ML17312A640

From kanterella
Revision as of 08:55, 29 October 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Proposed Tech Specs 3/4.9.6,increasing Refueling Machine Overload Cut Off Limit to 2,000 Lb,In 50 Lb Increments,For Removal of Stuck Fuel Assembly from Core Location A-06
ML17312A640
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 03/26/1996
From:
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
Shared Package
ML17312A639 List:
References
NUDOCS 9604020293
Download: ML17312A640 (2)


Text

REFUELING OPERATIONS

~ ~ '-'e 314.9 6 REFUELING MACHINE LIMITING CONDITION FOR OPERATION The refueling machine for of fuel assemblies

'.9.6 shall be used movement and shall be OPERABLE with:

a. A minimum capacity of 3590 pounds and an overload cut off limit .

of less than or equal to 1600+ounds for the refueling machine.

APPLICABILITY: During movement of fuel assemblies within the refueling cavity.

ACTION:

With the above requirements for the refueling machine not satisfied; suspend use of the refueling machine from operations involving the movement of fuel assemblies.

SURVEILLANCE RE UIREMENTS 4.9.6.1 The refueling machine used for movement of fuel assemblies shall be demonstrated OPERABLE within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> prior to the start of'uch operations by performing a load test of at least 3590 pounds and demonstrating an automatic load cut off when the refueling machine load exceeds 160&pounds.

qg 960326 pgp ADQC g 050005~~

p~R

+ chai~ )Q i acsmgqg +o 2c oc> (~~As < n, gg ~z ~</

l p.ct'pMomks 4(- Qq pp~ovg(

) o~+r~ Q-Q ( g+ ~",

~<~~ ++)(

4-Z. ~)ze, a~a(',p a+~.

J PALO VERDE UNLT 2 3/4 9-6 AMENDMENT NO. ~76

0 0 c"