Proposed Tech Spec 4.7.2 Re Component Cooling Water Sys Surveillance Requirements
ML17348A967
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 06/21/1991
From:
FLORIDA POWER & LIGHT CO.
To:
Shared Package
ML17348A966 List:
References
NUDOCS 9107030302
Download: ML17348A967 (5)


Text

~ ~

ATTACHMENT 3 PROPOSED TECHNICAL SPECIFICATION Markel-up Technical Specifications Pages, 3/4 7-12 (no change, for reference only) 3/4 7-13 9107030302 910621 PDR ADOCK 05000250 P

PDR

il PLANT SYSTEMS 3/4. 7. 2 COMPONENT COOLING WATER SYSTEM LIMITING CONDITION FOR OPERATION 3.7.2 The Component Cooling Water System (CCW) shall be OPERABLE with:

a. Three CCW pumps, and
b. Two CCW heat exchangers.

APPLICABILITY: MODES 1, 2, 3, and 4.

ACTION:

a. With only two CCW pumps with independent power supplies OPERABLE, restore the inoperable'CW pump to OPERABLE status within 30 days or be in HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />. The provisions of Specification 3.0.4 are not applicable.
b. With only one CCW pump OPERABLE or with two CCW'umps OPERABLE but not from independent power supplies, restore two pumps from independent power supplies to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

C. With less than two CCW heat exchangers OPERABLE, restore two heat exchangers to OPERABLE status within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> or be in HOT 'STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

SURVEILLANCE RE UIREMENTS 4.7.2 The Component Cooling Water System (CCW) shall be demonstrated OPERABLE:

a. At least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />, by verifying that two heat exchangers and one pump are capable of removing design basis heat loads.

TURKEY POINT - UNITS 3 8( 4 3/4 7-12 AMENDMENT NOS.137 AND 132

SURVEILLANCE RE UIREMENTS Continued

b. At least once per 31 days by: (1) verifying that'ach valve (manual, power-operated, or automatic) servicing safety" related equipment that

.is not locked, sealed, or otherwise secured in position is in its correct position, and (2) veri ing by a performance test the heat exchanger surveillance curves +

C. At least once per 18 months during shutdown, by verifying that:

1) Each automatic valve servicing safety-related equipment actuates to its correct position on a SI test signal, and
2) Each Component Cooling Water System pump starts automatically on a SI test signal.
3) Interlocks required for CCW operability are OPERABLE.

I eckn eat speci4 e4mn 4 I. D.L &) <s <>~ 4-pp~'+i

~4v.g in+> Jvlo46 9 or vs 0 if',z Pn v'i led Aa+:

I) gurv~i)la ~c 4.g. z..b 4) )s p~Q~w)~k ~o loden ~~

'7a I o~s a)I~ .~-cr.J ig ~ Rc~c.4 Cooi + ~Y~~~

Gvg o0 8'f l F, aAnd

4) <>6FAWr ll nnk -be ~+~cg /liow 4> sa4i<~~+4g p~k~~c e.c. pf 4 is s~rv~il l.cu c.c.

TURKEY POINT - UNITS 3 8 4 3/4 7-13 AMENDMENT NOS.137 AND 132

~ ~