MONTHYEARRNP-RA/08-0124, Response to Request for Additional Information NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors2008-12-17017 December 2008 Response to Request for Additional Information NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors RNP-RA/07-0016, Response to NRC Request for Additional Information Regarding Proposed Technical Specifications Change to Section 3.5.22007-02-22022 February 2007 Response to NRC Request for Additional Information Regarding Proposed Technical Specifications Change to Section 3.5.2 ML0901504242004-08-25025 August 2004 Progress Energy Carolinas, Inc., Handouts for the Brunswick and H.B. Robinson NPP Tours During the Shearon Harris Scol Environmental Site Audit of Alternative Sites ML0223300802002-08-14014 August 2002 Drawing HBR2-8255LR, Fire Protection System Flow Diagram. Sheet 6 of 6 ML0223300782002-08-14014 August 2002 Drawing HBR2-8255LR, Fire Protection System Deluge & Pre-Action Control Valve Flow Diagram. Sheet 5 of 6 ML0223300752002-08-14014 August 2002 Drawing HBR2-8255LR, Fire Protection System Deluge & Pre-Action Control Valve Flow Diagram. Sheet 4 of 6 ML0223300702002-08-14014 August 2002 Drawing HBR2-8255LR, Fire Protection System Containment Flow Diagram. Sheet 3 of 6 ML0223300662002-08-14014 August 2002 Drawing HBR2-8255LR, Fire Protection System Flow Diagram. Sheet 2 of 6 ML0223300612002-08-14014 August 2002 Drawing HBR2-8255LR, Fire Protection Intake Structure Flow Diagram. Sheet 1 of 6 2008-12-17
[Table view] Category:Letter type:RNP
MONTHYEARRNP-RA/21-0035, Duke Energy Progress, Inc - Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report2021-02-18018 February 2021 Duke Energy Progress, Inc - Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report RNP-RA/20-0234, Independent Spent Fuel Storage Installation, Registration of Use of Spent Fuel Casks2020-07-23023 July 2020 Independent Spent Fuel Storage Installation, Registration of Use of Spent Fuel Casks RNP-RA/20-0199, Registration of Use of Spent Fuel Casks2020-06-25025 June 2020 Registration of Use of Spent Fuel Casks RNP-RA/18-0063, Request for Extension of Due Date for Seismic Probabilistic Risk Assessment Submittal2018-11-29029 November 2018 Request for Extension of Due Date for Seismic Probabilistic Risk Assessment Submittal RNP-RA/18-0060, Transmittal of Core Operating Limits Report2018-10-17017 October 2018 Transmittal of Core Operating Limits Report RNP-RA/18-0050, Response to Supplemental Request for Additional Information Regarding License Amendment Request Proposing to Add a Qualified Offsite Circuit to Technical Specification 3.8.1, AC Sources - Operating and the Use of Load Tap Change2018-08-0101 August 2018 Response to Supplemental Request for Additional Information Regarding License Amendment Request Proposing to Add a Qualified Offsite Circuit to Technical Specification 3.8.1, AC Sources - Operating and the Use of Load Tap Change RNP-RA/18-0044, Supplement to License Amendment Request Proposing to Add a Qualified Offsite Circuit to Technical Specification 3.8.1, AC Sources - Operating and the Use of Load Tap Changers in the Automatic Mode of Operation on the Startup Transform2018-07-11011 July 2018 Supplement to License Amendment Request Proposing to Add a Qualified Offsite Circuit to Technical Specification 3.8.1, AC Sources - Operating and the Use of Load Tap Changers in the Automatic Mode of Operation on the Startup Transformers RNP-RA/18-0039, Transmittal of Emergency Procedure Revisions and 10 CFR 50.54(q) Summary of Analysis2018-06-27027 June 2018 Transmittal of Emergency Procedure Revisions and 10 CFR 50.54(q) Summary of Analysis RNP-RA/18-0041, Independent Spent Fuel Storage Installation - Register as User for Cask2018-06-13013 June 2018 Independent Spent Fuel Storage Installation - Register as User for Cask RNP-RA/18-0036, Response to Request for Additional Information (RAI) Regarding Amendment Request Proposing to Add a Qualified Offsite Circuit to Technical Specification 3.8.1, AC Sources - Operating and the Use ...2018-05-16016 May 2018 Response to Request for Additional Information (RAI) Regarding Amendment Request Proposing to Add a Qualified Offsite Circuit to Technical Specification 3.8.1, AC Sources - Operating and the Use ... RNP-RA/18-0029, Submittal of 2017 Annual Radiological Environmental Operating Report2018-05-0808 May 2018 Submittal of 2017 Annual Radiological Environmental Operating Report RNP-RA/18-0031, (Hbrsep), Unit 2 - 2017 Annual Radioactive Effluent Release Report and Offsite Dose Calculation Manual, Revision 352018-04-23023 April 2018 (Hbrsep), Unit 2 - 2017 Annual Radioactive Effluent Release Report and Offsite Dose Calculation Manual, Revision 35 RNP-RA/18-0015, Application for Technical Specifications Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequently Requirements to a Licensee Controlled Program2018-04-16016 April 2018 Application for Technical Specifications Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequently Requirements to a Licensee Controlled Program RNP-RA/18-0024, Report of Changes Pursuant to 10 CFR 50.59(d)(2)2018-04-0202 April 2018 Report of Changes Pursuant to 10 CFR 50.59(d)(2) RNP-RA/18-0020, Notification of Change in Licensed Operator Status2018-02-20020 February 2018 Notification of Change in Licensed Operator Status RNP-RA/18-0003, Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report2018-01-23023 January 2018 Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report RNP-RA/17-0085, Request for Additional Information Regarding Application to Revise Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles2018-01-0808 January 2018 Request for Additional Information Regarding Application to Revise Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles RNP-RA/17-0086, Transmittal of Emergency Procedure Revision and 10 CFR 50.54(q) Summary of Analyses2017-12-14014 December 2017 Transmittal of Emergency Procedure Revision and 10 CFR 50.54(q) Summary of Analyses RNP-RA/17-0081, Submittal of Change in Licensed Operators Medical Status2017-12-11011 December 2017 Submittal of Change in Licensed Operators Medical Status RNP-RA/17-0079, Operator License Renewal Application2017-12-0707 December 2017 Operator License Renewal Application RNP-RA/17-0071, Independent Spent Fuel Storage Installation (ISFSI) Registration for Use of General License Spent Fuel Casks2017-10-19019 October 2017 Independent Spent Fuel Storage Installation (ISFSI) Registration for Use of General License Spent Fuel Casks RNP-RA/17-0068, Response to NRC Request for Additional Information Related to License Amendment Request Regarding Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles2017-09-28028 September 2017 Response to NRC Request for Additional Information Related to License Amendment Request Regarding Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles RNP-RA/17-0037, License Amendment Request Proposing to Add a Qualified Offsite Circuit to Technical Specifications 3.8.1, AC Sources-Operating and the Use of Load Tap Changers in the Automatic Mode of Operation on the Startup Transformers2017-09-27027 September 2017 License Amendment Request Proposing to Add a Qualified Offsite Circuit to Technical Specifications 3.8.1, AC Sources-Operating and the Use of Load Tap Changers in the Automatic Mode of Operation on the Startup Transformers RNP-RA/17-0043, Relief Request (RR)-12 for Relief from Volumetric/Surface Examination Frequency Requirements of ASME Code Case N-729-42017-09-22022 September 2017 Relief Request (RR)-12 for Relief from Volumetric/Surface Examination Frequency Requirements of ASME Code Case N-729-4 RNP-RA/17-0065, Refueling Outage 30 Steam Generator Tube Inspection Report2017-09-18018 September 2017 Refueling Outage 30 Steam Generator Tube Inspection Report RNP-RA/17-0060, Notification of Change in Licensed Operator Status2017-08-10010 August 2017 Notification of Change in Licensed Operator Status RNP-RA/17-0058, Notification of Change in Licensed Operator Status2017-08-0303 August 2017 Notification of Change in Licensed Operator Status RNP-RA/17-0055, Transmittal of Core Operating Limits Report for Cycle 312017-07-26026 July 2017 Transmittal of Core Operating Limits Report for Cycle 31 RNP-RA/17-0042, Submittal of the PWROG-14048-P, Revision 1, to Satisfy the Regulatory Commitment Related to the Pressurized Water Reactor Internals Program Plan for Aging Management of Reactor Internals2017-06-29029 June 2017 Submittal of the PWROG-14048-P, Revision 1, to Satisfy the Regulatory Commitment Related to the Pressurized Water Reactor Internals Program Plan for Aging Management of Reactor Internals RNP-RA/17-0051, Submittal of Nine Day Inservice Inspection Summary Report2017-06-29029 June 2017 Submittal of Nine Day Inservice Inspection Summary Report RNP-RA/17-0041, Transmittal of Technical Specifications Bases Revisions2017-05-23023 May 2017 Transmittal of Technical Specifications Bases Revisions RNP-RA/17-0038, (Hbrsep), Unit No. 2 - 2016 Annual Radiological Environmental Operating Report2017-05-0909 May 2017 (Hbrsep), Unit No. 2 - 2016 Annual Radiological Environmental Operating Report RNP-RA/17-0034, Modification of Request for Technical Specification Change to Change Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles (MF9544)2017-05-0202 May 2017 Modification of Request for Technical Specification Change to Change Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles (MF9544) RNP-RA/17-0036, (Hbrsep), Unit No. 2 - 2016 Annual Radioactive Effluent Release Report and Offsite Dose Calculation Manual, Current Revision 342017-04-25025 April 2017 (Hbrsep), Unit No. 2 - 2016 Annual Radioactive Effluent Release Report and Offsite Dose Calculation Manual, Current Revision 34 RNP-RA/17-0031, Provides Additional Information Regarding License Amendment Request to Adopt Technical Specifications Task Force (TSTF) Traveler 522, Revision 02017-04-20020 April 2017 Provides Additional Information Regarding License Amendment Request to Adopt Technical Specifications Task Force (TSTF) Traveler 522, Revision 0 RNP-RA/17-0033, Flood Hazard Mitigating Strategies Assessment (MSA) Report Submittal2017-04-12012 April 2017 Flood Hazard Mitigating Strategies Assessment (MSA) Report Submittal RNP-RA/17-0014, Resubmittal of Request for Technical Specification Change to Change Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles2017-04-0303 April 2017 Resubmittal of Request for Technical Specification Change to Change Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles RNP-RA/17-0028, Submittal of Engineering Calculation in Support of a Request for Technical Specification Change to Change Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles2017-04-0303 April 2017 Submittal of Engineering Calculation in Support of a Request for Technical Specification Change to Change Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles RNP-RA/17-0021, Transmittal of Core Operating Limits Report2017-03-13013 March 2017 Transmittal of Core Operating Limits Report RNP-RA/17-0019, Supplemental Submittal to Correct Marked Up Technical Specifications (TS) Pages Transmitted with Application for Technical Specification Task Force (TSTF)-339, Relocate TS Parameters to the COLR Consistent with WCAP-14483, Revision 22017-03-0808 March 2017 Supplemental Submittal to Correct Marked Up Technical Specifications (TS) Pages Transmitted with Application for Technical Specification Task Force (TSTF)-339, Relocate TS Parameters to the COLR Consistent with WCAP-14483, Revision 2 RNP-RA/17-0015, Independent Spent Fuel Storage Installations - Letter Regarding Report of Changes Pursuant to 10 CFR 72.482017-02-22022 February 2017 Independent Spent Fuel Storage Installations - Letter Regarding Report of Changes Pursuant to 10 CFR 72.48 RNP-RA/17-0016, Independent Spent Fuel Storage Installation - Annual Radioactive Effluent Release Report2017-02-22022 February 2017 Independent Spent Fuel Storage Installation - Annual Radioactive Effluent Release Report RNP-RA/17-0015, H.B. Robinson Steam Electric Plant & ISFSIs - Report of Changes Pursuant to 10 CFR 72.482017-02-22022 February 2017 H.B. Robinson Steam Electric Plant & ISFSIs - Report of Changes Pursuant to 10 CFR 72.48 RNP-RA/16-0100, Response to Apparent Violation in NRC Inspection Report 05000261/2016404, EA-16-2272017-01-24024 January 2017 Response to Apparent Violation in NRC Inspection Report 05000261/2016404, EA-16-227 RNP-RA/16-0097, Transmittal Letter for Response to Inspection Report Temporary Instruction 2201/004, Inspection of Implementation of Interim Cyber Security Milestones 1-7, Inspection Report 05000261/20154052016-12-15015 December 2016 Transmittal Letter for Response to Inspection Report Temporary Instruction 2201/004, Inspection of Implementation of Interim Cyber Security Milestones 1-7, Inspection Report 05000261/2015405 RNP-RA/16-0089, Request for Withdrawal of License Amendment Request for Change Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles2016-11-10010 November 2016 Request for Withdrawal of License Amendment Request for Change Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles RNP-RA/16-0090, Notification of Rescheduled Date for 2017 Emergency Preparedness Graded Exercise2016-11-10010 November 2016 Notification of Rescheduled Date for 2017 Emergency Preparedness Graded Exercise RNP-RA/16-0087, Technical Specifications Section 5.6.6 Post Accident Monitoring Instrumentation Report for Inoperable High Range Containment Area Radiation Monitors2016-10-31031 October 2016 Technical Specifications Section 5.6.6 Post Accident Monitoring Instrumentation Report for Inoperable High Range Containment Area Radiation Monitors RNP-RA/16-0078, Technical Specifications Section 5.6.6, Post Accident Monitoring Instrumentation Report for Inoperable High Range Containment Area Radiation Monitors2016-10-0505 October 2016 Technical Specifications Section 5.6.6, Post Accident Monitoring Instrumentation Report for Inoperable High Range Containment Area Radiation Monitors RNP-RA/16-0079, Response to Request for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Light Water Reactor Electric Generating Plants.2016-10-0505 October 2016 Response to Request for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Light Water Reactor Electric Generating Plants. 2021-02-18
[Table view] |
Text
10 CFR 50.90 Progress Energy Serial: RNP-RA/07-0016
ýLb 2'2 2007 United States Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261/LICENSE NO. DPR-23 RESPONSE TO NRC REQUEST FOR ADDITIONAL INFORMATION REGARDING PROPOSED TECHNICAL SPECIFICATIONS CHANGE TO SECTION 3.5.2 Ladies and Gentlemen:
In a letter dated June 1, 2006, Carolina Power and Light Company, also known as Progress Energy Carolinas, Inc. (PEC), requested NRC review and approval of a change to the surveillance requirement for the containment sump as described in Technical Specifications Section 3.5.2 for H. B. Robinson Steam Electric Plant (HBRSEP), Unit No. 2. An NRC request for additional information (RAI) pertaining to this amendment request was received by facsimile transmission dated January 30, 2007. Attachment II to this letter provides the response to the
- RAI, Attachment I provides an Affirmation in accordance with the provisions of 10 CFR 50.30(b).
If you have any questions concerning this matter, please contact Mr. C. T. Baucom at (843) 857-1253.
Sincerely, Jan F. Lucas Manager - Support Services - Nuclear Progress Energy Carolinas, Inc.
Robinson Nuclear PlantX A xw 3581 West Entrance Road Hartsville, SC 29550
United States Nuclear Regulatory Commission Serial: RNP-RA/07-0016 Page 2 of 2 JFL/cac Attachments: I. Affirmation II. Response to NRC Request for Additional Information Regarding Proposed Technical Specifications Change to Section 3.5.2 c: Dr. W. D. Travers, NRC, Region II Mr. C. P. Patel, NRC, NRR NRC Resident Inspector
United States Nuclear Regulatory Commission Attachment I to Serial: RNP-RA/07-0016 Page 1 of I AFFIRMATION The information contained in letter RNP-RA/07-0016 is true and correct to the best of my information, knowledge and belief; and the sources of my information are officers, employees, contractors, and agents of Carolina Power and Light Company, also known as Progress Energy Carolinas, Inc. I declare under penalty of perjury that the foregoing is true and correct.
Executed On:
Thomas D. Walt Vice President, HBRSEP, Unit No. 2
United States Nuclear Regulatory Commission Attachment II to Serial: RNP-RA/07-0016 Page 1 of 3 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 RESPONSE TO NRC REQUEST FOR ADDITIONAL INFORMATION REGARDING PROPOSED TECHNICAL SPECIFICATIONS CHANGE TO SECTION 3.5.2 The following responses are provided for the NRC request for additional information (RAI) that was received by facsimile transmission dated January 30, 2007:
NRC Request:
This request is for additional information (RAI) and is a follow-up to a previous NRC RAI transmitted on September 11, 2006. Your response contained a discussion of surveillance requirement of sump suction inlet & a description of the strainer assembly and included Figure 1 (Planned Strainer Configuration), and Figure 2 (Current Sump configuration).
A review of these figures indicates that one string of modules of the new strainer assembly (Figure 1), as well as portions of the new suction piping for both strings of modules are located inside the bioshield wall. The old sump screen (Figure 2) was completely outside the protective shield wall.
Please provide a summary of evaluations performed to confirm the structural adequacy of the new strainer assembly (including portions of the new suction piping at the new location) from the consideration of any potential jet impingement, missile impact, and pipe whip.
Response
This RAI pertains to the reconfiguration of the emergency core cooling system (ECCS) sump that was shown in the figures provided with the previous RAI response letter dated November 20, 2006. Specifically, this RAI requests a summary of evaluations to confirm structural adequacy of the new strainers from the consideration of any potential jet impingement, missile impact, and pipe whip.
The engineering change process, as described in the Progress Energy Nuclear Generation Group procedure EGR-NGGC-0005, is being used to design and document the installation of this modification at H. B. Robinson Steam Electric Plant (HBRSEP), Unit No. 2. Engineering Change (EC) 63481 documents the evaluations of the proposed modification, including documentation of the evaluation of potential jet impingement, missile impact, and pipe whip.
EC 63481 states that the strainer assembly is adequately protected from the hazardous effects of missiles. This conclusion is based on the evaluation of the locations of the strainer sections. The strainer sections outside the shield wall (also referred to as the crane wall) are protected by the crane wall and outer containment wall. Figure 1 from the November 20, 2006 letter is provided with this letter to show the location of these strainer sections.
United States Nuclear Regulatory Commission Attachment II to Serial: RNP-RA/07-0016 Page 2 of 3 EC 63481 further states that the majority of the strainer sections located inside the crane wall are under the refueling canal and that the remaining strainer sections located inside the crane wall are not in the direct line of sight of potential missile hazards inside the surrounding reactor coolant system (RCS) pump bays.
The evaluation of pipe whip and jet impingement described in EC 63481 is based on the following criteria:
- Containment integrity must be maintained, i.e., pipes must be retained such that pipe whip or jet impingement does not result in impact on the containment liner.
- "Consequential failures" are not permitted, i.e., equipment required to mitigate an accident cannot be rendered inoperable as a direct result of pipe whip or impingement from the accident initiator.
" Interacting pipe failures are not permitted, i.e., failure of a pipe as a result of impact from the accident initiator that could increase the severity of the initial accident.
EC 63481 describes the evaluation of the potential pipe whip and jet impingement sources. This evaluation concluded that it is necessary to protect the strainer from damage that could occur due to a high energy line break in the normal letdown line, upstream of the letdown isolation valves (LCV-460A and LCV-460B). Therefore, an additional engineering change (EC 61244) was initiated to design and construct a jet impingement shield to protect the strainer from a high energy jet that could emanate from the normal letdown line upstream of the letdown isolation valves. The approximate location of the proposed jet impingement shield is provided on Figure 1.
United States Nuclear Regulatory Commission Attachment II to Serial: RNP-RA/07-0016 Page 3 of 3 Figure 1: Planned Strainer Configuration MMU Wwar C,
,-n..c.. ft gltl I;, *¢*? 7 O~!I~1 (C-~i't)
- .- ICA~CCI
-KAM--3J IK-1!-*1/2 j "U AZ 9 PLM\
'li-EIC FWLL. A-I---
iNSA -
L~J I i~
A/
I /
V,&GM. "iT
(",T 1
/
PLANOIEW