ML070990023

From kanterella
Revision as of 03:27, 13 July 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search

Technical Specifications, Changes Surveillance Requirement (SR) 3.5.2.6
ML070990023
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 04/04/2007
From: Chandu Patel
NRC/NRR/ADRO/DORL/LPLII-2
To: Walt T
Carolina Power & Light Co
Patel C, NRR/DORL/LPL2-2, 415-3025
Shared Package
ML070810258 List:
References
TAC MD2180
Download: ML070990023 (2)


Text

-3-neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required;D. Pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess, and use in amounts as required any byproduct, source, or special-nuclear material without restriction to chemical or physical form for sample analysis or instrument and equipment calibration or associated with radioactive apparatus or components; E. Pursuant to the Act and 10 CFR Parts 30 and 70, to possess, but not separate, such'byproduct and special nuclear materials as may be produced by operation of the facility.3. This renewed license shall be deemed to contain and is subject to the conditions specified in the following Commission regulations:

10 CFR Part 20, Section 30.34 of 10 CFR Part 30, Section 40.41 of 10 CFR Part 40, Section 50.54 and 50.59 of 10 CFR Part 50, and Section 70.32 of 10 CFR Part 70; and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below: A. Maximum Power Level The licensee is authorized to operate the facility at a steady state reactor core power level not in excess of 2339 megawatts thermal.B. Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 213 are hereby incorporated in the license.The license shall operate the facility in accordance with the Technical Specifications.

(1) For Surveillance Requirements (SRs) that are new in Amendment 176 to Final Operating License DPR-23, the first performance is due at the end of the first surveillance interval that begins at implementation of Amendment 176. For SRs that existed prior to Amendment 176, including SRs with modified acceptance criteria and SRs whose frequency of performance is being extended, the first performance is due at the end of the first surveillance interval that begins on the date the Surveillance was last performed prior to implementation of Amendment 176.Renewed Facility Operating License No. DPR-23 Amendment No. 213 ECCS-Operating 3.5.2 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY SR 3.5.2.3 Verify each ECCS pump's developed head at In accordance the test flow point is greater than or with the equal to the required developed head. Inservice Testing Program SR 3.5.2.4 Verify each ECCS automatic valve in the 18 months flow path that is not locked, sealed, or otherwise secured in position, actuates to the correct position on an actual or simulated actuation signal.SR 3.5.2.5 Verify each ECCS pump starts automatically 18 months on an actual or simulated actuation signal.SR 3.5.2.6 Verify, by visual inspection, the ECCS 18 months containment sump suction inlet is not restricted by debris and the suction inlet strainers show no evidence of structural distress or abnormal corrosion.(continued)

HBRSEP Unit No. 2 3.5-6 Amendment No. 2U