Errata for Diablo Canyon Nuclear Power Plant, Units 1 and 2 - Notification of NRC Initial Operator Licensing Examination 05000275-12-302; 05000323-12-302
ML12319A332
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 11/13/2012
From: Vincent Gaddy
Operations Branch IV
To: Halpin E
Pacific Gas & Electric Co
References
50-275/12-302, 50-323/12-302
Download: ML12319A332 (4)


See also: IR 05000275/2012302

Text

UNITE D S TATE S

NUC LEAR RE GULATOR Y C OMMI S SI ON

R E G IO N I V

1600 EAST LAMAR BLVD

AR L I NGTON , TEXAS 7 601 1- 4511

November 13, 2012

Mr. Edward D. Halpin

Senior Vice President and

Chief Nuclear Officer

Pacific Gas and Electric Company

Diablo Canyon Power Plant

P.O. Box 56, Mail Code 104/6

Avila Beach, CA 93424

SUBJECT: ERRATA FOR DIABLO CANYON NUCLEAR POWER PLANT, UNITS 1 AND 2 -

NOTIFICATION OF NRC INITIAL OPERATOR LICENSING EXAMINATION

05000275/2012302; 05000323/2012302

Dr. Mr. Halpin:

This Errata corrects the cover page to change the inspection report number from

05000275/2013301; 05000323/2013301 to 05000275/2012302; 05000323/2012302. Please

replace the cover page with the enclosed revised page. We regret any inconvenience this may

have caused.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be

available electronically for public inspection in the NRC Public Document Room or from the

Publicly Available Records (PARS) component of the NRCs document system, ADAMS.

ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the

Public Electronic Reading Room).

Should you have any questions concerning this inspection, we will be pleased to discuss them.

Sincerely,

/RA/

Vincent Gaddy, Chief

Operations Branch

Division of Reactor Safety

Dockets: 50-275; 50-323

Licenses: DPR-80; DPR-82

Enclosure:

Errata - Cover Page for Diablo Canyon Nuclear Power Plant

Notification of NRC Initial Operator Licensing Examination,

dated June 28, 2012

E. Halpin -2-

Electronic distribution by RIV:

Regional Administrator (Elmo.Collins@nrc.gov)

Deputy Regional Administrator (Art.Howell@nrc.gov)

DRP Director (Kriss.Kennedy@nrc.gov)

Acting DRP Deputy Director (Barry.Westreich@nrc.gov)

Acting DRS Director (Tom.Blount@nrc.gov)

Acting DRS Deputy Director (Jeff.Clark@nrc.gov)

Senior Resident Inspector (Thomas.Hipschman@nrc.gov)

Resident Inspector (Laura.Micewski@nrc.gov)

Branch Chief, DRP/B (Neil.OKeefe@nrc.gov)

Senior Project Engineer, DRP/B (Leonard.Willoughby@nrc.gov)

Project Engineer, DRP/B (David.You@nrc.gov)

DC Administrative Assistant (Madeleine.Arel-Davis@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Public Affairs Officer (Lara.Uselding@nrc.gov)

Project Manager (Joseph.Sebrosky@nrc.gov)

Branch Chief, DRS/TSB (Ray.Kellar@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Technical Support Assistant (Loretta.Williams@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

OEMail Resource

RIV/ETA: OEDO (Cayetano.Santos@nrc.gov)

DRS/TSB STA (Dale.Powers@nrc.gov)

ADAMS: No # Yes # SUNSI Review Complete Reviewer Initials: SMG

  1. Publicly Available # Non-Sensitive

Non-publicly Available Sensitive

RIV: DRS/OPS RIV: DRS/BC OPS

SGarchow VGaddy

/RA/ /RA/

11/13/2012 11/13/2012

OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax

ENCLOSURE

REVISED COVER PAGE

FOR

DIABLO CANYON NUCLEAR POWER PLANT, UNITS 1 AND 2 -

NOTIFICATION OF NRC INITIAL OPERATOR LICENSING

EXAMINATION 05000275/2012302; 05000323/2012302

UNITE D S TATE S

NUC LEAR RE GULATOR Y C OMMI S SI ON

R E G IO N I V

1600 EAST LAMAR BLVD

AR L I NGTON , TEXAS 7 601 1- 4511

June 28, 2012

John T. Conway, Senior Vice President

and Chief Nuclear Officer

Pacific Gas and Electric Company

77 Beale Street, B32

San Francisco, CA 94105

SUBJECT: DIABLO CANYON NUCLEAR POWER PLANT, UNITS 1 AND 2 -

NOTIFICATION OF NRC INITIAL OPERATOR LICENSING EXAMINATION

05000275/2012302; 05000323/2012302

Dear Mr. Conway:

In a telephone conversation on January 25, 2012 between Messrs. Ron Fortier, Senior

Instructor, and Steve Garchow, Chief Examiner, arrangements were made for the administration

of licensing examinations at Diablo Canyon Power Plant during the weeks of November 26 and

December 3, 2012.

As agreed during the telephone conversation, the staff of the U.S. Nuclear Regulatory

Commission (NRC) will prepare the written examination and will coordinate the development of

the operating test based on the guidelines in NUREG-1021, Operator Licensing Examination

Standards for Power Reactors, Revision 9, Supplement 1, and NUREG-1122, Knowledge and

Abilities Catalog for Nuclear Power Plant Operators, Revision 2, Supplement 1. Your staff will

be given the opportunity to review the examinations during the week of July 20, 2012.

To meet the above schedule, it will be necessary for your staff to furnish the operating test

outlines by September 7, 2012. The operating tests and supporting reference materials

identified in Attachment 3 to ES-201 will be due by October 5, 2012. Pursuant to Title 10,

Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized

representative of the facility licensee shall approve the outlines and tests before they are

submitted to the NRC for review and approval. All materials shall be complete and ready-to-

use.] We request that any personal, proprietary, sensitive unclassified, or safeguards

information in your response be contained in a separate enclosure and appropriately marked.

Any delay in receiving the required reference materials, or the submittal of inadequate or

incomplete materials, may cause the examinations to be rescheduled. In addition, your support

for on-site validation of the examinations is required during the week of November 5, 2012.