Dua 2017 Ile - Administered Exam RO-SRO Admin JPMs
ML17214A259
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 06/14/2017
From: Bielby M
Operations Branch III
To:
NextEra Energy Duane Arnold
Bielby M
Shared Package
ML16308A454 List:
References
Download: ML17214A259 (102)


Text

JOB PERFORMANCE MEASURE JPM Page 1 of 10 JPM TITLE: Evaluate License Maintenance and Over Time Requirements JPM NUMBER: 2.1.2-01 REV. 1 TASK NUMBER(S) / 96.05 (Reactor Operator)

TASK TITLE(S):

K/A NUMBERS: Generic 2.1.2 K/A VALUE: 4.1 Justification (FOR K/A VALUES <3.0):

TASK APPLICABILITY:

RO SRO STA Non-Lic SRO CERT OTHER:

APPLICABLE METHOD OF TESTING: Simulate/Walkthrough: Perform: X EVALUATION LOCATION: In-Plant: Control Room:

Simulator: X Other:

Lab:

Time for Completion: 20 Minutes Time Critical: NO Alternate Path [NRC]: NO Alternate Path [INPO]: NO Developed by:

Instructor/Developer Date Reviewed by:

Instructor (Instructional Review) Date Validated by:

SME (Technical Review) Date Approved by:

Training Supervision Date Approved by:

Training Program Owner Date TR-AA-230-1003-F10, Revision 2

G2.1.2, Evaluate License Maintenance and Over Time JPM Requirements REV. 1 Page 2 of 10 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

1. Are all items on the signature page filled in correctly?
2. Has the JPM been reviewed and validated by SMEs?
3. Can the required conditions for the JPM be appropriately established in the simulator if required?
4. Do the performance steps accurately reflect trainees actions in accordance with plant procedures?
5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
6. Has the completion time been established based on validation data or incumbent experience?
7. If the task is time critical, is the time critical portion based upon actual task performance requirements?
8. Is the job level appropriate for the task being evaluated if required?
9. Is the K/A appropriate to the task and to the licensee level if required?
10. Is justification provided for tasks with K/A values less than 3.0?
11. Have the performance steps been identified and classified (Critical /

Sequence / Time Critical) appropriately?

12. Have all special tools and equipment needed to perform the task been identified and made available to the trainee?
13. Are all references identified, current, accurate, and available to the trainee?
14. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?
15. Are all critical steps supported by procedural guidance? (e.g., if licensing, EP or other groups were needed to determine correct actions, then the answer should be NO.)
16. If the JPM is to be administered to an LOIT student, has the required knowledge been taught to the individual prior to administering the JPM?

TPE does not have to be completed, but the JPM evaluation may not be valid if they have not been taught the required knowledge.

All questions/statements must be answered YES or N/A or the JPM is not valid for use. If all questions/statements are answered YES or N/A, then the JPM is considered valid and can be performed as written. The individual(s) performing the initial validation shall sign and date the cover sheet.

Protected Content: (CAPRs, corrective actions, licensing commitments, etc. associated with this material)

{C001}

TR-AA-230-1003-F10, Revision 2

G2.1.2, Evaluate License Maintenance and Over Time JPM Requirements REV. 1 Page 3 of 10 UPDATE LOG: Indicate in the following table any minor changes or major revisions (as defined in TR-AA-230-1003) made to the material after initial approval. Or use separate Update Log form TR-AA-230-1003-F16.

PREPARER DATE

  1. DESCRIPTION OF CHANGE REASON FOR CHANGE AR/TWR#

SUPERVISOR DATE Beaumier Revision to update to new form 17-1 NRC LOIT 1

and procedure revision update Exam TR-AA-230-1003-F10, Revision 2

G2.1.2, Evaluate License Maintenance and Over Time JPM Requirements REV. 1 Page 4 of 10 SIMULATOR SET-UP: (Only required for simulator JPMs)

SIMULATOR SETUP INSTRUCTIONS:

If the JPM is performed somewhere other than the simulator, ensure that there is a copy of:

  • ODI-009, NUCLEAR STATION PLANT EQUIPMENT OPERATOR, REACTOR OPERATOR, SENIOR REACTOR OPERATOR, AND SHIFT TECHNICAL ADVISOR QUALIFICATION REQUIREMENTS.

SIMULATOR MALFUNCTIONS: NONE SIMULATOR OVERRIDES: NONE SIMULATOR REMOTE FUNCTIONS: NONE Required Materials:

  • ODI-009, Nuclear Station Plant Equipment Operator, Reactor Operator, Senior Reactor Operator, and Shift Technical Advisor Qualification Requirements, current revision General

References:

  • ODI-009, Rev. 47 Task Standards:
  • Determine that he cannot take the watch based on not getting a 10 hour1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br /> break between shifts.
  • Determine that he is not able to assume the watch based on not standing 5 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> shifts.

TR-AA-230-1003-F10, Revision 2

G2.1.2, Evaluate License Maintenance and Over Time JPM Requirements REV. 1 Page 5 of 10 I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

  • Todays date is June 30, 2017 and the time is currently 2000.
  • The plant is currently operating at 100%.
  • You are a licensed Reactor Operator whose only assignment since April 1, 2017 has been to the Work Control Center.
  • During the Second quarter of 2017 you stood the following watches assigned to the Control Room as the ANSOE.

April 2 0700 to 1900 April 17 0700 to 1500 April 27 1900 to 0700 April 28 1900 to 0700 June 17 0700 to 1900

  • You have just finished standing a partial watch, (1100 to 1900), for John Black, (ANSOE).

INITIATING CUES (IF APPLICABLE):

  • You have just received a call from the Control Room Shift Manager that some personal problems have come up for one of the on shift RO licenses. The SM requests you to come back into work tomorrow morning, Saturday, July 1, 2017, and complete the NSOE watch starting at 0200 and ending at 0700.
  • Are you allowed to take the watch? Why or why not?

NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator.

TR-AA-230-1003-F10, Revision 2

G2.1.2, Evaluate License Maintenance and Over Time JPM Requirements REV. 1 Page 6 of 10 JPM PERFORMANCE INFORMATION Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).

NOTE: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.

Performance Step:1 The Candidate will review his hours worked, then review AD-AA-101-Critical Y 1004 section 4.2.1 for exceeding any of the following:

  • No more than 16 work hours in any 24-hour period
  • No more than 26 work hours in any 48-hour period
  • No more than 72 work hours in any 7 day (168-hour) period
  • At least a 10-hour break between successive work periods, or an 8-hour break when a break of less than 10 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br /> is necessary to accommodate a crews scheduled transition between work schedules or shifts
  • A 34-hour break in any 216-hour (9-day) period Standard: Determines that he has not met the 10-hour break requirement.

Evaluator Note: If the candidate stops at this reason, prompt the student by asking if there is any other reason that he could not take the watch.

If the candidate knows of another reason but cannot remember the procedure, ask the operator How would you get this procedure? If the candidate indicates looking in NAMS or a different acceptable way, hand the operator ODI-009.

Performance: SATISFACTORY UNSATISFACTORY Comments:

TR-AA-230-1003-F10, Revision 2

G2.1.2, Evaluate License Maintenance and Over Time JPM Requirements REV. 1 Page 7 of 10 Performance Step:2 Review ODI-009 for requirements of maintaining an active license, and Critical Y determine the following:

For ROs to be considered active, they shall stand operating crew watch stations requiring respective qualification for a minimum of five 12-hour shifts per calendar quarter, and no more than four months shall transpire between standing watches.

Standard: ODI-009 requires five 12-hour shifts, based on the above conditions; he has not met the requirements of ODI-009 and cannot assume the watch as ANSOE.

Evaluator Note: If the candidate stops at this reason, prompt the student by asking if there is any other reason that he could not take the watch.

If the candidate knows of another reason but cannot remember the procedure, ask the operator How would you get this procedure? If the candidate indicates looking in NAMS or a different acceptable way, hand the operator AD-AA-101-1004.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues: When the candidate has discussed the questions in the turnover the JPM is complete.

NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator.

Stop Time:

TR-AA-230-1003-F10, Revision 2

G2.1.2, Evaluate License Maintenance and Over Time JPM Requirements REV. 1 Page 8 of 10 Examinee: Evaluator:

RO SRO STA Non-Lic SRO CERT Date:

LOIT RO LOIT SRO PERFORMANCE RESULTS: SAT: UNSAT:

Remediation required: YES NO COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).

EXAMINER NOTE: ENSURE ALL EXAM MATERIAL IS COLLECTED AND PROCEDURES CLEANED, AS APPROPRIATE.

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

TR-AA-230-1003-F10, Revision 2

JPM Page 9 of 10 TURNOVER SHEET INITIAL CONDITIONS:

  • Todays date is June 30, 2017 and the time is currently 2000.
  • The plant is currently operating at 100%.
  • You are a licensed Reactor Operator whose only assignment since April 1, 2017 has been to the Work Control Center.
  • During the Second quarter of 2017 you stood the following watches assigned to the Control Room as the ANSOE.

April 2 0700 to 1900 April 17 0700 to 1500 April 27 1900 to 0700 April 28 1900 to 0700 June 17 0700 to 1900

  • You have just finished standing a partial watch, (1100 to 1900), for John Black, (ANSOE).

INITIATING CUES (IF APPLICABLE):

  • You have just received a call from the Control Room Shift Manager that some personal problems have come up for one of the on shift RO licenses. The SM requests you to come back into work tomorrow morning, Saturday, July 1, 2017, and complete the NSOE watch starting at 0200 and ending at 0700.
  • Are you allowed to take the watch? Why or why not?

NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator.

TR-AA-230-1003-F10, Revision 2

JPM Page 10 of 10 To be able to use the macros, after opening Word go to: Tools/Macro/Security and set the security level at either Low or Medium, close completely out of Word and reopen Word to activate Macros. If you are concerned with macro viruses, check with your site to be assured of active virus scanning.

TOOLBAR BUTTONS for JPM Template Toolbars Results from pressing toolbar buttons Buttons Update JPM Information - Runs the macro for inputting information into the cover sheet.

[Note: - The JPM Title and Number is automatically added to the top of the second page by the use of Cross Reference fields.]

Add JPM Step - Adds a Performance Step Press Enter before inserting a Step box Critical Step - Toggles the Performance Step to Critical. Removes all of the text to the right of the words Critical and replaces them with the text string Y (SEQ-). The cursor is placed between the - and the ), to allow you to insert the sequence number for the performance step.

[NOTE - You must have your cursor inside the Performance Step table you want to make into a critical step otherwise you get an error message.]

Non-Critical Step - Toggles the Performance Step to Non-Critical. Removes all of the text to the right of the words Critical and replaces them with the text string N (SEQ-). The cursor is placed between the - and the ), to allow you to insert the sequence number for the performance step.

[NOTE - You must have your cursor inside the Performance Step table you want to make into a non-critical step otherwise you get an error message.]

Evaluator Note - Adds a row to the Performance Step table under the Standard: line, to allow you to enter any notes for the Evaluator.

Remove Evaluator Note - Removes the Evaluator Note: line if it was added to the Performance Step table.

[NOTE - You must have your cursor inside the Performance Step you want to remove the Evaluator Note from otherwise it removes two lines from the table above the cursor.]

Evaluator Cue - Adds a row to the Performance Step table above the Performance: line, to allow you to enter any cues for the Evaluator.

Remove Evaluator Cue - Removes the Evaluator Cue: line if it was added to the Performance Step table.

[NOTE - You must have your cursor inside the Performance Step you want to remove the Evaluator Cue from otherwise it removes two lines from the table above the cursor.]

TR-AA-230-1003-F10, Revision 2

JOB PERFORMANCE MEASURE JPM Page 1 of 10 JPM TITLE: Perform STP 3.0.0-01, Instrument Checks - SBLC Level, Temperature and Boron Concentration JPM NUMBER: 2.1.18-06 REV. 2 TASK NUMBER(S) / 1.07/

TASK TITLE(S): Perform Surveillance Test Procedures K/A NUMBERS: 2.1.18 K/A VALUE: RO 3.4/ SRO 4.1 Justification (FOR K/A VALUES <3.0): N/A TASK APPLICABILITY:

RO SRO STA Non-Lic SRO CERT OTHER:

APPLICABLE METHOD OF TESTING: Simulate/Walkthrough: Perform: X EVALUATION LOCATION: In-Plant: Control Room:

Simulator: Other: X Lab:

Time for Completion: 10 Minutes Time Critical: No Alternate Path [NRC]: No Alternate Path [INPO]: No Developed by:

Instructor/Developer Date Reviewed by:

Instructor (Instructional Review) Date Validated by:

SME (Technical Review) Date Approved by:

Training Supervision Date Approved by:

Training Program Owner Date Filename: RO Admin JPM A1.2.docx TR-AA-230-1003-F10 Revision 2

2.1.18-06, Perform STP 3.0.0-01, Instrument Checks - SBLC Level, JPM Temperature and Boron Concentration, Rev. 2 Page 2 of 10 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

1. Are all items on the signature page filled in correctly?
2. Has the JPM been reviewed and validated by SMEs?
3. Can the required conditions for the JPM be appropriately established in the simulator if required?
4. Do the performance steps accurately reflect trainees actions in accordance with plant procedures?
5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
6. Has the completion time been established based on validation data or incumbent experience?
7. If the task is time critical, is the time critical portion based upon actual task performance requirements?
8. Is the job level appropriate for the task being evaluated if required?
9. Is the K/A appropriate to the task and to the licensee level if required?
10. Is justification provided for tasks with K/A values less than 3.0?
11. Have the performance steps been identified and classified (Critical /

Sequence / Time Critical) appropriately?

12. Have all special tools and equipment needed to perform the task been identified and made available to the trainee?
13. Are all references identified, current, accurate, and available to the trainee?
14. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?
15. Are all critical steps supported by procedural guidance? (e.g., if licensing, EP or other groups were needed to determine correct actions, then the answer should be NO.)
16. If the JPM is to be administered to an LOIT student, has the required knowledge been taught to the individual prior to administering the JPM?

TPE does not have to be completed, but the JPM evaluation may not be valid if they have not been taught the required knowledge.

All questions/statements must be answered YES or N/A or the JPM is not valid for use. If all questions/statements are answered YES or N/A, then the JPM is considered valid and can be performed as written. The individual(s) performing the initial validation shall sign and date the cover sheet.

Protected Content: (CAPRs, corrective actions, licensing commitments, etc. associated with this material)

{C001}

Filename: RO Admin JPM A1.2.docx TR-AA-230-1003-F10 Revision 2

2.1.18-06, Perform STP 3.0.0-01, Instrument Checks - SBLC Level, JPM Temperature and Boron Concentration, Rev. 2 Page 3 of 10 UPDATE LOG: Indicate in the following table any minor changes or major revisions (as defined in TR-AA-230-1003) made to the material after initial approval. Or use separate Update Log form TR-AA-230-1003-F16.

PREPARER DATE

  1. DESCRIPTION OF CHANGE REASON FOR CHANGE AR/TWR#

SUPERVISOR DATE Rev. 0 02008578 10/28/

Updated for changes D Finch 15 Rev. 1 regarding location of 02088292 Chemistry Status Board See Cover Updated to fill in data from Rev. 2 Chemistry Status Board Filename: RO Admin JPM A1.2.docx TR-AA-230-1003-F10 Revision 2

2.1.18-06, Perform STP 3.0.0-01, Instrument Checks - SBLC Level, JPM Temperature and Boron Concentration, Rev. 2 Page 4 of 10 SIMULATOR SET-UP: (Only required for simulator JPMs)

SIMULATOR SETUP INSTRUCTIONS: None SIMULATOR MALFUNCTIONS: None SIMULATOR OVERRIDES: None SIMULATOR REMOTE FUNCTIONS: None SETUP INTRUCTIONS: In STP 3.0.0-01, Instrument Checks, Section SBLC Level, Temperature and Boron Concentration document the following:

  • Boron Concentration: 12.9%
  • Specific Gravity: 0.901
  • LI2600B: 74
  • TIC2602 (Tank Temp.): 82F
  • TI2619 (Pipe Temp.): 85F Required Materials:
  • STP 3.0.0-01, Section and Attachments Regarding SBLC Level, Temperature and Boron Concentration, Current Revision
  • Calculator General

References:

  • STP 3.0.0-01, Rev. 158 Task Standards:
  • Determines and documents the Effective Tank Level in gallons.
  • Plots SBLC Effective Tank Level vs. Boron Conc on Attachment 6.
  • Plots SBLC Tank Temp and Pipe Temp vs. Boron Concentration on Attachment 7.

Filename: RO Admin JPM A1.2.docx TR-AA-230-1003-F10 Revision 2

2.1.18-06, Perform STP 3.0.0-01, Instrument Checks - SBLC Level, JPM Temperature and Boron Concentration, Rev. 2 Page 5 of 10 I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

  • Plant is operating at 100% power.
  • STP 3.0.0-01, Instrument Checks is being performed.

INITIATING CUES (IF APPLICABLE):

  • You are directed to complete the SBLC Level, Temperature, and Boron Concentration section of STP 3.0.0-01, Instrument Checks.

NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator.

Filename: RO Admin JPM A1.2.docx TR-AA-230-1003-F10 Revision 2

2.1.18-06, Perform STP 3.0.0-01, Instrument Checks - SBLC Level, JPM Temperature and Boron Concentration, Rev. 2 Page 6 of 10 JPM PERFORMANCE INFORMATION Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).

NOTE: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.

Performance Step: 1 Determines and documents the Effective Tank Level in gallons.

Critical Y (SEQ-)

Standard: Determines and documents the Effective Tank Level in gallons.

Evaluator Note: The operator will substitute the values obtained for the unknowns in the equation to determine Effective Tank Level in gallons:

39.64 [(LI2600B reading x k) - 3.18]

39.64 [(74 x .901) - 3.18]

Evaluator Cue: The operator should determine the value of Effective Tank Level in gallons is 2516.9 or 2517.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Filename: RO Admin JPM A1.2.docx TR-AA-230-1003-F10 Revision 2

2.1.18-06, Perform STP 3.0.0-01, Instrument Checks - SBLC Level, JPM Temperature and Boron Concentration, Rev. 2 Page 7 of 10 Performance Step: 2 Plots SBLC Effective Tank Level vs. Boron Conc on Attachment 6.

Critical Y (SEQ-)

Standard: Plots SBLC Effective Tank Level vs. Boron Conc on Attachment 6.

Determines that the plot is outside of the acceptable area and reports this to the CRS.

The operator initials the column.

Evaluator Note: The candidate may not inform the CRS of the plot being outside of the acceptable area until the SBLC Level, Temperature and Boron Concentration section is completed.

Evaluator Cue: When informed that the plot is outside of the acceptable area, acknowledge the information.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 3 Plots SBLC Tank Temp and Pipe Temp vs. Boron Concentration on Critical Y (SEQ-) Attachment 7.

Standard: Plots SBLC Tank Temp and Pipe Temp vs. Boron Concentration on Attachment 7.

Determines that the plot is in the acceptable area.

The operator initials the column.

Performance: SATISFACTORY UNSATISFACTORY Comments:

When the operator informs the evaluator that the SBLC Level, Temperature Terminating Cues: and Boron Concentration section of STP 3.0.0-01, Instrument Checks is complete, with the exception of Verification of the BLUE light on for the SBLC Heat Trace Temp Controller.

NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator.

Stop Time:

Filename: RO Admin JPM A1.2.docx TR-AA-230-1003-F10 Revision 2

2.1.18-06, Perform STP 3.0.0-01, Instrument Checks - SBLC Level, JPM Temperature and Boron Concentration, Rev. 2 Page 8 of 10 Examinee: Evaluator:

RO SRO STA Non-Lic SRO CERT Date:

LOIT RO LOIT SRO PERFORMANCE RESULTS: SAT: UNSAT:

Remediation required: YES NO COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).

EXAMINER NOTE: ENSURE ALL EXAM MATERIAL IS COLLECTED AND PROCEDURES CLEANED, AS APPROPRIATE.

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

Filename: RO Admin JPM A1.2.docx TR-AA-230-1003-F10 Revision 2

Page 9 of 10 TURNOVER SHEET INITIAL CONDITIONS:

  • Plant is operating at 100% power.
  • STP 3.0.0-01, Instrument Checks is being performed.

INITIATING CUES (IF APPLICABLE):

  • You are directed to complete the SBLC Level, Temperature, and Boron Concentration section of STP 3.0.0-01, Instrument Checks.

NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator.

Filename: RO Admin JPM A1.2.docx TR-AA-230-1003-F10 Revision 2

Page 10 of 10 To be able to use the macros, after opening Word go to: Tools/Macro/Security and set the security level at either Low or Medium, close completely out of Word and reopen Word to activate Macros. If you are concerned with macro viruses, check with your site to be assured of active virus scanning.

TOOLBAR BUTTONS for JPM Template Toolbars Results from pressing toolbar buttons Buttons Update JPM Information - Runs the macro for inputting information into the cover sheet.

[Note: - The JPM Title and Number is automatically added to the top of the second page by the use of Cross Reference fields.]

Add JPM Step - Adds a Performance Step Press Enter before inserting a Step box Critical Step - Toggles the Performance Step to Critical. Removes all of the text to the right of the words Critical and replaces them with the text string Y (SEQ-). The cursor is placed between the - and the ), to allow you to insert the sequence number for the performance step.

[NOTE - You must have your cursor inside the Performance Step table you want to make into a critical step otherwise you get an error message.]

Non-Critical Step - Toggles the Performance Step to Non-Critical. Removes all of the text to the right of the words Critical and replaces them with the text string N (SEQ-). The cursor is placed between the - and the ), to allow you to insert the sequence number for the performance step.

[NOTE - You must have your cursor inside the Performance Step table you want to make into a non-critical step otherwise you get an error message.]

Evaluator Note - Adds a row to the Performance Step table under the Standard: line, to allow you to enter any notes for the Evaluator.

Remove Evaluator Note - Removes the Evaluator Note: line if it was added to the Performance Step table.

[NOTE - You must have your cursor inside the Performance Step you want to remove the Evaluator Note from otherwise it removes two lines from the table above the cursor.]

Evaluator Cue - Adds a row to the Performance Step table above the Performance: line, to allow you to enter any cues for the Evaluator.

Remove Evaluator Cue - Removes the Evaluator Cue: line if it was added to the Performance Step table.

[NOTE - You must have your cursor inside the Performance Step you want to remove the Evaluator Cue from otherwise it removes two lines from the table above the cursor.]

Filename: RO Admin JPM A1.2.docx TR-AA-230-1003-F10 Revision 2

JOB PERFORMANCE MEASURE JPM Page 1 of 13 JPM TITLE: Perform STP 3.8.1-01, OFFSITE POWER SOURCES. DETERMINE THAT SWITCHYARD MAINTENANCE CAN BE PERFORMED.

JPM NUMBER: 2.2.12-06 REV. 0 TASK NUMBER(S) / 1.07 (Reactor Operator)

TASK TITLE(S):

K/A NUMBERS: Generic, 2.2.12 K/A VALUE: 3.7 / 4.1 Justification (FOR K/A VALUES <3.0):

TASK APPLICABILITY:

RO SRO STA Non-Lic SRO CERT OTHER:

APPLICABLE METHOD OF TESTING: Simulate/Walkthrough: Perform: X EVALUATION LOCATION: In-Plant: Control Room:

Simulator: X Other: X Lab:

Time for Completion: 15 Minutes Time Critical: NO Alternate Path [NRC]: NO Alternate Path [INPO]: NO Developed by:

Instructor/Developer Date Reviewed by:

Instructor (Instructional Review) Date Validated by:

SME (Technical Review) Date Approved by:

Training Supervision Date Approved by:

Training Program Owner Date TR-AA-230-1003-F10, Revision 2

2.2.12-06, Perform STP 3.8.1-01, OFFSITE POWER SOURCES.

DETERMINE THAT SWITCHYARD MAINTENANCE CAN BE JPM Page 2 of 13 PERFORMED. Rev. 0 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

1. Are all items on the signature page filled in correctly?
2. Has the JPM been reviewed and validated by SMEs?
3. Can the required conditions for the JPM be appropriately established in the simulator if required?
4. Do the performance steps accurately reflect trainees actions in accordance with plant procedures?
5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
6. Has the completion time been established based on validation data or incumbent experience?
7. If the task is time critical, is the time critical portion based upon actual task performance requirements?
8. Is the job level appropriate for the task being evaluated if required?
9. Is the K/A appropriate to the task and to the licensee level if required?
10. Is justification provided for tasks with K/A values less than 3.0?
11. Have the performance steps been identified and classified (Critical /

Sequence / Time Critical) appropriately?

12. Have all special tools and equipment needed to perform the task been identified and made available to the trainee?
13. Are all references identified, current, accurate, and available to the trainee?
14. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?
15. Are all critical steps supported by procedural guidance? (e.g., if licensing, EP or other groups were needed to determine correct actions, then the answer should be NO.)
16. If the JPM is to be administered to an LOIT student, has the required knowledge been taught to the individual prior to administering the JPM?

TPE does not have to be completed, but the JPM evaluation may not be valid if they have not been taught the required knowledge.

All questions/statements must be answered YES or N/A or the JPM is not valid for use. If all questions/statements are answered YES or N/A, then the JPM is considered valid and can be performed as written. The individual(s) performing the initial validation shall sign and date the cover sheet.

Protected Content: (CAPRs, corrective actions, licensing commitments, etc. associated with this material)

{C001}

TR-AA-230-1003-F10, Revision 2

2.2.12-06, Perform STP 3.8.1-01, OFFSITE POWER SOURCES.

DETERMINE THAT SWITCHYARD MAINTENANCE CAN BE JPM Page 3 of 13 PERFORMED. Rev. 0 UPDATE LOG: Indicate in the following table any minor changes or major revisions (as defined in TR-AA-230-1003) made to the material after initial approval. Or use separate Update Log form TR-AA-230-1003-F16.

PREPARER DATE

  1. DESCRIPTION OF CHANGE REASON FOR CHANGE AR/TWR#

SUPERVISOR DATE Beaumier 17-1 NRC LOIT 0 Modified JPM from 2.2.12-02 Exam TR-AA-230-1003-F10, Revision 2

2.2.12-06, Perform STP 3.8.1-01, OFFSITE POWER SOURCES.

DETERMINE THAT SWITCHYARD MAINTENANCE CAN BE JPM Page 4 of 13 PERFORMED. Rev. 0 JPM SETUP INSTRUCTIONS:

1. Insert Simulator Overrides listed below
2. Place a Maintenance In Progress tag on the handswitch for the J breaker
3. NOTE: This JPM can be run either in the simulator using the 1C08 panel set up in normal full power lineup with the J Breaker de-energized, or in a classroom using the attached panel pictures
4. Mark up a copy of STP 3.8.1-01 as follows:

o General In the point-of-use section, put the DATE as today, the TIME as NOW, in the printer ID, put TC-R1, and initial.

Mark TODAY in all pages in the Performance Date blanks.

Initial all notes and cautions in the body of the procedure.

o Prerequisites Initial steps 6.1 and 6.2.

X the 7.1 section SIMULATOR MALFUNCTIONS: NONE SIMULATOR OVERRIDES:

TIME OVERRIDE ID OVERRIDE ET DELAY INITIAL FINAL DESCRIPTION Setup DO-ED-193 OCB5550(1) ON OFF STARTUP XFMR "J" BREAKER OPEN (GREEN)

Setup DO-ED-194 OCB5550(2) ON OFF STARTUP XFMR "J" BREAKER OPEN (RED)

SIMULATOR REMOTE FUNCTIONS:NONE Required Materials: 1. Pictures of 1C08 if not performing in the Simulator

2. Three colored pens (Red, Blue, and Green, preferably), for the filling out of a new offsite circuit power map.
3. A copy of STP 3.8.1-01 marked per the Setup Instructions.
4. Straight edge ruler
5. OI 304.1A22 Simplified Substation Drawing General

References:

STP 3.8.1-01, Rev. 5 Task Standards:

  • Determine that Maintenance can be performed by ITC as requested
  • Completed map of STP 3.8.1-01 proving that maintenance can be performed.

TR-AA-230-1003-F10, Revision 2

2.2.12-06, Perform STP 3.8.1-01, OFFSITE POWER SOURCES.

DETERMINE THAT SWITCHYARD MAINTENANCE CAN BE JPM Page 5 of 13 PERFORMED. Rev. 0 I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

  • The plant is running at 100% electrical output. The only inoperable piece of equipment is the J Breaker (5550). It was tagged out for maintenance.
  • ITC is requesting to perform maintenance on two breakers:
  • CB-3110 B Breaker AND
  • CB-5950 AB Breaker
  • ITC will be performing maintenance on the B and AB Breakers at the same time.

INITIATING CUES (IF APPLICABLE):

  • The CRS has directed you to perform STP 3.8.1-01, Offsite Power Sources to determine if DAEC can support ITCs request.

NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator.

AND Provide candidate with:

  • Pictures of 1C08
  • Pre-marked copy of STP 3.8.1-01
  • Three colored pens
  • Straight edge
  • OI 304.1A22 Simplified Substation Drawing (Only if requested)

TR-AA-230-1003-F10, Revision 2

2.2.12-06, Perform STP 3.8.1-01, OFFSITE POWER SOURCES.

DETERMINE THAT SWITCHYARD MAINTENANCE CAN BE JPM Page 6 of 13 PERFORMED. Rev. 0 JPM PERFORMANCE INFORMATION Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).

NOTE: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.

Performance Step:1 The candidate will completed STP 3.8.1-01 Critical Y Standard: The only portion of the STP that is critical is the completion of Attachment 1 marked up to indicate that two independent sources are still available.

Evaluator Cue: To be considered SAT the filled out Attachment 1 should look like the one attached to this JPM Performance: SATISFACTORY UNSATISFACTORY Comments:

TR-AA-230-1003-F10, Revision 2

2.2.12-06, Perform STP 3.8.1-01, OFFSITE POWER SOURCES.

DETERMINE THAT SWITCHYARD MAINTENANCE CAN BE JPM Page 7 of 13 PERFORMED. Rev. 0 Performance Step:2 Candidate will determine if DAEC can support the requested Critical Y maintenance.

Standard: Candidate will indicate that DAEC can support the requested maintenance.

Evaluator Note: Some of the breakers on the Attachment are not on 1C08 and are listed below.

Evaluator Cue: If the candidate wants to know the position of any of these breakers, role play as the CRS and depending on which breakers are requested, indicate the following:

ITC has been contacted and:

  • SW 8090 A (L2 (Fairfax)) and/or
  • SW 7510 C (L3 (Dysart))

are closed and voltages are satisfactory Performance: SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues: When the RO indicates that DAEC can either support or cant support the maintenance and hands it back STP 3.8.1-01 to the CRS, the JPM is over.

NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator.

Stop Time:

TR-AA-230-1003-F10, Revision 2

2.2.12-06, Perform STP 3.8.1-01, OFFSITE POWER SOURCES.

DETERMINE THAT SWITCHYARD MAINTENANCE CAN BE JPM Page 8 of 13 PERFORMED. Rev. 0 Examinee: Evaluator:

RO SRO STA Non-Lic SRO CERT Date:

LOIT RO LOIT SRO PERFORMANCE RESULTS: SAT: UNSAT:

Remediation required: YES NO COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).

EXAMINER NOTE: ENSURE ALL EXAM MATERIAL IS COLLECTED AND PROCEDURES CLEANED, AS APPROPRIATE.

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

TR-AA-230-1003-F10, Revision 2

TURNOVER SHEET INITIAL CONDITIONS:

  • The plant is running at 100% electrical output. The only inoperable piece of equipment is the J Breaker (5550). It was tagged out for maintenance.
  • ITC is requesting to perform maintenance on two breakers:
  • CB-3110 B Breaker AND
  • CB-5950 AB Breaker
  • ITC will be performing maintenance on the B and AB Breakers at the same time.

INITIATING CUES (IF APPLICABLE):

  • The CRS has directed you to perform STP 3.8.1-01, Offsite Power Sources to determine if DAEC can support ITCs request.

NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator.

TR-AA-230-1003-F10, Revision 2

TR-AA-230-1003-F10, Revision 2 TR-AA-230-1003-F10, Revision 2 7510 L3 "C" Dysart Sub Power Source Breaker Transformer Bus 5950 5560 Line "AB" "K" 6th Street Sub Unacceptable path for the purposes of this STP.

4290 161KV 1A 1A "I" West Bus 301 302 345KV West Bus 2820 6780 L6 "S" "F" Hills 1A3 Sub 3110 0220 0710 8490 T1 1X4 1X3 "B" "H" "T" "M" Hazelton Sub 1A4 4730 2690 L7 "R" "D" 345KV East Bus 9180 161KV 1A 1A L1 "G" East Bus 401 402 Hiawatha Sub - Indicates that multiple ways to achieve power exist as long as the candidate has at least one power source to the T1 transformer this part of the map is SAT.

8090 5550 L2 "A" "J" Fairfax Sub TR-AA-230-1003-F10, Revision 2

TR-AA-230-1003-F10, Revision 2 2.3.12-03, Determine Personnel Availability to Perform Rad Area Task, JPM Rev. 0 Page 1 of 9 JPM TITLE: DETERMINE PERSONNEL AVAILABIITY TO PERFORM RAD AREA TASK JPM NUMBER: 2.3.12-03 REV. 0 TASK NUMBER(S) / 96.05 TASK TITLE(S): CONDUCT PLANT OPERATIONS IN ACCORDANCE WITH ADMINISTRATIVE PROCEDURES K/A NUMBERS: GENERIC 2.3.12 K/A VALUE: 3.2/3.7 Justification (FOR K/A VALUES <3.0):

TASK APPLICABILITY:

RO SRO STA Non-Lic SRO CERT OTHER:

APPLICABLE METHOD OF TESTING: Simulate/Walkthrough: Perform: X EVALUATION LOCATION: In-Plant: Control Room:

Simulator: Other: X Lab:

Time for Completion: 10 Minutes Time Critical: NO Alternate Path [NRC]: NO Alternate Path [INPO]: NO Developed by:

Instructor/Developer Date Reviewed by:

Instructor (Instructional Review) Date Validated by:

SME (Technical Review) Date Approved by:

Training Supervision Date Approved by:

Training Program Owner Date

2.3.12-03, Determine Personnel Availability to Perform Rad Area Task, JPM Rev. 0 Page 2 of 9 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

1. Are all items on the signature page filled in correctly?
2. Has the JPM been reviewed and validated by SMEs?
3. Can the required conditions for the JPM be appropriately established in the simulator if required?
4. Do the performance steps accurately reflect trainees actions in accordance with plant procedures?
5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
6. Has the completion time been established based on validation data or incumbent experience?
7. If the task is time critical, is the time critical portion based upon actual task performance requirements?
8. Is the job level appropriate for the task being evaluated if required?
9. Is the K/A appropriate to the task and to the licensee level if required?
10. Is justification provided for tasks with K/A values less than 3.0?
11. Have the performance steps been identified and classified (Critical /

Sequence / Time Critical) appropriately?

12. Have all special tools and equipment needed to perform the task been identified and made available to the trainee?
13. Are all references identified, current, accurate, and available to the trainee?
14. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?
15. Are all critical steps supported by procedural guidance? (e.g., if licensing, EP or other groups were needed to determine correct actions, then the answer should be NO.)
16. If the JPM is to be administered to an LOIT student, has the required knowledge been taught to the individual prior to administering the JPM?

TPE does not have to be completed, but the JPM evaluation may not be valid if they have not been taught the required knowledge.

All questions/statements must be answered YES or N/A or the JPM is not valid for use. If all questions/statements are answered YES or N/A, then the JPM is considered valid and can be performed as written. The individual(s) performing the initial validation shall sign and date the cover sheet.

Protected Content: (CAPRs, corrective actions, licensing commitments, etc. associated with this material)

{C001}

2.3.12-03, Determine Personnel Availability to Perform Rad Area Task, JPM Rev. 0 Page 3 of 9 UPDATE LOG: Indicate in the following table any minor changes or major revisions (as defined in TR-AA-230-1003) made to the material after initial approval. Or use separate Update Log form TR-AA-230-1003-F16.

PREPARER DATE

  1. DESCRIPTION OF CHANGE REASON FOR CHANGE AR/TWR#

SUPERVISOR DATE See Cover Rev. 0 Developed for 2017 LOCT Annual Operating Exam.

2.3.12-03, Determine Personnel Availability to Perform Rad Area Task, JPM Rev. 0 Page 4 of 9 SIMULATOR SET-UP: (Only required for simulator JPMs)

SIMULATOR SETUP INSTRUCTIONS:

SIMULATOR MALFUNCTIONS: None SIMULATOR OVERRIDES: None SIMULATOR REMOTE FUNCTIONS: None Required Materials:

  • Calculator
  • Candidate may refer to ACP 1411.17, OCCUPATIONAL DOSE LIMITS AND UPGRADES (Level of Usage is Information Use). If he states he would refer to the ACP, provide him with a copy.

General

References:

  • ACP 1411.17, OCCUPATIONAL DOSE LIMITS AND UPGRADES, Revision 24 Task Standards:
  • Calculate actual exposure
  • Determines Operator A CANNOT perform the task without exceeding DAEC limits and that Plant General Manager permission is required.
  • Determines Operator B CANNOT perform the task without exceeding DAEC limits and that Site Vice President permission is required.

2.3.12-03, Determine Personnel Availability to Perform Rad Area Task, JPM Rev. 0 Page 5 of 9 I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

  • Entry to the reactor building is required to manually close MO-2701, RWCU SUCTION OUTBOARD ISOLATION o This valve failed to isolate remotely due to a steam leak from a cracked weld in RWCU
  • Plant Management has decided that the following operators are required to perform the work and will make the required area entry
  • Estimated time to complete the task will be approximately 24 minutes
  • Radiation levels at the valve are as high as 3000 mR/hr
  • ONLY two (2) individuals are available to perform the task:

A. Operator A is a Licensed Reactor Operator who has received a dose of 1500 mR this year (TLD #1, Employee # - 00001, SSN: 111-11-1111)

B. Operator B is a Licensed Reactor Operator who has received a dose of 1900 mR this year (TLD #2, Employee # - 00002, SSN: 222-22-2222)

INITIATING CUES (IF APPLICABLE):

  • The Control Room Supervisor has directed you to determine, using the maximum dose rate expected, what is the expected radiation exposure for the maintenance.

-AND-

  • What, if any, special permissions are required to perform the above stated maintenance IAW ACP 1411.17, OCCUPATIONAL DOSE LIMITS AND UPGRADES?

NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator.

2.3.12-03, Determine Personnel Availability to Perform Rad Area Task, JPM Rev. 0 Page 6 of 9 JPM PERFORMANCE INFORMATION Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).

NOTE: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.

Performance Step: 1 Using turnover data, calculate the expected exposure for the task.

Critical Y ACP 1411.17 Standard: For each operator - Calculates that a 24 minute exposure in a 3000 mR/hr field will cause a dose of 1200 mR.

Evaluator Note: Student may use paper or a calculator to calculate exposure:

a. 24 minutes = 0.4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />
b. 0.4 hrs X 3000 mR/hr - 1200 mR for each operator Performance: SATISFACTORY UNSATISFACTORY Comments: ________________________________________________________________

2.3.12-03, Determine Personnel Availability to Perform Rad Area Task, JPM Rev. 0 Page 7 of 9 Performance Step: 2 Determine the requirement for each operator to close MO-2701 in regards to Critical Y permission to exceed administrative limits.

ACP 1411.17. Section 3.2 Standard: Determines Operator A is NOT available to close MO-2701 without exceeding DAEC Administrative Limits:

  • Operator A has previously received 1500 mR therefore, 1200 mR would cause him/her to exceed the 2000 mR administrative limit and would require the permission of the Plant General Manager to exceed.

Performance: SATISFACTORY UNSATISFACTORY Comments: ________________________________________________________________

Performance Step: 3 Determine the requirement for each operator to close MO-2701 in regards to Critical Y permission to exceed administrative limits.

ACP 1411.17. Section 3.2 Standard: Determines Operator B is NOT available to close MO-2701 without exceeding DAEC Administrative Limits:

  • Operator B has previously received 1900 mR therefore, 1200 mR would cause him/her to exceed the 3000 mR administrative limit and would require the permission of the Site Vice President to exceed.

Performance: SATISFACTORY UNSATISFACTORY Comments: ________________________________________________________________

When the candidate has stated the expected dose for the task and states whose, Terminating Cues:

if any, permission is required for each operator to perform the maintenance, the JPM is complete.

NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator.

Stop Time:

2.3.12-03, Determine Personnel Availability to Perform Rad Area Task, JPM Rev. 0 Page 8 of 9 Examinee: Evaluator:

RO SRO STA Non-Lic SRO CERT Date:

LOIT RO LOIT SRO PERFORMANCE RESULTS: SAT: UNSAT:

Remediation required: YES NO COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).

EXAMINER NOTE: ENSURE ALL EXAM MATERIAL IS COLLECTED AND PROCEDURES CLEANED, AS APPROPRIATE.

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

Filename: RO Admin JPM A3.docx TR-AA-230-1003-F10 Revision 2

Page 9 of 9 TURNOVER SHEET INITIAL CONDITIONS:

  • Entry to the reactor building is required to manually close MO-2701, RWCU SUCTION OUTBOARD ISOLATION o This valve failed to isolate remotely due to a steam leak from a cracked weld in RWCU
  • Plant Management has decided that the following operators are required to perform the work and will make the required area entry
  • Estimated time to complete the task will be approximately 24 minutes
  • Radiation levels at the valve are as high as 3000 mR/hr
  • ONLY two (2) individuals are available to perform the task:

C. Operator A is a Licensed Reactor Operator who has received a dose of 1500 mR this year (TLD #1, Employee # - 00001, SSN: 111-11-1111)

D. Operator B is a Licensed Reactor Operator who has received a dose of 1900 mR this year (TLD #2, Employee # - 00002, SSN: 222-22-2222)

INITIATING CUES (IF APPLICABLE):

  • The Control Room Supervisor has directed you to determine, using the maximum dose rate expected, what is the expected radiation exposure for the maintenance.

-AND-

  • What, if any, special permissions are required to perform the above stated maintenance IAW ACP 1411.17, OCCUPATIONAL DOSE LIMITS AND UPGRADES?

NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator.

Filename: RO Admin JPM A3.docx TR-AA-230-1003-F10 Revision 2

JOB PERFORMANCE MEASURE JPM Page 1 of 10 JPM TITLE: Determine Risk and the Resultant Protected Systems JPM NUMBER: 2.1.2-05 REV. 1 TASK NUMBER(S) / SRO 1.11 Ensure the Conduct of Plant Operations and Maintenance TASK TITLE(S): are in Compliance with Administrative Procedures.

K/A NUMBERS: Generic 2.1.2 K/A VALUE: 4.4 Justification (FOR K/A VALUES <3.0):

TASK APPLICABILITY:

RO SRO STA Non-Lic SRO CERT OTHER:

APPLICABLE METHOD OF TESTING: Simulate/Walkthrough: Perform: X EVALUATION LOCATION: In-Plant: Control Room:

Simulator: X Other:

Lab:

Time for Completion: 15 Minutes Time Critical: NO Alternate Path [NRC]: NO Alternate Path [INPO]: NO Developed by:

Instructor/Developer Date Reviewed by:

Instructor (Instructional Review) Date Validated by:

SME (Technical Review) Date Approved by:

Training Supervision Date Approved by:

Training Program Owner Date TR-AA-230-1003-F10, Revision 2

2.1.2-05, Determine Risk and the Resultant Protected Systems, JPM Rev. 1 Page 2 of 10 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

1. Are all items on the signature page filled in correctly?
2. Has the JPM been reviewed and validated by SMEs?
3. Can the required conditions for the JPM be appropriately established in the simulator if required?
4. Do the performance steps accurately reflect trainees actions in accordance with plant procedures?
5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
6. Has the completion time been established based on validation data or incumbent experience?
7. If the task is time critical, is the time critical portion based upon actual task performance requirements?
8. Is the job level appropriate for the task being evaluated if required?
9. Is the K/A appropriate to the task and to the licensee level if required?
10. Is justification provided for tasks with K/A values less than 3.0?
11. Have the performance steps been identified and classified (Critical /

Sequence / Time Critical) appropriately?

12. Have all special tools and equipment needed to perform the task been identified and made available to the trainee?
13. Are all references identified, current, accurate, and available to the trainee?
14. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?
15. Are all critical steps supported by procedural guidance? (e.g., if licensing, EP or other groups were needed to determine correct actions, then the answer should be NO.)
16. If the JPM is to be administered to an LOIT student, has the required knowledge been taught to the individual prior to administering the JPM?

TPE does not have to be completed, but the JPM evaluation may not be valid if they have not been taught the required knowledge.

All questions/statements must be answered YES or N/A or the JPM is not valid for use. If all questions/statements are answered YES or N/A, then the JPM is considered valid and can be performed as written. The individual(s) performing the initial validation shall sign and date the cover sheet.

Protected Content: (CAPRs, corrective actions, licensing commitments, etc. associated with this material)

{C001}

TR-AA-230-1003-F10, Revision 2

2.1.2-05, Determine Risk and the Resultant Protected Systems, JPM Rev. 1 Page 3 of 10 UPDATE LOG: Indicate in the following table any minor changes or major revisions (as defined in TR-AA-230-1003) made to the material after initial approval. Or use separate Update Log form TR-AA-230-1003-F16.

PREPARER DATE

  1. DESCRIPTION OF CHANGE REASON FOR CHANGE AR/TWR#

SUPERVISOR DATE See Cover Update to new form and admin 17-1 NRC LOIT Rev. 1 changes Exam TR-AA-230-1003-F10, Revision 2

2.1.2-05, Determine Risk and the Resultant Protected Systems, JPM Rev. 1 Page 4 of 10 SIMULATOR SET-UP: (Only required for simulator JPMs)

SIMULATOR SETUP INSTRUCTIONS:

1. Ensure the OSM office computer is logged in.
2. Ensure EOOS is operational.
3. Ensure all systems/components on EOOS are available.
4. Ensure NAMS software is operational.

SIMULATOR MALFUNCTIONS:NONE SIMULATOR OVERRIDES:NONE SIMULATOR REMOTE FUNCTIONS: NONE Required Materials: 1. Computer with EOOS and NAMS.

2. OP-AA-102-1003, Guarded Equipment, Rev 20.

General

References:

1. OP-AA-102-1003, Guarded Equipment, Revision 20.
2. OI 150, RCIC Rev 85
3. Technical Specifications Task Standards: 1. Candidate toggles 1D120 and XR1 LLRPSF Transformer to unavailable and runs EOOS
2. Determines the recommended protected systems in accordance with OP-AA-102-1003.
  • 1D12
  • 1D22
  • XR2
  • 1VAC015B TR-AA-230-1003-F10, Revision 2

2.1.2-05, Determine Risk and the Resultant Protected Systems, JPM Rev. 1 Page 5 of 10 I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

  • You are the Work Control Center Supervisor.
  • The plant is operating at 100% power.
  • The following equipment will be tagged out and unavailable due to emergent repairs during your shift and assume all of the equipment listed below will be unavailable at the same time.
  • A RCIC Room Cooler, 1VAC015A
  • XR1 LLRPSF Transformer
  • 125VDC Swing Charger, 1D120 INITIATING CUES (IF APPLICABLE):
  • The Shift Manager directs you to determine:
  • Determine the equipment to be guarded in accordance with OP-AA-102-1003.

NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator.

TR-AA-230-1003-F10, Revision 2

2.1.2-05, Determine Risk and the Resultant Protected Systems, JPM Rev. 1 Page 6 of 10 JPM PERFORMANCE INFORMATION Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).

NOTE: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.

Performance Step:1 Candidate consults OP-AA-102-1003 and toggles 1D120, XR1 Critical Y LLRPSF Transformer to unavailable and runs a Risk Case using EOOS.

Standard: Candidate toggles 1D120 and XR1 LLRPSF Transformer to unavailable and runs EOOS and reports overall risk is GREEN with an approximate CDF of 1.72E-6 and a LERF of 4.67E-7 Evaluator Note: IF the Candidate toggle RCIC to Unavailable, then this step is UNSAT as per TRM 3.5.2 and OI 150 P&L #7, both room coolers unavailable would leave RCIC Unavailable. With one room available, RCIC is available.

Performance: SATISFACTORY UNSATISFACTORY Comments:

TR-AA-230-1003-F10, Revision 2

2.1.2-05, Determine Risk and the Resultant Protected Systems, JPM Rev. 1 Page 7 of 10 Performance Step:2 OP-AA-102-1003 is consulted to determine the recommended Critical Y guarded systems/areas for the 1D120, XR1 LLRPSF Transformer, and 1VAC015A being UNAVAILABLE.

Standard: The Candidate determines that the recommended guarded equipment designated in OP-AA-102-1003 is:

  • 1D12
  • 1D22
  • XR2
  • 1VAC015B Performance: SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues: Once the candidate gives you the report on the risk status and the protected systems, the JPM is complete.

NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator.

Stop Time:

TR-AA-230-1003-F10, Revision 2

2.1.2-05, Determine Risk and the Resultant Protected Systems, JPM Rev. 1 Page 8 of 10 Examinee: Evaluator:

RO SRO STA Non-Lic SRO CERT Date:

LOIT RO LOIT SRO PERFORMANCE RESULTS: SAT: UNSAT:

Remediation required: YES NO COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).

EXAMINER NOTE: ENSURE ALL EXAM MATERIAL IS COLLECTED AND PROCEDURES CLEANED, AS APPROPRIATE.

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

TR-AA-230-1003-F10, Revision 2

JPM Page 9 of 10 TURNOVER SHEET INITIAL CONDITIONS:

  • You are the Work Control Center Supervisor.
  • The plant is operating at 100% power.
  • The following equipment will be tagged out and unavailable due to emergent repairs during your shift and assume all of the equipment listed below will be unavailable at the same time.
  • A RCIC Room Cooler, 1VAC015A
  • XR1 LLRPSF Transformer
  • 125VDC Swing Charger, 1D120 INITIATING CUES (IF APPLICABLE):
  • The Shift Manager directs you to determine:
  • Determine the equipment to be guarded in accordance with OP-AA-102-1003.

NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator.

TR-AA-230-1003-F10, Revision 2

JPM Page 10 of 10 To be able to use the macros, after opening Word go to: Tools/Macro/Security and set the security level at either Low or Medium, close completely out of Word and reopen Word to activate Macros. If you are concerned with macro viruses, check with your site to be assured of active virus scanning.

TOOLBAR BUTTONS for JPM Template Toolbars Results from pressing toolbar buttons Buttons Update JPM Information - Runs the macro for inputting information into the cover sheet.

[Note: - The JPM Title and Number is automatically added to the top of the second page by the use of Cross Reference fields.]

Add JPM Step - Adds a Performance Step Press Enter before inserting a Step box Critical Step - Toggles the Performance Step to Critical. Removes all of the text to the right of the words Critical and replaces them with the text string Y (SEQ-). The cursor is placed between the - and the ), to allow you to insert the sequence number for the performance step.

[NOTE - You must have your cursor inside the Performance Step table you want to make into a critical step otherwise you get an error message.]

Non-Critical Step - Toggles the Performance Step to Non-Critical. Removes all of the text to the right of the words Critical and replaces them with the text string N (SEQ-). The cursor is placed between the - and the ), to allow you to insert the sequence number for the performance step.

[NOTE - You must have your cursor inside the Performance Step table you want to make into a non-critical step otherwise you get an error message.]

Evaluator Note - Adds a row to the Performance Step table under the Standard: line, to allow you to enter any notes for the Evaluator.

Remove Evaluator Note - Removes the Evaluator Note: line if it was added to the Performance Step table.

[NOTE - You must have your cursor inside the Performance Step you want to remove the Evaluator Note from otherwise it removes two lines from the table above the cursor.]

Evaluator Cue - Adds a row to the Performance Step table above the Performance: line, to allow you to enter any cues for the Evaluator.

Remove Evaluator Cue - Removes the Evaluator Cue: line if it was added to the Performance Step table.

[NOTE - You must have your cursor inside the Performance Step you want to remove the Evaluator Cue from otherwise it removes two lines from the table above the cursor.]

TR-AA-230-1003-F10, Revision 2

JOB PERFORMANCE MEASURE JPM Page 1 of 9 JPM TITLE: DETERMINE REPORTABILITY - UNUSUAL EVENT AND PLANT SHUTDOWN REQUIRED BY T.S.

JPM NUMBER: 2.1.18-02 REV. 2 TASK NUMBER(S) / 1.03 TASK TITLE(S): DETERMINE REPORTABILITY K/A NUMBERS: 2.1.18 (GENERIC) K/A VALUE: 3.8 Justification (FOR K/A VALUES <3.0):

TASK APPLICABILITY:

RO SRO STA Non-Lic SRO CERT OTHER:

APPLICABLE METHOD OF TESTING: Simulate/Walkthrough: Perform: X EVALUATION LOCATION: In-Plant: Control Room:

Simulator: X Other:

Lab:

Time for Completion: 15 Minutes Time Critical: NO Alternate Path [NRC]: NO Alternate Path [INPO]: NO Developed by:

Instructor/Developer Date Reviewed by:

Instructor (Instructional Review) Date Validated by:

SME (Technical Review) Date Approved by:

Training Supervision Date Approved by:

Training Program Owner Date Filename: SRO Admin JPM A1.2.doc TR-AA-230-1003-F10 Revision 2

2.1.18-02, Determine Reportability - Unusual Event and Plant Shutdown JPM required by T.S., Rev. 2 Page 2 of 9 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

1. Are all items on the signature page filled in correctly?
2. Has the JPM been reviewed and validated by SMEs?
3. Can the required conditions for the JPM be appropriately established in the simulator if required?
4. Do the performance steps accurately reflect trainees actions in accordance with plant procedures?
5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
6. Has the completion time been established based on validation data or incumbent experience?
7. If the task is time critical, is the time critical portion based upon actual task performance requirements?
8. Is the job level appropriate for the task being evaluated if required?
9. Is the K/A appropriate to the task and to the licensee level if required?
10. Is justification provided for tasks with K/A values less than 3.0?
11. Have the performance steps been identified and classified (Critical /

Sequence / Time Critical) appropriately?

12. Have all special tools and equipment needed to perform the task been identified and made available to the trainee?
13. Are all references identified, current, accurate, and available to the trainee?
14. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?
15. Are all critical steps supported by procedural guidance? (e.g., if licensing, EP or other groups were needed to determine correct actions, then the answer should be NO.)
16. If the JPM is to be administered to an LOIT student, has the required knowledge been taught to the individual prior to administering the JPM?

TPE does not have to be completed, but the JPM evaluation may not be valid if they have not been taught the required knowledge.

All questions/statements must be answered YES or N/A or the JPM is not valid for use. If all questions/statements are answered YES or N/A, then the JPM is considered valid and can be performed as written. The individual(s) performing the initial validation shall sign and date the cover sheet.

Protected Content: (CAPRs, corrective actions, licensing commitments, etc. associated with this material)

{C001}

Filename: SRO Admin JPM A1.2.doc TR-AA-230-1003-F10 Revision 2

2.1.18-02, Determine Reportability - Unusual Event and Plant Shutdown JPM required by T.S., Rev. 2 Page 3 of 9 UPDATE LOG: Indicate in the following table any minor changes or major revisions (as defined in TR-AA-230-1003) made to the material after initial approval. Or use separate Update Log form TR-AA-230-1003-F16.

PREPARER DATE

  1. DESCRIPTION OF CHANGE REASON FOR CHANGE AR/TWR#

SUPERVISOR DATE SEE COVER Revised for 2013 LOCT Annual Operating Exam. Placed on new Rev. 2 01093101 form TR-AA-230-1003-F10 SEE COVER Filename: SRO Admin JPM A1.2.doc TR-AA-230-1003-F10 Revision 2

2.1.18-02, Determine Reportability - Unusual Event and Plant Shutdown JPM required by T.S., Rev. 2 Page 4 of 9 SIMULATOR SET-UP: (Only required for simulator JPMs)

SIMULATOR SETUP INSTRUCTIONS: None SIMULATOR MALFUNCTIONS: None SIMULATOR OVERRIDES: None SIMULATOR REMOTE FUNCTIONS: None Required Materials: 1. LI-AA-102-1001, Regulatory Reporting, current revision

2. NUREG 1022 General

References:

1. LI-AA-102-1001, Regulatory Reporting, Rev. 16
2. NUREG 1022, Rev.3
3. Event #47129, Nine Mile Point Unusual Event Task Standards: 1. Determines that this event requires only the following INEs:
  • 1 Hour Report § 50.72(a)(1)(i) The declaration of any of the Emergency Classes specified in the licensees approved Emergency Plan.
  • 4 Hour Report § 50.72(b)(2)(i) The initiation of any nuclear plant shutdown required by the plants Technical Specifications.

Filename: SRO Admin JPM A1.2.doc TR-AA-230-1003-F10 Revision 2

2.1.18-02, Determine Reportability - Unusual Event and Plant Shutdown JPM required by T.S., Rev. 2 Page 5 of 9 I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

INITIAL CONDITIONS:

  • The plant was at 100% power.
  • Four hours ago, the operating crew entered T.S. action statement 3.4.4 Condition A due to unidentified leakage greater 5 gpm.
  • At this time, the crew entered T.S. action statement 3.4.4 Condition C because the required action and associated completion time was not met.
  • Plant shutdown has commenced.
  • There has been no ECCS actuation.
  • State and Local authorities have been notified of the Unusual Event per EPIP 1.2.
  • The Shift Communicator is performing notifications for the Unusual Event.

INITIATING CUES (IF APPLICABLE):

  • You are the Shift Manager.
  • Determine ALL of the Immediate Notification Event (INE) time requirements for this event.

NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator.

Filename: SRO Admin JPM A1.2.doc TR-AA-230-1003-F10 Revision 2

2.1.18-02, Determine Reportability - Unusual Event and Plant Shutdown JPM required by T.S., Rev. 2 Page 6 of 9 JPM PERFORMANCE INFORMATION Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).

NOTE: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.

NOTE: This JPM is written using a new procedure. Additional consideration and time maybe required for completion.

Performance Step: 1 Use LI-AA-102-1001 to determine the Immediate Notification Event (INE) time Critical Y requirement for the event.

LI-AA-102-1001 Standard: The candidate determines that the following Immediate Notification Event (INE) time requirements apply:

For EAL Declaration:

  • 1 Hour Report § 50.72(a)(1)(i) The declaration of any of the Emergency Classes specified in the licensees approved Emergency Plan.

Evaluator Note: An INE is an incident that requires a 1, 4, 8, or 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> telephone notification. (See procedure definitions)

There are other LER requirements associated with this event, and the candidate may provide information on those also - those LER items are NOT critical to this JPM.

Evaluator Cue: If the candidate provides information for other LER requirements, Cue the candidate that another person will complete the other items.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Filename: SRO Admin JPM A1.2.doc TR-AA-230-1003-F10 Revision 2

2.1.18-02, Determine Reportability - Unusual Event and Plant Shutdown JPM required by T.S., Rev. 2 Page 7 of 9 Performance Step: 2 Use LI-AA-102-1001 to determine any additional Immediate Notification Event Critical Y (INE) time requirements for the event.

LI-AA-102-1001 Standard: The candidate determines that the following Immediate Notification Event (INE) time requirements apply:

For the initiation of a plant shutdown required by Tech Specs:

  • 4 Hour Report § 50.72(b)(2)(i) The initiation of any nuclear plant shutdown required by the plants Technical Specifications.

Evaluator Note: An INE is an incident that requires a 1, 4, 8, or 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> telephone notification. (See procedure definitions)

There are other LER requirements associated with this event, and the candidate may provide information on those also - those LER items are NOT critical to this JPM.

Evaluator Cue: If the candidate provides information for other LER requirements, Cue the candidate that another person will complete the other LER items.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues: When the candidate makes his determination and reports it to the evaluator, inform the candidate the JPM is complete.

NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator.

Stop Time:

Filename: SRO Admin JPM A1.2.doc TR-AA-230-1003-F10 Revision 2

2.1.18-02, Determine Reportability - Unusual Event and Plant Shutdown JPM required by T.S., Rev. 2 Page 8 of 9 Examinee: Evaluator:

RO SRO STA Non-Lic SRO CERT Date:

LOIT RO LOIT SRO PERFORMANCE RESULTS: SAT: UNSAT:

Remediation required: YES NO COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).

EXAMINER NOTE: ENSURE ALL EXAM MATERIAL IS COLLECTED AND PROCEDURES CLEANED, AS APPROPRIATE.

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

Filename: SRO Admin JPM A1.2.doc TR-AA-230-1003-F10 Revision 2

Page 9 of 9 TURNOVER SHEET INITIAL CONDITIONS:

  • The plant was at 100% power.
  • Four hours ago, the operating crew entered T.S. action statement 3.4.4 Condition A due to unidentified leakage greater 5 gpm.
  • At this time, the crew entered T.S. action statement 3.4.4 Condition C because the required action and associated completion time was not met.
  • Plant shutdown has commenced.
  • There has been no ECCS actuation.
  • State and Local authorities have been notified of the Unusual Event per EPIP 1.2.
  • The Shift Communicator is performing notifications for the Unusual Event.

INITIATING CUES (IF APPLICABLE):

  • You are the Shift Manager.
  • Determine ALL of the Immediate Notification Event (INE) time requirements for this event.

NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator.

Filename: SRO Admin JPM A1.2.doc TR-AA-230-1003-F10 Revision 2

JOB PERFORMANCE MEASURE JPM Page 1 of 10 JPM TITLE: Review a Work Order for closure JPM NUMBER: 2.2.19-01 REV. 2 TASK NUMBER(S) / 1.13 Ensure plant activities are performed in accordance with Work TASK TITLE(S): Management Processes, Procedures and Policies K/A NUMBERS: Generic 2.2.19 K/A VALUE: 3.4 Justification (FOR K/A VALUES <3.0):

TASK APPLICABILITY:

RO SRO STA Non-Lic SRO CERT OTHER:

APPLICABLE METHOD OF TESTING: Simulate/Walkthrough: Perform: X EVALUATION LOCATION: In-Plant: Control Room:

Simulator: X Other:

Lab:

Time for Completion: 20 Minutes Time Critical: NO Alternate Path [NRC]: NO Alternate Path [INPO]: NO Developed by:

Instructor/Developer Date Reviewed by:

Instructor (Instructional Review) Date Validated by:

SME (Technical Review) Date Approved by:

Training Supervision Date Approved by:

Training Program Owner Date TR-AA-230-1003-F10, Revision 2

2.2.19-01, Review a Work Order for closure, Rev.2 JPM Page 2 of 10 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

1. Are all items on the signature page filled in correctly?
2. Has the JPM been reviewed and validated by SMEs?
3. Can the required conditions for the JPM be appropriately established in the simulator if required?
4. Do the performance steps accurately reflect trainees actions in accordance with plant procedures?
5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
6. Has the completion time been established based on validation data or incumbent experience?
7. If the task is time critical, is the time critical portion based upon actual task performance requirements?
8. Is the job level appropriate for the task being evaluated if required?
9. Is the K/A appropriate to the task and to the licensee level if required?
10. Is justification provided for tasks with K/A values less than 3.0?
11. Have the performance steps been identified and classified (Critical /

Sequence / Time Critical) appropriately?

12. Have all special tools and equipment needed to perform the task been identified and made available to the trainee?
13. Are all references identified, current, accurate, and available to the trainee?
14. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?
15. Are all critical steps supported by procedural guidance? (e.g., if licensing, EP or other groups were needed to determine correct actions, then the answer should be NO.)
16. If the JPM is to be administered to an LOIT student, has the required knowledge been taught to the individual prior to administering the JPM?

TPE does not have to be completed, but the JPM evaluation may not be valid if they have not been taught the required knowledge.

All questions/statements must be answered YES or N/A or the JPM is not valid for use. If all questions/statements are answered YES or N/A, then the JPM is considered valid and can be performed as written. The individual(s) performing the initial validation shall sign and date the cover sheet.

Protected Content: (CAPRs, corrective actions, licensing commitments, etc. associated with this material)

{C001}

TR-AA-230-1003-F10, Revision 2

2.2.19-01, Review a Work Order for closure, Rev.2 JPM Page 3 of 10 UPDATE LOG: Indicate in the following table any minor changes or major revisions (as defined in TR-AA-230-1003) made to the material after initial approval. Or use separate Update Log form TR-AA-230-1003-F16.

PREPARER DATE

  1. DESCRIPTION OF CHANGE REASON FOR CHANGE AR/TWR#

SUPERVISOR DATE Beaumier Update form and admin 17-1 LOIT NRC Rev.2 changes Exam TR-AA-230-1003-F10, Revision 2

2.2.19-01, Review a Work Order for closure, Rev.2 JPM Page 4 of 10 SIMULATOR SET-UP: (Only required for simulator JPMs)

SIMULATOR SETUP INSTRUCTIONS: NONE Required Materials: 1. Marked up copy of Work Order PM TASK 01(PMRQ 21005-5).

2. Marked up copy of STP 3.5.1-05 General

References:

  • MD-062, Rev. 15
  • STP 3.5.1-05 Rev. 73 Task Standards:
  • Determines that there are no initials for the QC step 3.
  • Using the STP, determines that the MO-2239 did not stroke within the ASME limits in the CLOSE direction.

TR-AA-230-1003-F10, Revision 2

2.2.19-01, Review a Work Order for closure, Rev.2 JPM Page 5 of 10 I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

  • You are the Shift Manager.
  • Work Order PM TASK 01(PMRQ 21005-5) is ready for review.

INITIATING CUES (IF APPLICABLE):

  • You are to review Work Order PM TASK 01(PMRQ 21005-5) for closure.

NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator.

TR-AA-230-1003-F10, Revision 2

2.2.19-01, Review a Work Order for closure, Rev.2 JPM Page 6 of 10 JPM PERFORMANCE INFORMATION Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).

NOTE: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.

Performance Step:1 3. INSPECT per procedure VALVOP-L200-08.

Critical Y

  • Work this step with the electrical and mechanical steps as needed for job completion Standard: Review step for completion Evaluator Note: Candidate should note that this QC step was not signed off as required.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step:2 Review the Data Sheet VALVOP-L200-08 for completion.

Critical N Standard: Review VALVOP-L200-08 for completion Evaluator Note: The candidate does not need to review this data sheet to complete the JPM, however, with the QC initials not completed on the Work Order the student should review the Data Sheet for QC completion.

Performance: SATISFACTORY UNSATISFACTORY Comments:

TR-AA-230-1003-F10, Revision 2

2.2.19-01, Review a Work Order for closure, Rev.2 JPM Page 7 of 10 Performance Step:3 8. STROKE the valve per the applicable steps in STP 3.5.1-05 or Critical Y 3.5.1-06 per the CRS direction and RECORD the stroke times in this work task. If sat, REMOVE entries from Inop TS Equip Log.

Standard: Candidate should review applicable portions of STP 3.5.1-05 Evaluator Note: Candidate should determine that the ASME stroke time for MO-2239 is not met (ASME time is 12.1 seconds. Documented time is 12.5 seconds.)

Performance: SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues: The JPM is complete when the candidate has reviewed the WO IAW MD-062 and STP 3.5.1-05, and it is determined that the QC step is not signed and MO-2239 did not meet its ASME close times.

NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator.

Stop Time:

TR-AA-230-1003-F10, Revision 2

2.2.19-01, Review a Work Order for closure, Rev.2 JPM Page 8 of 10 Examinee: Evaluator:

RO SRO STA Non-Lic SRO CERT Date:

LOIT RO LOIT SRO PERFORMANCE RESULTS: SAT: UNSAT:

Remediation required: YES NO COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).

EXAMINER NOTE: ENSURE ALL EXAM MATERIAL IS COLLECTED AND PROCEDURES CLEANED, AS APPROPRIATE.

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

TR-AA-230-1003-F10, Revision 2

JPM Page 9 of 10 TURNOVER SHEET INITIAL CONDITIONS:

  • You are the Shift Manager.
  • Work Order PM TASK 01(PMRQ 21005-5) is ready for review.

INITIATING CUES (IF APPLICABLE):

  • You are to review Work Order PM TASK 01(PMRQ 21005-5) for closure.

NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator.

TR-AA-230-1003-F10, Revision 2

JPM Page 10 of 10 To be able to use the macros, after opening Word go to: Tools/Macro/Security and set the security level at either Low or Medium, close completely out of Word and reopen Word to activate Macros. If you are concerned with macro viruses, check with your site to be assured of active virus scanning.

TOOLBAR BUTTONS for JPM Template Toolbars Results from pressing toolbar buttons Buttons Update JPM Information - Runs the macro for inputting information into the cover sheet.

[Note: - The JPM Title and Number is automatically added to the top of the second page by the use of Cross Reference fields.]

Add JPM Step - Adds a Performance Step Press Enter before inserting a Step box Critical Step - Toggles the Performance Step to Critical. Removes all of the text to the right of the words Critical and replaces them with the text string Y (SEQ-). The cursor is placed between the - and the ), to allow you to insert the sequence number for the performance step.

[NOTE - You must have your cursor inside the Performance Step table you want to make into a critical step otherwise you get an error message.]

Non-Critical Step - Toggles the Performance Step to Non-Critical. Removes all of the text to the right of the words Critical and replaces them with the text string N (SEQ-). The cursor is placed between the - and the ), to allow you to insert the sequence number for the performance step.

[NOTE - You must have your cursor inside the Performance Step table you want to make into a non-critical step otherwise you get an error message.]

Evaluator Note - Adds a row to the Performance Step table under the Standard: line, to allow you to enter any notes for the Evaluator.

Remove Evaluator Note - Removes the Evaluator Note: line if it was added to the Performance Step table.

[NOTE - You must have your cursor inside the Performance Step you want to remove the Evaluator Note from otherwise it removes two lines from the table above the cursor.]

Evaluator Cue - Adds a row to the Performance Step table above the Performance: line, to allow you to enter any cues for the Evaluator.

Remove Evaluator Cue - Removes the Evaluator Cue: line if it was added to the Performance Step table.

[NOTE - You must have your cursor inside the Performance Step you want to remove the Evaluator Cue from otherwise it removes two lines from the table above the cursor.]

TR-AA-230-1003-F10, Revision 2

JOB PERFORMANCE MEASURE JPM Page 1 of 9 JPM TITLE: VENT PRIMARY CONTAINMENT WITH TORUS HARD PIPE VENT JPM NUMBER: 2.3.11-01 REV. 0 TASK NUMBER(S) / 6.30 Direct Crew Response to Vent the Torus via Hard Pipe Vent TASK TITLE(S):

K/A NUMBERS: 2.3.11 K/A VALUE: 4.3 Justification (FOR K/A VALUES <3.0):

TASK APPLICABILITY:

RO SRO STA Non-Lic SRO CERT OTHER:

APPLICABLE METHOD OF TESTING: Simulate/Walkthrough: Perform: X EVALUATION LOCATION: In-Plant: Control Room:

Simulator: X Other:

Lab:

Time for Completion: 10 Minutes Time Critical: NO Alternate Path [NRC]: NO Alternate Path [INPO]: NO Developed by:

Instructor/Developer Date Reviewed by:

Instructor (Instructional Review) Date Validated by:

SME (Technical Review) Date Approved by:

Training Supervision Date Approved by:

Training Program Owner Date TR-AA-230-1003-F10, Revision 2

2.3.11-01, VENT PRIMARY CONTAINMENT WITH TORUS HARD JPM PIPE VENT, Rev. 0 Page 2 of 9 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

1. Are all items on the signature page filled in correctly?
2. Has the JPM been reviewed and validated by SMEs?
3. Can the required conditions for the JPM be appropriately established in the simulator if required?
4. Do the performance steps accurately reflect trainees actions in accordance with plant procedures?
5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
6. Has the completion time been established based on validation data or incumbent experience?
7. If the task is time critical, is the time critical portion based upon actual task performance requirements?
8. Is the job level appropriate for the task being evaluated if required?
9. Is the K/A appropriate to the task and to the licensee level if required?
10. Is justification provided for tasks with K/A values less than 3.0?
11. Have the performance steps been identified and classified (Critical /

Sequence / Time Critical) appropriately?

12. Have all special tools and equipment needed to perform the task been identified and made available to the trainee?
13. Are all references identified, current, accurate, and available to the trainee?
14. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?
15. Are all critical steps supported by procedural guidance? (e.g., if licensing, EP or other groups were needed to determine correct actions, then the answer should be NO.)
16. If the JPM is to be administered to an LOIT student, has the required knowledge been taught to the individual prior to administering the JPM?

TPE does not have to be completed, but the JPM evaluation may not be valid if they have not been taught the required knowledge.

All questions/statements must be answered YES or N/A or the JPM is not valid for use. If all questions/statements are answered YES or N/A, then the JPM is considered valid and can be performed as written. The individual(s) performing the initial validation shall sign and date the cover sheet.

Protected Content: (CAPRs, corrective actions, licensing commitments, etc. associated with this material)

{C001}

TR-AA-230-1003-F10, Revision 2

2.3.11-01, VENT PRIMARY CONTAINMENT WITH TORUS HARD JPM PIPE VENT, Rev. 0 Page 3 of 9 UPDATE LOG: Indicate in the following table any minor changes or major revisions (as defined in TR-AA-230-1003) made to the material after initial approval. Or use separate Update Log form TR-AA-230-1003-F16.

PREPARER DATE

  1. DESCRIPTION OF CHANGE REASON FOR CHANGE AR/TWR#

SUPERVISOR DATE Beaumier New for 17-1 LOIT Rev. 0 New for 17-1 LOIT NRC Exam NRC Exam TR-AA-230-1003-F10, Revision 2

2.3.11-01, VENT PRIMARY CONTAINMENT WITH TORUS HARD JPM PIPE VENT, Rev. 0 Page 4 of 9 SIMULATOR SET-UP: (Only required for simulator JPMs)

SIMULATOR SETUP INSTRUCTIONS:NONE PROCEDURAL MARKUPS:

  • SEP 301.3, TORUS VENT VIA HARDPIPE VENT, SECTION 1.1 INITIATION OF HARD PIPE VENT FROM CONTROL ROOM o MARK AS COMPLETE:

NOTE AND CONTINUOUS RECHECK STATEMENT PRIOR TO STEP (1)

STEP (1) THROUGH (5)

Required Materials:

  • SEP 301.3, Torus Vent VIA Hardpipe Vent, current revision
  • Calculator General

References:

  • SEP 301.3, Torus Vent VIA Hardpipe Vent, Rev. 11 Task Standards:
  • Calculate actual Torus level using SEP 301.3 Appendix 1
  • Determine that venting the Torus VIA the Hardpipe Vent is NOT allowed TR-AA-230-1003-F10, Revision 2

2.3.11-01, VENT PRIMARY CONTAINMENT WITH TORUS HARD JPM PIPE VENT, Rev. 0 Page 5 of 9 I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

  • A severe accident has occurred
  • An Extended Loss of AC Power, (ELAP), has been declared
  • It has been determined that SEP 301.3, TORUS VENT VIA HARDPIPE VENT, may be required
  • Torus water level as read on LI-4396A is 17 feet INITIATING CUES (IF APPLICABLE):

As a support SRO you are to continue with SEP 301.3, Section 1.1 INITIATION OF HARD PIPE VENT FROM CONTROL ROOM, and determine if venting via the hard pipe vent is allowed.

NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator.

TR-AA-230-1003-F10, Revision 2

2.3.11-01, VENT PRIMARY CONTAINMENT WITH TORUS HARD JPM PIPE VENT, Rev. 0 Page 6 of 9 JPM PERFORMANCE INFORMATION Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).

NOTE: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.

Performance Step:1 NOTE Critical N If the plant is in an Extended Loss of AC Power, (ELAP), it may be necessary to vent the Torus with a Torus level greater than 16 feet.

The guidance of EC 0000285475 Evaluation 16-M01 will allow venting of the Torus up to a Torus level of 24 by using LI-4396A or B, Containment Water Level Indicator, 0-98 feet, at 1C03.

Standard: The Operator will placekeep the NOTE.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step:2 CONTINUOUS RECHECK STATEMENT Critical N IF the plant is in an ELAP condition AND Torus level is greater than 16 feet, THEN using Appendix 1, verify that Torus water level is less than 24 feet.

Standard: The Operator will proceed to Appendix 1.

Evaluator Note: The Operator will determine from the turnover that current Torus level is greater than 16 feet and an ELAP is occurring.

Performance: SATISFACTORY UNSATISFACTORY Comments:

TR-AA-230-1003-F10, Revision 2

2.3.11-01, VENT PRIMARY CONTAINMENT WITH TORUS HARD JPM PIPE VENT, Rev. 0 Page 7 of 9 Performance Step:3 Applying a Correction Factor To LI-4396 A or B Containment Water Critical Y Level Indicator, 0-98 Feet Standard: The Operator will calculate actual Torus water level.

Evaluator Note: The Operator will calculate actual Torus water level as follows:

Torus Water Level = 17 feet + (23-20 psig)*(2.48 feet/psig) = 24.4 feet Evaluator Cue: IF/WHEN the Operator indicates the need for Drywell and Torus Pressures, CUE the Operator that:

  • Drywell Pressure is 23 psig
  • Torus Pressure is 20 psig Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step:4 CONTINUOUS RECHECK STATEMENT Critical Y IF the plant is in an ELAP condition AND Torus level is greater than 16 feet, THEN using Appendix 1, verify that Torus water level is less than 24 feet.

Standard: The Operator will determine that the crew CANNOT vent from the Torus VIA the Hardpipe Vent.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues: WHEN the actual Torus level and determination of venting is reported, CUE the Operator that the JPM is complete.

NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator.

Stop Time:

TR-AA-230-1003-F10, Revision 2

2.3.11-01, VENT PRIMARY CONTAINMENT WITH TORUS HARD JPM PIPE VENT, Rev. 0 Page 8 of 9 Examinee: Evaluator:

RO SRO STA Non-Lic SRO CERT Date:

LOIT RO LOIT SRO PERFORMANCE RESULTS: SAT: UNSAT:

Remediation required: YES NO COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).

EXAMINER NOTE: ENSURE ALL EXAM MATERIAL IS COLLECTED AND PROCEDURES CLEANED, AS APPROPRIATE.

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

TR-AA-230-1003-F10, Revision 2

JPM Page 9 of 9 TURNOVER SHEET INITIAL CONDITIONS:

  • A severe accident has occurred
  • An Extended Loss of AC Power, (ELAP), has been declared
  • It has been determined that SEP 301.3, TORUS VENT VIA HARDPIPE VENT, may be required
  • Torus water level as read on LI-4396A is 17 feet INITIATING CUES (IF APPLICABLE):

As a support SRO you are to continue with SEP 301.3, Section 1.1 INITIATION OF HARD PIPE VENT FROM CONTROL ROOM, and determine if venting via the hard pipe vent is allowed.

NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator.

TR-AA-230-1003-F10, Revision 2

JOB PERFORMANCE MEASURE JPM Page 1 of 22 JPM TITLE: EVALUATE PARS WHEN CONDITIONS CHANGE JPM NUMBER: 2.4.44-01 REV. 1 TASK NUMBER(S) / 3.01 TASK TITLE(S): IMPLEMENT THE EMERGENCY PLAN K/A NUMBERS: 2.4.44 K/A VALUE: SRO 4.4 Justification (FOR K/A VALUES <3.0):

TASK APPLICABILITY:

RO SRO STA Non-Lic SRO CERT OTHER:

APPLICABLE METHOD OF TESTING: Simulate/Walkthrough: Perform: X EVALUATION LOCATION: In-Plant: Control Room:

Simulator: X Other: X Lab:

Time for Completion: 20 Minutes Time Critical: YES Alternate Path [NRC]: NO Alternate Path [INPO]: NO Developed by:

Instructor/Developer Date Reviewed by:

Instructor (Instructional Review) Date Validated by:

SME (Technical Review) Date Approved by:

Training Supervision Date Approved by:

Training Program Owner Date Filename: SRO Admin JPM A4.docx TR-AA-230-1003-F10 Revision 2

2.4.44-01, Evaluate PARs when Conditions Change, Rev. 1 JPM Page 2 of 22 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

1. Are all items on the signature page filled in correctly?
2. Has the JPM been reviewed and validated by SMEs?
3. Can the required conditions for the JPM be appropriately established in the simulator if required?
4. Do the performance steps accurately reflect trainees actions in accordance with plant procedures?
5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
6. Has the completion time been established based on validation data or incumbent experience?
7. If the task is time critical, is the time critical portion based upon actual task performance requirements?
8. Is the job level appropriate for the task being evaluated if required?
9. Is the K/A appropriate to the task and to the licensee level if required?
10. Is justification provided for tasks with K/A values less than 3.0?
11. Have the performance steps been identified and classified (Critical /

Sequence / Time Critical) appropriately?

12. Have all special tools and equipment needed to perform the task been identified and made available to the trainee?
13. Are all references identified, current, accurate, and available to the trainee?
14. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?
15. Are all critical steps supported by procedural guidance? (e.g., if licensing, EP or other groups were needed to determine correct actions, then the answer should be NO.)
16. If the JPM is to be administered to an LOIT student, has the required knowledge been taught to the individual prior to administering the JPM?

TPE does not have to be completed, but the JPM evaluation may not be valid if they have not been taught the required knowledge.

All questions/statements must be answered YES or N/A or the JPM is not valid for use. If all questions/statements are answered YES or N/A, then the JPM is considered valid and can be performed as written. The individual(s) performing the initial validation shall sign and date the cover sheet.

Protected Content: None Filename: SRO Admin JPM A4.docx TR-AA-230-1003-F10 Revision 2

2.4.44-01, Evaluate PARs when Conditions Change, Rev. 1 JPM Page 3 of 22 UPDATE LOG: Indicate in the following table any minor changes or major revisions (as defined in TR-AA-230-1003) made to the material after initial approval. Or use separate Update Log form TR-AA-230-1003-F16.

PREPARER DATE

  1. DESCRIPTION OF CHANGE REASON FOR CHANGE AR/TWR#

SUPERVISOR DATE Rev. 0 New JPM Revised for 2016 LOCT Annual Exam. JPM required revision due Rev. 1 to new NOTE-5.

02107035 Filename: SRO Admin JPM A4.docx TR-AA-230-1003-F10 Revision 2

2.4.44-01, Evaluate PARs when Conditions Change, Rev. 1 JPM Page 4 of 22 SIMULATOR SET-UP: (Only required for simulator JPMs)

SIMULATOR SETUP INSTRUCTIONS: No setup required.

SIMULATOR MALFUNCTIONS: None SIMULATOR OVERRIDES: None SIMULATOR REMOTE FUNCTIONS: None Filename: SRO Admin JPM A4.docx TR-AA-230-1003-F10 Revision 2

2.4.44-01, Evaluate PARs when Conditions Change, Rev. 1 JPM Page 5 of 22 Required Materials: EPIP 3.3 EPIP Form NOTE 5 EPIP Form PAR-01 General

References:

EPIP chapter 1.1, Rev. 29 EPIP chapter 1.2, Rev. 48 EPIP chapter 2.5, Rev. 21 EPIP chapter 3.3, Rev. 33 EPIP Form NOTE-5, Rev. 18 EPIP Form PAR-01, Rev. 4 Task Standards: 1. PAR upgrade determined

2. EPIP Form Box 4 - Student marks Drill.
3. EPIP Form Box 11 - Student writes in 15 mph.
4. EPIP Form Box 12 - Student writes in 185 degrees.
5. EPIP Form Box 14 - SRO checks Is occurring (go to block 15)
6. EPIP Form Box 18 - SRO enters todays date and time
7. EPIP Form Box 19 - SRO checks [ ] E
8. When filled out, the student submits the EPIP FORM NOTE-05 to the OSM to sign within the 15 minutes from the PARS change determination.
9. The student contacts Linn, Benton Counties and the state via the ALL CALL phone within 15 minutes from the PARS change determination.

Filename: SRO Admin JPM A4.docx TR-AA-230-1003-F10 Revision 2

2.4.44-01, Evaluate PARs when Conditions Change, Rev. 1 JPM Page 6 of 22 I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

(GIVE the Student Turnover Sheet #1 and the completed in EAL form)

TURNOVER SHEET #1 INITIAL CONDITIONS: *This JPM is TIME CRITICAL*

  • Its Saturday evening and a severe accident has occurred at DAEC.
  • The ERO cannot respond to the plant due to a major ice storm that has ALL Roads in Eastern Iowa closed due to 100% ice covered conditions and multiple accidents.
  • RPV level was at -110 inches for a considerable time, it is now at 30 inches and stable.
  • Emergency Depressurization has been performed.
  • The TSC is NOT staffed at this time.
  • An EAL declaration of GENERAL EMERGENCY has been made.
  • State, Local, and National Governmental notifications have been made for this GENERAL EMERGENCY.

Inform me once you have looked at and understand Turnover Sheet #1 and the completed NOTE 5.

Once the student has indicated that he/she understands the previous information, provide Turnover Sheet #2 Filename: SRO Admin JPM A4.docx TR-AA-230-1003-F10 Revision 2

2.4.44-01, Evaluate PARs when Conditions Change, Rev. 1 JPM Page 7 of 22 TURNOVER SHEET #2 Since the GENERAL EMERGENCY has been declared and notifications made, the following has occurred

  • The Shift Chemist has just run a Midas Dose Assessment, and has reported the following results:

o The dose assessment predicts the following readings for the area outside the Site Boundary:

At 3 miles, the projected TEDE Dose will be 2.5R and the projected CDE Dose will be 4.8R.

At 5 miles, the projected TEDE Dose will be 0.9R and the projected CDE Dose will be 2R.

  • The STA has completed a Fuel Damage Assessment worksheet, which shows that approximately 25% of fuel damage has occurred.
  • The current wind speed is 15 mph, from 185 degrees.
  • The Off Gas Stack KAMAN HIGH alarm is activated. A filtered release is in progress. It is unknown how long the release will last.

INITIATING CUES:

  • You are an extra SRO on shift.
  • Determine any changes needed to be made to the Protective Action Recommendations based upon the new information and perform required actions.

This JPM is TIME CRITICAL.

NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator.

Filename: SRO Admin JPM A4.docx TR-AA-230-1003-F10 Revision 2

2.4.44-01, Evaluate PARs when Conditions Change, Rev. 1 JPM Page 8 of 22 JPM PERFORMANCE INFORMATION Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).

NOTE: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.

Performance Step: 1 Reviews the PROTECTIVE ACTION DECISION MAKING Critical N RECOMMENDATIONS, table PAR-01.

PAR-01 Standard: Reviews and placekeeps table PAR-01.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Filename: SRO Admin JPM A4.docx TR-AA-230-1003-F10 Revision 2

2.4.44-01, Evaluate PARs when Conditions Change, Rev. 1 JPM Page 9 of 22 Performance Step: 2 Based on Midas dose assessment conditions, determines that the Protective Critical N Action Recommendations should be Upgraded from the Default Recommendations.

Standard: Determines the need to upgrade the Protective Action Recommendations from the default Protective Action Recommendations.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 3 Determines that the Protective Action Recommendations are to:

Critical Y Evacuate, (or shelter if release duration is 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> or less), within a 2 mile radius and to 5 miles in the downwind subareas, and shelter downwind subareas from PAR-01 5 miles to EPZ edge. All others monitor and prepare.

Standard: Determines that the PAR block E should be recommended to the state. This should be determined within 15 minutes from Turnover #2 (start of JPM).

Evaluator Note: 15 minute Notification Clock starts now, Note the Time ______________.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Filename: SRO Admin JPM A4.docx TR-AA-230-1003-F10 Revision 2

JPM 2.4.44-01, Evaluate PARs when Conditions Change, Rev. 1 Page 10 of 22 Performance Step: 4 Recommend that the state initially shelter rather than evacuate the population Critical N until conditions improve, based upon given weather conditions.

PAR-02 Standard: RECOMMEND that the state initially shelter 2-mile radius and 5 mile down wind sub-areas, based on weather conditions.

Evaluator Note: The student should recommend shelter vice evacuation. However, this is the State of Iowas decision, it does not constitute failure if not recommended, but should be noted as a competency.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 5

4. STATUS: [ ] ACTUAL [ ] DRILL Critical Y Standard:

EPIP NOTE-05 Block 4 Marked as a DRILL Evaluator NOTE: Boxes 1, 2, 3, and 6 are marked during the notification process Performance: SATISFACTORY UNSATISFACTORY Comments:

Filename: SRO Admin JPM A4.docx TR-AA-230-1003-F10 Revision 2

JPM 2.4.44-01, Evaluate PARs when Conditions Change, Rev. 1 Page 11 of 22 Performance Step: 6 5. IF an EAL is being declared, THEN provide the following message to the Critical N offsite agencies, otherwise: [ ] N/A (and go to step 8)

This is the Duane Arnold Energy Center. We have declared a(n) _____**,

standby for additional information.

    • State one of the following: [ ] Unusual Event [ ] Alert []

Site Area Emergency [ ] General Emergency

5. IF an EAL is being declared, THEN provide the following message to the offsite agencies, otherwise: [ X] N/A (and go to step 8)

Standard:

This is the Duane Arnold Energy Center. We have declared a(n) _____**,

EPIP NOTE-05 Block 5 standby for additional information.

    • State one of the following: [ ] Unusual Event [ ] Alert [ ] Site Area Emergency [

] General Emergency Evaluator NOTE: Message confirmation check marks are marked during the notification process Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 7

8. Plant Status: [ ] At Power [ ] Shutdown Critical N Standard:

EPIP NOTE-05 Block 8 Marked as the Plant is Shutdown (turnover item)

Performance: SATISFACTORY UNSATISFACTORY Comments:

Filename: SRO Admin JPM A4.docx TR-AA-230-1003-F10 Revision 2

JPM 2.4.44-01, Evaluate PARs when Conditions Change, Rev. 1 Page 12 of 22 Performance Step: 8

9. [ ] PAR Change Only [ ] EAL Termination [ ] Recovery [ ] N/A Critical N Standard:

EPIP NOTE-05 Block 9 Marked as PAR Change Only Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 9

10. Facility in Command and Control: [ ] CR [ ] TSC [ ] EOF Critical N Standard:

EPIP NOTE-05 Block 10 Mark the Control Room as the Command and Control Center Performance: SATISFACTORY UNSATISFACTORY Comments:

Filename: SRO Admin JPM A4.docx TR-AA-230-1003-F10 Revision 2

JPM 2.4.44-01, Evaluate PARs when Conditions Change, Rev. 1 Page 13 of 22 Performance Step: 10

11. Wind Speed (50m preferred) __________ mph Critical Y Standard:

EPIP NOTE-05 Block 11 Enters wind speed at 15 mph from the turnover sheet Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 11

12. Wind Direction (50m preferred) from _______ degrees Critical Y Standard:

EPIP NOTE-05 Block 12 Enters 185 degrees for wind direction from the turnover sheet Performance: SATISFACTORY UNSATISFACTORY Comments:

Filename: SRO Admin JPM A4.docx TR-AA-230-1003-F10 Revision 2

JPM 2.4.44-01, Evaluate PARs when Conditions Change, Rev. 1 Page 14 of 22

13. Category F EAL declaration only, otherwise: [ ] N/A Performance Step: 12 Fuel cladding Barrier [ ] Loss [ ] Pot. Loss Critical N RCS Barrier [ ] Loss [ ] Pot. Loss Primary Containment Loss [ ] Loss [ ] Pot. Loss Standard:

EPIP NOTE-05 Block 13 Marks the Loss of the Fuel Cladding Barrier, Primary Containment Barrier, and RCS Barrier.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 13 14. Abnormal Release due to the event?

Critical Y [ ] Has not occurred (go to block 18)

[ ] Has occurred but is terminated (go to block 15)

[ ] Is occurring (go to block 15)

Standard:

EPIP NOTE-05 Block 14 Marks is occurring and moves on to Block 15 Performance: SATISFACTORY UNSATISFACTORY Comments:

Filename: SRO Admin JPM A4.docx TR-AA-230-1003-F10 Revision 2

JPM 2.4.44-01, Evaluate PARs when Conditions Change, Rev. 1 Page 15 of 22

15. Airborne Release to the Environment Performance Step: 14

[ ] Below Federal Limits (no Kaman Hi-Hi)

Critical N

[ ] At or Above Federal limits (Kaman Hi-Hi)

Standard:

EPIP NOTE-05 Block 15 Marks Below Federal Limits (no Kaman Hi-Hi)

Performance: SATISFACTORY UNSATISFACTORY Comments:

16. Type of Release Performance Step: 15 [ ] Airborne Filtered Critical N [ ] Airborne Unfiltered

[ ] Radioactive Liquid Standard:

EPIP NOTE-05 Block 16 Marks Airborne Filtered Performance: SATISFACTORY UNSATISFACTORY Comments:

Filename: SRO Admin JPM A4.docx TR-AA-230-1003-F10 Revision 2

JPM 2.4.44-01, Evaluate PARs when Conditions Change, Rev. 1 Page 16 of 22

17. Projected Duration of Release Performance Step: 16 [ ] Unknown (4hour default)

Critical N [ ] 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> or less

[ ] Release Duration estimate: ________hour(s)

Standard:

EPIP NOTE-05 Block 17 SRO checks Unknown (4hour default)

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 17 18. Time / Date of PAR Change determination or N/A: Time: ___________

Critical Y Date: ____________ [ ] N/A Standard:

EPIP NOTE-05 Block 18 SRO fills in PAR change Date and Time Performance: SATISFACTORY UNSATISFACTORY Comments:

Filename: SRO Admin JPM A4.docx TR-AA-230-1003-F10 Revision 2

JPM 2.4.44-01, Evaluate PARs when Conditions Change, Rev. 1 Page 17 of 22 Performance Step: 18

19. Utility Protective Action Recommendations General Emergency [ ] E Critical Y Standard:

EPIP NOTE-05 Block 19 SRO marks General Emergency E Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 19

20. Additional Information Critical N Standard:

SRO leaves block 20 blank, may write none, or may provide a clarifying note.

EPIP NOTE-05 Block 20 Evaluator NOTE: It is not necessary to repeat information from previous blocks Performance: SATISFACTORY UNSATISFACTORY Comments:

Filename: SRO Admin JPM A4.docx TR-AA-230-1003-F10 Revision 2

JPM 2.4.44-01, Evaluate PARs when Conditions Change, Rev. 1 Page 18 of 22 Performance Step: 20 Approval Critical N Standard:

SRO states that the NOTE-05 is ready for approval.

EPIP NOTE-05 Block 20 Print a name and write a signature, date and time. DO NOT correct anything.

Evaluator CUE:

Return the NOTE-05 to the SRO and tell him to perform the notification.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 21 1. Using the All-Call phone press All Call to contact the offsite agencies (inform Critical N personnel to standby)

Standard: SRO presses All Call on the All-Call phone to contact the offsite agencies EPIP NOTE-05 Block 1 (inform personnel to standby) - OR - uses alternate numbers Evaluator CUE: Have the SRO simulate using the phone and act as each agency contacted.

If the SRO presses All Call respond as Linn County, initials LC then Benton County initials BC then as State of Iowa initials IA Evaluator NOTE: Write down the time ____________ you replied as the first agency. This will be the TIME CRITICAL information required for step 18 below. The 15 minute NRC requirement still applies even if alternate phone numbers are used.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Filename: SRO Admin JPM A4.docx TR-AA-230-1003-F10 Revision 2

JPM 2.4.44-01, Evaluate PARs when Conditions Change, Rev. 1 Page 19 of 22 Performance Step: 22

2. First offsite agency contacted: Time: _________________

Critical Y Standard:

SRO Documents the time in box 2 the first agency was contacted.

EPIP NOTE-05 Block 2 Evaluator NOTE: The first agency contacted is required to be complete 15 minutes after the event is declared.

This initial notification satisfies the time requirement for the NRC DEP-PI.

Performance: SATISFACTORY UNSATISFACTORY Time SRO acknowledged the initial turnover: __________

Comments:

Time recorded for the PAR Change: __________

Elapsed Time: __________

Time recorded for the PAR Change: __________

Time recorded for notification in block 2: __________

Elapsed Time: __________

IF both elapsed times are < 15 minutes, then the TIME CRITICAL requirement of this JPM is satisfied.

Terminating Cues: When All Call is simulated, Cue the operator that you are Linn, Benton and state, and that the JPM is complete.

NOTE: Ensure the turnover sheet that was given to the examinee is returned to the evaluator.

Stop Time:

Filename: SRO Admin JPM A4.docx TR-AA-230-1003-F10 Revision 2

JPM 2.4.44-01, Evaluate PARs when Conditions Change, Rev. 1 Page 20 of 22 Examinee: Evaluator:

RO SRO STA Non-Lic SRO CERT Date:

LOIT RO LOIT SRO PERFORMANCE RESULTS: SAT: UNSAT:

Remediation required: YES NO COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).

EXAMINER NOTE: ENSURE ALL EXAM MATERIAL IS COLLECTED AND PROCEDURES CLEANED, AS APPROPRIATE.

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

Filename: SRO Admin JPM A4.docx TR-AA-230-1003-F10 Revision 2

TURNOVER SHEET #1 This JPM is TIME CRITICAL

  • Its Saturday evening and a severe accident has occurred at DAEC.
  • The ERO cannot respond to the plant due to a major ice storm that has ALL Roads in Eastern Iowa closed due to 100% ice covered conditions and multiple accidents.
  • RPV level was at -110 inches for a considerable time, it is now at 30 inches and stable.
  • Emergency Depressurization has been performed.
  • The TSC is NOT staffed at this time.
  • An EAL declaration of GENERAL EMERGENCY has been made.
  • State, Local, and National Governmental notifications have been made for this GENERAL EMERGENCY Filename: SRO Admin JPM A4.docx TR-AA-230-1003-F10 Revision 2

TURNOVER SHEET #2 Continuing INITIAL CONDITIONS:

Since the GENERAL EMERGENCY has been declared and notifications made, the following has occurred

  • The Shift Chemist has just run a Midas Dose Assessment, and has reported the following results:

o The dose assessment predicts the following readings for the area outside the Site Boundary:

At 3 miles, the projected TEDE Dose will be 2.5R and the projected CDE Dose will be 4.8R.

At 5 miles, the projected TEDE Dose will be 0.9R and the projected CDE Dose will be 2R.

  • The STA has completed a Fuel Damage Assessment worksheet, which shows that approximately 25% of fuel damage has occurred.
  • The current wind speed is 15 mph, from 185 degrees.
  • The Off Gas Stack KAMAN HIGH alarm is activated. A filtered release is in progress. It is unknown how long the release will last.

INITIATING CUES:

  • You are an extra SRO on shift.
  • Determine any changes needed to be made to the Protective Action Recommendations based upon the new information and perform required actions.

This JPM is TIME CRITICAL.

Filename: SRO Admin JPM A4.docx TR-AA-230-1003-F10 Revision 2