|
---|
Category:Technical Specifications
MONTHYEARML23353A1712024-01-18018 January 2024 Issuance of Amendment No. 237 to Clarify Support System Requirements for the Residual Heat Removal System and Control Room Air Conditioning System Under Technical Specifications 3.4.8, 3.7.11, and 3.9.6 ML23347A1212024-01-11011 January 2024 Issuance of Amendment No. 236 to Adopt TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Volume Values to Licensee Control EPID L-2023-LLA-0046) ML23228A0252023-09-25025 September 2023 Issuance of Amendment No. 234 to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test Frequencies ML23166B0882023-09-20020 September 2023 Issuance of Amendment No. 233 for Adoption of Alternative Source Term and Revision of Technical Specifications ML23052A0462023-02-21021 February 2023 Enclosure 4 - Revised Technical Specifications (Retyped Version) ML23052A0452023-02-21021 February 2023 Enclosure 3 - Revised Technical Specifications (Red Line Version) ML23067A1692022-12-29029 December 2022 Technical Specifications, Chapter 3.4, Reactor Coolant System ML23067A1602022-12-29029 December 2022 Technical Specifications, Chapter 3.6, Containment Systems ML23067A1612022-12-29029 December 2022 Technical Specifications, Chapter 1, Use and Application ML23067A1622022-12-29029 December 2022 Technical Specifications, Chapter 3.1, Reactivity Control Systems ML23067A1642022-12-29029 December 2022 Technical Specifications, Chapter 5, Administrative Controls ML23067A1652022-12-29029 December 2022 Technical Specifications, Chapter 3.8, Electrical Power System ML23067A1672022-12-29029 December 2022 Technical Specifications, List of Effective Pages ML23067A1582022-12-29029 December 2022 Technical Specifications, Chapter 3.5, Emergency Core Cooling Systems (ECCS) ML23067A1682022-12-29029 December 2022 Technical Specifications, Chapter 4, Design Features ML23067A1702022-12-29029 December 2022 Technical Specifications, Chapter 3.9, Refueling Operations ML23067A1562022-12-29029 December 2022 Technical Specifications, Chapter 3.7, Plant Systems ML23067A1572022-12-29029 December 2022 Technical Specifications, Chapter 3.3, Instrumentation ML23067A1632022-12-29029 December 2022 Technical Specifications, Chapter 2, Safety Limits (Sls) ML23067A1592022-12-29029 December 2022 Technical Specifications, Chapter 3, Limiting Condition for Operation (LCO) and Surveillance Requirement (SR) Applicability ML23067A1662022-12-29029 December 2022 Technical Specifications, Table of Contents ML23067A1712022-12-29029 December 2022 Technical Specifications, Chapter 3.2, Power Distribution Limits ML22301A0072022-12-0202 December 2022 Issuance of Amendment No. 229 to Revise Technical Specifications to Adopt TSTF-505, Revision 2, and TSTF-439, Revision 2 ML22334A2572022-11-30030 November 2022 Proposed Technical Specification TOC Page (Markup) ML22334A2602022-11-30030 November 2022 Revised Technical Specification Pages (Clean Pages) ML22334A2592022-11-30030 November 2022 Revised Technical Specification Pages (Markup) ML22334A2582022-11-30030 November 2022 Proposed Technical Specification TOC Page (Clean Page) ML22285A1182022-10-12012 October 2022 Attachment 1 to Enclosure 1: Marked-Up Existing Technical Specifications ML22285A1192022-10-12012 October 2022 Attachment 2 to Enclosure 1: Revised Clean Technical Specifications ML22251A3452022-09-0808 September 2022 Attachment 2: Retyped TS Pages for TS 3.6.8 ML22251A3442022-09-0808 September 2022 Attachment 1: Marked-Up TS Pages for TS 3.6.8 ULNRC-06744, Revised Technical Specification Pages2022-08-0404 August 2022 Revised Technical Specification Pages ML22181B1322022-06-30030 June 2022 Attachment 2 - Replacement for Attachment 2, Proposed Technical Specification Changes (Mark-up), of ULNRC-06688 ML22181B1332022-06-30030 June 2022 Attachment 3 - Replacement for Attachment 3, Revised Technical Specification Pages, of ULNRC-06688, as Corrected in ULNRC-06702 ML22153A1772022-06-0202 June 2022 Attachment 1 - Marked-Up Existing Technical Specifications ML22153A1782022-06-0202 June 2022 Attachment 2 - Revised Clean Technical Specifications ML21343A0972021-12-0909 December 2021 Attachment 3: Revised Technical Specifications Pages ML21343A0962021-12-0909 December 2021 Attachment 2: Proposed Technical Specifications Changes (Mark-Up) ML21335A4562021-12-0101 December 2021 Enclosure 4: Retyped Technical Specification Pages ML21335A4552021-12-0101 December 2021 Enclosure 3: Proposed Technical Specification Changes (Mark-Up) ULNRC-06702, Enclosureplacement Version of Attachment 3 to ULNRC-06688, Revision to Technical Specifications to Adopt Risk-Informed Completion Times TSTF-5052021-11-24024 November 2021 Enclosureplacement Version of Attachment 3 to ULNRC-06688, Revision to Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505 ML21194A2842021-06-22022 June 2021 Technical Specification, Chapter 3.7, Plant Systems ML21194A2912021-06-22022 June 2021 Technical Specification, Chapter 3.9, Refueling Operations ML21194A2902021-06-22022 June 2021 Technical Specification, Chapter 4.0, Design Features ML21194A2892021-06-22022 June 2021 Technical Specification, List of Effective Pages ML21194A2882021-06-22022 June 2021 Technical Specification, Table of Contents ML21194A2872021-06-22022 June 2021 Technical Specification, Chapter 3.8, Electrical Power Systems ML21194A2852021-06-22022 June 2021 Technical Specification, Chapter 3.6, Containment Systems ML21194A2862021-06-22022 June 2021 Technical Specification, Chapter 5.0, Administrative Controls ML21194A2832021-06-22022 June 2021 Technical Specification, Chapter 3.2, Power Distribution Limits 2024-01-18
[Table view] |
Text
CHAPTER TABLE OF CONTENTS CHAPTER 2.0 SAFETY LIMITS (SLs)
Section Page 2.1 SLs ........................................................................................................... 2.0-1 2.2 SL Violations ............................................................................................ 2.0-1 CALLAWAY PLANT 2.0-i
SLs 2.0 2.0 SAFETY LIMITS (SLs) 2.1 SLs 2.1.1 Reactor Core SLs In MODES 1 and 2, the combination of THERMAL POWER, Reactor Coolant System (RCS) highest loop average temperature, and pressurizer pressure shall not exceed the limits specified in the COLR; and the following SLs shall not be exceeded:
2.1.1.1 The departure from nucleate boiling ratio (DNBR) shall be maintained 1.17 for the WRB-2 DNB correlation.
2.1.1.2 The peak fuel centerline temperature shall be maintained < 5080ºF, decreasing by 58ºF per 10,000 MWd/MTU of burnup.
2.1.2 RCS Pressure SL In MODES 1, 2, 3, 4, and 5, the RCS pressure shall be maintained 2735 psig.
2.2 SL Violations 2.2.1 If SL 2.1.1 is violated, restore compliance and be in MODE 3 within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.
2.2.2 If SL 2.1.2 is violated:
2.2.2.1 In MODE 1 or 2, restore compliance and be in MODE 3 within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.
2.2.2.2 In MODE 3, 4, or 5, restore compliance within 5 minutes.
CALLAWAY PLANT 2.0-1 Amendment 216