Letter Sequence Response to RAI |
|---|
|
Results
Other: ML13241A022, ML13337A594, ML14010A331, ML14335A642, ML15301A093, NL-13-043, Overall Integrated Plan in Response to March 12, 2012, Commission Order Modifying License with Regard to Reliable Spent Fuel Pool Instrumentation, NL-13-109, First Six-Month Status Report for the Implementation of Order EA-12-051 Modifying Licenses with Regard to Requirements for to Reliable Spent Fuel Pool Instrumentation, NL-13-110, First Six-Month Status Report for the Implementation of Order EA-12-049 Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events, NL-13-114, Implementation of License Renewal Regulatory Commitments, NL-14-029, Second Six-Month Status Report for the Implementation of Order EA-12-051, Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation, NL-14-031, Centers Second Six-Month Status Report for the Implementation of Order EA-12-049 Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events, NL-14-109, Third Six-Month Status Report for the Implementation of Order EA-12-051 Modifying Licenses with Regard to Requirements for to Reliable Spent Fuel Pool Instrumentation, NL-14-110, Third Six-Month Status Report for the Implementation of Order EA-12-049 Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events, NL-15-025, Fourth Six-Month Status Report for the Implementation of Order EA-12-049 Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events, NL-15-026, Fourth Six-Month Status Report for the Implementation of Order EA-12-051 Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation, NL-15-059, Notification of Full Compliance with Order EA-12-049 Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events and Order EA-12-051 Modifying Licenses with Regard, NL-15-111, Implementation of Order EA-12-051 Modifying Licenses with Regard to Requirements for to Reliable Spent Fuel Pool Instrumentation, NL-15-112, Fifth Six-Month Status Report for the Implementation of Order EA-12-049 Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events, NL-16-024, Centers Sixth Six-Month Status Report for the Implementation of Order EA-12-049 Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events, NL-16-089, Notification of Full Compliance with Order EA-12-049 Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events and Order EA-12-051 Modifying Licenses with Regard .
|
MONTHYEARML13058A7632013-02-27027 February 2013 Joint Motion for Alteration to Filing Schedule Project stage: Request NL-13-043, Overall Integrated Plan in Response to March 12, 2012, Commission Order Modifying License with Regard to Reliable Spent Fuel Pool Instrumentation2013-02-27027 February 2013 Overall Integrated Plan in Response to March 12, 2012, Commission Order Modifying License with Regard to Reliable Spent Fuel Pool Instrumentation Project stage: Other ML13169A1272013-06-25025 June 2013 Request for Additional Information Regarding Reliable Spent Fuel Pool Instrumentation, Order No. EA-12-051 Project stage: RAI NL-13-108, Letter in Reply to Request for Additional Information Regarding the License Renewal Application2013-08-16016 August 2013 Letter in Reply to Request for Additional Information Regarding the License Renewal Application Project stage: Response to RAI NL-13-103, Response to Request for Additional Information (RAI) Regarding Reliable Spent Fuel Pool (SFP) Instrumentation (Order No, EA-12-051)2013-08-20020 August 2013 Response to Request for Additional Information (RAI) Regarding Reliable Spent Fuel Pool (SFP) Instrumentation (Order No, EA-12-051) Project stage: Response to RAI NL-13-110, First Six-Month Status Report for the Implementation of Order EA-12-049 Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events2013-08-27027 August 2013 First Six-Month Status Report for the Implementation of Order EA-12-049 Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events Project stage: Other NL-13-109, First Six-Month Status Report for the Implementation of Order EA-12-051 Modifying Licenses with Regard to Requirements for to Reliable Spent Fuel Pool Instrumentation2013-08-27027 August 2013 First Six-Month Status Report for the Implementation of Order EA-12-051 Modifying Licenses with Regard to Requirements for to Reliable Spent Fuel Pool Instrumentation Project stage: Other NL-13-114, Implementation of License Renewal Regulatory Commitments2013-08-28028 August 2013 Implementation of License Renewal Regulatory Commitments Project stage: Other ML13241A0222013-08-28028 August 2013 Lr Hearing - IPEC License Renewal - Implementation of Unit 2 License Renewal Regulatory Commitments - NL-13-114 Project stage: Other ML13248A4922013-09-0505 September 2013 Lr Hearing - RAI Set 2013-05 Project stage: Request ML13273A3482013-09-30030 September 2013 NRC Staff Hearing File Update 56 Project stage: Request ML13298A8052013-11-0808 November 2013 Interim Staff Evaluation and Request for Additional Information Regarding the Overall Integrated Plan for Implementation of Order EA-12-051, Reliable Spent Fuel Pool Instrumentation (TAC Nos. MF0737 and Project stage: RAI ML14010A3312014-01-14014 January 2014 Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for Indian Point Energy Center, Units 2 and 3, TAC Nos.: MF0744 and MF0745 Project stage: Other ML13337A5942014-01-24024 January 2014 Interim Staff Evaluation and Audit Report Relating to Overall Integrated Plan in Response to Order EA-12-049 (Mitigation Strategies) Project stage: Other NL-14-031, Centers Second Six-Month Status Report for the Implementation of Order EA-12-049 Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events2014-02-27027 February 2014 Centers Second Six-Month Status Report for the Implementation of Order EA-12-049 Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events Project stage: Other NL-14-029, Second Six-Month Status Report for the Implementation of Order EA-12-051, Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation2014-02-27027 February 2014 Second Six-Month Status Report for the Implementation of Order EA-12-051, Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation Project stage: Other NL-14-109, Third Six-Month Status Report for the Implementation of Order EA-12-051 Modifying Licenses with Regard to Requirements for to Reliable Spent Fuel Pool Instrumentation2014-08-27027 August 2014 Third Six-Month Status Report for the Implementation of Order EA-12-051 Modifying Licenses with Regard to Requirements for to Reliable Spent Fuel Pool Instrumentation Project stage: Other NL-14-110, Third Six-Month Status Report for the Implementation of Order EA-12-049 Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events2014-08-27027 August 2014 Third Six-Month Status Report for the Implementation of Order EA-12-049 Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events Project stage: Other NL-14-132, Response to 03/12/2012, Request for Information Pursuant to Title 10 of the Code of Federal Regulation 50.54(f) Regarding Recommendations of the Near-Term Task Force (NTTF) Review of Insights from the Fukushima Dia-ichi2014-11-0303 November 2014 Response to 03/12/2012, Request for Information Pursuant to Title 10 of the Code of Federal Regulation 50.54(f) Regarding Recommendations of the Near-Term Task Force (NTTF) Review of Insights from the Fukushima Dia-ichi Project stage: Request ML14335A6422014-12-0909 December 2014 Report for the Onsite Audit Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Instrumentation Related to Orders EA-12-049 and EA-12-051 Project stage: Other NL-15-012, Request for Relaxation from NRC Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events2015-01-28028 January 2015 Request for Relaxation from NRC Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events Project stage: Request NL-15-026, Fourth Six-Month Status Report for the Implementation of Order EA-12-051 Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation2015-02-27027 February 2015 Fourth Six-Month Status Report for the Implementation of Order EA-12-051 Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation Project stage: Other NL-15-025, Fourth Six-Month Status Report for the Implementation of Order EA-12-049 Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events2015-02-27027 February 2015 Fourth Six-Month Status Report for the Implementation of Order EA-12-049 Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events Project stage: Other ML15085A0692015-03-16016 March 2015 Retraction of Entergys Request for Relaxation from NRC Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events Project stage: Request NL-15-036, Retraction of Entergy'S Request for Relaxation from NRC Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events2015-03-16016 March 2015 Retraction of Entergy'S Request for Relaxation from NRC Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events Project stage: Request ML15079A3542015-03-24024 March 2015 Withdrawal of Request for Relaxation of the Schedule Requirements for Order EA-12-049,Issuance of Order to Modify Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis Events Project stage: Withdrawal NL-15-059, Notification of Full Compliance with Order EA-12-049 Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events and Order EA-12-051 Modifying Licenses with Regard2015-05-20020 May 2015 Notification of Full Compliance with Order EA-12-049 Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events and Order EA-12-051 Modifying Licenses with Regard Project stage: Other NL-15-112, Fifth Six-Month Status Report for the Implementation of Order EA-12-049 Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events2015-08-28028 August 2015 Fifth Six-Month Status Report for the Implementation of Order EA-12-049 Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events Project stage: Other NL-15-111, Implementation of Order EA-12-051 Modifying Licenses with Regard to Requirements for to Reliable Spent Fuel Pool Instrumentation2015-08-28028 August 2015 Implementation of Order EA-12-051 Modifying Licenses with Regard to Requirements for to Reliable Spent Fuel Pool Instrumentation Project stage: Other ML15301A0932015-10-30030 October 2015 Plan for the Onsite Audit Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-049 and EA-12-051 Project stage: Other NL-16-024, Centers Sixth Six-Month Status Report for the Implementation of Order EA-12-049 Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events2016-02-29029 February 2016 Centers Sixth Six-Month Status Report for the Implementation of Order EA-12-049 Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events Project stage: Other ML16155A0842016-04-29029 April 2016 APS Response to Request for Additional Information Regarding Overall Integrated Plan for Implementation of Order EA-12-051, Reliable Spent Fuel Pool Lnstrumentation Project stage: Response to RAI NL-16-089, Notification of Full Compliance with Order EA-12-049 Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events and Order EA-12-051 Modifying Licenses with Regard .2016-08-12012 August 2016 Notification of Full Compliance with Order EA-12-049 Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events and Order EA-12-051 Modifying Licenses with Regard . Project stage: Other NL-16-115, Response to Request for Additional Information Regarding Review of Compliance with Order EA-12-049 Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events,2016-12-0202 December 2016 Response to Request for Additional Information Regarding Review of Compliance with Order EA-12-049 Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events, Project stage: Response to RAI 2014-12-09
[Table View] |
Text
Entergy Enteray Nuclear Northeast Indian Point Energy Center 450 Broadway, GSB P.O. Box 249 Buchanan, NY 10511-0249 Tel (914) 254-2055 Fred Dacimo Vice President Operations License Renewal NL-13-108 August 16, 2013 U.S. Nuclear Regulatory Commission Document Control Desk 11545 Rockville Pike, TWFN-2 F1 Rockville, MD 20852-2738
SUBJECT:
REFERENCE:
Reply to Request for Additional Information Regarding the License Renewal Application Indian Point Nuclear Generating Unit Nos. 2 & 3 Docket Nos. 50-247 and 50-286 License Nos. DPR-26 and DPR-64 NRC letter, "Request for Additional Information for the Review of the Indian Point Nuclear Generating Unit Nos. 2 and 3, License Renewal Application, SET 2013-03" dated July 17, 2013
Dear Sir or Madam:
Entergy Nuclear Operations, Inc is providing, in the attachment, the additional information requested in the referenced letter pertaining to NRC review of the License Renewal Application (LRA) for Indian Point 2 and Indian Point 3.
There are no new regulatory commitments in this submittal.
If you have any questions, or require additional information, please contact Mr. Robert Walpole at 914-254-6710.
I Oeclarý und er penalty of perjury that the foregoing is true and correct. Executed on Av,.q4X" IL, 2013.
\\1,3 FRD/rw
Docket Nos. 50-247 & 50-286 NL-13-108 Page 2 of 2
Attachment:
Reply to NRC Request for Additional Information Regarding the License Renewal Application cc:
Mr. William Dean, Regional Administrator, NRC Region I Mr. Sherwin E. Turk, NRC Office of General Counsel, Special Counsel Mr. Dave Wrona, NRC Branch Chief, Engineering Review Branch I Ms. Kimberly Green, NRC Sr. Project Manager, Division of License Renewal Mr. Douglas Pickett, NRR Senior Project Manager Ms. Bridget Frymire, New York State Department of Public Service NRC Resident Inspector's Office Mr. Francis J. Murray, Jr., President and CEO NYSERDA
ATTACHMENT TO NL-13-108 REPLY TO NRC REQUEST FOR ADDITIONAL INFORMATION REGARDING THE LICENSE RENEWAL APPLICATION ENTERGY NUCLEAR OPERATIONS, INC.
INDIAN POINT NUCLEAR GENERATING UNIT NOS. 2 & 3 DOCKET NOS. 50-247 AND 50-286
Docket Nos. 50-247 & 50-286 NL-13-108 Attachment Page 1 of 3 INDIAN POINT NUCLEAR GENERATING UNIT NOS. 2 AND 3 LICENSE RENEWAL APPLICATION (LRA)
REQUESTS FOR ADDITIONAL INFORMATION (RAI)
CHANGES TO THE METAL ENCLOSED BUS INSPECTION PROGRAM RAI 3.0.3.2.11-1
Background:
On April 23, 2007, Entergy Nuclear Operations, Inc. (Entergy or the applicant) applied for renewal of the operating licenses for Indian Point Nuclear Generating Units 2 and 3 (IP2 and IP3). The Metal Enclosed Bus (MEB) Inspection Program is described in license renewal application (LRA) Section B.1.20 and includes an enhancement to revise appropriate procedures to add the 480V MEB associated with Substation A to the scope of the program. This enhancement is also reflected in the LRA Updated Final Safety Evaluation Report (UFSAR) Section A.2.1.19. Entergy considered this MEB to be within the scope of license renewal because it provides ac power to the IP2 diesel fire pump (DFP).
By letter dated May 6, 2013, Entergy stated that it is making a change to the LRA regarding the MEB Inspection Program and the associated regulatory commitments. Specifically, based on a recent evaluation, Entergy determined that the 480V MEB is not used for starting the DFP, but it is used to maintain batteries in a charged state, which in turn provide dc power for starting the DFP and power instrumentation. Entergy stated that any loss of the 480V MEB associated with Substation A would initiate an automatic start of the DFP via the batteries.
Therefore, the 480V MEB associated with Substation A does not perform a license renewal intended function and thus, Entergy is removing the 480V MEB from the scope of program.
Issue:
Title 10 of the Code of Federal Regulations 10 CFR 54.4(a)(3) requires, in part, that all systems, structures, and components relied on in safety analyses or plant evaluations to perform a function that demonstrates compliance with the Commission's regulation for fire protection (10 CFR 50.48) are within the scope of license renewal. This is iterated in Section 2.1.3.1.3 of NUREG-1800, Revision 1, "Standard Review Plan for Review of License Renewal Applications for Nuclear Power Plants," which includes the following example:
...if an NSR diesel generator is required for safe shutdown under the fire protection plan, the diesel generator and all SSCs specifically relied upon for that generator to comply with NRC regulations shall be included within the scope of license renewal under 10 CFR 54.4(a)(3). Such SSCs may include, but should not be limited to, the cooling water system or systems relied upon for operability, the diesel support pedestal, and any applicable power supply cable specifically relied upon for safe shutdown in the event of a fire.
The DFP is relied upon to demonstrate compliance with the Commission's regulation for fire protection, and therefore, is within the scope of license renewal. The staff considers the MEB
Docket Nos. 50-247 & 50-286 NL-13-108 Attachment Page 2 of 3 associated with 480V Substation A to be within the scope of license renewal because it provides ac power to the chargers to maintain the DFP batteries at full charge. The fully charged batteries will be able to start the DFP during the fire events. It appears that if the 480V MEB is not part of an aging management program, the batteries which start the DFP may become depleted and unable to perform their intended function.
Request:
Provide a technical justification for why the 480V MEB Substation A is not relied upon for the DFP to demonstrate compliance with NRC regulations. Please refer to any applicable documents or statements in your current licensing basis to support your justification.
Response to RAI 3.0.3.2.11-1 The IP2 diesel fire pump (DFP) serves as backup for the electric fire pumps in the event the electric fire pumps can't provide the pressure required for the water-based fire protection systems. The DFP is designed with a number of features, including auto start capability, to ensure its reliability. The DFP starts automatically upon the following conditions.
- 1. Water pressure drop in the IPEC fire main water system.
- 2. Loss of electrical supply to the DFP room or to the DFP auxiliaries.
Alternating current (AC) power to the DFP room is provided by a 480 VAC feed that utilizes cables and metal-enclosed bus (MEB) from Substation A, which is owned and operated by Consolidated Edison Company. The 480 VAC feed connects to a step-down transformer, which, in turn, is connected to a 120 VAC lighting panel. The lighting panel provides 120 VAC power to the dual battery charger located in the DFP controller panel.
Either of two batteries can start the DFP. The batteries are charged from the engine alternator during DFP operation and by the battery charger during standby conditions. The battery charger automatically maintains the charge on the two batteries. A panel located in the central control room alerts the operators if AC power is lost and if the DFP is running. The diesel fire pump will automatically start as sensed by loss of Feeder 13W84, Substation A, or loss of AC power to the charger. (Ref. 1, 2, 3, 4, 8, and 9).
Thus, by design, in its normal alignment, a failure of the power source to the battery charger will not prevent the diesel fire pump (DFP) from performing its intended function. Loss of AC power to the battery charger actuates an automatic start of the DFP using the energy stored in the batteries.
Prior to a loss of the power source to the battery charger, the batteries will be in a charged state capable of starting the DFP. They will not be "depleted and unable to perform their intended function."
The components that provide power to the battery charger, including the 480 VAC metal-enclosed bus, are not relied on to demonstrate compliance with the Commission's regulation for fire protection (10 CFR 50.48). Therefore, those components do not perform a license renewal intended function as defined in 10 CFR 54.4. As stated above, the batteries, and not the incoming AC power supply,
Docket Nos. 50-247 & 50-286 NL-13-108 Attachment Page 3 of 3 are relied upon to provide power to start the diesel fire pump (DFP) engine upon a valid demand for DFP operation in the event of a fire. After the DFP engine starts, its electrical power needs are met by an engine-driven alternator, which also provides power to maintain the charge on the batteries. In short, because the nonsafety-related AC power source (including feeder, substation, electrical breakers and metal-enclosed bus) is not relied upon to start or run the DFP, its failure will not prevent the DFP from performing its license renewal intended function.
Entergy performs routine testing and monitoring associated with the DFP. On a weekly basis, Entergy checks the battery bank voltage and measures the electrolyte levels to ensure that the individual cells are charged. On a monthly basis, Entergy starts the DFP using the batteries and runs it for at least 30 minutes. As part of the monthly test, Entergy confirms that the operators receive an alarm indicating the engine is running. An alternate battery bank is selected for starting the DFP for each monthly test. In addition, Entergy initiates a loss of power to the battery charger once a year to test the auto-start feature of the DFP. This test also confirms that the operators receive the charger failure alarm. IPEC administrative controls regarding fire system impairments specify the required actions, time frames, and compensatory measures to restore non-functional (impaired) fire protection equipment. Any condition that would challenge the ability of the DFP to automatically start from its normal standby condition (i.e., from the fully charged battery bank(s))
would render the DFP non-functional (impaired) and require corrective actions to restore the DFP in seven days. This provides additional assurance that the batteries are always fully charged and available to perform their intended function in supporting the auto start capability of the DFP. (Ref 1, 5,6,7)
Summary The DFP serves as backup for the electric fire pumps in the event the electric fire pumps cannot maintain the pressure in the water-based fire protection system. The DFP, therefore, is relied upon to demonstrate compliance with NRC fire protection regulations. Each of the charged battery banks is capable of providing sufficient current to operate the DFP engine starter. The DFP starts using the energy stored in the batteries. The battery charger is not necessary to start the DFP or capable of starting the DFP. Once the DFP is started, the engine alternator provides the necessary electrical power to operate the engine and to keep the batteries charged. Thus, the nonsafety-related AC power supply to the DFP battery charger, which includes the 480 VAC metal-enclosed bus in Substation A, performs no license renewal intended function. In addition, routine monitoring and alarms provide operators adequate assurance of the DFP availability.
References:
- 1. Alarm Response Procedure 2-ARP-010
- 2. Technical Manual 2027
- 3. Drawing A208655
- 4. Design Basis Document IP2-DBD-221
- 5.
Diesel Fire Pump Weekly Test Procedure 2-PT-WO05
- 6. Diesel Fire Pump Monthly Test Procedure 2-PT-M040
- 7. Station Administrative Procedure SAO-703
- 8. System Operating Procedure 2-SOP-29.6
- 9. Engineering Report IP-RPT-12-LRD44