ML13098A970

From kanterella
Revision as of 19:47, 4 November 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Assessment Follow-Up Letter for Kewaunee Power Station
ML13098A970
Person / Time
Site: Kewaunee Dominion icon.png
Issue date: 04/08/2013
From: Reynolds S
Division Reactor Projects III
To: Heacock D
Dominion Energy Kewaunee
References
Download: ML13098A970 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 April 8, 2013 Mr. David A. Heacock President and Chief Nuclear Officer Dominion Energy Kewaunee, Inc.

Inssbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711

SUBJECT:

ASSESSMENT FOLLOW-UP LETTER FOR KEWAUNEE POWER STATION

Dear Mr. Heacock:

As a result of our continuous review of plant performance, which was completed on April 4, 2013, the NRC updated its assessment of Kewaunee Power Station. The NRCs evaluation consisted of a review of performance indicators and inspection results. This letter informs you of the NRCs assessment of your facility. This letter supplements, but does not supersede, the annual assessment letter issued on March 4, 2013.

On April 4, 2013, the NRC sent you a letter that stated the final significance determination of an inspection finding in the Emergency Preparedness Cornerstone (ML13094A270) which was of low to moderate safety significance (White). The finding involved your staffs failure to restore the capability to classify emergency action levels (EALs) RG1.1, General Emergency, and RS1.1, Site Area Emergency as a result of the loss of System Particulate, Iodine, and Noble Gas (SPING) indication on the Plant Process Computer System (PPCS) and Radserv stations from February 28, 2011, until March 30, 2011.

The NRC has determined that performance at Kewaunee Power Station was in the Regulatory Response Column of the Reactor Oversight Process Action Matrix beginning the 4th quarter of 2012. The NRC will conduct a supplemental inspection to review the actions taken to address the performance issues using Inspection Procedure 95001, Inspection for One or Two White Inputs in a Strategic Performance Area. The objectives of this supplemental inspection are to determine whether or not the root causes and contributing causes of risk-significant performance issues are understood, determine whether or not the extent of condition and extent of cause of risk significant performance issues are identified, and determine whether or not your corrective actions for risk-significant performance issues are sufficient to address the root and contributing causes and prevent recurrence. We do not currently plan on scheduling the supplemental inspection until you notify us of your readiness for the inspection. We may decide to conduct the inspection earlier if we determine that you are not being timely in addressing the performance issues.

D. Heacock In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the component of NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRCs Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact Kenneth Riemer at 630-829-9628 with any questions you have regarding this letter.

Sincerely,

/RA/

Steven A. Reynolds, Director Division of Reactor Projects Docket No. 50-305 License No. DPR-43 cc: Distribution via ListServTM

D. Heacock In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the component of NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRCs Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact Kenneth Riemer at 630-829-9628 with any questions you have regarding this letter.

Sincerely,

/RA/

Steven A. Reynolds, Director Division of Reactor Projects Docket No. 50-305 License No. DPR-43 cc: Distribution via ListServTM DISTRIBUTION:

See next page DOCUMENT NAME: Kewaunee Assessment Follow-Up Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII N RIII E RIII N NAME NShah:rj NShah for SReynolds KRiemer DATE 4/8/13 4/8/13 4/8/13 OFFICIAL RECORD COPY

Letter to D. Heacock from S. Reynolds dated April 8, 2013

SUBJECT:

ASSESSMENT FOLLOW-UP LETTER FOR KEWAUNEE POWER STATION DISTRIBUTION:

Doug Huyck RidsNrrDorlLpl3-1 Resource RidsNrrPMKewaunee RidsNrrDirsIrib Resource Chuck Casto Cynthia Pederson Steven Orth Allan Barker Christine Lipa Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak ROPassessment.Resource@nrc.gov