Submittal of Regulatory Issue Summary, RIS 2014-05, Preparation and Scheduling of Operator Licensing Examinations
ML14155A342
Person / Time
Site: Summer  South Carolina Electric & Gas Company icon.png
Issue date: 05/30/2014
From: Barbee A
South Carolina Electric & Gas Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML14155A342 (3)


Text

Andy T. Barbee Director,Nuclear Training 803.345.4034 A SCANA COMPANY May 30, 2014 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001

Dear Sir / Madam:

Subject:

VIRGIL C. SUMMER NUCLEAR STATION, UNITS 1, 2 AND 3 DOCKET NO. 50-395 DOCKET NO.52-027 AND 52-028 OPERATING LICENSE NO. NPF-12 COMBINED LICENSE NO. NPF-93 AND NPF-94 REGULATORY ISSUE

SUMMARY

, RIS 2014-05 PREPARATION AND SCHEDULING OF OPERATOR LICENSING EXAMINATIONS Attached please find South Carolina Electric & Gas Company's anticipated schedule for operator licensing examinations for V. C. Summer Units 1, 2 and 3.

Should you have any questions concerning Unit 1 exams, please call Mr. Neil E.

Constance at (803) 345-4028., For questions concerning Units 2 and 3 exams, please call Mr. Patrick C. Leary at. (803) 931-5130.

TS/ATB/sr Attachments (2) c: K. B. Marsh S. A. Williams S. A. Byrne N. 'E. Constance J. B. Archie P. C. Leary N. S. Cams NRC Resident Inspector J. H. Hamilton K. M. Sutton J. W. Williams NSRC W. M. Cherry RTS (CR-14-02621)

V. M. McCree File (814.04, RR 1150)

M. T. Widmann PRSF (RC-14-0094)

E. F. Guthrie Virgil C.Summer Station - Post Office Box 88. Jenkinsville, SC . 29065

  • F(803) 941-9776

NRC FORM 536 U. S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 09130/2014 (09-2011) Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden estimate to the Information Services Branch OPERATOR LICENSING (T-5F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internet e-EXAMINATION DATA mail to Infocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503. Ifa means used to impose an information collection does not display a currently valid OMB conhol number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.

FACILITY NRC REGION Virgil C. Summer Nuclear Station, Units 2 and 3 11 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2016 CY 2017 CY 2018 CY 2019 ESTIMATED NUMBER OF LICENSEE-PREPARED EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2016 CY 2017 CY 2018 CY 2019 NUMBER OF REACTOR 0 0 0 0 OPERATORS NUMBER OFýSENIOR REACTOR 24 24 24 24 OPERATORS - INSTANT NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE 0 0 0 0 NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE 9/19/2016 7/10/2017 3/5/2018 3/11/2019 ALTERNATE DATE 9/12/2016 7/24/2017 3/12/2018 3/25/2019 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2016 CY 2017 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 24 0 0 0 24 0 CANDIDATES NRC FORM 536 (09-2011)

NRC FORM 536 U. S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 09/3012014 (09-2011) Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden estimate to the Information Services Branch OPERATOR LICENSING (T-5F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internet e-EXAMINATION DATA mail to Infocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503. Ifa means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.

FACILITY NRC REGION Virgil C. Summer Nuclear Station, Unit 1 II A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2016 CY 2017 CY 2018 CY 2019 ESTIMATED NUMBER OF LICENSEE-PREPARED 1 1 1 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2016 CY 2017 CY 2018 CY 2019 NUMBER OF REACTOR 6 6 6 6 OPERATORS NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS - INSTANT NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE 3 3 NUMBER OF SENIOR REACTOR OPERATORS - LIMITED 0 PROPOSED DATES PRIMARY DATE 06/06/2016 05/30/2017 05/29/2018 05/28/2019 ALTERNATE DATE 06/13/2016 06/05/2017 06/04/2018 06/03/2019 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2016 CY 2017 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 6 0 0 0 6 0 CANDIDATES NRC FORM 536 (09-2011)