Letter Sequence Response to RAI |
---|
CAC:MF8864, Revise Shutdown Margin Definition to Address Advanced Fuel Designs (Approved, Closed) CAC:MF8865, Revise Shutdown Margin Definition to Address Advanced Fuel Designs (Approved, Closed) |
|
MONTHYEARML16257A4112016-07-31031 July 2016 DUKE-0B21-1104-000(NP), Safety Analysis Report for Brunswick Steam Electric Plant, Units 1 and 2, Maximum Extended Load Line Limit Analysis Plus. Project stage: Request ML16257A4102016-09-0606 September 2016 Request for License Amendment Regarding Core Flow Operating Range Expansion Project stage: Request BSEP 16-0083, Steam Electric Plant, Units 1 And. 2 - Application to Revise Technical Specifications to Adopt TSTF-535, Revision O, Revise Shutdown Margin Definition to Address Advance Fuel Designs.2016-11-18018 November 2016 Steam Electric Plant, Units 1 And. 2 - Application to Revise Technical Specifications to Adopt TSTF-535, Revision O, Revise Shutdown Margin Definition to Address Advance Fuel Designs. Project stage: Request ML16362A0752016-12-23023 December 2016 NRR E-mail Capture - Brunswick, Units 1 and 2 - Acceptance of License Amendment Request Regarding Application to Revise Technical Specifications to Adopt TSTF-535 Project stage: Acceptance Review ML17082A3042017-03-0909 March 2017 NRR E-mail Capture - Brunswick Unit 1 and Unit 2 Request for Additional Information Related Containment Accident Pressure in the Mellla+ LAR (CACs MF8864 and MF8865) Project stage: RAI BSEP 17-0029, Response to Request for Additional Information Regarding Request for License Amendment Regarding Core Flow Operating Range Expansion2017-04-0606 April 2017 Response to Request for Additional Information Regarding Request for License Amendment Regarding Core Flow Operating Range Expansion Project stage: Response to RAI ML17088A3962017-06-0707 June 2017 Issuance of Amendments Regarding Revisions of Technical Specifications to Adopt TSTF-535, Revise Shutdown Margin Definition to Address Advanced Fuel Designs Project stage: Approval ML17275A2772017-10-0202 October 2017 E-mail, Request for Additional Information Related Containment Accident Pressure in the Mellla+ LAR (CAC Nos. MF8864 and MF8865) (Non-Proprietary) Project stage: RAI BSEP 17-0093, Response to Request for Additional Information Regarding Request for License Amendment Regarding Core Flow Operating Range Expansion2017-11-0101 November 2017 Response to Request for Additional Information Regarding Request for License Amendment Regarding Core Flow Operating Range Expansion Project stage: Response to RAI ML18010A0512018-01-0505 January 2018 Unit 2 - Request for Additional Information Related to the Mellla+ LAR (CACs MF8864 and MF8865) (Nonproprietary) Project stage: RAI ML18010A0502018-01-0505 January 2018 E-mail Re. Brunswick Units 1 and Unit 2 - Request for Additional Information Related to the Mellla+ LAR (CACs MF8864 and MF8865) Project stage: RAI BSEP 18-0021, Response to Request for Additional Information Regarding Request for License Amendment Regarding Core Flow Operating Range Expansion (CAC Nos. MF8864 and MF8865). Without Proprietary Enclosure2018-02-0505 February 2018 Response to Request for Additional Information Regarding Request for License Amendment Regarding Core Flow Operating Range Expansion (CAC Nos. MF8864 and MF8865). Without Proprietary Enclosure Project stage: Response to RAI ML18045A8592018-02-14014 February 2018 Withdrawal of Information Relating to the Request for License Amendment Regarding Core Flow Operating Range Expansion Project stage: Withdrawal BSEP 18-0027, ANP-3655NP, Revision 0, Brunswick Mellla+ CRDA Assessment with Draft Criteria.2018-02-28028 February 2018 ANP-3655NP, Revision 0, Brunswick Mellla+ CRDA Assessment with Draft Criteria. Project stage: Draft Other ML18075A3302018-03-0101 March 2018 Response to Request for Additional Information SNPB-RAI-2 Regarding Request for License Amendment Regarding Core Flow Operating Range Expansion (CAC Nos. MF8864 and MF8865) Project stage: Response to RAI ML18067A1032018-03-0808 March 2018 NRR E-mail Capture - Brunswick Unit 1 and Unit 2 Request for Additional Information Related Human Factors in the Mellla+ LAR (CACs MF8864 and MF8865, EPID: L-2016-LLA-0009) Project stage: RAI ML18071A3732018-03-12012 March 2018 NRR E-mail Capture - Correction: Brunswick Unit 1 and Unit 2 Request for Additional Information Related Human Factors in the Mellla+ LAR (CACs MF8864 and MF8865, EPID: L-2016-LLA-0009) Project stage: RAI 2017-04-06
[Table View] |
|
---|
Category:Letter type:BSEP
MONTHYEARBSEP 19-0012, Submittal of 2018 Sea Turtle Annual Report2019-01-17017 January 2019 Submittal of 2018 Sea Turtle Annual Report BSEP 18-0052, Annual Radiological Environmental Operating Report - 20172018-05-10010 May 2018 Annual Radiological Environmental Operating Report - 2017 BSEP 18-0051, Annual Radioactive Effluent Release Report - 20172018-04-26026 April 2018 Annual Radioactive Effluent Release Report - 2017 BSEP 18-0045, Request for License Amendment: Technical Specification 3.8.3, Diesel Fuel Oil, One-Time Extension of Main Fuel Oil Storage Tank Completion Time2018-04-25025 April 2018 Request for License Amendment: Technical Specification 3.8.3, Diesel Fuel Oil, One-Time Extension of Main Fuel Oil Storage Tank Completion Time BSEP 18-0054, Response to Request for Additional Information Regarding Inservice Inspection Program Proposed Alternative ISI-09 in Accordance with 10 CFR 50.55a(z)(1) Regarding Reactor Pressure Vessel Circumferential.2018-04-24024 April 2018 Response to Request for Additional Information Regarding Inservice Inspection Program Proposed Alternative ISI-09 in Accordance with 10 CFR 50.55a(z)(1) Regarding Reactor Pressure Vessel Circumferential. BSEP 18-0048, Response to Request for Additional Information Regarding Inservice Inspection Program Proposed Alternative ISI-09 in Accordance with 10 CFR 50.55a(z)(1) Regarding Reactor Pressure Vessel Circumferential Shell Weld Examinations2018-04-11011 April 2018 Response to Request for Additional Information Regarding Inservice Inspection Program Proposed Alternative ISI-09 in Accordance with 10 CFR 50.55a(z)(1) Regarding Reactor Pressure Vessel Circumferential Shell Weld Examinations BSEP 18-0044, Application of Dissimilar Metal Weld Full Structural Overlay - Reactor Pressure Vessel Nozzles N4A and N4D2018-04-11011 April 2018 Application of Dissimilar Metal Weld Full Structural Overlay - Reactor Pressure Vessel Nozzles N4A and N4D BSEP 18-0046, Supplement to Response to Request for Additional Information SRXB-RAI-2 Regarding Request for License Amendment Regarding Core Flow Operating Range Expansion2018-04-10010 April 2018 Supplement to Response to Request for Additional Information SRXB-RAI-2 Regarding Request for License Amendment Regarding Core Flow Operating Range Expansion BSEP 18-0047, Supplement to Proposed Alternative in Accordance with 10 CFR 50.55a(z)(2) for End of Interval Leakage Test2018-04-0505 April 2018 Supplement to Proposed Alternative in Accordance with 10 CFR 50.55a(z)(2) for End of Interval Leakage Test BSEP 18-0041, Request for License Amendment to Revise the Technical Specifications to Relocate the Pressure-Temperature Limit Curves to a Pressure and Temperature Limits Report2018-04-0404 April 2018 Request for License Amendment to Revise the Technical Specifications to Relocate the Pressure-Temperature Limit Curves to a Pressure and Temperature Limits Report BSEP 18-0043, Application of Dissimilar Metal Weld Full Structural Overlay - Reactor Pressure Vessel Nozzles N4A and N4D2018-03-31031 March 2018 Application of Dissimilar Metal Weld Full Structural Overlay - Reactor Pressure Vessel Nozzles N4A and N4D BSEP 18-0035, Response to Request for Additional Information Regarding Request for License Amendment Regarding Core Flow Operating Range Expansion2018-03-29029 March 2018 Response to Request for Additional Information Regarding Request for License Amendment Regarding Core Flow Operating Range Expansion BSEP 18-0042, Cycle 22 Core Operating Limits Report (COLR)2018-03-27027 March 2018 Cycle 22 Core Operating Limits Report (COLR) BSEP 18-0040, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) for End of Interval Leakage Test2018-03-23023 March 2018 Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) for End of Interval Leakage Test BSEP 18-0039, Proposed In-Service Inspection Alternative for Application of Dissimilar Metal Weld Full Structural Overlay - Nozzles N4A and N4D2018-03-19019 March 2018 Proposed In-Service Inspection Alternative for Application of Dissimilar Metal Weld Full Structural Overlay - Nozzles N4A and N4D BSEP 18-0034, Corrected Affidavit Relating to the Request for License Amendment Regarding Core Flow Operating Range Expansion2018-03-16016 March 2018 Corrected Affidavit Relating to the Request for License Amendment Regarding Core Flow Operating Range Expansion BSEP 18-0032, Additional Testing Information Relating to the Request for License Amendment Regarding Core Flow Operating Range Expansion2018-03-14014 March 2018 Additional Testing Information Relating to the Request for License Amendment Regarding Core Flow Operating Range Expansion BSEP 18-0026, Additional Information Regarding Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) for Reactor Pressure Vessel Nozzle-to-Vessel Weld Examination2018-03-0707 March 2018 Additional Information Regarding Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) for Reactor Pressure Vessel Nozzle-to-Vessel Weld Examination BSEP 18-0014, Fifth 10-Year Inservice Testing Program Plan2018-02-19019 February 2018 Fifth 10-Year Inservice Testing Program Plan BSEP 18-0021, Response to Request for Additional Information Regarding Request for License Amendment Regarding Core Flow Operating Range Expansion (CAC Nos. MF8864 and MF8865). Without Proprietary Enclosure2018-02-0505 February 2018 Response to Request for Additional Information Regarding Request for License Amendment Regarding Core Flow Operating Range Expansion (CAC Nos. MF8864 and MF8865). Without Proprietary Enclosure BSEP 18-0017, Revision to Radiological Emergency Response Plan and Implementing Procedure2018-01-30030 January 2018 Revision to Radiological Emergency Response Plan and Implementing Procedure BSEP 18-0015, Inservice Inspection Program Proposed Alternative ISI-09 in Accordance with 10 CFR 50.55a(z)(1) Regarding Reactor Pressure Vessel Circumferential Shell Weld Examinations2018-01-23023 January 2018 Inservice Inspection Program Proposed Alternative ISI-09 in Accordance with 10 CFR 50.55a(z)(1) Regarding Reactor Pressure Vessel Circumferential Shell Weld Examinations BSEP 18-0013, Supplement to Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control2018-01-23023 January 2018 Supplement to Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control BSEP 18-0001, Application to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements2018-01-23023 January 2018 Application to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements BSEP 18-0012, Application to Revise Technical Specifications to Adopt TSTF-208, Revision 0, Extension of Time to Reach Mode 2 in LCO 3.0.32018-01-23023 January 2018 Application to Revise Technical Specifications to Adopt TSTF-208, Revision 0, Extension of Time to Reach Mode 2 in LCO 3.0.3 BSEP 18-0009, 2017 Sea Turtle Annual Report2018-01-15015 January 2018 2017 Sea Turtle Annual Report BSEP 17-0098, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components (Sscs) for Nuclear Power Reactors2018-01-10010 January 2018 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components (Sscs) for Nuclear Power Reactors BSEP 17-0119, Snubber Program Plan for Fifth 10-Year Interval Inservice Testing Program2018-01-10010 January 2018 Snubber Program Plan for Fifth 10-Year Interval Inservice Testing Program BSEP 17-0115, Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control2018-01-0404 January 2018 Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control BSEP 17-0110, Seventh Six-Month Status Report in Response to June 6, 2013, Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions2017-12-20020 December 2017 Seventh Six-Month Status Report in Response to June 6, 2013, Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions BSEP 17-0121, Post-Examination Documentation and Comments for Operator Retake Initial Examination2017-12-14014 December 2017 Post-Examination Documentation and Comments for Operator Retake Initial Examination BSEP 17-0120, Withdrawal of Request for Risk-Informed Exigent License Amendment - Technical Specification 3.8.1, AC Sources - Operating, One-Time Extension of Emergency Diesel Generator Completion Times and Suspension..2017-12-12012 December 2017 Withdrawal of Request for Risk-Informed Exigent License Amendment - Technical Specification 3.8.1, AC Sources - Operating, One-Time Extension of Emergency Diesel Generator Completion Times and Suspension.. BSEP 17-0118, Supplement to Response to Request for Additional Information Regarding Request for Risk-Informed Exigent License Amendment - Technical Specification 3.8.1, AC Sources - Operating, One-Time Extension of Emergency Diesel..2017-12-0707 December 2017 Supplement to Response to Request for Additional Information Regarding Request for Risk-Informed Exigent License Amendment - Technical Specification 3.8.1, AC Sources - Operating, One-Time Extension of Emergency Diesel.. BSEP 17-0117, Response to Request for Additional Information (Probabilistic Risk Assessment and Human Performance Branches) Regarding Request for Risk-Informed Exigent License Amendment - Technical Specification 3.8.1 AC Sources..2017-12-0606 December 2017 Response to Request for Additional Information (Probabilistic Risk Assessment and Human Performance Branches) Regarding Request for Risk-Informed Exigent License Amendment - Technical Specification 3.8.1 AC Sources.. BSEP 17-0116, Response to Request for Additional Information Regarding Request for Risk- Informed Exigent License Amendment - Technical Specification 3.8.1, AC Sources - Operating, One-Time Extension of ..2017-12-0404 December 2017 Response to Request for Additional Information Regarding Request for Risk- Informed Exigent License Amendment - Technical Specification 3.8.1, AC Sources - Operating, One-Time Extension of .. BSEP 17-0104, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) for Reactor Pressure Vessel Nozzle-to-Vessel Weld Examination2017-11-29029 November 2017 Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) for Reactor Pressure Vessel Nozzle-to-Vessel Weld Examination BSEP 17-0111, Request for Risk-Informed Exigent License Amendment - Technical Specification 3.8.1, AC Sources Operating, One-Time Extension of Emergency Diesel Generator Completion Times and Suspension of Surveillance Requirements2017-11-28028 November 2017 Request for Risk-Informed Exigent License Amendment - Technical Specification 3.8.1, AC Sources Operating, One-Time Extension of Emergency Diesel Generator Completion Times and Suspension of Surveillance Requirements BSEP 17-0109, Response to Request for Additional Information Regarding Request for Emergency License Amendment - Technical Specification 3.8.1, AC Sources - Operating, One-Time Extension of Emergency Diesel Generator Completion Times And.2017-11-24024 November 2017 Response to Request for Additional Information Regarding Request for Emergency License Amendment - Technical Specification 3.8.1, AC Sources - Operating, One-Time Extension of Emergency Diesel Generator Completion Times And. BSEP 17-0108, Request for Emergency License Amendment - Technical Specification 3.8.1, AC Sources - Operating, One-Time Extension of Emergency Diesel Generator Completion Times and Suspension of Surveillance Requirements2017-11-22022 November 2017 Request for Emergency License Amendment - Technical Specification 3.8.1, AC Sources - Operating, One-Time Extension of Emergency Diesel Generator Completion Times and Suspension of Surveillance Requirements BSEP 17-0017, Submittal of Request for License Amendment for Performance-Based Fire Protection Alternative for Thermal Insulation Material2017-11-15015 November 2017 Submittal of Request for License Amendment for Performance-Based Fire Protection Alternative for Thermal Insulation Material BSEP 17-0100, Fifth 10-Year Inservice Testing Interval2017-11-0202 November 2017 Fifth 10-Year Inservice Testing Interval BSEP 17-0089, Updates to Request for License Amendment Regarding Core Flow Operating Range Expansion2017-11-0101 November 2017 Updates to Request for License Amendment Regarding Core Flow Operating Range Expansion BSEP 17-0093, Response to Request for Additional Information Regarding Request for License Amendment Regarding Core Flow Operating Range Expansion2017-11-0101 November 2017 Response to Request for Additional Information Regarding Request for License Amendment Regarding Core Flow Operating Range Expansion BSEP 17-0078, Request for License Amendment - DC Sources - Operating Surveillance Requirement (SR) 3.8.4.52017-10-0303 October 2017 Request for License Amendment - DC Sources - Operating Surveillance Requirement (SR) 3.8.4.5 BSEP 17-0076, Registration for Use of General License Spent Fuel Casks2017-09-0606 September 2017 Registration for Use of General License Spent Fuel Casks BSEP 17-0081, Revision to Radiological Emergency Response Plan Implementing Procedures2017-09-0505 September 2017 Revision to Radiological Emergency Response Plan Implementing Procedures BSEP 17-0039, Submittal of Response to Inspection Report 05000324/2015404 and 05000325/2015404, Dated March 30, 2015, Inspection of Interim Cyber Security Milestones 1-7 and Target Set Requirements2017-08-15015 August 2017 Submittal of Response to Inspection Report 05000324/2015404 and 05000325/2015404, Dated March 30, 2015, Inspection of Interim Cyber Security Milestones 1-7 and Target Set Requirements BSEP 17-0071, ISFSI - Registration for Use of General License Spent Fuel Casks2017-08-15015 August 2017 ISFSI - Registration for Use of General License Spent Fuel Casks BSEP 17-0064, Application of Dissimilar Metal Weld Full Structural Overlay on Reactor Pressure Vessel Nozzle N92017-07-10010 July 2017 Application of Dissimilar Metal Weld Full Structural Overlay on Reactor Pressure Vessel Nozzle N9 BSEP 17-0060, Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control.2017-06-29029 June 2017 Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control. 2019-01-17
[Table view] Category:Response to Request for Additional Information (RAI)
MONTHYEARRA-23-0199, Response to Request for Additional Information (RAI) Regarding Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) for Inservice Inspection of the Torus Metallic Liner2023-08-18018 August 2023 Response to Request for Additional Information (RAI) Regarding Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) for Inservice Inspection of the Torus Metallic Liner RA-22-0147, Duke Energy Carolinas, LLC, and Duke Energy Progress, LLC, Response to Request for Additional Information (RAI) Regarding License Amendment Request for Relocating the Duke Energy Emergency Operations Facility2022-05-13013 May 2022 Duke Energy Carolinas, LLC, and Duke Energy Progress, LLC, Response to Request for Additional Information (RAI) Regarding License Amendment Request for Relocating the Duke Energy Emergency Operations Facility RA-22-0003, Response to Requests for Additional Information for Reactor Vessel Closure Stud Exam Extension Alternative2022-01-31031 January 2022 Response to Requests for Additional Information for Reactor Vessel Closure Stud Exam Extension Alternative RA-21-0275, Response to Request for Additional Information, Exemption Request for Senior Reactor Operator License Application2021-10-25025 October 2021 Response to Request for Additional Information, Exemption Request for Senior Reactor Operator License Application RA-21-0262, Response to Request for Additional Information Regarding Proposed Alternative to ASME Boiler & Pressure Vessel Code Section XI Requirements for Repair/Replacement of Service Water (SW) System Buried Piping2021-10-0404 October 2021 Response to Request for Additional Information Regarding Proposed Alternative to ASME Boiler & Pressure Vessel Code Section XI Requirements for Repair/Replacement of Service Water (SW) System Buried Piping RA-21-0063, 1, 2; Catawba Nuclear Station 1, 2; H. B. Robinson Steam Electric Plant 2; Mcgguire Nuclear Station 1, 2; Oconee Nuclear Station 1, 2, 3; Shearon Harris Nuclear Power Plant 1 - Response to RAI Re Amend for Emergency Plan2021-03-11011 March 2021 1, 2; Catawba Nuclear Station 1, 2; H. B. Robinson Steam Electric Plant 2; Mcgguire Nuclear Station 1, 2; Oconee Nuclear Station 1, 2, 3; Shearon Harris Nuclear Power Plant 1 - Response to RAI Re Amend for Emergency Plan RA-21-0032, Duke Energy - Response to Requests for Additional Info for Request to Use a Provision of Later Edition & Addenda of the ASME Boiler & Pressure Vessel Code, Section XI for Repair/Replacement Activities in Accordance with 10 CFR 50.55a(g)(42021-02-11011 February 2021 Duke Energy - Response to Requests for Additional Info for Request to Use a Provision of Later Edition & Addenda of the ASME Boiler & Pressure Vessel Code, Section XI for Repair/Replacement Activities in Accordance with 10 CFR 50.55a(g)(4)( RA-20-0364, 1 & 2 - Response to RAI for License Amendment Request to Modify Approved 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors Categorization Process2020-11-24024 November 2020 1 & 2 - Response to RAI for License Amendment Request to Modify Approved 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors Categorization Process RA-20-0324, Response to Request for Additional Information for Proposed Alternative for RPV Nozzle-to-Vessel Weld and Inner Radii Examination Requirements2020-10-27027 October 2020 Response to Request for Additional Information for Proposed Alternative for RPV Nozzle-to-Vessel Weld and Inner Radii Examination Requirements RA-19-0380, Response to Request for Additional Information Regarding Advanced Framatome Methodologies License Amendment Request2019-10-17017 October 2019 Response to Request for Additional Information Regarding Advanced Framatome Methodologies License Amendment Request RA-19-0295, Response to Request for Additional Information - License Amendment Request to Revise Units 1 & 2 Technical Specification 5.5.12 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies2019-07-25025 July 2019 Response to Request for Additional Information - License Amendment Request to Revise Units 1 & 2 Technical Specification 5.5.12 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies RA-19-0241, Response to Request for Additional Information Regarding Advanced Framatome Methodologies License Amendment Request2019-06-18018 June 2019 Response to Request for Additional Information Regarding Advanced Framatome Methodologies License Amendment Request RA-19-0240, Response to Request for Additional Information Regarding Advanced Framatome Methodologies License Amendment Request2019-05-29029 May 2019 Response to Request for Additional Information Regarding Advanced Framatome Methodologies License Amendment Request RA-19-0217, Supplement to Response to Request for Additional Information - Application to Revise Technical Specifications to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery ...2019-05-16016 May 2019 Supplement to Response to Request for Additional Information - Application to Revise Technical Specifications to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery ... RA-19-0152, Response to NRC Request for Additional Information (RAI) Regarding Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures,Systems, and Components (Sscs) for Nuclear Power Reactors.2019-04-0808 April 2019 Response to NRC Request for Additional Information (RAI) Regarding Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures,Systems, and Components (Sscs) for Nuclear Power Reactors. RA-19-0150, Response to Request for Additional Information - Request for License Amendment - Technical Specification 3.3.8.1, Loss of Power (LOP) Instrumentation2019-04-0303 April 2019 Response to Request for Additional Information - Request for License Amendment - Technical Specification 3.3.8.1, Loss of Power (LOP) Instrumentation RA-19-0010, Response to NRC RAI Re Application to Adapt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors2019-02-13013 February 2019 Response to NRC RAI Re Application to Adapt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors RA-19-0089, Response to Request for Additional Information - Application to Revise Technical Specifications to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure...2019-02-0808 February 2019 Response to Request for Additional Information - Application to Revise Technical Specifications to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure... RA-18-0246, Revised Response to Request for Additional Information: Request for License Amendment to Revise the Technical Specifications to Relocate the Pressure- Temperature Limit Curves to a Pressure & Temperature ..2018-12-11011 December 2018 Revised Response to Request for Additional Information: Request for License Amendment to Revise the Technical Specifications to Relocate the Pressure- Temperature Limit Curves to a Pressure & Temperature .. RA-18-0178, Response to NRC Request for Additional Information (RAI) Regarding Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components (Sscs) for ...2018-11-0202 November 2018 Response to NRC Request for Additional Information (RAI) Regarding Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components (Sscs) for ... RA-18-0100, Request for License Amendment Regarding Application of Advanced Framatome Methodologies2018-10-11011 October 2018 Request for License Amendment Regarding Application of Advanced Framatome Methodologies RA-18-0144, Response to March 12, 2012, Request for Information Enclosure 2, Recommendation 2.1, Flooding, Required Response 3, Flooding Focused Evaluation Summary Report2018-09-27027 September 2018 Response to March 12, 2012, Request for Information Enclosure 2, Recommendation 2.1, Flooding, Required Response 3, Flooding Focused Evaluation Summary Report RA-18-0163, Response to Request for Additional Information - Request for License Amendment to Revise the Technical Specifications to Relocate the Pressure-Temperature Limit Curves to a Pressure and Temperature Limits Report2018-09-27027 September 2018 Response to Request for Additional Information - Request for License Amendment to Revise the Technical Specifications to Relocate the Pressure-Temperature Limit Curves to a Pressure and Temperature Limits Report BSEP 18-0054, Response to Request for Additional Information Regarding Inservice Inspection Program Proposed Alternative ISI-09 in Accordance with 10 CFR 50.55a(z)(1) Regarding Reactor Pressure Vessel Circumferential.2018-04-24024 April 2018 Response to Request for Additional Information Regarding Inservice Inspection Program Proposed Alternative ISI-09 in Accordance with 10 CFR 50.55a(z)(1) Regarding Reactor Pressure Vessel Circumferential. BSEP 18-0048, Response to Request for Additional Information Regarding Inservice Inspection Program Proposed Alternative ISI-09 in Accordance with 10 CFR 50.55a(z)(1) Regarding Reactor Pressure Vessel Circumferential Shell Weld Examinations2018-04-11011 April 2018 Response to Request for Additional Information Regarding Inservice Inspection Program Proposed Alternative ISI-09 in Accordance with 10 CFR 50.55a(z)(1) Regarding Reactor Pressure Vessel Circumferential Shell Weld Examinations BSEP 18-0046, Supplement to Response to Request for Additional Information SRXB-RAI-2 Regarding Request for License Amendment Regarding Core Flow Operating Range Expansion2018-04-10010 April 2018 Supplement to Response to Request for Additional Information SRXB-RAI-2 Regarding Request for License Amendment Regarding Core Flow Operating Range Expansion BSEP 18-0035, Response to Request for Additional Information Regarding Request for License Amendment Regarding Core Flow Operating Range Expansion2018-03-29029 March 2018 Response to Request for Additional Information Regarding Request for License Amendment Regarding Core Flow Operating Range Expansion ML18075A3302018-03-0101 March 2018 Response to Request for Additional Information SNPB-RAI-2 Regarding Request for License Amendment Regarding Core Flow Operating Range Expansion (CAC Nos. MF8864 and MF8865) BSEP 18-0021, Response to Request for Additional Information Regarding Request for License Amendment Regarding Core Flow Operating Range Expansion (CAC Nos. MF8864 and MF8865). Without Proprietary Enclosure2018-02-0505 February 2018 Response to Request for Additional Information Regarding Request for License Amendment Regarding Core Flow Operating Range Expansion (CAC Nos. MF8864 and MF8865). Without Proprietary Enclosure BSEP 17-0115, Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control2018-01-0404 January 2018 Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control BSEP 17-0118, Supplement to Response to Request for Additional Information Regarding Request for Risk-Informed Exigent License Amendment - Technical Specification 3.8.1, AC Sources - Operating, One-Time Extension of Emergency Diesel..2017-12-0707 December 2017 Supplement to Response to Request for Additional Information Regarding Request for Risk-Informed Exigent License Amendment - Technical Specification 3.8.1, AC Sources - Operating, One-Time Extension of Emergency Diesel.. BSEP 17-0117, Response to Request for Additional Information (Probabilistic Risk Assessment and Human Performance Branches) Regarding Request for Risk-Informed Exigent License Amendment - Technical Specification 3.8.1 AC Sources..2017-12-0606 December 2017 Response to Request for Additional Information (Probabilistic Risk Assessment and Human Performance Branches) Regarding Request for Risk-Informed Exigent License Amendment - Technical Specification 3.8.1 AC Sources.. BSEP 17-0116, Response to Request for Additional Information Regarding Request for Risk- Informed Exigent License Amendment - Technical Specification 3.8.1, AC Sources - Operating, One-Time Extension of ..2017-12-0404 December 2017 Response to Request for Additional Information Regarding Request for Risk- Informed Exigent License Amendment - Technical Specification 3.8.1, AC Sources - Operating, One-Time Extension of .. BSEP 17-0109, Response to Request for Additional Information Regarding Request for Emergency License Amendment - Technical Specification 3.8.1, AC Sources - Operating, One-Time Extension of Emergency Diesel Generator Completion Times And.2017-11-24024 November 2017 Response to Request for Additional Information Regarding Request for Emergency License Amendment - Technical Specification 3.8.1, AC Sources - Operating, One-Time Extension of Emergency Diesel Generator Completion Times And. RA-17-0039, Response to Request for Additional Information (RAI) Regarding 10 CFR 50.55a(z)(1)Proposed Alternative to ASME Section XI Threads in Flange Examination (17-GO-001)2017-08-0909 August 2017 Response to Request for Additional Information (RAI) Regarding 10 CFR 50.55a(z)(1)Proposed Alternative to ASME Section XI Threads in Flange Examination (17-GO-001) BSEP 17-0048, Clarification of Responses for Requests for Additional Information, License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-423, Revision 1, Technical Specification End States..2017-05-24024 May 2017 Clarification of Responses for Requests for Additional Information, License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-423, Revision 1, Technical Specification End States.. BSEP 17-0029, Response to Request for Additional Information Regarding Request for License Amendment Regarding Core Flow Operating Range Expansion2017-04-0606 April 2017 Response to Request for Additional Information Regarding Request for License Amendment Regarding Core Flow Operating Range Expansion BSEP 17-0026, Response to Request for Additional Information, License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-423,Revision 1, Technical Specifications End States, NEDC-32988-A.2017-03-25025 March 2017 Response to Request for Additional Information, License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-423,Revision 1, Technical Specifications End States, NEDC-32988-A. BSEP 17-0019, Enclosure 2 - Response to Request for Additional Information Regarding License Amendment Request for Reactor Protection System (RPS) Electrical Protection Assembly (EPA) Electric Power Monitoring Surveillance Requirements (Srs) 3.3.8.2.2017-03-0101 March 2017 Enclosure 2 - Response to Request for Additional Information Regarding License Amendment Request for Reactor Protection System (RPS) Electrical Protection Assembly (EPA) Electric Power Monitoring Surveillance Requirements (Srs) 3.3.8.2.2 an ML17087A2632017-03-0101 March 2017 Response to Request for Additional Information Regarding License Amendment Request for Reactor Protection System (RPS) Electrical Protection Assembly (EPA) Electric Power Monitoring Surveillance... BSEP 16-0113, High Frequency Supplement to Seismic Hazard Screening Report, Response to Nrg Request for Information Regarding Recommendation 2.1 of Near-Term Task Force Review of Insights from Fukushima Dai-ichi Accident2016-12-15015 December 2016 High Frequency Supplement to Seismic Hazard Screening Report, Response to Nrg Request for Information Regarding Recommendation 2.1 of Near-Term Task Force Review of Insights from Fukushima Dai-ichi Accident BSEP 16-0104, Spent Fuel Pool Evaluation Supplemental Report, Response to NRC Request for Information Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-lchi Accident2016-12-15015 December 2016 Spent Fuel Pool Evaluation Supplemental Report, Response to NRC Request for Information Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-lchi Accident BSEP 16-0112, (Bsep), Unit Nos. 1 and 2 - Individual Plant Examination of External Events (IPEEE) Supplement to Seismic Hazard Screening Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding ...2016-12-15015 December 2016 (Bsep), Unit Nos. 1 and 2 - Individual Plant Examination of External Events (IPEEE) Supplement to Seismic Hazard Screening Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding ... BSEP 16-0109, Response to Request for Additional Information, Revision to Requested Implementation Schedule, and Status Update - License Amendment Request Regarding Relocation of Specific Surveillance Frequency Requirements to Licensee-2016-11-17017 November 2016 Response to Request for Additional Information, Revision to Requested Implementation Schedule, and Status Update - License Amendment Request Regarding Relocation of Specific Surveillance Frequency Requirements to Licensee- BSEP 16-0101, Response to Request for Supplemental Information for License Amendment Request Regarding Core Flow Operating Range Expansion2016-11-0909 November 2016 Response to Request for Supplemental Information for License Amendment Request Regarding Core Flow Operating Range Expansion ML16330A5052016-11-0909 November 2016 Response to Request for Supplemental Information in Support of MELLLA + LAR, Non-Proprietary Information - Class I (Public) BSEP 16-0100, Clarification of Responses for Requests for Additional Information License Amendment Request for Relocation of Specific Surveillance Frequency Requirements to a Licensee-Controlled Program2016-11-0101 November 2016 Clarification of Responses for Requests for Additional Information License Amendment Request for Relocation of Specific Surveillance Frequency Requirements to a Licensee-Controlled Program RA-16-0035, Response to Request for Additional Information (RAI) Regarding Application for Emergency Operations Facility (EOF) Consolidation2016-10-0303 October 2016 Response to Request for Additional Information (RAI) Regarding Application for Emergency Operations Facility (EOF) Consolidation BSEP 16-0070, Response to Request for Additional Information Regarding License Amendment Request to Relocation of Specific Surveillance Frequency Requirements to a Licensee-Controlled Program2016-08-15015 August 2016 Response to Request for Additional Information Regarding License Amendment Request to Relocation of Specific Surveillance Frequency Requirements to a Licensee-Controlled Program BSEP 16-0072, Response to Request for Additional Information Regarding License Amendment Request to Relocation of Specific Surveillance Frequency Requirements to a Licensee-Controlled Program2016-08-0404 August 2016 Response to Request for Additional Information Regarding License Amendment Request to Relocation of Specific Surveillance Frequency Requirements to a Licensee-Controlled Program 2023-08-18
[Table view] |
Text
William R. Gideon Vice President Brunswick Nuclear Plant P.O. Box 10429 Southport, NC 28461 o: 910.457.3698 April 6, 2017 Serial: BSEP 17-0029 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001
Subject:
Brunswick Steam Electric Plant, Unit Nos. 1 and 2 Renewed Facility Operating License Nos. DPR-71 and DPR-62 Docket Nos. 50-325 and 50-324 Response to Request for Additional Information Regarding Request for License Amendment Regarding Core Flow Operating Range Expansion (CAC Nos. MF8864 and MF8865)
Reference:
- 1. Letter from William R. Gideon (Duke Energy) to the U.S. Nuclear Regulatory Commission Document Control Desk, Request for License Amendment Regarding Core Flow Operating Range Expansion, dated September 6, 2016, ADAMS Accession Number ML16257A410
- 2. NRC E-mail Capture, Brunswick Unit 1 and Unit 2 Request for Additional Information related Containment Accident Pressure in the MELLLA+ LAR (CACs MF8864 and MF8865), dated March 9, 2017, ADAMS Accession Number ML17082A304 Ladies and Gentlemen:
By letter dated September 6, 2016 (i.e., Reference 1), Duke Energy Progress, LLC (Duke Energy), submitted a license amendment request (LAR) for the Brunswick Steam Electric Plant (BSEP), Unit Nos. 1 and 2. The proposed amendment would expand the core power-flow operating range (i.e., Maximum Extended Load Line Limit Analysis Plus (MELLLA+)).
On March 9, 2017, by electronic mail (i.e., Reference 2), the NRC provided a request for additional information (RAI) regarding the LAR. Duke Energy's response is provided in the enclosure of this letter.
No regulatory commitments are contained in this letter.
Please refer any questions regarding this submittal to Mr. Lee Grzeck, Manager - Regulatory Affairs, at (910) 457-2487.
U.S. Nuclear Regulatory Commission Page 2 of 2 I declare, under penalty of perjury, that the foregoing is true and correct. Executed on s: v April 6, 2017.
William R. Gideon WRM/wrm
Enclosure:
NRC Response to Request for Additional Information SRXB-C-RAl-1 cc (with enclosure):
U.S. Nuclear Regulatory Commission, Region II ATTN: Ms. Catherine Haney, Regional Administrator 245 Peachtree Center Ave, NE, Suite 1200 Atlanta, GA 30303-1257 U.S. Nuclear Regulatory Commission ATTN: Mr. Andrew Hon (Mail Stop OWFN 8G9A) (Electronic Copy Only) 11555 Rockville Pike Rockville, MD 20852-2738 Andrew.Hon@nrc.gov U.S. Nuclear Regulatory Commission ATTN: Ms. Michelle P. Catts, NRC Senior Resident Inspector 8470 River Road Southport, NC 28461-8869 Chair - North Carolina Utilities Commission (Electronic Copy Only) 4325 Mail Service Center Raleigh, NC 27699-4300 swatson@ncuc.net Mr. W. Lee Cox, Ill, Section Chief (Electronic Copy Only)
Radiation Protection Section North Carolina Department of Health and Human Services 1645 Mail Service Center Raleigh, NC 27699-1645 lee.cox@dhhs.nc.gov
BSEP 17-0029 Enclosure Page 1 of 4 NRC Request for Additional Information SRXB-C-RAI-1 Regulatory Basis:
10 CFR 50 Appendix A, Criterion 38, Containment heat removal
Background:
Reference 2 states that the Brunswick Steam Electric Plant (BSEP) Units 1 and 2 depend on the Containment Accident Pressure (CAP) developed during postulated accidents for assuring a positive Net Positive Suction Head (NPSH) margin for the Emergency Core Cooling System (ECCS) and the containment heat removal system pumps. In a letter dated May 31, 2002, the Nuclear Regulatory Commission (NRC) staff Safety Evaluation Report (SER) for the Extended Power Uprate (EPU) for BSEP, Units 1 and 2 (i.e., Amendment No. 222 to Facility Operating License No. DPR-71 and Amendment No. 247 to Facility Operating License No. DPR-62) approved use of CAP of up to 5.0 psig for NPSH requirements from the available post-LOCA containment pressure of 11.3 psig at EPU conditions. Subsequent to issuance of the SER for EPU, the NRC staff issued SECY-11-0014 (Reference 7) for addressing the Advisory Committee for Reactor Safeguards (ACRS) concerns for the use of CAP. Enclosure 1, (Reference 8) of SECY-11-0014, Section 6.0 provides staff guidance on the use of CAP in determining the NPSH margins of ECCS and containment heat removal system pumps.
Requested additional information:
Since the BSEP Units 1 and 2 use CAP for assuring positive NPSH margins for the ECCS and the containment heat removal system pumps, the guidance in SECY-11-0014 is applicable for quantifying NPSH margins and supersedes the previously approved use of CAP in which the margins were not quantified. Sections 6.6.3 and Section 6.6.9 of Enclosure 1 (Reference 8) of SECY-11-0014 states:
A 95/95 lower tolerance limit should be used to calculate the containment accident pressure used to determine the NPSHa [NPSH available].
A realistic calculation of NPSHa should be performed to compare with the NPSHa determined from the Monte Carlo 95/95 calculation.
The licensee has not addressed Section 6.6.3 and 6.6.9 of Enclosure 1 (Reference 8) of SECY-11-0014. Specifically, the statistical analysis proposed by the Boiling Water Reactor Owners Group (BWROG) described in References 3 and 4, approved by NRC in Reference 5 and 6, has not been performed by the licensee to demonstrate and quantify NPSH margin for the postulated design basis Loss of Coolant Accident (LOCA) in the Analysis of Record (AOR).
Please provide the statistical analysis as described in Reference 4 to satisfactorily address the criteria in Sections 6.6.3 and 6.6.9 in Reference 8.
The licensee may note the Monticello EPU and Maximum Extended Load Line Limit Analysis Plus (MELLLA+) CAP document (Reference 9) as a precedent which addressed all criteria of Section 6.6 of Reference 8 including performing the statistical analysis described in Sections 6.6.3 and 6.6.9.
BSEP 17-0029 Enclosure Page 2 of 4
References:
- 1. Letter from Duke Energy to NRC dated September 6, 2016, Brunswick Steam Electric Plant, Unit Nos. 1 and 2 Renewed Facility Operating License Nos. DPR-71 and DPR-62 Docket Nos. 50-325 and 50-324 Request for License Amendment Regarding Core Flow Operating Range Expansion, (ADAMS Accession Number ML16257A410)
- 2. Enclosure 11 to Reference 1, SECY-11-0014 Discussion - Use of Containment Accident Pressure (CAP) in Analyzing ECCS and Containment Heat Removal System Pump Performance, (ADAMS Accession Number ML16257A411)
- 3. BWROG letter to NRC dated November 21, 2014, Submittal of Revised BWROG Topical Reports NEDC-33347P Revision 1 (Proprietary Version) and NEDO-33347 Revision 1 (Non-Proprietary Version), "Containment Overpressure Credit for Net Positive Suction Head (NPSH), (ADAMS Accession number ML14325A626)
- 4. Attachment 1 to Reference 1, NEDC-33347P Revision 1 Proprietary Version Containment Overpressure Credit for Net Positive Suction Head (NPSH), (ADAMS Accession Number ML14325A625)
- 5. Letter from NRC to BWROG dated December 21, 2016, Final Safety Evaluation for Boiling Water Reactor Owners Group Topical Report NEDC-33347P/NEDO-33347, Revision 1, Containment Overpressure Credit for Net Positive Suction Head (NPSH)
(CAC No. Mf6708), (ADAMS Accession Number ML16351A176)
- 6. Enclosure to Reference 5, U.S. Nuclear Regulatory Commission Final Safety Evaluation for Topical Report NEDC-33347P/NEDO-33347, Revision 1, Containment Overpressure Credit For Net Positive Suction Head (NPSH) CAC NO. MF6708, (ADAMS Accession Number ML16351A179)
- 7. SECY 11-0014, Use of Containment Accident Pressure in Analyzing Emergency Core Cooling System and Containment Heat Removal System Pump Performance in Postulated Accidents, (ADAMS Accession Number ML1025901961)
- 8. Enclosure 1 to SECY-11-0014, The Use of Containment Accident Pressure in Reactor Safety Analysis ADAMS ML102110167, (ADAMS Accession Number ML102110167)
- 9. Letter from Northern States Power Company to NRC dated September 28, 2012, Monticello Extended Power Uprate and Maximum Extended Load Line Limit Analysis Plus License Amendment Requests: Supplement to Address SECY 11-0014 Use of Containment Accident Pressure (TAC Nos. MD9990 and ME3145),(ADAMS Accession Number ML12276A057)
Response
In response to the Nuclear Regulatory Commission's (NRC) ongoing review of the Duke Energy Progress, LLC (Duke Energy) license amendment request (LAR) for the Brunswick Steam Electric Plant (BSEP), Unit Nos. 1 and 2 (i.e., Reference 1), Duke Energy is providing the following information to address the NRC's request for additional information (RAI) on 1 of the submittal. The RAI is related to Duke's discussion of criteria 6.6.3 and 6.6.9 of Enclosure 1 of SECY-11-0014 (i.e., Reference 2).
As part of the BSEP Extended Power Uprate (EPU), a credit for containment overpressure of up to 5 psig was approved, in May 2002, by the NRC (i.e., Reference 3) for evaluating low pressure Emergency Core Cooling System (ECCS) pump net positive suction head (NPSH). The results of the NPSH evaluation for EPU conditions are discussed in BSEP Updated Final Safety
BSEP 17-0029 Enclosure Page 3 of 4 Analysis Report (UFSAR), Section 6.3.2.2.5. This section reflects the BSEP Analysis of Record (AOR) for ECCS NPSH. As discussed in UFSAR Section 6.3.2.2.5.2, "the maximum required overpressure needed to ensure NPSH is 2.65 psig, with 11.3 psig containment overpressure available. In all cases, the available containment overpressure is in excess of three times the amount required to ensure adequate NPSH."
The generic disposition of the ECCS NPSH topic in the MELLLA+ License Topical Report (i.e.,
Reference 4) describes that the MELLLA+ operating domain expansion does not result in an increase in the heat addition to the suppression pool following a LOCA. As discussed in Sections 3.9.3 and 4.2.6 of Enclosure 5 of Duke Energy's MELLLA+ submittal (i.e.,
Reference 1), consistent with the generic disposition (i.e., Reference 4), BSEP operation in the MELLLA+ domain has no negative impact on ECCS NPSH.
No new or increased credit for Containment Accident Pressure (CAP) is requested for assuring NPSH margins are acceptable. In contrast to the Monticello CAP analysis, which was provided due to an increase in the temperature, pressure, flow or mechanical loads due to EPU or MELLLA+, the BSEP NPSH analysis is unaffected by MELLLA+ as described in the MELLLA+
LAR. Therefore, applying the SECY-11-0014 criteria to the ECCS NPSH AOR is not required.
It is Duke Energys position that the guidance in SECY-11-0014 does not supersede the previously approved use of CAP for BSEP. Specifically, the SECY itself states as option 1 (i.e.,
option 1 as later adopted by the NRC Commissioners):
The staff resumes work on EPU applications. The staffs evaluation of current EPU applications, as well as future applications for new or increased credit for CAP, would be consistent with staff practice in implementing the current risk review guidance (SRP Section 19.2), including the review of nonrisk-informed applications such as EPUs (Appendix D of SRP Section 19.2) and the recently-developed deterministic guidance based on ACRS recommendations to include uncertainty and margins in CAP calculations. The staff would not further consider the issue of CAP credit, per se, as a generic safety matter. The staff will update the regulatory guidance to remove the specific guidance disfavoring the use of CAP in determining NPSH margin. [Emphasis Added]
Therefore, MELLLA+ has no adverse impact on ECCS NPSH and SECY-11-0014 does not supersede BSEPs previously approved use of CAP.
At a meeting with the NRC on January 8, 2013 (i.e., Reference 5), the use of the "new uncertainty methods" for the NPSH analyses associated with MELLLA+ were discussed for the purpose of confirming the suitability of the existing 5 psig CAP credit. In the BSEP response to SECY criterion 1, included with Enclosure 11 of the MELLLA+ submittal (i.e., Reference 1), the vendor-supplied NPSHR value was increased by 21% to perform the NPSH margin calculations for the Design Basis Accident-Loss of Coolant Accident (DBA-LOCA). The results of the analysis are discussed in Enclosure 11 of the MELLLA+ submittal and demonstrate that NPSH margin existed for all cases with the most limiting case providing a minimum margin of 1.1 feet for Residual Heat Removal (RHR) and 0.6 feet for Core Spray (CS) pumps. Although the Reference 5 meeting notes only address the 21% margin, Duke Energy elected to evaluate key SECY-11-004 criteria in a manner that demonstrates no additional CAP is needed after applying the SECY guidance.
BSEP 17-0029 Enclosure Page 4 of 4 The specific RAI states that Sections 6.6.3 and 6.6.9 of Enclosure 1 of SECY-11-0014 were not addressed in Enclosure 11 of the MELLLA+ submittal (i.e., Reference 1) and requests that the statistical 95/95 analysis be performed as outlined in SECY-11-0014. These sections of SECY-11-0014, Enclosure 1, are interrelated in that Section 6.6.3 specifies that a 95/95 lower tolerance limit be used to calculate the containment accident pressure used to determine NPSHA and that Section 6.6.9 specifies that a realistic calculation of NPSHA be performed and compared to the 95/95 calculation. Though a 95/95 calculation was not performed for 1 of the MELLLA+ submittal, the NPSH margin demonstrated by the realistic analysis relative to the conservative analysis and the BSEP design basis containment analysis allows an appropriate comparison for satisfying the SECY-11-0014, Enclosure 1, Section 6.6.9 criteria of demonstrating margins. Furthermore, the wetwell pressure response from the realistic model demonstrated significant margin, with the calculated available containment overpressure in excess of two times the 5 psi CAP used in the NPSH margin calculations.
In conclusion, MELLLA+ has no adverse impact on ECCS NPSH and SECY-11-0014 does not supersede BSEPs previously approved use of CAP. Duke Energy elected to evaluate key criteria from SECY-2011-14 as a confirmation that no additional CAP is needed after applying SECY-11-0014 guidance. The margins demonstrated in these evaluations, as presented in 1 of the MELLLA+ LAR submittal (i.e., Reference 1), satisfy this purpose without further evaluation.
References:
- 1. Letter from William R. Gideon (Duke Energy) to U.S. Nuclear Regulatory Commission, Brunswick Steam Electric Plant, Unit Nos. 1 and 2 Renewed Facility Operating License Nos. DPR-71 and DPR-62 Docket Nos. 50-325 and 50-324 Request for License Amendment Regarding Core Flow Operating Range Expansion, dated September 6, 2016, ADAMS Accession No. ML16257A410
- 2. SECY-11-0014, Use of Containment Accident Pressure in Analyzing Emergency Core Cooling System and Containment Heat Removal System Pump Performance in Postulated Accidents, dated January 31, 2011, ADAMS Accession No. ML102590196
- 3. Letter from Brenda L. Mozafari (NRC) to John S. Keenan (CP&L), Brunswick Steam Electric Plant, Units 1 and 2 - Issuance of Amendment Re: Extended Power Uprate (TAC Nos. MB2700 and MB2701), May 31, 2002, ADAMS Accession No. ML021430551
- 4. GE Hitachi Nuclear Energy, General Electric Boiling Water Reactor Maximum Extended Load Line Limit Analysis Plus, NEDC-33006P-A, Revision 3, June 2009
- 5. Letter from Christopher Gratton (NRC) to Carolina Power & Light Company, Summary of January 8, 2013 Meeting with Duke Energy Carolinas to Discuss Planned Amendment Requests at Brunswick Steam Electric Plants Units 1 and 2 (TAC Nos. MF0359 and MF0360), dated January 17, 2013, ADAMS Accession No. ML13016A014