Other: ML13337A594, ML14010A331, ML14335A642, ML15301A093, NL-13-043, Overall Integrated Plan in Response to March 12, 2012, Commission Order Modifying License with Regard to Reliable Spent Fuel Pool Instrumentation, NL-13-109, First Six-Month Status Report for the Implementation of Order EA-12-051 Modifying Licenses with Regard to Requirements for to Reliable Spent Fuel Pool Instrumentation, NL-13-110, First Six-Month Status Report for the Implementation of Order EA-12-049 Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events, NL-14-029, Second Six-Month Status Report for the Implementation of Order EA-12-051, Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation, NL-14-031, Centers Second Six-Month Status Report for the Implementation of Order EA-12-049 Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events, NL-14-109, Third Six-Month Status Report for the Implementation of Order EA-12-051 Modifying Licenses with Regard to Requirements for to Reliable Spent Fuel Pool Instrumentation, NL-14-110, Third Six-Month Status Report for the Implementation of Order EA-12-049 Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events, NL-15-025, Fourth Six-Month Status Report for the Implementation of Order EA-12-049 Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events, NL-15-026, Fourth Six-Month Status Report for the Implementation of Order EA-12-051 Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation, NL-15-059, Notification of Full Compliance with Order EA-12-049 Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events and Order EA-12-051 Modifying Licenses with Regard, NL-15-059, Notification of Full Compliance with Order EA-12-049 Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events and Order EA-12-051 Modifying Licenses with Regard.., NL-15-111, Implementation of Order EA-12-051 Modifying Licenses with Regard to Requirements for to Reliable Spent Fuel Pool Instrumentation, NL-15-112, Fifth Six-Month Status Report for the Implementation of Order EA-12-049 Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events, NL-16-024, Center'S Sixth Six-Month Status Report for the Implementation of Order EA-12-049 Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events, NL-16-024, Centers Sixth Six-Month Status Report for the Implementation of Order EA-12-049 Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events, NL-16-089, Notification of Full Compliance with Order EA-12-049 Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events and Order EA-12-051 Modifying Licenses with Regard .
|
MONTHYEARNL-13-043, Overall Integrated Plan in Response to March 12, 2012, Commission Order Modifying License with Regard to Reliable Spent Fuel Pool Instrumentation2013-02-27027 February 2013 Overall Integrated Plan in Response to March 12, 2012, Commission Order Modifying License with Regard to Reliable Spent Fuel Pool Instrumentation Project stage: Other ML13169A1272013-06-25025 June 2013 Request for Additional Information Regarding Reliable Spent Fuel Pool Instrumentation, Order No. EA-12-051 Project stage: RAI NL-13-103, Response to Request for Additional Information (RAI) Regarding Reliable Spent Fuel Pool (SFP) Instrumentation (Order No, EA-12-051)2013-08-20020 August 2013 Response to Request for Additional Information (RAI) Regarding Reliable Spent Fuel Pool (SFP) Instrumentation (Order No, EA-12-051) Project stage: Response to RAI NL-13-103, Response to Request for Additional Information (RAI) Regarding Reliable Spent Fuel Pool (SFP) Instrumentation (Order No, EA-12-051) (TAC Nos. MF0737 and MF0738)2013-08-20020 August 2013 Response to Request for Additional Information (RAI) Regarding Reliable Spent Fuel Pool (SFP) Instrumentation (Order No, EA-12-051) (TAC Nos. MF0737 and MF0738) Project stage: Response to RAI NL-13-109, First Six-Month Status Report for the Implementation of Order EA-12-051 Modifying Licenses with Regard to Requirements for to Reliable Spent Fuel Pool Instrumentation2013-08-27027 August 2013 First Six-Month Status Report for the Implementation of Order EA-12-051 Modifying Licenses with Regard to Requirements for to Reliable Spent Fuel Pool Instrumentation Project stage: Other NL-13-110, First Six-Month Status Report for the Implementation of Order EA-12-049 Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events2013-08-27027 August 2013 First Six-Month Status Report for the Implementation of Order EA-12-049 Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events Project stage: Other ML13276A7352013-10-0303 October 2013 Lr Hearing - IPEC License Renewal - Response to Set 2013-05 RAI (Cathodic Protection) Project stage: RAI ML13298A8052013-11-0808 November 2013 Interim Staff Evaluation and Request for Additional Information Regarding the Overall Integrated Plan for Implementation of Order EA-12-051, Reliable Spent Fuel Pool Instrumentation (TAC Nos. MF0737 and Project stage: RAI ML14010A3312014-01-14014 January 2014 Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for Indian Point Energy Center, Units 2 and 3, TAC Nos.: MF0744 and MF0745 Project stage: Other ML13337A5942014-01-24024 January 2014 Interim Staff Evaluation and Audit Report Relating to Overall Integrated Plan in Response to Order EA-12-049 (Mitigation Strategies) Project stage: Other NL-14-031, Centers Second Six-Month Status Report for the Implementation of Order EA-12-049 Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events2014-02-27027 February 2014 Centers Second Six-Month Status Report for the Implementation of Order EA-12-049 Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events Project stage: Other NL-14-029, Second Six-Month Status Report for the Implementation of Order EA-12-051, Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation2014-02-27027 February 2014 Second Six-Month Status Report for the Implementation of Order EA-12-051, Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation Project stage: Other NL-14-109, Third Six-Month Status Report for the Implementation of Order EA-12-051 Modifying Licenses with Regard to Requirements for to Reliable Spent Fuel Pool Instrumentation2014-08-27027 August 2014 Third Six-Month Status Report for the Implementation of Order EA-12-051 Modifying Licenses with Regard to Requirements for to Reliable Spent Fuel Pool Instrumentation Project stage: Other NL-14-110, Third Six-Month Status Report for the Implementation of Order EA-12-049 Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events2014-08-27027 August 2014 Third Six-Month Status Report for the Implementation of Order EA-12-049 Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events Project stage: Other NL-14-132, Response to 03/12/2012, Request for Information Pursuant to Title 10 of the Code of Federal Regulation 50.54(f) Regarding Recommendations of the Near-Term Task Force (NTTF) Review of Insights from the Fukushima Dia-ichi2014-11-0303 November 2014 Response to 03/12/2012, Request for Information Pursuant to Title 10 of the Code of Federal Regulation 50.54(f) Regarding Recommendations of the Near-Term Task Force (NTTF) Review of Insights from the Fukushima Dia-ichi Project stage: Request ML14335A6422014-12-0909 December 2014 Report for the Onsite Audit Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Instrumentation Related to Orders EA-12-049 and EA-12-051 Project stage: Other NL-15-012, Request for Relaxation from NRC Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events2015-01-28028 January 2015 Request for Relaxation from NRC Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events Project stage: Request NL-15-025, Fourth Six-Month Status Report for the Implementation of Order EA-12-049 Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events2015-02-27027 February 2015 Fourth Six-Month Status Report for the Implementation of Order EA-12-049 Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events Project stage: Other NL-15-026, Fourth Six-Month Status Report for the Implementation of Order EA-12-051 Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation2015-02-27027 February 2015 Fourth Six-Month Status Report for the Implementation of Order EA-12-051 Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation Project stage: Other NL-15-036, Retraction of Entergy'S Request for Relaxation from NRC Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events2015-03-16016 March 2015 Retraction of Entergy'S Request for Relaxation from NRC Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events Project stage: Request ML15079A3542015-03-24024 March 2015 Withdrawal of Request for Relaxation of the Schedule Requirements for Order EA-12-049,Issuance of Order to Modify Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis Events Project stage: Withdrawal NL-15-059, Notification of Full Compliance with Order EA-12-049 Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events and Order EA-12-051 Modifying Licenses with Regard..2015-05-20020 May 2015 Notification of Full Compliance with Order EA-12-049 Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events and Order EA-12-051 Modifying Licenses with Regard.. Project stage: Other NL-15-059, Notification of Full Compliance with Order EA-12-049 Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events and Order EA-12-051 Modifying Licenses with Regard2015-05-20020 May 2015 Notification of Full Compliance with Order EA-12-049 Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events and Order EA-12-051 Modifying Licenses with Regard Project stage: Other NL-15-112, Fifth Six-Month Status Report for the Implementation of Order EA-12-049 Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events2015-08-28028 August 2015 Fifth Six-Month Status Report for the Implementation of Order EA-12-049 Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events Project stage: Other NL-15-111, Implementation of Order EA-12-051 Modifying Licenses with Regard to Requirements for to Reliable Spent Fuel Pool Instrumentation2015-08-28028 August 2015 Implementation of Order EA-12-051 Modifying Licenses with Regard to Requirements for to Reliable Spent Fuel Pool Instrumentation Project stage: Other ML15301A0932015-10-30030 October 2015 Plan for the Onsite Audit Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-049 and EA-12-051 Project stage: Other NL-16-024, Centers Sixth Six-Month Status Report for the Implementation of Order EA-12-049 Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events2016-02-29029 February 2016 Centers Sixth Six-Month Status Report for the Implementation of Order EA-12-049 Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events Project stage: Other NL-16-024, Center'S Sixth Six-Month Status Report for the Implementation of Order EA-12-049 Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events2016-02-29029 February 2016 Center'S Sixth Six-Month Status Report for the Implementation of Order EA-12-049 Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events Project stage: Other ML16155A0842016-04-29029 April 2016 APS Response to Request for Additional Information Regarding Overall Integrated Plan for Implementation of Order EA-12-051, Reliable Spent Fuel Pool Lnstrumentation Project stage: Response to RAI NL-16-089, Notification of Full Compliance with Order EA-12-049 Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events and Order EA-12-051 Modifying Licenses with Regard .2016-08-12012 August 2016 Notification of Full Compliance with Order EA-12-049 Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events and Order EA-12-051 Modifying Licenses with Regard . Project stage: Other NL-16-115, Response to Request for Additional Information Regarding Review of Compliance with Order EA-12-049 Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events,.2016-12-0202 December 2016 Response to Request for Additional Information Regarding Review of Compliance with Order EA-12-049 Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events,. Project stage: Response to RAI NL-16-115, Response to Request for Additional Information Regarding Review of Compliance with Order EA-12-049 Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events,2016-12-0202 December 2016 Response to Request for Additional Information Regarding Review of Compliance with Order EA-12-049 Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events, Project stage: Response to RAI 2014-08-27
[Table View] |
|
---|
Category:Legal-Hearing File
MONTHYEARML16365A1382016-12-30030 December 2016 IP Disclosures Supplement 95 ML16306A0232016-10-31031 October 2016 Hearing File Index Supplement 93 ML16274A1312016-09-30030 September 2016 IP Disclosures Supplement 92 ML16244A1532016-08-31031 August 2016 IP Disclosures Supplement 91 ML16211A3332016-07-29029 July 2016 IP Disclosures Supplement 90 ML16182A5122016-06-30030 June 2016 Disclosures - Supplement 89 ML16152B0182016-05-31031 May 2016 Disclosures Supplement 88 ML16119A3622016-04-28028 April 2016 Disclosures Supplement 87 ML16091A2532016-03-31031 March 2016 IP Disclosures Supplement 86 ML16060A4362016-02-29029 February 2016 NRC Staff Hearing File Update 85 ML16029A1732016-01-29029 January 2016 NRC Staff Hearing File Update 84 ML15362A3632015-12-28028 December 2015 NRC Staff Hearing File Update 83 ML15334A1582015-11-30030 November 2015 NRC Staff Hearing File Update 82 ML15303A3132015-10-30030 October 2015 NRC Staff Hearing File Update 81 ML15273A3152015-09-30030 September 2015 NRC Staff Hearing File Update 80 ML15240A0352015-08-28028 August 2015 NRC Staff Hearing File Supplement 79 ML15212A6692015-07-31031 July 2015 NRC Staff Hearing File Update 78 ML15181A0872015-06-30030 June 2015 NRC Staff Hearing File Update 77 ML15149A3402015-05-29029 May 2015 NRC Staff Hearing File Update 76 ML15120A1622015-04-30030 April 2015 NRC Staff Hearing File Update 75 ML15090A4692015-03-31031 March 2015 NRC Staff Hearing File Update 74 ML15058A2412015-02-27027 February 2015 NRC Staff Hearing File Update 73 ML15030A4892015-01-30030 January 2015 NRC Staff Hearing File Update 72 ML14364A1132014-12-30030 December 2014 Letter to ASLB with Hearing File Supplement 71 ML14329B3322014-11-25025 November 2014 NRC Staff Hearing File Update 70 ML14304A4322014-10-31031 October 2014 NRC Staff Hearing File Update 69 ML14241A3372014-08-29029 August 2014 NRC Staff Hearing File Update 67 ML14212A5992014-07-31031 July 2014 NRC Staff Hearing File Update 66 ML14212A3742014-07-31031 July 2014 NRC Staff Hearing File Update 66 ML14181A5272014-06-30030 June 2014 NRC Staff Hearing File Update 65 for Indian Point, Units 2 and 3 ML14150A1342014-05-30030 May 2014 NRC Staff Hearing File Update 64 ML14120A1642014-04-30030 April 2014 NRC Staff Hearing File Update 63 in the Matter of Indian Point, Units 2 and 3 ML14090A1762014-03-31031 March 2014 NRC Staff Transmittal of Indian Point License Renewal Hearing File Index, Supplement 62 - March 31, 2014 ML14059A1982014-02-28028 February 2014 NRC Staff Transmittal of Attachment 1 - Indian Point Licenses Renewal Hearing File Index, Supplement 61 ML13365A1642013-12-31031 December 2013 NRC Staff Hearing File Update 59 ML13336A5372013-12-0202 December 2013 NRC Staff Hearing File Update 58 ML13304B4222013-10-31031 October 2013 NRC Staff Hearing File Update 57 ML13273A3482013-09-30030 September 2013 NRC Staff Hearing File Update 56 ML13242A2282013-08-30030 August 2013 NRC Staff Transmittal of Indian Point License Renewal Hearing File Index, Supplement 55 - August 30, 2013 ML13212A3862013-07-31031 July 2013 NRC Staff Transmittal of Attachment 1 - Indian Point License Renewal Hearing File Index - Supplement 54 - July 31, 2013 ML13205A4522013-07-24024 July 2013 Notice of Withdrawal of Karla Raimundi on Behalf of Hudson River Sloop Clearwater, Inc. in the Matter of Indian Point, Units 2 and 3 ML13205A4512013-07-24024 July 2013 Certificate of Services of Notice of Withdrawal of Karla Raimundi on Behalf of Hudson River Sloop Clearwater, Inc. in the Matter of Indian Point, Units 2 and 3 ML13182A2282013-06-28028 June 2013 NRC Staff Hearing File Update 53 ML13151A2982013-05-31031 May 2013 NRC Staff Transfer of Indian Point License Renewal Hearing File Index - Supplement 52 - May 31, 2013 ML13123A4582013-05-0303 May 2013 Combined Reply to NRC and Entergy Findings of Fact and Conclusions of Law Regarding Contention EC-3A Regarding Environmental Justice ML13123A4572013-05-0303 May 2013 Certificate of Service - Combined Reply to NRC and Entergy Findings of Fact and Conclusions of Law Regarding Contention EC-3A Regarding Environmental Justice ML13120A1422013-04-30030 April 2013 NRC Staff Hearing File Update 51 in the Matter of Indian Point, Units 2 and 3 ML13088A0402013-03-29029 March 2013 NRC Staff Hearing File Update 50 in the Matter of Entergy Nuclear Operations, Inc. (Indian Point Nuclear Generating Units 2 and 3) ML13081A7592013-03-22022 March 2013 Post-Hearing Findings of Fact and Conclusions of Law Supporting Contention EC-3A Regarding Environment Justice ML13081A7602013-03-22022 March 2013 Certification of Service for Post-Hearing Findings of Fact and Conclusions of Law Supporting Contention EC-3A Regarding Environment Justice 2016-09-30
[Table view] |
Text
UNITE D STATE S N UCLEAR REGULATORY C OMMI SS I ON WASHINGTON, DC 20555 - 0001 September 30, 2013 Administrative Judge Administrative Judge Lawrence G. McDade, Chair Dr. Richard E. Wardwell Atomic Safety and Licensing Board Panel Atomic Safety and Licensing Board Panel Mail Stop T-3 F23 Mail Stop T-3 F23 U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Washington, DC 20555-0001 Administrative Judge Michael F. Kennedy Atomic Safety and Licensing Board Panel Mail Stop T-3 F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 In the Matter of ENTERGY NUCLEAR OPERATIONS, INC.
(Indian Point Nuclear Generating Units 2 and 3)
Docket Nos. 50-247-LR and 50-286-LR
Dear Administrative Judges:
Pursuant to the Atomic Safety and Licensing Boards December 18, 2008, Memorandum and Order (Addressing Requests that the Proceeding be Conducted Pursuant to Subpart G), slip op. at 13, the Licensing Board's Order (Granting Consent Motion Regarding Mandatory Disclosures), dated January 30, 2009, at 1, the staff of the U.S. Nuclear Regulatory Commission (Staff) herein notifies the Licensing Board and the parties that the hearing file has been supplemented for this proceeding. Materials in the hearing file may be accessed through the Agencywide Documents Access and Management System (ADAMS). An index containing the ADAMS accession number, date, and title or description of each item in Hearing File Index, Supplement 56 is appended hereto as Attachment 1.
On or about October 10, 2013, the documents identified in the hearing file will be made available via the Electronic Hearing Docket (EHD), which may be accessed at the following URL: http://ehd.nrc.gov/EHD_Proceeding/home.asp. The hearing file will be contained in a sub-folder entitled, Indian PT Hearing File, Supplement 56 in the Indian_PT_2&3_50-247&50-286-LR" folder of the EHD.
In addition, as required by 10 C.F.R. § 2.336(b)(5), the Staff is producing a privilege log, identifying documents withheld under the deliberative process privilege, which is appended hereto as Attachment 2. Also attached is the Declaration of John W. Lubinski formally invoking the deliberative process privilege with respect to the documents in Attachment 2.
Judge McDade September 30, 2013 Judge Kennedy Judge Wardwell The Staff will preserve and maintain the privileged documents identified in the log during the pendency of this proceeding.
Further, pursuant to 10 C.F.R. § 2.336(c), attached is the Affidavit of Kimberly J. Green, certifying that all relevant materials required by this section have been disclosed, and that the disclosures are accurate and complete as to documents identified by September 24, 2013.
Finally, the NRC Staff notes that it has made a good faith effort to identify and characterize all documents meeting the criteria of 10 C.F.R. § 2.336(b) and 10 C.F.R. § 2.1203 in this proceeding. In identifying these documents, the Staff does not concede their relevance to the license renewal issues to be decided in this proceeding.
Sincerely,
/Signed (electronically) by/
Anita Ghosh Counsel for NRC Staff
Enclosures:
Attachment 1 - Hearing File Index, Supplement 56 Attachment 2 - Deliberative Process Privilege Log Declaration of John W. Lubinski Affidavit of Kimberly J. Green cc w/Encls.: Service List
Attachment 1 - Indian Point License Renewal Hearing File Index Supplement 56 - September 30, 2013 Accession Document ID# Title Number Date 56-0001 ML13268A563 11/23/2012 2012/11/23 Indian Point LR Hearing - RE: Riverkeeper Comments on Indian Point Draft Biological Opinion 56-0002 ML13268A565 11/23/2012 2012/11/23 Indian Point LR Hearing - RE: Riverkeeper Comments on Indian Point Draft Biological Opinion 56-0003 ML13241A022 08/28/2013 2013/08/28 Indian Point LR Hearing - IPEC License Renewal - Implementation of Unit 2 License Renewal Regulatory Commitments - NL-13-114 56-0004 ML13241A021 08/28/2013 2013/08/28 Indian Point LR Hearing - RE: IPEC License Renewal - Implementation of Unit 2 License Renewal Regulatory Commitments - NL-13-114 56-0005 ML13248A492 09/05/2013 2013/09/05 Indian Point LR Hearing - RAI Set 2013-05 56-0006 ML13248A496 09/05/2013 2013/09/05 Indian Point LR Hearing - RE: RAI Set 2013-05 56-0007 ML13248A495 09/05/2013 2013/09/05 Indian Point LR Hearing - Summary of Teleconference Call on August 13 56-0008 ML13262A581 09/19/2013 2013/09/19 Indian Point LR Hearing - Department of State File #F 2012-1028 (Indian Point) 56-0009 ML13268A463 01/29/2013 Biological Opinion to be Issued to the Nuclear Regulatory Commission (NRC) for the Continued Operation of Indian Point Unit 2 and Unit 3 56-0010 ML13247A175 08/28/2013 Indian Point Nuclear Generating Unit 2 Implementation of License Renewal Regulatory Commitments.
56-0011 ML13247A171 08/16/2013 Indian Point, Units 2 & 3 - Letter In Reply to Request for Additional Information Regarding the License Renewal Application.
56-0012 ML13263A020 09/19/2013 IR 05000247/2013010; 09/09/2013 - 09/12/2013; Indian Point Nuclear Generating Unit 2; License Renewal Inspection.
56-0013 ML13240A076 09/03/2013 RAI Set 2013-5 follow-up RAI on CP.
56-0014 ML13184A082 09/23/2013 Summary of Conference Call Held on July 2, 2013, Between the NRC and Entergy Nuclear Operations, Inc., Concerning May 6, 2013 Letter Regarding Changes to Metal Enclosed Bus Inspection Program for IP Nuclear Generating Units 2 and 3.
56-0015 ML13231A040 08/29/2013 Telecon Summary 08-13-13 Cathodic Protection RAI Response.
Attachment 2 - Indian Point License Renewal Hearing File Index Deliberative Process Privilege, Supplement 56 - September 30, 2013 Certain documents otherwise subject to inclusion in the hearing file and mandatory disclosures for this proceeding have been determined by the NRC Staff to contain information subject to withholding from public disclosures as predecisional, deliberative information. Pursuant to 10 C.F.R. § 2.336(b)(5), the Staff is providing this log to identify the following documents, withheld under the "deliberative process" privilege.
Addressee Author Name Estimated Accession Document Document Name ID # & Author Title Comment Page Number Date Type & Addressee Affiliation Count Affiliation DP- ML13240A221 J. Lubinski, 2013/08/21 Indian Point 08/21/2013 E-Mail S. Williams, Internal 4 56- NRC/NRR LR Hearing - FW: Status NRC/EDO discussion 001 of Indian Point License Y. Diaz- regarding status Renewal Technical Sanabria, of Indian Point Review NRC/NRR license renewal J. Uhle, technical review NRC/NRR E. Leeds, NRC/NRR D. Dorman, NRC/NRR K. Green, NRC/NRR A. Hiser, NRC/NRR R. Plasse, NRC/NRR M. Johnson, NRC/EDO B. Wittick, NRC/EDO J. Monninger, NRC/NRR M. Evans, NRC/NRR D. Pickett, NRC/NRR R. Beall, NRC/NRR M. Galloway, NRC/NRR 1
Attachment 2 - Indian Point License Renewal Hearing File Index Deliberative Process Privilege, Supplement 56 - September 30, 2013 Addressee Author Name Estimated Accession Document Document Name ID # & Author Title Comment Page Number Date Type & Addressee Affiliation Count Affiliation DP- ML13239A429 K. Green, 2013/08/27 Indian Point 08/27/2013 E-Mail w/ W. Gardner, Internal 4 56- NRC/NRR LR Hearing - Please see Attachment NRC/NRR discussion 002 me W. Holston, regarding draft NRC/NRR RAI
Attachment:
Draft RAI DP- ML13239A430 W. Gardner, 2013/08/27 Indian Point 08/27/2013 E-Mail K. Green, Internal 2 56- NRC/NRR LR Hearing - RE: Please NRC/NRR discussion 003 see me W. Holston, regarding draft NRC/NRR RAI DP- ML13239A431 W. Holston, 2013/08/27 Indian Point 08/27/2013 E-Mail K. Green, Internal 2 56- NRC/NRR LR Hearing - RE: Please NRC/NRR discussion 004 see me W. Gardner, regarding draft NRC/NRR RAI DP- ML13240A223 J. Lubinski, 2013/08/28 Indian Point 08/28/2013 E-Mail J. Uhle, Internal 2 56- NRC/NRR LR Hearing - FW: Here's NRC/NRR discussion 005 the Link to the D. Dorman, regarding letter to Acknowledgement Letter NRC/NRR Congresswoman E. Leeds, Lowey NRC/NRR M. Evans, NRC/NRR K. Green, NRC/NRR M. Galloway, NRC/NRR 2
Attachment 2 - Indian Point License Renewal Hearing File Index Deliberative Process Privilege, Supplement 56 - September 30, 2013 Addressee Author Name Estimated Accession Document Document Name ID # & Author Title Comment Page Number Date Type & Addressee Affiliation Count Affiliation DP- ML13241A023 W. Holston, 2013/08/29 Indian Point 08/29/2013 E-Mail J. Gavula, Internal 2 56- NRC/NRR LR Hearing - Alternative NRC/NRR discussion 006 for IP RAI on OTI Program W. Gardner, regarding draft NRC/NRR RAI K. Green, NRC/NRR S. Bloom, NRC/NRR DP- ML13242A182 J. Lubinski, 2013/08/30 Indian Point 08/30/2013 E-Mail S. Stuchell, Internal 3 56- NRC/NRR LR Hearing - RE: From NRC/NRR discussion 007 ET/LT meeting this S. Bahadur, regarding letter to morning NRC/NRR Congresswoman L. Kokajko, Lowey NRC/NRR S. Helton, NRC/NRR K. Green, NRC/NRR Y. Diaz-Sanabria, NRC/NRR M. Galloway, NRC/NRR 3
Attachment 2 - Indian Point License Renewal Hearing File Index Deliberative Process Privilege, Supplement 56 - September 30, 2013 Addressee Author Name Estimated Accession Document Document Name ID # & Author Title Comment Page Number Date Type & Addressee Affiliation Count Affiliation DP- ML13242A183 S. Stuchell, 2013/08/30 Indian Point 08/30/2013 E-Mail J. Lubinski, Internal 3 56- NRC/NRR LR Hearing - RE: From NRC/NRR discussion 008 ET/LT meeting this S. Bahadur, regarding letter to morning NRC/NRR Congresswoman L. Kokajko, Lowey NRC/NRR S. Helton, NRC/NRR K. Green, NRC/NRR Y. Diaz-Sanabria, NRC/NRR M. Galloway, NRC/NRR M. Banic, NRC/NRR T. Mensah, NRC/NRR DP- ML13252A294 J. Poehler, 2013/09/09 Indian Point 09/09/2013 E-Mail w/ J. Medoff, Internal 6 56- NRC/NRR LR Hearing - AI 1 RAI Attachment NRC/NRR discussion 009 Draft regarding draft RAI
Attachment:
Draft RAI 4
Attachment 2 - Indian Point License Renewal Hearing File Index Deliberative Process Privilege, Supplement 56 - September 30, 2013 Addressee Author Name Estimated Accession Document Document Name ID # & Author Title Comment Page Number Date Type & Addressee Affiliation Count Affiliation DP- ML13253A026 J. Lubinski, 2013/09/10 Indian Point 09/10/2013 E-Mail J. Uhle, Internal 2 56- NRC/NRR LR Hearing - FW: NRC/NRR discussion 010 Resolution of Issue with E. Leeds, regarding letter to Acknowledgement Letter NRC/NRR Congresswoman from OCA to Rep. Lowey D. Dorman, Lowey NRC/NRR M. Evans, [Also withheld NRC/NRR under Attorney-M.Galloway, Client privilege]
NRC/NRR K. Green, NRC/NRR DP- ML13256A441 K. Green, 2013/09/13 Indian Point 09/13/2013 E-Mail D. Pickett, Internal 3 56- NRC/NRR LR Hearing - RE: Receipt NRC/NRR discussion 011 of Indian Point Letter J. Trapp, regarding RAI on Implementing License NRC/RGN-I license renewal Renewal Commitments commitments DP- ML13259A008 J. Trapp, 2013/09/16 Indian Point 09/16/2013 E-Mail K. Green, Internal 3 56- NRC/RGN-I LR Hearing - RE: Receipt NRC/NRR discussion 012 of Indian Point Letter D. Pickett, regarding RAI on Implementing License NRC/NRR license renewal Renewal Commitments commitments DP- ML13261A343 W. Holston, 2013/09/18 Indian Point 09/18/2013 E-Mail w/ S. Bloom, Internal 13 56- NRC/NRR LR Hearing - Indian Point Attachment NRC/NRR discussion 013 LR-ISG-2012-02 RAI W. Gardner, regarding draft Gardner Holston NRC/NRR RAI 11.18.13.docx K. Green, NRC/NRR
Attachment:
Draft RAI 5
Attachment 2 - Indian Point License Renewal Hearing File Index Deliberative Process Privilege, Supplement 56 - September 30, 2013 Addressee Author Name Estimated Accession Document Document Name ID # & Author Title Comment Page Number Date Type & Addressee Affiliation Count Affiliation DP- ML13261A533 S. Bloom, 2013/09/18 Indian Point 09/18/2013 E-Mail w/ K. Green, Internal 13 56- NRC/NRR LR Hearing - Indian Point Attachment NRC/NRR discussion 014 LR-ISG-2012-02 RAI C. Spruill, regarding draft Gardner Holston 11.18.13 NRC/NRR RAI W. Holston, NRC/NRR
Attachment:
W. Gardner, Draft RAI NRC/NRR DP- ML13267A027 K. Green, 2013/09/24 Indian Point 09/24/2013 E-Mail w/ W. Holston, Internal 13 56- NRC/NRR LR Hearing - FW: Attachment NRC/NRR discussion 015 ATTORNEY-CLIENT regarding draft PRIVILEGE: Review of RAI draft RAI on internal corrosion and coatings
Attachment:
Draft RAI with OGC comments
[Also withheld under Attorney-Client privilege]
DP- ML13267A346 W. Holston, 2013/09/24 Indian Point 09/24/2013 E-Mail w/ K. Green, Internal 15 56- NRC/NRR LR Hearing - FW: Attachment NRC/NRR discussion 016 Callaway LR-ISG-2012-02 S. Bloom, regarding draft Gardner Holston NRC/NRR RAI 09.24.13.docx
Attachment:
Draft RAI for Callaway plant 6
September 30, 2013 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of )
)
ENTERGY NUCLEAR OPERATIONS, INC. ) Docket Nos. 50-247-LR, 50-286-LR
)
)
(Indian Point Nuclear Generating Units 2 and 3) )
DECLARATION OF JOHN W. LUBINSKI I, John W. Lubinski, do hereby state as follows:
- 1. I am employed as the Director of the Division of License Renewal (DLR) in the U.S. Nuclear Regulatory Commissions (NRC) Office of Nuclear Reactor Regulation (NRR). My supervisory responsibilities include oversight of the NRC Staffs review and evaluation of the Indian Point Nuclear Generating Units 2 and 3 license renewal application.
- 2. As part of their responsibilities in updating the hearing file and mandatory disclosures for these proceedings, NRC staff members under my supervision identified documents as privileged because they contained information concerning the Staffs pre-decisional deliberative process. The documents are listed in Attachment 2 to the submission of the Staffs Hearing File Index Supplement 56.
- 3. I have personally reviewed the documents identified as privileged in , and have determined, in accordance with the guidance set forth in Management Directive 3.4, that they contain pre-decisional information concerning the Staffs review of the license renewal application. The documents contain either the Staffs analyses, recommendations, opinions, or evaluations, and may not necessarily reflect the final agency
position with respect to the matters discussed therein. The documents comprise part of the deliberative process necessary for the Staffs review of the pending license renewal application.
- 4. Further, I have determined that disclosure of the documents could result in harm to the agency, in that it would (a) prematurely disclose the preliminary views of individual Staff members and/or the Staff prior to reaching a final agency decision, and could thus create confusion as to the actual policy or views of the NRC Staff; (b) hinder the efficiency of the Staff, in that forced disclosure of its internal discussions on an unresolved issue would tend to chill all future deliberations and would interfere with the Staffs ability to engage in a free exchange of opinions and analyses prior to publishing its final review documents; and (c) imply or suggest incorrectly that the opinions of the Staff members involved in these communications are actually the final decisions of the agency, while no such final decision has yet been made.
- 5. Accordingly, I formally invoke the deliberative process privilege with respect to the documents listed in Attachment 2 to the submission of the Staffs Hearing File Index Supplement 56.
- 6. I declare under penalty of perjury that the foregoing is true and correct to the best of my knowledge, information and belief.
Executed in Accord with 10 CFR 2.304(d)
John W. Lubinski Executed in Rockville, Maryland this 30th day of September, 2013
September 30, 2013 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of )
)
ENTERGY NUCLEAR OPERATIONS, INC. ) Docket Nos. 50-247-LR, 50-286-LR
)
)
(Indian Point Nuclear Generating )
Units 2 and 3) )
AFFIDAVIT OF KIMBERLY J. GREEN CONCERNING MANDATORY DISCLOSURE REQUIREMENT OF 10 C.F.R. § 2.336(b)
I, Kimberly J. Green, do hereby state as follows:
- 1. I am employed as a Senior Mechanical Engineer in the Division of License Renewal in the U.S. Nuclear Regulatory Commissions (NRC) Office of Nuclear Reactor Regulation. I serve as the hearing file project manager for the Indian Point Nuclear Generating Units 2 and 3 license renewal application (LRA). Among other things, I am assisting with the preparation of the hearing file and mandatory disclosures in connection with the LRA at issue in this proceeding.
- 2. I hereby certify that all relevant materials required to be disclosed pursuant to 10 C.F.R. § 2.336 (b) and (c) in the captioned proceeding have been disclosed, and that the disclosures are accurate and complete for documents identified as of September 24, 2013.
- 3. I declare under penalty of perjury that the foregoing is true and correct to the best of my knowledge, information and belief.
Executed in Accord with 10 CFR 2.304(d)
Kimberly J. Green Executed in Rockville, Maryland this 30th day of September 2013
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of )
)
ENTERGY NUCLEAR OPERATIONS, INC. ) Docket Nos. 50-247-LR, 50-286-LR
)
(Indian Point Nuclear Generating )
Units 2 and 3) )
CERTIFICATE OF SERVICE Pursuant to 10 C.F.R § 2.305 (revised), I hereby certify that copies of the foregoing Letter to the Atomic Safety and Licensing Board regarding the Indian Point Hearing File, including: - Indian Point License Renewal Hearing File Index Supplement 56; Attachment 2
- Indian Point License Renewal Hearing File Index Supplement 56 - Deliberative Process Privilege; Declaration of John W. Lubinski, dated September 30, 2013; and Affidavit of Kimberly J. Green, dated September 30, 2013, in the above-captioned proceeding have been served upon the Electronic Information Exchange, the NRCs E-Filing System, this 30th day of September, 2013.
/Signed (electronically) by/
Anita Ghosh Counsel for NRC Staff U.S. Nuclear Regulatory Commission Office of the General Counsel Mail Stop - O-15D21 Washington, DC 20555 Telephone: (301) 415-4113 E-mail: anita.ghosh@nrc.gov Date of signature: September 30, 2013