CAC:MF8864, Revise Shutdown Margin Definition to Address Advanced Fuel Designs (Approved, Closed) CAC:MF8865, Revise Shutdown Margin Definition to Address Advanced Fuel Designs (Approved, Closed) |
|
MONTHYEARML16257A4112016-07-31031 July 2016 DUKE-0B21-1104-000(NP), Safety Analysis Report for Brunswick Steam Electric Plant, Units 1 and 2, Maximum Extended Load Line Limit Analysis Plus. Project stage: Request ML16257A4102016-09-0606 September 2016 Request for License Amendment Regarding Core Flow Operating Range Expansion Project stage: Request BSEP 16-0083, Steam Electric Plant, Units 1 And. 2 - Application to Revise Technical Specifications to Adopt TSTF-535, Revision O, Revise Shutdown Margin Definition to Address Advance Fuel Designs.2016-11-18018 November 2016 Steam Electric Plant, Units 1 And. 2 - Application to Revise Technical Specifications to Adopt TSTF-535, Revision O, Revise Shutdown Margin Definition to Address Advance Fuel Designs. Project stage: Request ML16362A0752016-12-23023 December 2016 NRR E-mail Capture - Brunswick, Units 1 and 2 - Acceptance of License Amendment Request Regarding Application to Revise Technical Specifications to Adopt TSTF-535 Project stage: Acceptance Review ML17082A3042017-03-0909 March 2017 NRR E-mail Capture - Brunswick Unit 1 and Unit 2 Request for Additional Information Related Containment Accident Pressure in the Mellla+ LAR (CACs MF8864 and MF8865) Project stage: RAI BSEP 17-0029, Response to Request for Additional Information Regarding Request for License Amendment Regarding Core Flow Operating Range Expansion2017-04-0606 April 2017 Response to Request for Additional Information Regarding Request for License Amendment Regarding Core Flow Operating Range Expansion Project stage: Response to RAI ML17088A3962017-06-0707 June 2017 Issuance of Amendments Regarding Revisions of Technical Specifications to Adopt TSTF-535, Revise Shutdown Margin Definition to Address Advanced Fuel Designs Project stage: Approval ML17275A2772017-10-0202 October 2017 E-mail, Request for Additional Information Related Containment Accident Pressure in the Mellla+ LAR (CAC Nos. MF8864 and MF8865) (Non-Proprietary) Project stage: RAI BSEP 17-0093, Response to Request for Additional Information Regarding Request for License Amendment Regarding Core Flow Operating Range Expansion2017-11-0101 November 2017 Response to Request for Additional Information Regarding Request for License Amendment Regarding Core Flow Operating Range Expansion Project stage: Response to RAI ML18010A0512018-01-0505 January 2018 Unit 2 - Request for Additional Information Related to the Mellla+ LAR (CACs MF8864 and MF8865) (Nonproprietary) Project stage: RAI ML18010A0502018-01-0505 January 2018 E-mail Re. Brunswick Units 1 and Unit 2 - Request for Additional Information Related to the Mellla+ LAR (CACs MF8864 and MF8865) Project stage: RAI BSEP 18-0021, Response to Request for Additional Information Regarding Request for License Amendment Regarding Core Flow Operating Range Expansion (CAC Nos. MF8864 and MF8865). Without Proprietary Enclosure2018-02-0505 February 2018 Response to Request for Additional Information Regarding Request for License Amendment Regarding Core Flow Operating Range Expansion (CAC Nos. MF8864 and MF8865). Without Proprietary Enclosure Project stage: Response to RAI ML18045A8592018-02-14014 February 2018 Withdrawal of Information Relating to the Request for License Amendment Regarding Core Flow Operating Range Expansion Project stage: Withdrawal BSEP 18-0027, ANP-3655NP, Revision 0, Brunswick Mellla+ CRDA Assessment with Draft Criteria.2018-02-28028 February 2018 ANP-3655NP, Revision 0, Brunswick Mellla+ CRDA Assessment with Draft Criteria. Project stage: Draft Other ML18075A3302018-03-0101 March 2018 Response to Request for Additional Information SNPB-RAI-2 Regarding Request for License Amendment Regarding Core Flow Operating Range Expansion (CAC Nos. MF8864 and MF8865) Project stage: Response to RAI ML18067A1032018-03-0808 March 2018 NRR E-mail Capture - Brunswick Unit 1 and Unit 2 Request for Additional Information Related Human Factors in the Mellla+ LAR (CACs MF8864 and MF8865, EPID: L-2016-LLA-0009) Project stage: RAI ML18071A3732018-03-12012 March 2018 NRR E-mail Capture - Correction: Brunswick Unit 1 and Unit 2 Request for Additional Information Related Human Factors in the Mellla+ LAR (CACs MF8864 and MF8865, EPID: L-2016-LLA-0009) Project stage: RAI 2017-04-06
[Table View] |
|
---|
Category:Letter
MONTHYEARIR 05000324/20230112023-12-26026 December 2023 NRC Fire Protection Team Inspection - FPTI Report 05000324/2023011 and 05000325/2023011 IR 05000324/20234022023-12-14014 December 2023 Security Baseline Inspection Report 05000324-2023402 and 05000325-2023402 ML23297A0262023-11-27027 November 2023 Proposed Alternatives to ASME Code Section XI Subsection IWE Requirements for Torus Metallic Liner Inspections ML23317A3462023-11-14014 November 2023 Duke Fleet - Correction Letter to License Amendment Nos. 312 & 340 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000324/20230032023-11-0101 November 2023 Integrated Inspection Report 05000324/2023003 and 05000325/2023003 IR 05000324/20230102023-10-17017 October 2023 Biennial Problem Identification and Resolution Inspection Report 05000324/2023010 and 05000325/2023010 IR 05000325/20234012023-10-16016 October 2023 Security Baseline Inspection Report 05000324 and 05000325 2023401 ML23346A1322023-10-0606 October 2023 Communication from C-10 Research & Education Foundation Regarding NextEra Common Emergency Fleet Plan License Amendment Request and Related Documents Subsequently Published ML23256A0882023-09-25025 September 2023 Issuance of Alternative to Steam Generator Welds ML23195A0782023-08-29029 August 2023 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000324/20230052023-08-23023 August 2023 Updated Inspection Plan for Brunswick Steam Electric Plant, Units 1 and 2 (Report 05000324/2023005 and 05000325/2023005) IR 05000324/20230022023-08-0404 August 2023 Integrated Inspection Report 05000324/2023002 and 05000325/2023002 ML23201A2042023-07-28028 July 2023 Summary of Regulatory Audit in Support of Alternative Request RA-22-0308 for Inservice Inspection of the Torus Metallic Liner IR 05000324/20243012023-07-25025 July 2023 Notification of Licensed Operator Initial Examination 05000325/2024301 and 05000324/2024301 ML23212B2682023-07-25025 July 2023 Notification of Licensed Operator Initial Examination 05000325/2024301 and 05000324/2024301 ML23146A0012023-05-24024 May 2023 EN 56538 - Engine Systems Inc and Brunswick ML23212A9502023-05-24024 May 2023 Engine Systems, Inc., Part 21 Report Re Woodward EGB-35P Governor/Actuator with Foreign Material ML23130A3902023-05-12012 May 2023 Regulatory Audit Plan in Support of Alternative Request RA 22-0308 for Inservice Inspection of the Torus Metallic Liner IR 05000324/20230012023-05-10010 May 2023 Integrated Inspection Report 05000324 2023001 and 05000325 2023001 ML23118A0762023-05-0101 May 2023 Approval for Use of Specific Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI IR 05000324/20220042023-04-0404 April 2023 Reissue - Brunswick Steam Electric Plant - Integrated Inspection Report 05000324/2022004 and 05000325/022004 ML22332A4932023-03-10010 March 2023 William States Lee III 1 and 2 - Issuance of Amendments Regarding the Relocation of the Emergency Operations Facility IR 05000324/20220062023-03-0101 March 2023 Annual Assessment Letter for Brunswick Steam Electric Plant, Units 1 and 2 NRC Inspection Reports 05000324/2022006 and 05000325/2022006 ML23033A5252023-02-0808 February 2023 Integrated Inspection Report 05000324/2022004 and 05000325/2022004 IR 05000324/20223012023-02-0303 February 2023 NRC Operator License Examination Report 05000325/2022301 and 05000324/2022301 IR 05000324/20224022022-11-23023 November 2022 Security Baseline Inspection Report 05000324 2022402 and 05000325 2022402 ML22332A0132022-11-23023 November 2022 Operator Licensing Written Examination Approval 05000325/2022301 and 05000324/2022301 ML22096A0032022-11-18018 November 2022 McGuire Nuclear Station and Shearon Harris Nuclear Power Plant Authorization of RA-19-0352 Regarding Use of Alternative for RPV Head Closure Stud Examinations ML22256A2532022-11-14014 November 2022 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-541, Rev. 2 IR 05000324/20224032022-11-10010 November 2022 Cyber Security Inspection Report 05000324/2022403 and 05000325/2022403 ML22307A1762022-11-0707 November 2022 Notification of an NRC Fire Protection Team Inspection (FPTI) IR 05000324/20220032022-11-0707 November 2022 Integrated Inspection Report 05000324/2022003 and 05000325/2022003 ML22258A0302022-09-15015 September 2022 Evacuation Time Estimate Reports IR 05000324/20220052022-08-24024 August 2022 Updated Inspection Plan for Brunswick Steam Electric Plant (Report 05000324/2022005 and 05000325/2022005) ML22230D0692022-08-22022 August 2022 Documentation of the Completion of Required Actions Taken in Response to the Lessons Learned from the Fukushima Dai-ichi Accident IR 05000324/20220022022-08-0505 August 2022 Integrated Inspection Report 05000324/2022002 and 05000325/2022002 IR 05000324/20220102022-06-27027 June 2022 Design Basis Assurance Inspection (Teams) Inspection Report 05000324 2022010 and 05000325 2022010 ML22028A1742022-05-12012 May 2022 Issuance of Amendment Nos. 309 and 337 Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-580, Revision 1 IR 05000324/20220012022-05-10010 May 2022 Integrated Inspection Report 05000324/2022001 and 05000325/2022001 ML22119A1352022-05-0909 May 2022 Information Request for the Cyber-Security Baseline Security Inspection, Notification to Perform Inspection 05000325/2022403; 05000324/2022403 ML22082A2682022-05-0202 May 2022 Issuance of Amendment Nos. 308 and 336 Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-505, Revision 2 ML22102A0502022-04-11011 April 2022 301 Corporate Notification Letter IR 05000324/20224012022-03-16016 March 2022 Security Baseline Inspection Report 05000324/2022401 and 05000325/2022401 ML22054A2152022-03-0808 March 2022 Correction to Amendments to Revise Standby Liquid Control System Boron Solution Storage Tank Volume Technical Specifications IR 05000324/20210062022-03-0202 March 2022 Annual Assessment Letter for Brunswick Steam Electric Plant, Units 1 and 2 (Reports No. 05000324/2021006 and 05000325/2021006) IR 05000324/20210042022-02-14014 February 2022 Integrated Inspection Report 05000324/2021004 and 05000325/2021004 ML22035A1262022-02-0909 February 2022 Withdrawal of Exemption Request from the Requirements of 10 CFR Part 50, Appendix E, Section IV.F.2.d (EPID L-2021-LLE-0055 (COVID-19)) ML21354A5032022-01-24024 January 2022 Requested Exemption from 10 CFR 50, Appendix E, Section IV.F.2.D Not Required (EPID L-2021-LLE-0055 (COVID-19)) ML22018A1842022-01-18018 January 2022 Notification of Brunswick Steam Electric Plant, Units 1 & 2 - Design Bases Assurance Inspection - U.S. Nuclear Regulatory Inspection Report 05000324/2022010 and 05000325/2022010 ML21348A7192021-12-21021 December 2021 Regulatory Audit Summary Regarding License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times 2023-09-25
[Table view] |
Text
William R. Gideon Vice President Brunswick Nuclear Plant P.O. Box 10429 Southport, NC 28461 o: 910.832.3698 February 14, 2018 Serial: BSEP 18-0018 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001
Subject:
Brunswick Steam Electric Plant, Unit Nos. 1 and 2 Renewed Facility Operating License Nos. DPR-71 and DPR-62 Docket Nos. 50-325 and 50-324 Withdrawal of Information Relating to the Request for License Amendment Regarding Core Flow Operating Range Expansion (CAC Nos. MF8864 and MF8865)
References:
- 1. Letter from William R. Gideon (Duke Energy) to the U.S. Nuclear Regulatory Commission Document Control Desk, Request for License Amendment Regarding Core Flow Operating Range Expansion, dated September 6, 2016, ADAMS Accession Number ML16257A410
- 2. SECY-11-0014, Use of Containment Accident Pressure in Analyzing Emergency Core Cooling System and Containment Heat Removal System Pump Performance in Postulated Accidents, dated January 31, 2011, ADAMS Accession Number ML102780586
- 3. Letter from William R. Gideon (Duke Energy) to the U.S. Nuclear Regulatory Commission Document Control Desk, Response to Request for Additional Information Regarding Request for License Amendment Regarding Core Flow Operating Range Expansion (CAC Nos. MF8864 and MF8865), dated April 6, 2017, ADAMS Accession Number ML17096A482
- 4. Letter from William R. Gideon (Duke Energy) to the U.S. Nuclear Regulatory Commission Document Control Desk, Response to Request for Additional Information Regarding License Amendment Regarding Core Flow Operating Range Expansion (CAC Nos. MF8864 and MF8865), dated November 1, 2017, ADAMS Accession Number ML17305A875 Ladies and Gentlemen:
By letter dated September 6, 2016 (i.e., Reference 1), Duke Energy Progress, LLC (Duke Energy), submitted a license amendment request (LAR) for the Brunswick Steam Electric Plant (BSEP), Unit Nos. 1 and 2. The proposed amendment would expand the core power-flow operating range (i.e., Maximum Extended Load Line Limit Analysis Plus (MELLLA+)). 1 of the MELLLA+ license amendment application provided a discussion of issues outlined in SECY-11-0014 (i.e., Reference 2) regarding containment accident pressure (CAP)
U.S. Nuclear Regulatory Commission Page 2 of 3 and described net positive suction head (NPSH) margin calculations performed by Duke Energy. This information was submitted to be responsive to NRC questions raised during a January 8, 2013, pre-submittal meeting for the BSEP MELLLA+ LAR by addressing considerations of SECY-11-0014. However, SECY-11-0014 is only applicable to extended power uprate applications and to applications for new or increased credit for CAP.
SECY-11-0014 is not applicable to the Safety Evaluation for BSEP's MELLLA+ LAR because no additional credit for CAP is needed for the BSEP MELLLA+ application.
The generic disposition of the Emergency Core Cooling System (ECCS) NPSH topic in the MELLLA+ license topical report (LTR) (i.e., NEDC-33006P-A, General Electric Boiling Water Reactor Maximum Extended Load Line Limit Analysis Plus) describes that the MELLLA+
operating domain does not result in an increase in heat addition to the suppression pool following a loss-of-coolant accident (LOCA). Based on the generic disposition, BSEP operation in the MELLLA+ domain will not have a negative impact on ECCS NPSH. As such, the existing licensing basis for CAP and the existing methodology for demonstrating adequate ECCS NPSH with CAP is being retained.
During the LAR review process, Duke Energy has provided several follow-up submittals (i.e.,
References 3 and 4) to address NRC questions related to the Enclosure 11 information. In discussions with the NRC regarding these follow-up responses on the Enclosure 11 information, Duke Energy confirmed that SECY-11-0014 is not applicable to the Safety Evaluation for BSEP's MELLLA+ LAR because MELLLA+ has no adverse impact on ECCS NPSH and that no new or increased reliance on CAP is needed for the BSEP MELLLA+ LAR.
Based on the further discussions, the NRC has agreed with Duke Energy's position that SECY-11-0014 is not applicable for the BSEP MELLLA+ LAR. Therefore, to remove confusion that may result from the presence of Enclosure 11, Duke Energy has agreed to and hereby withdraws the Enclosure 11 information, along with the supplemental responses regarding CAP, from consideration as part of the MELLLA+ license amendment application.
No new regulatory commitments are contained in this letter.
Please refer any questions regarding this submittal to Mr. Lee Grzeck, Manager - Regulatory Affairs, at (910) 832-2487.
I declare, under penalty of perjury, that the foregoing is true and correct. Executed on February 14, 2018.
Sincerely, lw()9 William R. Gideon WRM/wrm
U.S. Nuclear Regulatory Commission Page 3 of 3 cc: U.S. Nuclear Regulatory Commission, Region II ATTN: Ms. Catherine Haney, Regional Administrator 245 Peachtree Center Ave, NE, Suite 1200 Atlanta, GA 30303-1257 U.S. Nuclear Regulatory Commission ATTN: Mr. Andrew Hon (Mail Stop OWFN 8G9A) 11555 Rockville Pike Rockville, MD 20852-2738 U.S. Nuclear Regulatory Commission ATTN: Mr. Gale Smith, NRC Senior Resident Inspector 8470 River Road Southport, NC 28461-8869 Chair - North Carolina Utilities Commission (Electronic Copy Only) 4325 Mail Service Center Raleigh, NC 27699-4300 swatson@ncuc.net Mr. W. Lee Cox, III, Section Chief (Electronic Copy Only)
Radiation Protection Section North Carolina Department of Health and Human Services 1645 Mail Service Center Raleigh, NC 27699-1645 lee.cox@dhhs.nc.gov