ML17310B433

From kanterella
Revision as of 09:24, 29 October 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Proposed Tech Specs Sections 5.3.1 & 5.6.1, & New TS Section 3/4.9.13 & Bases 3/4.9.13
ML17310B433
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 06/20/1994
From:
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
Shared Package
ML17310B432 List:
References
NUDOCS 9407200228
Download: ML17310B433 (9)


Text

~ OR lNFORMATION ON DESIGN FEATURES 5.5 METEOROLOGICAL TOWER LOCATION 5.5.1--The meteorological tower shall be located as shown on Figure 5. 1-1.

5.6 FUEL STORAGE

5. 6. 1 CRIT I CALITY 5.6.1.1 The spent fuel storage racks are designed and shall be maintained with:

Qg pkv+ 'v a q 0 5 h o e r 'c i d

fr a

n i is d s c n

d a

n v

e a

i o n

. f e F++

b. A f~g,4cw nominal 9.5 Ax& center-to-center distance between ~

I l j, / / *,

~

5.6.1.2 The k ff for new fuel for the first core loading stored dry in the spent fuel storage racks shall not exceed 0.9B when aqueous foam moderation is assumed.

0 sc.vg DR I 5.6.2 The spent fuel storage pool is designed and shall be maintained to prevent inadvertent draining of the pool below elevation 137 feet " 6 inches.

CAPACITY 5.6.3 The spent fuel storage pool is designed and shall be maintained with a storage capacity limited to no more than 1329 fuel assemblies.

5.7 COMPONENT CYCLIC OR TRANSIENT LIMITS 5.7.1 The components identified in Table 5.7-1 are designed and shall be maintained within the cyclic or transient limits of Tables'5.7"1 and 5.7-2.

PALO VERDE - UNIT 1 5-6 9407200228 940620 I PDR ADOCK 05000528 P FDR

4 V

I II 1

FIGURE 5.6-1 ASSEMBLY BURNUP VERSUS INITIAL ENRICHMENT 4..30 50000

~ 45000

>40000 REGION 3

> 35000 z 30000 C

L. REGION 2

~ 25000 CQ

~20000 E ~oooo S

REGION 1

~+ 10000 5000 0

2.00 2.50 3.00 3.50 4.00 4..50 5.00 Initial Enrichment, wt  %

~~ 4/y esasg g/4 PALO VERDE-UNIT 1 5-6a AMENDMENT

+OR INFORMATION Oh DESIGN FEATURES

5. 5 METEOROLOGICAL TOWER LOCATION 5.5.1 The meteorological tower shall be loca-.ed as shown on Figure 5.1-1.

5.6 FUEL STORAGE

5. 6. 1 CRITICALITY 5.6. l. 1 The spent fuel storage racks are designed and shall be maintained with:
a. A'Ã T i a s or e a

- .'9 w e f o d i uesa o e: i w c of 2..o/

k' n.e ds.i ai t 9. o t erf$ AjY.

~

S o Inc, 4c S center-to-center distance oetween ~

b. A nominal 9.5 g>>

.'.6.1.2 The keTf for new fuel for the -.irst core .oading stored dry in the l, 4.,'

spent fuel s-orage racks shall not exceed 0.98 when aqueous foam moaeration is assumed. ~. ~

2nma'v < C DRAINAGE 5.6.2 The spent fuel storage pool is cesigneo and shall be maintained to prevent inadvertent draining of tt e pool below elevation 137 feet - 6 inches.

CAPACITY 5.6.3 The spent fuel storage pool is designed and shall be maintained with a storage capacity limited to no more than 1329 fuel, assemblies.

5.7 COMPONENT CYCLIC OR TRANSIENT LIMITS 5.7. 1 The components identified in Table 5.7-1 are designed and shall be maintained within the cyclic or transient limits of Tables 5.7-1 and 5.7-2.

PALO VERDE " UNIT 2 5"6

FIGURE 5.6-1 ASSEMBLY BURNUP YERSUS INITIAL ENRICHMENT 4.30 50000 45000

><oooo REGION 3 W 35OOO

~ \

~ 30000 REGION 2 Z 25000 CQ

~20000 E 15000 REGION I

~+ 10000 5000 0

2.00 2.50 3.00 3.50 4.00 4.50 5.00 Initial Enrichment, wt

(~~ 4./$

egggg 5/g PALO VERDE-UNIT 2 5-6a AMENDMENT

OOR INFORMATION ON[

- DESIGN FEATURES

5. 5 METEOROLOGICAL TOWER LOCATION 5.5. 1 The meteorological tower shall be located as shown on Figure 5.1-1.
5. 6 FUEL STORAGE
5. 6. 1 CRITICALITY 5.6.1. 1 The spent fuel storage racks are designed and shall be maintained with:

g 8 g~gC a. g f i 1 t l ss t n re o 0 0 d i d a r, u s os v wn f e a / ru e s

a te a ds ie n to 9 fte P+

b. A

~)ec.<as nominal 9.5)feetr center-to-center distance between ~

I + + >~gC. Ce ( I 4d.CL +'ICPHQ ~

5.6.1.2 The k'ff eff for new fuel for the first core loading stored dry in the spent fuel storage racks shall not exceed 0.98 when aqueous foam moderation is assumed.

Me mew.4 DRAINAGE 5.6.2 The spent fuel storage pool is designed and shall be maintained to prevent inadvertent draining of the pool below elevation 137 feet - 6 inches.

CAPACITY 5.6.3 The spent fuel storage pool is designed and shall be maintained with a storage capacity limited to no more than 1329 fuel assemblies.

5.7 COMPONENT CYCLIC OR TRANSIENT LIMITS 5.7.1 The components identified in Table 5.7-1 are designed and shall be maintained within the cyclic or transient limits of Tables 5.7-1 and 5.7-2.

PALO VERDE - UNIT 3 5" 6

'll N

I Y

FIGURE 5.6-1 ASSEMBLY BURNUP VERSUS INITIAL ENRICHMENT.

4.30 50000

~ 45000

>40OOO REGION 3 W 35000

~ \

Z 30000 REGION 2 Z 25000 CQ

~20000 E ~oooo S

REGION. 1

+ 10000 5000 0

2.00 2.50 3.00 3.50 4.00 4-.50 5.00 Initial Enrichment, wt m

~~ 3/4 gok~~g 4/4 PALO VERDE-UNIT 3 5-6a AMENDMENT