MONTHYEARML24296A0652024-10-22022 October 2024 NRR E-mail Capture - Arkansas Nuclear One, Unit 2 - Verbal Authorization of Relief Request for the Proposed Alternative ANO2-RR-24-001 ML24227A0072024-08-13013 August 2024 NRR E-mail Capture - LIC-109 Acceptance - ANO 2 - Proposed Alternative for Implementation of Extended Reactor Vessel In-Service Inspection Interval (ANO2-ISI-24-02) - EPID L-2024-LLR-0048 ML24218A0652024-08-0202 August 2024 NRR E-mail Capture - LIC-109 Acceptance Review - Arkansas Nuclear One, Unit 1 - License Amendment Request - Request for Review and Approval Changes to SAR and to a Confirmatory Order - Pzr Htr Emergency Power Supply - EPID L-2024-LLA-0092 ML24180A0022024-06-26026 June 2024 NRR E-mail Capture - LIC-109 Acceptance - ANO 1 and 2 - Proposed Alternatives for Examinations of SG Pressure Retaining Welds and Full Penetrations Nozzles - EPID L-2024-LLR-0038 ML24149A3672024-05-28028 May 2024 August 2024 Emergency Preparedness Exercise Inspection - Request for Information ML24117A0262024-04-26026 April 2024 NRR E-mail Capture - ANO Unit 2 - Acceptance of Requested Licensing Action License Amendment Request to Revise Typographical Errors in Technical Specifications ML24088A0082024-03-27027 March 2024 NRR E-mail Capture - ANO-2 -- TSTF-505 Post-Audit Final RAI (L-2023-LLA-0052) ML23269A0232023-09-22022 September 2023 NRR E-mail Capture - Arkansas Nuclear One, Unit 2 - TSTF-505 Audit Questions ML23240A3412023-08-28028 August 2023 NRR E-mail Capture - ANO-2, Grand Gulf, and River Bend - Acceptance Review of LAR Revising TSs to Adopt TSTF-205, Revision of Channel Calibration, Channel Functional Test, and Related Definitions ML23194A1752023-07-13013 July 2023 NRR E-mail Capture - ANO-1 - Acceptance Review of Alternative Request ANO1-ISI-037 ML23187A0432023-07-0303 July 2023 NRR E-mail Capture - Arkansas Nuclear One, Unit 1 - TSTF-505 Audit Agenda ML23166A0132023-06-14014 June 2023 NRR E-mail Capture - Arkansas Nuclear One, Unit 1 - TSTF-505 Audit Questions ML23130A2752023-05-10010 May 2023 NRR E-mail Capture - ANO Unit 2- Acceptance of Requested Licensing Action LAR to Adopt TSTF-505 Revision 2 ML23118A0692023-04-28028 April 2023 NRR E-mail Capture - ANO Unit 1 - Acceptance of Requested Licensing Action LAR to Modify ANO-1 TS 3.3.1, Reactor Protection System Instrumentation (L-2023-LLA-0048) ML23104A1052023-03-10010 March 2023 NRR E-mail Capture - ANO-2 Final RAI Alternative Request for Life-of-Repair of RVCH Pen. 46 ML23072A3672023-03-0909 March 2023 NRR E-mail Capture - Entergy Fleet - Acceptance Review of Quality Assurance Program Manual Reduction in Commitment ML23039A0872023-02-0808 February 2023 NRR E-mail Capture - Arkansas Nuclear One, Unit 2 - Acceptance Review of Relief Request ANO2-RR-23-001, Half-Nozzle Repair of RVCH Penetration 46 (L-2023-LLR-0000) ML23026A1322023-01-26026 January 2023 NRR E-mail Capture - ANO Unit 1 - Acceptance of Requested Licensing Action LAR to Adopt TSTF-505 Revision 2 ML22354A0122022-12-19019 December 2022 NRR E-mail Capture - ANO-1 and ANO-2 - Acceptance Review of Request for Alternative ANO-CISI-002 Alternative Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (L-2022-LLR-0080) ML22349A0112022-12-14014 December 2022 NRR E-mail Capture - Final RAI Relief Request ANO1-ISI-035 ML22341A1202022-12-0707 December 2022 NRR E-mail Capture - ANO Unit 1 - Acceptance of Requested Licensing Action LAR to to Remove Technical Specification Condition Allowing Two Reactor Coolant Pump Operation (L-2022-LLA-0161) ML22273A0982022-09-30030 September 2022 NRR E-mail Capture - ANO Units 1 and 2 - Acceptance of Requested Licensing Action Emergency Plan Staffing Requirements ML22265A2012022-09-22022 September 2022 NRR E-mail Capture - ANO-1 - Acceptance Review of Relief Request ANO1-ISI-036 ML22188A1782022-07-0707 July 2022 NRR E-mail Capture - ANO-1 - Acceptance Review of Relief Request ANO1-ISI-035 ML22174A1362022-06-23023 June 2022 NRR E-mail Capture - ANO-2 Final RAI Relief Requests ANO2-ISI-023 Through -028 (EPIDs L-2022-LLR-0022 Through -0027) ML22151A3262022-05-31031 May 2022 August 2022 Emergency Preparedness Exercise Inspection - Request for Information ML22124A2452022-05-0404 May 2022 NRR E-mail Capture - ANO-1 and ANO-2 - Final RAI 2 License Amendment Requests to Implement Provisions of 10 CFR 50.69 (L-2021-LLA-0105/-0106) ML22108A1642022-04-18018 April 2022 NRR E-mail Capture - ANO-1: Final RAI License Amendment Request Concerning TS Changes Due to Revised Dose Calculations (L-2021-LLA-0181) ML22081A3902022-03-22022 March 2022 NRR E-mail Capture - ANO-2 - Acceptance Review of Relief Requests ANO2-ISI-023, -024, -025, -026, -027, and -028 (Epids: L-2022-LLR-022, -023, -024, -025, -026, and -027) ML22034A5482022-02-0303 February 2022 NRR E-mail Capture - Final RAI License Amendment Requests to Implement Provisions of 10 CFR 50.69 (L-2021-LLA-0105/-0106) ML22020A0822022-01-19019 January 2022 NRR E-mail Capture - ANO-1 and 2 - Final RAI 2 License Amendment Requests to Allow the ECP to Remain Operable on a One-Time Basis for Up to 65 Days to Perform Piping Upgrade (L-2021-LLA-0015) ML22020A0742022-01-13013 January 2022 NRR E-mail Capture - ANO Unit 2 - Acceptance of Requested Licensing Action Alternative ANO2-PT-003 ML21314A1212021-11-0909 November 2021 Verbal Authorization of Relief Request ANO2-RR-21-002 ML21312A0382021-11-0505 November 2021 NRR E-mail Capture - ANO-2 RAI Relief Request ANO2-RR-21-002 ML21312A4792021-11-0505 November 2021 Email: NRC Staff Preliminary Questions Regarding X Energy LLC Xe-100 Topical Report: Risk-Informed Performance-Based Licensing Basis Development ML21308A5602021-11-0404 November 2021 NRR E-mail Capture - Arkansas Nuclear One, Units 1 and 2, Grand Gulf, River Bend, and Waterford, Unit 3 - Acceptance Review of LAR to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements ML21292A0112021-10-18018 October 2021 NRR E-mail Capture - ANO, 1 and 2, Grand Gulf, River Bend, Waterford, 3 - Acceptance Review of LAR to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position ML21287A1692021-10-13013 October 2021 Record of 10-13-21 Verbal Authorization of ANO2-R&R-012 (L-2021-LLR-0082) ML21298A1562021-10-11011 October 2021 NRR E-mail Capture - ANO-2 Final RAI Relief Request ANO2-R&R-012 Concerning Rv Closure Head Penetration 46 ML21273A0672021-09-29029 September 2021 NRR E-mail Capture - ANO-2 Final RAI 2 License Amendment Request to Adopt a Safety Function Determination Program ML21238A3742021-08-23023 August 2021 RFI Email - Cyber PI&R Inspection (ANO) ML21252A0052021-08-20020 August 2021 NRR E-mail Capture - ANO-1 and 2 Final RAI License Amendment Request to Allow the ECP to Remain Operable on a One-Time Basis for Up to 65 Days to Perform Piping Upgrade (L-2021-LLA-0015) ML21217A3302021-08-0505 August 2021 (ANO) Problem Identification and Resolution (PIR) Request for Information Combined ML21202A1662021-07-20020 July 2021 NRR E-mail Capture - ANO Unit 2 - Acceptance of Requested Licensing Action Alternative ANO2-PT-003 ML21201A0062021-07-19019 July 2021 NRR E-mail Capture - Arkansas Nuclear One, Units 1 and 2, and Waterford, Unit 3 - Acceptance Review of LAR to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections ML21197A0372021-07-16016 July 2021 NRR E-mail Capture - ANO-1 and 2 - Final RAI Final Response to GL 2004-02 ML21179A0052021-06-25025 June 2021 NRR E-mail Capture - ANO Unit 2 - Acceptance of Requested Licensing Action License Amendment Request to Adopt 10 CFR 50.69 ML21179A0042021-06-25025 June 2021 NRR E-mail Capture - ANO Unit 1 - Acceptance of Requested Licensing Action License Amendment Request to Adopt 10 CFR 50.69 ML21174A0342021-06-22022 June 2021 NRR E-mail Capture - Entergy Fleet (ANO, Ggulf, Rbend, & Waterford) - Acceptance Review for Relief Request to Use a Provision of a Later Edition of the ASME Code, Section XI for Periodic System Pressure Tests Exemptions ML21116A1092021-04-26026 April 2021 NRR E-mail Capture - ANO-1 and ANO-2: Final Supplemental RAI Proposed Alternative to ASME Section XI Requirements for Repair/Replacement of ECP Supply Piping 2024-08-02
[Table view] |
Text
From: BICE, DAVID B [DBICE@entergy.com]
Sent: Thursday, July 28, 2011 10:18 AM To: Kalyanam, Kaly Cc: CLARK, ROBERT W; PYLE, STEPHENIE L
Subject:
Upcoming TS Change Importance: High
- Kaly, As has been discussed somewhat in our biweekly calls, ANO-2 (CE, non-ITS plant) is nearing the time we will submit proposed TS changes that support our new Fuel Handling Accident (FHA) analysis. This part of the change is a side-bar from Alternate Source Term which was recently approved for ANO-2 and is pretty straight forward.
Due to the significant costs of TS changes, Entergy has a practice of reviewing a database of awaiting changes for any TS page that is being changed for another reason. In this case, we have determined that four TSTFs should be adopted simultaneously with the above change, since there is overlap between the TSs affected by the TSTFs and the TSs affected by the above FHA analysis. These TSTFs have long been on our plate to adopt, are someone older TSTFs, and all are associated with shutdown conditions.
Note that the FHA change must be submitted since our TSs are non-conservative in this regard (being tracked by a Condition Report and Administrative controls are already in place IAW Admin Letter 98-10).
As a result, on the surface the TS package may appear to be quite complex. However, the package is laid out such that each TSTF and the FHA are discussed separately and in a logical order, with the order maintained in each section of the LAR requiring discussion (proposed change, background, and technical justification sections). The changes necessary for each are discussed separately, and any "differences" between the TSTFs and our adoption of the TSTFs are discussed on a per-TSTF basis. Probably the biggest thing that makes it seem complex is that ANO-2 is non-ITS, so there are inherent wording differences that come along with the change, especially since ITS and Custom TS usage rules are different.
We wish to take every opportunity available to discuss this submittal with the Staff in order to minimize any issues that may arise during the NRC acceptance review. Therefore, I'd prefer a presubmittal conference call if possible. If necessary, I can come to your offices for a face-to-face meeting. To accommodate presubmittal discussions, I've included a short summary of the changes we will be proposing below. TSTF-51 is the oldest and farthest-reaching of the bunch. The others are pretty easy to grasp. From a standpoint of picking NRC reviewers, the changes are basically associated with moving fuel or shutdown reactivity. They do NOT affect dry fuel storage. Please let me know how you wish to proceed. Thanks very much for your patience in this matter.
David Bice ANO Licensing FHA - our old analysis did not consider the weight of the grapple and other components and therefore assumed the failure of only the dropped assembly. Our new analysis (already reviewed and found acceptable by the NRC in our AST letters), considers the added weight and results in the failure of both the dropped assembly and the impacted assembly seated in the vessel or fuel pool. This requires a change to all TSs that discuss the "movement of fuel" since related TSs may now be applicable even if moving new (unirradiated) fuel over irradiated fuel. Obviously, this affects a lot of TSs.
TSTF this is a very old TSTF that removes reference to "core alterations" and instead keys on the "movement of fuel" which is the bounding item considered in FHA analyses throughout the industry. It also adds the term "recently" to "irradiated fuel" for those plants and situations where analysis has shown that an FHA long after shutdown would not result in offsite dose limits being exceeded (for ANO, this would be > 100 hours0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br /> after shutdown, as previously reviewed and accepted by the NRC). Note that we are not adding the "recently" term to Control Room Emergency Ventilation System (CREVS) related specs (i.e., we are still going to require operable CREVS no matter how long we've been shutdown).
TSTF-272 - this corrects a deficiency in the Refueling Boron spec which currently only applies to the RCS. The correction applies the boron requirement to the Refueling Canal whenever it is connected to the RCS (vessel head removed).
TSTF-286 - This allows operators to control the plant by making minor changes in inventory level, temperature, etc. as needed, during conditions where the TSs require ceasing positive reactivity additions, provided required Shutdown Margin is maintained.
TSTF-471 - This is simply a supplement to TSTF-51 above. Following TSTF-51, it was noted the "core alterations" term was also located in some other specs. This TSTF deletes this term from the remaining locations.
RELOCATIONS/DELETIONS - while comparing the TSTFs with our specs along with performing a word search to ensure all affected TSs were identified, we had hits on specs that no longer exist in the ITS standard. These TSs are mainly proposed for relocation to the site Technical Requirements Manual (part of the SAR) consistent with ITS. One is proposed for deletion (minimum RCS flow for boron dilution) because it can be covered by other TSs, provided a couple minor changes are made to these specs (included in the submittal). The relocations are (short title): Decay Time, Communications (during fuel handling), Refueling Machine, and Crane Travel over fuel pool.