ML112440184

From kanterella
Revision as of 16:20, 12 November 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Inspection/Activity Report 22, 09/01/2011 - 12/31/2012
ML112440184
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 09/01/2011
From:
Division Reactor Projects II
To:
Shared Package
ML112440178 List:
References
IR-11-008
Download: ML112440184 (2)


Text

Page 1 of 2 Sequoyah 09/01/2011 08:52:53 Inspection / Activity Plan Report 22 09/01/2011 - 12/31/2012 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site PSB1-RP - RP PUBLIC RADIATION PROTECTION INSP 4 1, 2 09/12/2011 09/16/2011 IP 71124.04 Occupational Dose Assessment 1, 2 09/12/2011 09/16/2011 IP 71124.05 Radiation Monitoring Instrumentation 1, 2 09/12/2011 09/16/2011 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 1, 2 09/12/2011 09/16/2011 IP 71124.07 Radiological Environmental Monitoring Program 1, 2 09/12/2011 09/16/2011 IP 71151 Performance Indicator Verification PSB1EP - EMERGENCY PREPAREDNESS INSPECTION 1 1, 2 10/10/2011 10/14/2011 IP 7111402 Alert and Notification System Testing 1, 2 10/10/2011 10/14/2011 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 1, 2 10/10/2011 10/14/2011 IP 7111404 Emergency Action Level and Emergency Plan Changes 1, 2 10/10/2011 10/14/2011 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 1, 2 10/10/2011 10/14/2011 IP 71151 Performance Indicator Verification OL EXAM - INITIAL EXAM PREP 6 1 12/19/2011 12/23/2011 V23354 SEQUOYAH/JANUARY 2012 EXAM AT POWER FACILITIES OL EXAM - INITIAL EXAM - WEEK 1 6 1 01/16/2012 01/20/2012 V23354 SEQUOYAH/JANUARY 2012 EXAM AT POWER FACILITIES MODS - MODIFICATIONS INSPECTION 3 1, 2 01/16/2012 01/20/2012 IP 7111117T Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 1, 2 01/30/2012 02/03/2012 IP 7111117T Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications OL EXAM - INITIAL EXAM - WEEK 2 4 1 01/23/2012 01/27/2012 V23354 SEQUOYAH/JANUARY 2012 EXAM AT POWER FACILITIES EB3 HS - TRIENNIAL HEAT SINK INSPECTION 1 1, 2 07/16/2012 07/20/2012 IP 7111107T Heat Sink Performance PSB1-RP - OCCUPATIONAL RP BASELINE WK1 3 1, 2 10/22/2012 10/26/2012 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 10/22/2012 10/26/2012 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 10/22/2012 10/26/2012 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 10/22/2012 10/26/2012 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 1, 2 10/22/2012 10/26/2012 IP 71151 Performance Indicator Verification PSB1EP - EMERGENCY PREPAREDNESS EXERCISE 3 1, 2 10/22/2012 10/26/2012 IP 7111401 Exercise Evaluation 1, 2 10/22/2012 10/26/2012 IP 7111404 Emergency Action Level and Emergency Plan Changes 1, 2 10/22/2012 10/26/2012 IP 71151 Performance Indicator Verification This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures. Enclosure

Page 2 of 2 Sequoyah 09/01/2011 08:52:53 Inspection / Activity Plan Report 22 09/01/2011 - 12/31/2012 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site 7111108 - SQN 1 ISI 1 1 10/29/2012 11/02/2012 IP 7111108P Inservice Inspection Activities - PWR 7111108 - SQN 1 SG REPLACEMENT 1 1 10/29/2012 11/30/2012 IP 7111108P Inservice Inspection Activities - PWR PSB1-RP - OCCUPATIONAL RP BASELINE WK2 4 1, 2 11/05/2012 11/09/2012 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 11/05/2012 11/09/2012 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 11/05/2012 11/09/2012 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 11/05/2012 11/09/2012 IP 71124.04 Occupational Dose Assessment 1, 2 11/05/2012 11/09/2012 IP 71124.05 Radiation Monitoring Instrumentation 1, 2 11/05/2012 11/09/2012 IP 71151 Performance Indicator Verification OL RQ - REQUAL INSPECTION 2 1, 2 11/19/2012 11/23/2012 IP 7111111B Licensed Operator Requalification Program This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures. Enclosure