) ML22285A1192022-10-12012 October 2022 Attachment 2 to Enclosure 1: Revised Clean Technical Specifications ML22285A1182022-10-12012 October 2022 Attachment 1 to Enclosure 1: Marked-Up Existing Technical Specifications ML22251A3442022-09-0808 September 2022 Attachment 1: Marked-Up TS Pages for TS 3.6.8 ULNRC-06766, Attachment 2: Retyped TS Pages for TS 3.6.82022-09-0808 September 2022 Attachment 2: Retyped TS Pages for TS 3.6.8 ULNRC-06744, Revised Technical Specification Pages2022-08-0404 August 2022 Revised Technical Specification Pages ML22181B1322022-06-30030 June 2022 Attachment 2 - Replacement for Attachment 2, Proposed Technical Specification Changes (Mark-up), of ULNRC-06688 ML22181B1332022-06-30030 June 2022 Attachment 3 - Replacement for Attachment 3, Revised Technical Specification Pages, of ULNRC-06688, as Corrected in ULNRC-06702 ML22153A1772022-06-0202 June 2022 Attachment 1 - Marked-Up Existing Technical Specifications ML22153A1782022-06-0202 June 2022 Attachment 2 - Revised Clean Technical Specifications ML21343A0972021-12-0909 December 2021 Attachment 3: Revised Technical Specifications Pages ML21343A0962021-12-0909 December 2021 Attachment 2: Proposed Technical Specifications Changes (Mark-Up) ML21335A4562021-12-0101 December 2021 Enclosure 4: Retyped Technical Specification Pages ML21335A4552021-12-0101 December 2021 Enclosure 3: Proposed Technical Specification Changes (Mark-Up) ULNRC-06702, Enclosureplacement Version of Attachment 3 to ULNRC-06688, Revision to Technical Specifications to Adopt Risk-Informed Completion Times TSTF-5052021-11-24024 November 2021 Enclosureplacement Version of Attachment 3 to ULNRC-06688, Revision to Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505 ML21194A2752021-06-22022 June 2021 Technical Specification, Chapter 3.3, Instrumentation ML21194A2912021-06-22022 June 2021 Technical Specification, Chapter 3.9, Refueling Operations ML21194A2902021-06-22022 June 2021 Technical Specification, Chapter 4.0, Design Features ML21194A2892021-06-22022 June 2021 Technical Specification, List of Effective Pages ML21194A2882021-06-22022 June 2021 Technical Specification, Table of Contents ML21194A2872021-06-22022 June 2021 Technical Specification, Chapter 3.8, Electrical Power Systems ML21194A2852021-06-22022 June 2021 Technical Specification, Chapter 3.6, Containment Systems ML21194A2862021-06-22022 June 2021 Technical Specification, Chapter 5.0, Administrative Controls ML21194A2842021-06-22022 June 2021 Technical Specification, Chapter 3.7, Plant Systems 2024-01-18
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 July 22, 2010 Mr. Adam C. Heflin Senior Vice President and Chief Nuclear Officer Union Electric Company P.O. Box 620 Fulton, MO 65251
SUBJECT:
CALLAWAY PLANT, UNIT 1 - CORRECTION OF TECHNICAL SPECIFICATION PAGES 3.7-45 AND 3.7-46, ISSUED WITH AMENDMENT NO. 197, WHICH REVISED TECHNICAL SPECIFICATIONS 3.3.2 AND 3.7.2, AND ADDED A NEW TECHNICAL SPECIFICATION 3.7.19 (TAC NO. ME1324)
Dear Mr. Heflin:
By letter dated May 28, 2010 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML101121025), the U.S. Nuclear Regulatory Commission (NRC) issued the Amendment No. 197 to Facility Operating License No. NPF-30, for Callaway Plant, Unit 1. The amendment consisted of changes to the Technical Specifications (TSs) in response to your application dated May 4,2009 (ADAMS Accession No. ML091310167) (ULNRC-05566).
Amendment No. 197 revised TS 3.3.2, "Engineered Safety Feature Actuation System Instrumentation," and TS 3.7.2, "Main Steam Isolation Valves (MSIVs), Main Steam Isolation Valve Bypass Valves (MSIVBVs), and Main Steam Low Point Drain Isolation Valves (MSLPDIVs)," and added new TS 3.7.19, "Secondary System Isolation Valves (SSIVs)."
By electronic mail dated June 8,2010 (ADAMS Accession No. ML101940116), Mr. Thomas Elwood of your staff informed the NRC that a typographical error had been identified on TS pages 3.7-45 and 3.7-46 forwarded in Amendment No. 197. The page break of page 3.7-45 was incorrectly located immediately after REQUIRED ACTION A.2, instead of after "(continued)"
which had moved to the following page 3.7-46. The licensee stated that it had provided the correct pages 3.7-45 and 3.7-46 to NRC, and requested that the correct pages replace the erroneous pages.
The NRC staff reviewed the licensee's request and determined that the error was caused in the licensee-supplied revised pages for Amendment No. 197. The erroneous pages were sent by your staff by electronic mail on May 22, 2010, to Ms. Janet Burkhardt of the NRC staff, and were incorporated in the Amendment No. 197 as received by the NRC staff.
The NRC staff agrees that the pages should be corrected as requested by the licensee.
Accordingly, TS pages 3.7-45 and 3.7-46 have been corrected, and are enclosed for replacement in the Amendment No. 197.
A. Heflin -2 If you have any questions, please contact me at (301) 415-1476 or bye-mail at mohan. thadani@nrc.gov.
Sincerely, Mohan C. Thadani, Senior Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-483
Enclosure:
As stated cc w/encl: Distribution via Listserv
ENCLOSURE CALLAWAY PLANT, UNIT 1 DOCKET NO. 50-483 REPLACEMENT TECHNICAL SPECIFICATION PAGES 3.7-45 AND 3.7-46 FOR AMENDMENT NO. 197
SSIVs 3.7.19 3.7 PLANT SYSTEMS 3.7.19 Secondary System Isolation Valves (SSIVs)
LCO 3.7.19 The SSIVs shall be OPERABLE.
NOTE --------------------------------------------
Locked closed manual SSIVs may be opened under administrative controls.
APPLICABILITY: MODES 1, 2, and 3 except for each secondary system flow path when:
- a. At least one of the two associated SSIVs is closed and de-activated; or
- b. At least one of the two associated SSIVs is closed and isolated by a closed manual valve; or
- c. The SSIV flow path is isolated by two closed manual valves, or two closed de-activated automatic valves, or a combination of a closed manual valve and a closed de-activated automatic valve.
ACTIONS
NOTE ----------------------------------------------------------
Separate Condition entry is allowed for each secondary system flow path.
COMPLETION CONDITION REQUIRED ACTION TIME A. One or more SSIVs ------------------ NOTE ------------------
inoperable. Closed or isolated automatic SSIVs may be opened or unisolated under administrative controls.
A.1 Close or isolate SSIV. 7 days AND.
A.2 Verify SSIV is closed or Once per 7 days isolated.
(continued)
CALLAWAY PLANT 3.7-45 Amendment No. 197
SSIVs 3.7.19 ACTIONS (continued)
COMPLETION CONDITION REQUIRED ACTION TIME B. Required Action and B.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> Associated Completion Time not met. AND B.2 Be in MODE 4. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.19.1 Verify the isolation time of each automatic SSIV is In accordance with within limits. the Inservice Testing Program SR 3.7.19.2 Verify each automatic SSIV in the flow path actuates 18 months to the isolation position on an actual or simulated actuation signal.
CALLAWAY PLANT 3.7-46 Amendment No. 197
A. Heflin -2 If you have any questions, please contact me at (301) 415-1476 or bye-mail at mohan.thadani@nrc.gov.
Sincerely, Ira!
Mohan C. Thadani, Senior Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-483
Enclosure:
As stated cc w/encl: Distribution via Listserv DISTRIBUTION:
PUBLIC LPLIV Reading RidsAcrsAcnw_MailCTR Resource RidsNrrDirsltsb Resource RidsNrrDorlLpl4 Resource RidsNrrDssSbpb Resource RidsNrrLAJBurkhardt Resource RidsNrrPMCallaway Resource RidsOgcRp Resource RidsRgn4MailCenter Resource MHarnm, NRR/DIRS/ITSB SJones, NRR/DSS/SBPB ADAMS Accession No. ML101950210 OFFICE NRR/LPL4/PM NRR/LPL4/LA NRR/LPL4/BC NRR/LPL4/PM MMarkley MThadani NAME MThadani JBurkhardt (MThadani for) (NKalyanam for)