Similar Documents at Fermi |
---|
Category:Deficiency Report (per 10CFR50.55e and Part 21)
MONTHYEARML22301A1742022-10-28028 October 2022 Global Nuclear Fuel Americas, LLC (GNF) - Part 21 60-Day Interim Report Notification: GNF3 Raised Water Rod (SC-22-04 Rt) ML19347A4262019-12-10010 December 2019 General Atomics - Reportable Occurrence Under 10CFR21: Reported Failure in Analog High Range Radiation Monitor (RP-2C) ML19121A1552019-04-15015 April 2019 Curtiss-Wright Nuclear Division, Enertech - 10 CFR Part 21 Notification for SF-1154 Hydraulic Fluid ML19101A0972019-04-0404 April 2019 Weir Valves & Controls USA, Inc. Part 21 Written Notification - Event Number: 53973 - 24 Class 150 Globe Alve for RHRSW HX Isolation MOV, E1150F068B at Detroit Edison - Fermi, Unit 2, Experienced Two Stem Failures ML19087A2512019-03-11011 March 2019 Weir Valves & Controls USA, Inc. - 10 CFR Part 21 Report: 24 Class 150 Globe Failed to Fully Open Due to the Failure of the Anti-Rotation Key ML18302A2282018-10-19019 October 2018 Itt Enidine - USNRC 10CFR Part 21 Notification ML17081A4532017-03-20020 March 2017 Part 21 - Plastic Jar Dedication Sampling ML17026A4142017-01-20020 January 2017 C&D Technologies, Inc. - Part 21 - Plastic Jar Dedication Sampling ML16294A2642016-10-18018 October 2016 Part 21 Report - Defective Current to Pressure Transducers ML16209A0502016-07-13013 July 2016 Part 21 - Furmanite Nuclear Grade Leak Seal Material FSC-N-1B ML15288A1992015-10-0909 October 2015 Part 21 Interim Report - Potential Defect on P/N 535-601 Moore Industries Milliamp Modules ML15223B2632015-08-10010 August 2015 Notification of Part 21 Interim Report - Potential Defect on P/N 535-601 Moore Industries Milliamp ML15223B2642015-08-0606 August 2015 Part 21 Report - Notification of Deviation Regarding Hk Circuit Breaker Pivot Pin ML15103A2442015-04-0606 April 2015 Part 21 Report - Deviation of Hk Circuit Breaker Close Latch Spring ML14365A0592014-12-23023 December 2014 Part 21 Notification - Baldor AC Motors with Potential Bearing End Cap Alignment Issues ML14274A0522014-09-22022 September 2014 Final Report 10CFR Part 21 Evaluation Regarding Misaligned Separators in LCR-25 Standby Batteries, Revision 1 - Original Letter Did Not Include the List of Affected Utilities ML14265A0492014-09-12012 September 2014 Amendment to Part 21 Report from Abb, Inc Re Deviation of K-Line Circuit Secondary Close Latch (Event #50371) ML14237A1212014-08-15015 August 2014 Notification of Potential Part 21 Re Notice of Deviation Regarding K-Line Circuit Breaker Secondary Close Latch ML14210A0102014-07-23023 July 2014 Part 21 - Unseating of Valve Spring on Scram Solenoid Pilot Valve ML14204A7082014-07-23023 July 2014 Enclosure 2, Description of Closure Evaluation, Non-Proprietary Information - Class I (Public) ML14204A7072014-07-23023 July 2014 Completed Evaluation of Part 21 Potentially Reportable Condition Notification: Unseating of Valve Spring on SSPV ML14112A4812014-04-15015 April 2014 Letter from James Thigpen Nuclear Nonconformance Event Number 50017 ML14101A3442014-04-10010 April 2014 Notification of Part 21 - Potential Defect in Motors Shipped to DTE Electric Co ML14072A3262014-03-13013 March 2014 Enclosure 2: Description of Evaluation ML14072A3282014-03-13013 March 2014 Part 21 60-Day Interim Report Notification Re Unseating of Valve Spring on SSPV ML13340A3822013-12-0505 December 2013 Part 21 Reportable Condition Notification: Failure of Relay Logic Card Modules in 2 Out of 4 Voters ML13284A0842013-10-0303 October 2013 Deficiency Report from Baldor Electric Co., on Nuclear Nonconformance Event No. 49302 ML13238A2532013-08-21021 August 2013 Notification of Potential Part 21 Report - Foxboro Power Supply Potential Failures Due to Defective the Wraps and Holders ML13165A3422013-06-12012 June 2013 60-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers ML13093A1542013-04-0202 April 2013 Part 21 Notification - Protective Relays May Not Be Qualified for Harsh Environments ML13093A1532013-04-0202 April 2013 Part 21 Report - Foxboro Power Supply Potential Failures Due to Defective Tie Wraps and Holders ML13042A0962013-02-0808 February 2013 Completed Evaluation of Part 21 Potentially Reportable Condition Notification: Error in Main Steam Line High Flow Calculational Methodology ML13044A0752013-02-0808 February 2013 Part 21 - Completed Evaluation for Potential Error in Main Steam Line High Flow Calculational Methodology ML12352A1232012-12-13013 December 2012 60-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers ML12348A1362012-12-13013 December 2012 Part 21 60-Day Interim Report Notification: Adequacy of Design Change in Am Magne-Blast Circuit Breakers ML12347A3082012-12-12012 December 2012 Part 21 60-Day Interim Report Notification: Error in Main Steam Line High Flow Calculational Methodology ML12283A2462012-09-28028 September 2012 Part 21 - Fairbanks Morse Opposed Piston EDG Oil Pump Leak ML12319A0122012-09-27027 September 2012 Error in Main Steam Line High Flow Calculational Methodology ML1219103372012-07-0202 July 2012 Update 10 CFR Part 21 Notification of Defective Moore 535 Controllers ML12177A0562012-06-21021 June 2012 Part 21 - Reliability Degradation of Resistors in Trip Units and Readout Assemblies ML12163A1302012-06-0606 June 2012 Part 21 Report - Failure of CRD Collet Retainer Tube/Outer Tube Weld ML12158A4472012-06-0606 June 2012 Part 21 60-Day Interim Report Notification - Closufailure of CRD Collet Retainer Tube/Outer Tube Weld ML12153A0302012-05-29029 May 2012 Part-21 Notification - Protective Relays May Not Be Qualified for Harsh Environments ML12040A2832012-02-0707 February 2012 Notification of Potential Part 21 - Failure to Include Seismic Input in Reactor Control Blade Customer Guidance ML12038A0282012-02-0202 February 2012 Failure of CRD Collet Retainer Tube/Outer Tube Weld ML12032A2402012-02-0101 February 2012 Notification of Potential Part 21 - 60-Day Interim Report Notification: Failure of CRD Collet Retainer Tube/Outer Tube Weld ML11228A0842011-08-12012 August 2011 Notification of Part 21 - Failure to Include Seismic Input in Reactor Control Blade Customer Guidance ML1122401422011-08-11011 August 2011 Part 21 60-Day Interim Report Notification: Failure to Include Seismic Input in Channel-Control Blade Interference Customer Guidance ML1035001742010-12-15015 December 2010 Notification of Potential Part 21 Re 60-Day Interim Report Notification: Failure to Include Seismic Input in Channel-Control Blade Interference Customer Guidance ML1035100312010-12-15015 December 2010 Notification of Potential Part 21 Report Concerning Failure to Include Seismic Input in Reactor Control Blade Customer Guidance 2022-10-28
[Table view] |
Text
0410212013 U.S. Nuclear Regulatory Commission OperationsCenter Event Report Page I Part 21 (PAR) Event# 47975 Rep Org: ABB INC Notification Date / Time: 05/29/2012 17:07 (EDT)
Supplier: ABB INC Event Date / Time: 03/29/2012 (EDT)
Last Modification: 04/01/2013 Region: 1 Docket #:
City: CORAL SPRINGS Agreement State: Yes County: License #:
State: FL NRC Notified by: DENNIS BATOVSKY Notifications: HIRONORI PETERSON R3DO HQ Ops Officer: MARK ABRAMOVITZ PART 21 GROUP Emergency Class: NON EMERGENCY 10 CFR Section:
21.21(a)(2) INTERIM EVAL OF DEVIATION PART 21 NOTIFICATION - PROTECTIVE RELAYS MAY NOT BE QUALIFIED FOR HARSH ENVIRONMENTS The following report was received via fax:
"During the commercial grade dedication process for a unit that was returned for repair, the unit was found to be in nonconformance with ABB specifications. The ABB specifications require that two (2) particular components, integrated circuits (ICs) of plastic construction, are replaced with 2 ICs of ceramic construction during the assembly process. The chips found on the harmonic filter circuit board (HF Board) of the relays were of plastic construction.
While plastic ICs are approved for use in commercial relays, they have not been qualified for safety-related applications. Relays in this condition will function normally in mild environments, but have not been qualified for harsh environments, or for elevated radiation environments."
The affected solid state relays are 27N and 59G shipped between August 1, 2010 and October 15, 2010.
"Eighteen (18) Relays (Material number: 211T4175-HF-1 E) were sold to ABB Florence who in turn shipped the same to Detroit Edison's Fermi 2 Power Plant."
- ** UPDATE FROM TAUZER TO SNYDER AT 1730 EDT ON 4/1/13 ***
The supplier has concluded that the solid state relays with the plastic encapsulate are qualified for Class 1 E applications.
"ABB Coral Springs is providing this letter to close the interim report and notice of deviation from specification requirements associated with Solid State Relays 27N and 59G dated May 29, 2012 (Event ML12153A030).
04/02/2013 U.S. Nuclear Regulatory Commission OperationsCenter Event Report Page 2 Part 21 (PAR) Event # 47975 "As stated in the interim report, one of the actions to be completed was the qualification and testing of representative plastic ICs to confirm acceptability and use in safety-related applications.
"This letter is a follow-up notification that the plastic IC qualification and testing is complete, and based upon the results, we have concluded that the ICs with the plastic encapsulate are qualified for Class 1 E applications specific to the subject relays.
"Affected customers have been notified."
Notified R3DO (Daley) and Part 21 Reactors (Email).
March 28, 2013 Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Subject:
10 C.F.R. Part 21 Notifications of Potential Defect, Solid State Relays 27N and 59G Closure of Interim Report dated May 29, 2012 (Event ML12153A030)
Notification By: ABB Inc.
Distribution Automation 4300 Coral Ridge Drive Coral Springs, FL 33065
Dear Sir or Madam,
ABB Coral Springs is providing this letter to close the interim report and notice of deviation from specification requirements associated with Solid State Relays 27N and 59G dated May 29, 2012 (Event ML12153A030).
As stated in the interim report, one of the actions to be completed was the qualification and testing of representative plastic ICs to confirm acceptability and use in safety-related applications.
This letter is a follow-up notification that the plastic IC qualification and testing is complete, and based upon the results, we have concluded that the ICs with the plastic encapsulate are qualified for Class IE applications specific to the subject relays.
Affected customers have been notified.
jm Prl y yours, Dennis Batovsky Managing Director