Intial License Exam, Written Examination Review Worksheet, Form ES-401-9ML102230419 |
Person / Time |
---|
Site: |
Dresden |
---|
Issue date: |
03/08/2010 |
---|
From: |
NRC/RGN-III |
---|
To: |
|
---|
References |
---|
Download: ML102230419 (7) |
|
|
---|
Category:License-Operator
MONTHYEARML23285A2342023-10-13013 October 2023 Confirmation of Initial License Examination RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23160A1712023-06-0909 June 2023 Form 5.1-1 Post Examination Check Sheet ML23160A1672023-05-18018 May 2023 Form 1.3-1 Post Examination Security Agreement ML23160A1702023-05-18018 May 2023 Form 2.1-1 Examination Prep Checklist SVPLTR 23-0019, ILT 22-1 (2023-301) Svpltr 23-0019 Post-Exam Submittal Letter (1)2023-05-0101 May 2023 ILT 22-1 (2023-301) Svpltr 23-0019 Post-Exam Submittal Letter (1) ML23087A0482023-03-28028 March 2023 Operator Licensing Examination Approval - Dresden Nuclear Power Station, April 2023 ML23160A1832023-03-16016 March 2023 3.4-1 Events and Evolutions Checklist ML23160A1802023-03-16016 March 2023 2.3-1 Examination Outline Quality Checklist ML23160A0542023-03-16016 March 2023 2.3-2 - Operating Test Quality Checklist SVPLTR 23-0002, 2.3-4 - Written Examination Quality Checklist2023-03-16016 March 2023 2.3-4 - Written Examination Quality Checklist ML23160A1782023-03-0606 March 2023 ILT Exam Outline Submittal Letter ML23160A0522023-01-25025 January 2023 ILT Exam Submittal Letter RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000237/20213022021-12-29029 December 2021 NRC Initial License Examination Report 05000237/2021302; 05000249/2021302 ML22195A1342021-12-0303 December 2021 Nov 2021 Ile ES-403-1-Written Exam Grading Quality Checklist-Signed ML22195A1312021-12-0303 December 2021 Nov 2021 Ile ES-201-3 - Exam Security Agreement ML22195A1272021-12-0303 December 2021 Nov 2021 Ile ES-201-1 Exam Prep Checklist ML22195A1352021-11-15015 November 2021 Nov 2021 Ile Post-Exam Package Submittal Letter 11/15/2021 ML21287A0442021-10-18018 October 2021 Operator Licensing Examination Approval ML22195A2312021-09-19019 September 2021 Nov 2021 Ile Es 401-6 Written Exam Quality Checklist-Signed ML22195A2282021-09-19019 September 2021 Nov 2021 Ile Es 301-6 Competencies Checklist ML22195A2262021-09-19019 September 2021 Nov 2021 Ile Es 301-4 Simulator Scenario Quality Checklist-Signed ML22195A2222021-09-19019 September 2021 Nov 2021 Ile Es 301-3 Operating Test Quality Checklist-Signed ML22195A2372021-09-0707 September 2021 Nov 2021 Ile Written Exam Submittal Letter 09-07-2021 ML22195A2342021-08-16016 August 2021 Nov 2021 Ile Operating Test Submittal Letter 08-16-2021 ML22195A2662021-06-26026 June 2021 Nov 2021 Ile Es 301-5 Transients and Events Checklist ML22195A2632021-06-26026 June 2021 Nov 2021 Ile Es 201-2 Outline Quality Checklist ML22195A2672021-06-0404 June 2021 Nov 2021 Ile Es 201-2 Outlines Submittal Email ML21139A2372021-05-21021 May 2021 Confirmation of Initial License Examination ML22215A1812021-05-14014 May 2021 April 2021 Administered JPMs ML22236A3332021-05-14014 May 2021 Initial License Exam Forms ES-201-3 ML22236A3322021-05-14014 May 2021 Initial License Exam Form ES-403-1 ML22236A3302021-05-14014 May 2021 Initial License Exam Form ES-201-1 ML22236A3842021-05-14014 May 2021 Initial License Exam Letter 21-0029 ML22235A7572021-05-14014 May 2021 April 2021 Form ES-201-2 Written Outline Only ML22235A7562021-05-14014 May 2021 April 2021 Form ES-301-5 SVPLTR 21-0007, April 2021 Submittal Letter2021-05-14014 May 2021 April 2021 Submittal Letter ML22215A2492021-05-14014 May 2021 April 2021 Form ES-401-6 ML22215A2462021-05-14014 May 2021 April 2021 Form ES-301-6 ML22215A2422021-05-14014 May 2021 April 2021 Form ES-301-4 ML22215A2382021-05-14014 May 2021 April 2021 Form ES-301-3 ML22215A1852021-05-14014 May 2021 April 2021 Administered Scenarios ML22236A0172021-05-14014 May 2021 Initial License Exam Forms ES-301-2 ML22236A0162021-05-14014 May 2021 Initial License Exam Forms ES-301-1 ML22216A1872021-05-14014 May 2021 April 2021 Proposed JPMs ML22216A1902021-05-14014 May 2021 April 2021 Proposed Written Exam ML22216A1892021-05-14014 May 2021 April 2021 Proposed Scenarios ML22236A0182021-05-14014 May 2021 Initial License Exam Forms ES-401-1 and ES-401-3 rev1 ML22215A1862021-05-14014 May 2021 April 2021 Administered Written Exam 2023-06-09
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML23285A2342023-10-13013 October 2023 Confirmation of Initial License Examination RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23160A1712023-06-0909 June 2023 Form 5.1-1 Post Examination Check Sheet ML23160A1672023-05-18018 May 2023 Form 1.3-1 Post Examination Security Agreement ML23160A1702023-05-18018 May 2023 Form 2.1-1 Examination Prep Checklist SVPLTR 23-0019, ILT 22-1 (2023-301) Svpltr 23-0019 Post-Exam Submittal Letter (1)2023-05-0101 May 2023 ILT 22-1 (2023-301) Svpltr 23-0019 Post-Exam Submittal Letter (1) ML23087A0482023-03-28028 March 2023 Operator Licensing Examination Approval - Dresden Nuclear Power Station, April 2023 ML23160A1832023-03-16016 March 2023 3.4-1 Events and Evolutions Checklist ML23160A1802023-03-16016 March 2023 2.3-1 Examination Outline Quality Checklist SVPLTR 23-0002, 2.3-4 - Written Examination Quality Checklist2023-03-16016 March 2023 2.3-4 - Written Examination Quality Checklist ML23160A0542023-03-16016 March 2023 2.3-2 - Operating Test Quality Checklist ML23160A1782023-03-0606 March 2023 ILT Exam Outline Submittal Letter ML23160A0522023-01-25025 January 2023 ILT Exam Submittal Letter RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000237/20213022021-12-29029 December 2021 NRC Initial License Examination Report 05000237/2021302; 05000249/2021302 ML22195A1272021-12-0303 December 2021 Nov 2021 Ile ES-201-1 Exam Prep Checklist ML22195A1312021-12-0303 December 2021 Nov 2021 Ile ES-201-3 - Exam Security Agreement ML22195A1342021-12-0303 December 2021 Nov 2021 Ile ES-403-1-Written Exam Grading Quality Checklist-Signed ML22195A1352021-11-15015 November 2021 Nov 2021 Ile Post-Exam Package Submittal Letter 11/15/2021 ML21287A0442021-10-18018 October 2021 Operator Licensing Examination Approval ML22195A2312021-09-19019 September 2021 Nov 2021 Ile Es 401-6 Written Exam Quality Checklist-Signed ML22195A2282021-09-19019 September 2021 Nov 2021 Ile Es 301-6 Competencies Checklist ML22195A2262021-09-19019 September 2021 Nov 2021 Ile Es 301-4 Simulator Scenario Quality Checklist-Signed ML22195A2222021-09-19019 September 2021 Nov 2021 Ile Es 301-3 Operating Test Quality Checklist-Signed ML22195A2372021-09-0707 September 2021 Nov 2021 Ile Written Exam Submittal Letter 09-07-2021 ML22195A2342021-08-16016 August 2021 Nov 2021 Ile Operating Test Submittal Letter 08-16-2021 ML22195A2662021-06-26026 June 2021 Nov 2021 Ile Es 301-5 Transients and Events Checklist ML22195A2632021-06-26026 June 2021 Nov 2021 Ile Es 201-2 Outline Quality Checklist ML22195A2672021-06-0404 June 2021 Nov 2021 Ile Es 201-2 Outlines Submittal Email ML21139A2372021-05-21021 May 2021 Confirmation of Initial License Examination ML22236A6382021-05-14014 May 2021 April 2021 Initial License Exam Form ES-401-4 ML22215A1812021-05-14014 May 2021 April 2021 Administered JPMs ML22215A1852021-05-14014 May 2021 April 2021 Administered Scenarios ML22236A3332021-05-14014 May 2021 Initial License Exam Forms ES-201-3 ML22236A3322021-05-14014 May 2021 Initial License Exam Form ES-403-1 ML22236A3302021-05-14014 May 2021 Initial License Exam Form ES-201-1 ML22236A3842021-05-14014 May 2021 Initial License Exam Letter 21-0029 ML22235A7572021-05-14014 May 2021 April 2021 Form ES-201-2 Written Outline Only ML22235A7562021-05-14014 May 2021 April 2021 Form ES-301-5 SVPLTR 21-0007, April 2021 Submittal Letter2021-05-14014 May 2021 April 2021 Submittal Letter ML22215A2492021-05-14014 May 2021 April 2021 Form ES-401-6 ML22215A2462021-05-14014 May 2021 April 2021 Form ES-301-6 ML22215A2422021-05-14014 May 2021 April 2021 Form ES-301-4 ML22215A2382021-05-14014 May 2021 April 2021 Form ES-301-3 ML22215A1862021-05-14014 May 2021 April 2021 Administered Written Exam ML22236A6392021-05-14014 May 2021 April 2021 Initial License Exam Form ES-401-9 ML22236A0202021-05-14014 May 2021 Initial License Exam Forms ES-D1 ML22236A6372021-05-14014 May 2021 April 2021 Initial License Exam Form ES-301-7 ML22236A6402021-05-14014 May 2021 April 2021 Initial License Exam Operating Test Outline Comments 2023-06-09
[Table view] |
Text
ES-401 Written Examination Review Worksheet Form ES-401-9
- 1. 2. 3. Psychometric Flaws 4. Job Content Flaws 5. Other 6. 7. 8.
Q# LOK LOD (F/H) (1-5) Stem Cues T/F Cred. Partial Job- Minutia #/ Back- Q= SRO B/M/N U/E/S Explanation Focus Dist. Link units ward K/A Only 1 H@ 2 Y B S 2 H 3 Y B S 3 H 3 Y B S 4 F@ 3 Y B S 5 H 2 Y B S 6 H 3 Y B S 7 F 2 Y B S 8 H 2 N B U Meets K/A for ctmt integrity (219000, 216000, or 230000) but not 203000 for LPCI Injection Mode! Is LPCI injecting? Do torus sprays or torus cooling valves have auto close features? RE: Injection signal in but may not be injecting. Change level to -20 and lowering.
9 H@ 3 Y N S All 3 trains of SDC are energized from bus 23-1??? RE: Not all SDC is from same bus. Keep Q as is.
10 H 3 Y M S 11 F 2 Y B S 12 F 2 Y B S 13 H@ 3 Y B E What does DAN 903-3 A-1 say for why area must be evacuated?
References provided are insufficient. RE: DAN requires evacuating area on high radiation levels. No change to Q.
14 F@ 2 Y B S 15 F 2 Y N S 16 F 2 X N B U Explain why this is not a memory question?? Also,what does this have to do with High Offsite Release Rate? Dont you announce starting pumps? Suggest distractors as 2 pump starts and 2 alarm conditions instead of all pump starts and Rx criticality.
RE: Changed distractors to 2 pump starts and 2 alarm conditions.
Other pump starts do not require PA since pumps are inaccessible.
1
ES-401 Written Examination Review Worksheet Form ES-401-9
- 1. 2. 3. Psychometric Flaws 4. Job Content Flaws 5. Other 6. 7. 8.
Q# LOK LOD (F/H) (1-5) Stem Cues T/F Cred. Partial Job- Minutia #/ Back- Q= SRO B/M/N U/E/S Explanation Focus Dist. Link units ward K/A Only Higher LOK due to application of rule.
17 F@ 2 ? Y B E Capitalize CAN NOT? Are ROs reqd to know EOP step basis?
RE: Yes, EOs are expected to know this information. Capitalized NOT!
18 H 3 Y B S 19 H 2 Y N S 20 F 2 ? B U Doesnt appear to match K/A. Do you have any procedures that would restrict an offsite release based on meteorological conditions?
S How is the lift in progress material to the question? RE: Blow out panels are release path. Keep question as is.
21 H 3 Y B S 22 F@ 2 Y B S 23 H 3 Y B S 24 H 3 Y N S 25 F 3 Y N S 26 F@ 2 Y B S 27 F 2 Y B S 28 F@ 2 Y B S 29 H 2 Y N S 30 H 3 Y B S 31 H 2 Y B S 32 H 2 Y B S 33 F@ 2 Y N S 34 F 2 X Y B E Answer provided in DEOP 100 first Contingency box in Press leg.
Suggest white out on 350 psig in EOP Contingency block. RE: Will whiteout 350 in DEOP 100 contingency block.
2
ES-401 Written Examination Review Worksheet Form ES-401-9
- 1. 2. 3. Psychometric Flaws 4. Job Content Flaws 5. Other 6. 7. 8.
Q# LOK LOD (F/H) (1-5) Stem Cues T/F Cred. Partial Job- Minutia #/ Back- Q= SRO B/M/N U/E/S Explanation Focus Dist. Link units ward K/A Only 35 H 3 Y B S 36 H@ 3 Y B S 37 F 2 Y B S 38 H 2 Y N S 39 H@ 2 Y B S 40 F 2 Y N U Question stem written for U3, distractors written for U2! Re:
Changed Q during exam such that question stem written for U2.
41 H 2 Y N S 42 H 2 Y N S 43 F 2 Y N S 44 H@ 1 Y N U Need to increase level of difficulty here!! RE: Q had a 45% failure rate due to ground checks different between units. Change 2 2
distractors from 5 volts to 10 volts in case applicants add grounds.
45 F 2 Y N S 46 F 2 Y N S 47 F 2 Y N S 48 H@ 2 Y B S 49 F 2 Y M S 50 F@ 3 Y B S 51 F 3 Y B S 52 H 3 Y N S 53 H@ 2 Y N S 54 H 2 Y M S 55 F 2 Y N S 3
ES-401 Written Examination Review Worksheet Form ES-401-9
- 1. 2. 3. Psychometric Flaws 4. Job Content Flaws 5. Other 6. 7. 8.
Q# LOK LOD (F/H) (1-5) Stem Cues T/F Cred. Partial Job- Minutia #/ Back- Q= SRO B/M/N U/E/S Explanation Focus Dist. Link units ward K/A Only 56 H 2 Y B S 57 F 2 Y B S 58 H@ 2 Y B S 59 H 3 Y B S 60 H 3 Y B S 61 H@ 2 Y N S 62 H 2 Y B S 63 H 2 Y B S 64 F@ 2 Y B S 65 F 2 Y N S 66 F@ 2 Y N S 67 F 2 Y N S 68 F 2 Y N S 69 H@ 3 Y N S 70 F 2 Y B S 71 H@ 2 Y B S 72 H 3 Y B S 73 F 3 Y M S 74 F 2 Y B S 75 H@ 3 Y N S 4
ES-401 Written Examination Review Worksheet Form ES-401-9
- 1. 2. 3. Psychometric Flaws 4. Job Content Flaws 5. Other 6. 7. 8.
Q# LOK LOD (F/H) (1-5) Stem Cues T/F Cred. Partial Job- Minutia #/ Back- Q= SRO B/M/N U/E/S Explanation Focus Dist. Link units ward K/A Only 1 H@ 2
- Y B E Why are EP charts provided as references for this Q? Too easy -
direct lookup. RE: Braidwood missed EP call on this exact situation due to start of 15 minutes clock.. Reqd training at station. Changed distractors so that applicants have to chose when 15 minute clock starts.
2 H 2
- Y N S 3 H@ 3 Y B S 4 F 2 Y B S 5 H 3 Y B S 6 F 2
- Y B S 81 7 F@ 2 Y B S 8 F 2 Y N S 9 H 2 Y B S 84 10 H 3 Y B S 11 H 3 Y B E I imminent less than 2 minutes? Inserting CRAM rods may not be incorrect as initial operator action. Start from 23 Hg in lieu of 24?
RE: At EOL, need lots of CRAM rods to bite power. Only leaves 1 min 20 sec before reach reqd scram. Not enough time to insert CRAM rods. Leave Q as is.
12 H@ 2 Y N S 87 13 H 2 Y N S 14 H 3 X Y N U Are all DW coolers powered from Bus 33-1? If no, C could be correct answer also! RE: DW coolers powered from Buses 38 & 39.
S Also C distractor not correct since there was no isolation of DW cooling - no PCIS Level 2 present in Q stem! Leave Q as is.
15 H 2 Y N S 16 H 4 Y B S 91 5
ES-401 Written Examination Review Worksheet Form ES-401-9
- 1. 2. 3. Psychometric Flaws 4. Job Content Flaws 5. Other 6. 7. 8.
Q# LOK LOD (F/H) (1-5) Stem Cues T/F Cred. Partial Job- Minutia #/ Back- Q= SRO B/M/N U/E/S Explanation Focus Dist. Link units ward K/A Only 17 H@ 3 Y N S 18 H 4 Y B S 19 H 3 Y B S 20 H@ 3 Y N S 21 H 2 Y N S 22 H 2 Y N S 97 23 F@ 2 X Y B U Used temporary in stem and in correct distractor. Suggest using portable in lieu of temporary in distractor. RE: Replaced temporary with portable.
24 H 3 Y N S 25 F 2 Y N S 6
ES-401 Written Examination Review Worksheet Form ES-401-9 Instructions
[Refer to Section D of ES-401 and Appendix B for additional information regarding each of the following concepts.]
- 1. Enter the level of knowledge (LOK) of each question as either (F)undamental or (H)igher cognitive level.
- 2. Enter the level of difficulty (LOD) of each question using a 1 - 5 (easy - difficult) rating scale (questions in the 2 - 4 range are acceptable).
- 3. Check the appropriate box if a psychometric flaw is identified:
- The stem lacks sufficient focus to elicit the correct answer (e.g., unclear intent, more information is needed, or too much needless information).
- The stem or distractors contain cues (i.e., clues, specific determiners, phrasing, length, etc).
- The answer choices are a collection of unrelated true/false statements.
- The distractors are not credible; single implausible distractors should be repaired, more than one is unacceptable.
- One or more distractors is (are) partially correct (e.g., if the applicant can make unstated assumptions that are not contradicted by stem).
- 4. Check the appropriate box if a job content error is identified:
- The question is not linked to the job requirements (i.e., the question has a valid K/A but, as written, is not operational in content).
- The question requires the recall of knowledge that is too specific for the closed reference test mode (i.e., it is not required to be known from memory).
- The question contains data with an unrealistic level of accuracy or inconsistent units (e.g., panel meter in percent with question in gallons).
- The question requires reverse logic or application compared to the job requirements.
- 5. Check questions that are sampled for conformance with the approved K/A and those that are designated SRO-only (K/A and license level mismatches are unacceptable).
- 6. Enter question source: (B)ank, (M)odified, or (N)ew. Check that (M)odified questions meet criteria of ES-401 Section D.2.f.
- 7. Based on the reviewers judgment, is the question as written (U)nsatisfactory (requiring repair or replacement), in need of (E)ditorial enhancement, or (S)atisfactory?
- 8. At a minimum, explain any U ratings (e.g., how the Appendix B psychometric attributes are not being met).
@ - Denotes 30 initial review questions that verified references, K/A conformance, level of difficulty and level of knowledge.
RKWalton 1/20/2010 7