Category:Letter
MONTHYEARIR 05000387/20230042024-02-0707 February 2024 Integrated Inspection Report 05000387/2023004 and 05000388/2023004 PLA-8096, Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval2024-01-0404 January 2024 Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval PLA-8077, Emergency Plan Revision 67 (PLA-8077)2023-12-27027 December 2023 Emergency Plan Revision 67 (PLA-8077) IR 05000387/20230102023-12-11011 December 2023 Fire Protection Team Inspection Report 05000387/2023010 and 05000388/2023010 PLA-8089, Submittal of Revision to Inservice Testing Program Plan2023-12-0505 December 2023 Submittal of Revision to Inservice Testing Program Plan PLA-8084, Application to Revise Technical Specifications to Adopt TSTF-568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.22023-11-29029 November 2023 Application to Revise Technical Specifications to Adopt TSTF-568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.2 ML23345A0682023-11-28028 November 2023 Technical Specification Bases, Manual PLA-8091, Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inseervice Inspection Interval (PLA-8091)2023-11-0808 November 2023 Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inseervice Inspection Interval (PLA-8091) IR 05000387/20230032023-11-0303 November 2023 Integrated Inspection Report 05000387/2023003 and 05000388/2023003 PLA-8082, Proposed Amendment to Licenses NPF-14 and NPF-22: Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program2023-11-0202 November 2023 Proposed Amendment to Licenses NPF-14 and NPF-22: Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program ML23291A1132023-10-12012 October 2023 Submittal of Revision 71 to Updated Final Safety Analysis Report and Revision 25 to Fire Protection Review Report ML23279A0612023-10-0505 October 2023 Paragon Energy Solutions LLC, Part 21 Final Report Re Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs) ML23277A0412023-10-0505 October 2023 Notification of Commercial Grade Dedication Inspection (05000387/2024011 and 05000388/2024011) and Request for Information IR 05000387/20233012023-09-20020 September 2023 Initial Operator Licensing Examination Report 05000387/2023301 and 05000388/2023301 ML23254A0242023-09-0606 September 2023 Paragon Energy Solutions LLC, Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs) IR 05000387/20230052023-08-31031 August 2023 Updated Inspection Plan for Susquehanna Steam Electric Station, Units 1 and 2 (Report 05000387/2023005 and 05000388/2023005) ML23228A1952023-08-21021 August 2023 Summary of August 10, 2023, Public Observation Meeting Re. Proposed Alternative PLA-8080, Proposed Relief for Valve 251130 (PLA-8080)2023-08-14014 August 2023 Proposed Relief for Valve 251130 (PLA-8080) PLA-8074, Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval2023-08-0303 August 2023 Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval IR 05000387/20230022023-08-0101 August 2023 Integrated Inspection Report 05000387/2023002 and 05000388/2023002 ML23195A1852023-07-27027 July 2023 Correction to Technical Specifications Page 3.3-73 in Amendment No. 265 PLA-8076, Unit 2 - 21st Refueling Outage Owner'S Activity Report (PLA-8076)2023-07-20020 July 2023 Unit 2 - 21st Refueling Outage Owner'S Activity Report (PLA-8076) ML23201A0152023-07-20020 July 2023 Operator Licensing Examination Approval ML23200A1012023-07-19019 July 2023 Notification of Conduct of a Fire Protection Team Inspection ML23193A0062023-07-12012 July 2023 Requalification Program Inspection PLA-8078, Submittal of Unit 2 Cycle 22 Core Operating Limits Report, Revision 1, PLA-80782023-07-0505 July 2023 Submittal of Unit 2 Cycle 22 Core Operating Limits Report, Revision 1, PLA-8078 ML23163A1012023-06-12012 June 2023 10 CFR 50.46 Annual Report (Pla 8065) PLA-8054, Proposed Amendment to Licenses NPF-14 and NPF-22: Remove Control Rod Operability Separation Criteria and Replace Reference to Banked Position Withdrawal Sequence with the Analyzed Rod Position Sequence2023-06-0808 June 2023 Proposed Amendment to Licenses NPF-14 and NPF-22: Remove Control Rod Operability Separation Criteria and Replace Reference to Banked Position Withdrawal Sequence with the Analyzed Rod Position Sequence IR 05000387/20234012023-06-0707 June 2023 Security Baseline Inspection Report 05000387/2023401 and 05000388/2023401 PLA-8073, Proposed Relief Request for the Fifth 10-Year Inservice Inspection Interval2023-06-0101 June 2023 Proposed Relief Request for the Fifth 10-Year Inservice Inspection Interval PLA-8064, Response to NRC Regulatory Issue Summary 2023-01 (PLA-8064)2023-05-17017 May 2023 Response to NRC Regulatory Issue Summary 2023-01 (PLA-8064) ML23132A3212023-05-17017 May 2023 Associated Independent Spent Fuel Storage Installation - Issuance of Amendment Nos. 285 and 269 Related to Order Approving Transfer of Licenses PLA-8067, Notification of Completion of Emergence from Bankruptcy (PLA-8067)2023-05-17017 May 2023 Notification of Completion of Emergence from Bankruptcy (PLA-8067) IR 05000387/20230012023-05-12012 May 2023 Integrated Inspection Report 05000387/2023001 and 05000388/2023001 PLA-8066, Notification of Planned Closing Date and Information Identified in March 30, 2023 Order, PLA-80662023-05-0808 May 2023 Notification of Planned Closing Date and Information Identified in March 30, 2023 Order, PLA-8066 PLA-8053, Radiation Exposure Information and Reporting System2023-04-27027 April 2023 Radiation Exposure Information and Reporting System PLA-8058, Annual Radiological Environmental Operating Report (PLA-8058)2023-04-26026 April 2023 Annual Radiological Environmental Operating Report (PLA-8058) PLA-8041, Radioactive Effluent Release Report and Offsite Dose Calculation Manual (PLA-8041)2023-04-25025 April 2023 Radioactive Effluent Release Report and Offsite Dose Calculation Manual (PLA-8041) PLA-8047, 2022 Annual Environmental Operating Report (Nonradiological), PLA-80472023-04-19019 April 2023 2022 Annual Environmental Operating Report (Nonradiological), PLA-8047 PLA-8062, Supplement to Relief Request 4RR-10 Relief from Code Seal Weld Requirement for Valve 252F007B, PLA-80622023-04-11011 April 2023 Supplement to Relief Request 4RR-10 Relief from Code Seal Weld Requirement for Valve 252F007B, PLA-8062 PLA-8061, Relief Request 4RR-10 Relief from Code Seal Weld Requirement for Valve 25F007B, PLA-80612023-04-10010 April 2023 Relief Request 4RR-10 Relief from Code Seal Weld Requirement for Valve 25F007B, PLA-8061 ML23090A2302023-03-31031 March 2023 NRC Decommissioning Funding Status Report PLA-8049 PLA-8060, Submittal of Unit 2 Cycle 22 Core Operating Limits Report (PLA-8060)2023-03-30030 March 2023 Submittal of Unit 2 Cycle 22 Core Operating Limits Report (PLA-8060) ML23095A0572023-03-29029 March 2023 NRC Decommissioning Funding Status Report December 31, 2022 PLA-8057, Application for Order Approving Indirect Transfer of Control of Licenses and Approving Conforming License Amendments- Supplemental Information, PLA-80572023-03-15015 March 2023 Application for Order Approving Indirect Transfer of Control of Licenses and Approving Conforming License Amendments- Supplemental Information, PLA-8057 ML23065A1962023-03-0202 March 2023 EN 56387 Paragon - Part 21 Report Re Defect Identified in Automatic Transfer Switch Pn: NLI-ATS480A400X1 IR 05000387/20220062023-03-0101 March 2023 Annual Assessment Letter for Susquehanna Steam Electric Station, Units 1 and 2 (Reports 05000387/2022006 and 05000388/2022006) PLA-8052, (Sses), Proof of Financial Protection and Guarantee of Payment of Deferred Premiums2023-02-13013 February 2023 (Sses), Proof of Financial Protection and Guarantee of Payment of Deferred Premiums IR 05000387/20220042023-02-0808 February 2023 Integrated Inspection Report 05000387/2022004 and 05000388/2022004 ML23010A0882023-01-15015 January 2023 Summary of Regulatory Audit in Support of License Amendment Request to Revise Control Rod Technical Specifications 2024-02-07
[Table view] Category:Licensee Event Report (LER)
MONTHYEAR05000388/LER-2017-0102018-02-0202 February 2018 Condition Prohibited by Technical Specifications Due to Drift of Reactor Pressure Switches, LER 17-010-00 for Susquehanna, Unit 2 Regarding Condition Prohibited by Technical Specifications Due to Drift of Reactor Pressure Switches 05000387/LER-2017-0072017-10-0909 October 2017 Secondary Containment Declared Inoperable Due to the opening of a plenum., LER 17-007-00 for Susquehanna Steam Electric Station Regarding Secondary Containment Declared Inoperable Due to Supply Air Flow 05000387/LER-2017-0052017-10-0404 October 2017 Automatic Reactor Protection System Trip on High Neutron Flux, LER 17-005-01 for Susquehanna, Unit 1 Regarding Automatic Reactor Protection System Trip on High Neutron Flux 05000388/LER-2017-0082017-09-18018 September 2017 1 OF 3, LER 17-008-00 for Susquehanna, Unit 2, Regarding Condition Prohibited by Technical Specifications Due to a Loose Terminal Block Associated with a Primary Containment Isolation Valve 05000387/LER-2017-0062017-09-0606 September 2017 Control Room Envelope In-leakage Exceeded the Technical Specification Limit, LER 17-006-00 for Susquehanna, Unit 2, Regarding Secondary Containment Declared Inoperable Due to Trip of Zone II Exhaust Fan 05000387/LER-2017-0042017-08-0404 August 2017 Secondary Containment Declared Inoperable Due to Failure of an Exhaust Fan Breaker., LER 17-004-00 for Susquehanna, Unit 1, Regarding Secondary Containment Declared Inoperable Due to Failure of an Exhaust Fan Breaker 05000388/LER-2017-0022017-05-0505 May 2017 Implementation of Enforcement Guidance Memorandum (EGM) 11-003, Revision 3 during Unit 2 Refueling, LER 17-002-00 for Susquehanna, Unit 2, Regarding Implementation of Enforcement Guidance Memorandum (EGM) 11-003, Revision 3 During Unit 2 Refueling 05000387/LER-2017-0032017-05-0505 May 2017 Susquehanna Steam Electric Station Unit 1 05000387, LER 17-003-00 for Susquehanna, Units 1 and 2, Regarding Loss of Secondary Containment Zone 3 Due to Fan Trip 05000387/LER-2017-0012017-05-0505 May 2017 Secondary Containment Breach Due to Simultaneous Opening of Airlock Doors, LER 17-001-00 for Susquehanna, Unit 2, Regarding Secondary Containment Declared Inoperable Due to Airlock Doors Open Due to Sticking Door Latch 05000387/LER-2017-0022017-04-12012 April 2017 Secondary Containment Breach due to Simultaneous Opening of Airlock Doors, LER 17-002-00 for Susquehanna, Unit 1, Regarding Secondary Containment Breach due to Simultaneous Opening of Airlock Doors 05000388/LER-2016-0052016-07-12012 July 2016 Unit 2 HPCI Manually Overridden Prior to a Manual Scram During a Plant Transient, LER 16-005-00 for Susquehanna, Unit 2, Regarding HPCI Manually Overridden Prior to a Manual Scram During a Plant Transient 05000387/LER-2016-0152016-06-15015 June 2016 Secondary Containment Declared Inoperable Due to Airlock Doors Open Due to a Human Performance Error, LER 16-015-00 for Susquehanna, Unit 1, Regarding Secondary Containment Declared Inoperable Due to Airlock Doors Open Due to a Human Performance Error 05000387/LER-2016-0142016-06-0909 June 2016 Secondary Containment Declared Inoperable Due to Airlock Doors Open Due to a Human Performance Error, LER 16-014-00 for Susquehanna, Unit 1, Regarding Secondary Containment Declared Inoperable Due to Airlock Doors Open Due to a Human Performance Error 05000387/LER-2016-0132016-06-0909 June 2016 Secondary Containment Declared Inoperable Due to Simultaneous Opening of Double Airlock Doors, LER 16-013-00 for Susquehanna, Unit 1, Regarding Secondary Containment Declared Inoperable Due to Simultaneous Opening of Double Airlock Doors 05000387/LER-2016-0102016-05-31031 May 2016 Secondary Containment Declared Inoperable Due to Airlock Doors Open Due to Medical Emergency, LER 16-010-00 for Susquehanna, Unit 1, Regarding Secondary Containment Declared Inoperable Due to Airlock Doors Open Due to Medical Emergency 05000387/LER-2016-0092016-05-26026 May 2016 Valid Primary Containment Isolation Actuation during Local Leak Rate Testing due to Human Performance Error, LER 16-009-00 for Susquehanna, Unit 1, Regarding Valid Primary Containment Isolation Actuation During Local Leak Rate Testing Due to Human Performance Error 05000387/LER-2016-0082016-05-19019 May 2016 Inoperability of Diesel Generator Due to Misalignment of MOC Switch Contacts Due to Inadequate Post Maintenance Testing, LER 16-008-00 for Susquehanna, Unit 1, Regarding Inoperability of Diesel Generator Due to Misalignment of MOC Switch Contacts Due to Inadequate Post Maintenance Testing 05000387/LER-2016-0112016-05-16016 May 2016 Valve inoperability for a period longer than allowed by Technical Specifications, LER 16-011-00 for Susquehanna, Unit 1, Regarding Valve Inoperability for a Period Longer Than Allowed by Technical Specifications 05000387/LER-2016-0052016-05-16016 May 2016 Secondary Containment Declared Inoperable Due to Airlock Doors Open Due to Human Performance Error, LER 16-005-00 for Susquehanna, Units 1 and 2, Regarding Secondary Containment Declared Inoperable Due to Airlock Doors Open Due to Human Performance Error 05000387/LER-2016-0062016-05-10010 May 2016 Implementation of Enforcement Guidance Memorandum (EGM) 11-003, Revision 3, LER 16-006-00 for Susquehanna, Unit 1, Regarding Implementation of Enforcement Guidance Memorandum (EGM) 11-003, Revision 3 05000387/LER-2016-0042016-05-10010 May 2016 Momentary Loss of Secondary Containment due to Both Airlock Doors on Elevation 779 of the Unit 2 Reactor Building being Opened at the Same Time, LER 16-004-00 for Susquehanna, Unit 1, Regarding Momentary Loss of Secondary Containment Due to Both Airlock Doors on Elevation 779 of the Unit 2 Reactor Building Being Opened at the Same Time 05000387/LER-2016-0032016-05-0606 May 2016 Unit 2 Zone 3 HVAC unable to maintain Zone 3 differential pressure greater than 0.25 in wg, LER 16-003-00 for Susquehanna, Unit 1, Regarding Unit 2 Zone 3 HVAC Unable to Maintain Zone 3 Differential Pressure Greater Than 0.25 in wg 05000387/LER-2016-0072016-05-0303 May 2016 Inoperability of Swing Bus Transfer Switch Due to Deformed Bolt on Linkage, LER 16-007-00 for Susquehanna, Unit 1, Regarding Inoperability of Swing Bus Transfer Switch Due to Deformed Bolt on Linkage 05000387/LER-2016-0012016-04-18018 April 2016 Secondary Containment Declared Inoperable Due to an Airlock Doors Open Due to Random Occurrence, LER 16-001-00 for Susquehanna, Unit 1, Regarding Secondary Containment Declared Inoperable Due to an Airlock Doors Open Due to Random Occurrence 05000387/LER-2016-0022016-04-18018 April 2016 Secondary Containment Declared Inoperable Due to an Airlock Doors Open Due to Random Occurrence, LER 16-002-00 for Susquehanna, Unit 1, Regarding Secondary Containment Declared Inoperable Due to an Airlock Doors Open Due to Random Occurrence 05000387/LER-2015-0062016-03-30030 March 2016 Loss of Safety Function due to Inoperability of Both Trains of the Standby Gas Treatment System and a Loss of Safety Function of the Control Room Emergency Outside Air Supply System due to Air Flow Controller found in Manual, LER 15-006-01 for Susquehanna, Unit 1, Regarding Loss of Safety Function due to Inoperability of Both Trains of the Standby Gas Treatment System and a Loss of Safety Function of the Control Room Emergency Outside Air Supply System due to Air Flow... 05000387/LER-2015-0012016-02-10010 February 2016 Inoperability of the 'B' Emergency Diesel Generator due to Fuel Oil Leakage, LER 15-001-01 for Susquehanna, Unit 1, Regarding Condition Prohibited by Technical Specifications Due to Drift of Reactor Pressure Steam Dome - Low Switches 05000387/LER-2015-0032016-01-26026 January 2016 Secondary Containment Inoperability Due to Failure to Meet Technical Specification Surveillance Requirement 3.6.4.1.1, LER 15-003-01 for Susquehanna, Unit 1, Regarding Secondary Containment Inoperability Due to Failure to Meet Technical Specification Surveillance Requirement 3.6.4.1.1 05000387/LER-2015-0092016-01-11011 January 2016 Pressure Boundary Leakage From an Inadequate Weld Repair in Small Bore Pump Seal Vent Piping, LER 15-009-00 for Susquehanna, Unit 1, Regarding Pressure Boundary Leakage From an Inadequate Weld Repair in Small Bore Pump Seal Vent Piping 05000387/LER-2015-0072016-01-0808 January 2016 Unit 1 'B' Inboard Main Steam Isolation Valve, HV141F022B closed during surveillance test which caused a SCRAM on Unit 1, LER 15-007-00 for Susquehanna, Unit 1, Regarding 'B' Inboard Main Steam Isolation Valve, HV141 F022B Closed During Surveillance Test Which Caused a SCRAM PLA-7323, LER 015-001-00 for Susquehanna Regarding Inoperability of the B Emergency Diesel Generator Due to Fuel Oil Leakage2015-04-28028 April 2015 LER 015-001-00 for Susquehanna Regarding Inoperability of the B Emergency Diesel Generator Due to Fuel Oil Leakage 2018-02-02
[Table view] |