|
---|
Category:Legal-Affidavit
MONTHYEARML24162A0792024-06-0707 June 2024 OEDO-24-00083 - 10 CFR 2.206 - Diablo Canyon Units 1 and 2 Seismic CDF - Supplemental Declaration 6-7-2024 - DCL-23-022, 2023 Annual Statement of Insurance for Pacific Gas and Electric Companys Diablo Canyon Power Plant2023-03-29029 March 2023 2023 Annual Statement of Insurance for Pacific Gas and Electric Companys Diablo Canyon Power Plant DCL-19-082, Submittal of Site-Specific Decommissioning Cost Estimate2019-12-0404 December 2019 Submittal of Site-Specific Decommissioning Cost Estimate DCL-18-100, License Amendment Request 18-02 - License Amendment Request to Revise Technical Specification 5.6.5b1 Core Operating Limits Report (COLR) for Full Spectrum Loss-of-Coolant Accident Methodology2018-12-26026 December 2018 License Amendment Request 18-02 - License Amendment Request to Revise Technical Specification 5.6.5b1 Core Operating Limits Report (COLR) for Full Spectrum Loss-of-Coolant Accident Methodology ML16061A4522016-02-11011 February 2016 Submittal of Tricon Phase 2 Documents for the License Amendment Request for Process Protection System Replacement DCL-16-020, Diablo Canyon, Units 1 and 2 - Submittal of Tricon Phase 2 Documents for the License Amendment Request for Process Protection System Replacement2016-02-11011 February 2016 Diablo Canyon, Units 1 and 2 - Submittal of Tricon Phase 2 Documents for the License Amendment Request for Process Protection System Replacement ML16026A3882016-01-0505 January 2016 Westinghouse Electric Company, LLC, Submittal of Proprietary Version of LTR-DCPPS-15-008 Response to NRC RAI 73 (Open Item 129). ML15090A2752015-03-26026 March 2015 Independent Spent Fuel Storage Installation - Consent and Hearing Waiver Form ML14171A2372014-06-11011 June 2014 Submittal of Supplemental Analysis for Inservice Inspection Program Relief Request SWOL-REP-1 U2 ML14205A0352014-03-12012 March 2014 Affidavit No. 993754-AFF-104T, Dated 03/12/2014, Signed by Mark Herschthal DCL-14-034, Affidavit No. 993754-AFF-104T, Dated 03/12/2014, Signed by Mark Herschthal2014-03-12012 March 2014 Affidavit No. 993754-AFF-104T, Dated 03/12/2014, Signed by Mark Herschthal DCL-13-061, CS Innovations - Application for Witholding Proprietary Information from Public Disclosure, Enclosure, Attachment 22013-04-25025 April 2013 CS Innovations - Application for Witholding Proprietary Information from Public Disclosure, Enclosure, Attachment 2 DCL-13-021, Areva Affidavit for Areva Calculations 32-9199805-000, Diablo Canyon Power Plant Unit 2 Pzr Safety and Spray Nozzles Planar Flaw Analysis (Proprietary) and 32-9199937-000, DCPP Unit 2 - Evaluation of Laminar Indications in Pressurizer N2013-03-0505 March 2013 Areva Affidavit for Areva Calculations #32-9199805-000, Diablo Canyon Power Plant Unit 2 Pzr Safety and Spray Nozzles Planar Flaw Analysis (Proprietary) and #32-9199937-000, DCPP Unit 2 - Evaluation of Laminar Indications in Pressurizer Noz ML13078A2922013-03-0505 March 2013 Areva Affidavit for Areva Calculations #32-9199805-000, Diablo Canyon Power Plant Unit 2 Pzr Safety and Spray Nozzles Planar Flaw Analysis (Proprietary) and #32-9199937-000, DCPP Unit 2 - Evaluation of Laminar Indications in Pressurizer Noz ML12222A0942012-08-0202 August 2012 Submittal of Attachment 1, Quality Assurance Plan and Revised Phase 1 Documents for the License Amendment Request for Digital Process Protection System Replacement and Attachment 8 Affidavit 993754-AFF-38T DCL-12-069, Diablo Canyon, Units 1 and 2 - Submittal of Attachment 1, Quality Assurance Plan and Revised Phase 1 Documents for the License Amendment Request for Digital Process Protection System Replacement and Attachment 8 Affidavit 993754-AFF-38T2012-08-0202 August 2012 Diablo Canyon, Units 1 and 2 - Submittal of Attachment 1, Quality Assurance Plan and Revised Phase 1 Documents for the License Amendment Request for Digital Process Protection System Replacement and Attachment 8 Affidavit 993754-AFF-38T ML12137A0242012-05-15015 May 2012 Diablo Canyon - May Hearing File Update ML11297A0562011-10-18018 October 2011 Diablo Canyon - October Hearing File Update ML0715501312007-05-23023 May 2007 SER Compliance with WCAP-16260-P-A the Spatially Corrected Inverse Count Rate (Scicr) Method for Subcritical Reactivity Measurement DCL-05-121, Correction of Information Contained in License Amendment Request 05-04. Revision to Technical Specification 5.3.1. 'Unit Staff Qualifications.'2005-12-23023 December 2005 Correction of Information Contained in License Amendment Request 05-04. Revision to Technical Specification 5.3.1. 'Unit Staff Qualifications.' DCL-05-018, License Amendment Request 05-01 Revision to Technical Specification 5.5.9, Steam Generator Tube Surveillance Program, and 5.6.10, Steam Generator Tube Inspection Report. to Allow Use of the W* Alternate Repair Criteria.2005-03-11011 March 2005 License Amendment Request 05-01 Revision to Technical Specification 5.5.9, Steam Generator Tube Surveillance Program, and 5.6.10, Steam Generator Tube Inspection Report. to Allow Use of the W* Alternate Repair Criteria. DCL-04-149, License Amendment Request 04-07, Revision to Technical Specifications 3.7.17 and 4.3 for Cycles 14-16 for a Cask Pit Spent Fuel Storage Rack2004-11-0303 November 2004 License Amendment Request 04-07, Revision to Technical Specifications 3.7.17 and 4.3 for Cycles 14-16 for a Cask Pit Spent Fuel Storage Rack DCL-04-123, License Amendment Request 04-06 Removal of Technical Specifications 5.6.1, Occupational Radiation Exposure Report, and 5.6.4, Monthly Operating Reports2004-11-0101 November 2004 License Amendment Request 04-06 Removal of Technical Specifications 5.6.1, Occupational Radiation Exposure Report, and 5.6.4, Monthly Operating Reports DCL-04-104, Response to NRC Request for Additional Information Regarding License Amendment Request 04-01, 'Revised Steam Generator Voltage-based Repair Criteria Probability of Detection Method for Plant.2004-08-18018 August 2004 Response to NRC Request for Additional Information Regarding License Amendment Request 04-01, 'Revised Steam Generator Voltage-based Repair Criteria Probability of Detection Method for Plant. DCL-04-089, Response to June 14 and July 6, 2004, NRC Request for Additional Information Re License Amendment Request 03-18, Revision to Technical Specifications 5.5.9, 'Steam Generator (SG) Tube Surveillance Program,' & 5.6.10.2004-07-30030 July 2004 Response to June 14 and July 6, 2004, NRC Request for Additional Information Re License Amendment Request 03-18, Revision to Technical Specifications 5.5.9, 'Steam Generator (SG) Tube Surveillance Program,' & 5.6.10. DCL-04-095, 60-Day Response to NRC Bulletin 2004-01, Inspection of Alloy 82/182/600 Materials Used in the Fabrication of Pressurizer Penetrations and Steam Space Piping Connections at Pressurized Water Reactors2004-07-27027 July 2004 60-Day Response to NRC Bulletin 2004-01, Inspection of Alloy 82/182/600 Materials Used in the Fabrication of Pressurizer Penetrations and Steam Space Piping Connections at Pressurized Water Reactors DCL-04-066, Response to NRC Request for Additional Information Regarding License Amendment Request 03-12, Revision to Technical Specifications 3.3.1, 'Rts Instrumentation,' and 3.3.2, 'Esfas Instrumentation.'2004-06-0404 June 2004 Response to NRC Request for Additional Information Regarding License Amendment Request 03-12, Revision to Technical Specifications 3.3.1, 'Rts Instrumentation,' and 3.3.2, 'Esfas Instrumentation.' ML0412804352004-04-30030 April 2004 Notice of Change of Address ML0409704212004-03-31031 March 2004 Saybrook Capital, LLC Cover Sheet Application for Allowance and Payment of Interim Compensation and Reimbursement of Expenses for February 1 Through February 29, 2004 ML0409805912004-03-18018 March 2004 Public Policy Advocates Llc'S Cover Sheet Application for Allowance and Payment of Interim Compensation and Reimbursement of Expense for February 1, 2004 Through February 29, 2004 ML0406204532004-02-23023 February 2004 Declaration of Sandip Sen in Support of Debtor'S Motion for Authority to Establish Cash-collateralized Letter of Credit Program and Facility to Secure Gas Purchases, and to Incur Secured Debt Related Thereto (the Motion)' ML0403706042004-01-29029 January 2004 Declaration of Michael J. Donnelly in Support for Authority to Establish Cash-Collaterized Letter of Program and Facility to Secure Gas Purchases, and to Incur Secured Debt Related Thereto ML0403706012004-01-29029 January 2004 Declaration of Raymond X. Welch in Support of Motion for Authority to Establish Cash-Collateralized Letter of Credit Program and Facility to Secure Gas Purchases, and to Incur Secured Debt Related Thereto ML0400700982003-12-30030 December 2003 Howard, Rice Nemerovski, Canady, Falk & Rabkin Cover Sheet Application for Allowance and Payment of Interim Compensation and Reimbursement of Expenses for November, 2003 ML0400200602003-12-22022 December 2003 Declaration of Grant Guerra in Support of Motion for Order Authorizing the Debtor to Settle Claim No. 13377 Filed by the Presidio Trust ML0333810452003-11-26026 November 2003 Cooley Godward Llp'S Twenty-Ninth Cover Sheet Application for Allowance and Payment of Interim Compensation and Reimbursement of Expenses for the Period October 1, 2003 - October 31, 2003 ML0331800932003-11-0606 November 2003 Proof of Service ML0331701792003-10-31031 October 2003 Declaration of Michael J. Donnelly in Support of Pg&E'S Application for Authority to Incur Plan Implementation Expenses in Connection with Certain Financings DCL-03-133, Full Compliance with Order for Compensatory Measures Related to Fitness-For-Duty Enhancements Applicable to Nuclear Facility Security Force Personnel, Dated 04/29/03 (EA-03-038)2003-10-28028 October 2003 Full Compliance with Order for Compensatory Measures Related to Fitness-For-Duty Enhancements Applicable to Nuclear Facility Security Force Personnel, Dated 04/29/03 (EA-03-038) ML0331800862003-10-23023 October 2003 Relief from Stay Cover Sheet ML0331800902003-10-23023 October 2003 Declaration of Jennifer A. Becker in Support of City of Oakland and Port of Oakland'S Motion for Relief from Automatic Stay ML0328703662003-09-29029 September 2003 Skadden, Arps, Slate, Meagher & Flom Llp'S Cover Sheet Application for Allowance and Payment of Interim Compensation and Reimbursement of Expenses for the Period August 1, 2003 Through August 31, 2003 ML0327312982003-09-24024 September 2003 (Reorganized) California Power Exchange Corporation'S Limited Objection to Motion for Order Authorizing Pacific Gas and Electric Company to Compromise Claims Against El Paso Natural Gas Company Et Alia and to Enter Into Agreements Resolving ML0327314402003-09-23023 September 2003 Fact Witness Disclosure of Satellite Senior Income Fund, Satellite Senior Income Fund II and Deutsche Bank Trust Company Americas to Objection to Confirmation of Plan of Reorganization Under Chapter 11 of the Bankruptcy Code for Pacific Gas ML0327313322003-09-22022 September 2003 Notice of Hearing on Interim Compensation Applications of Professionals and Final Expense Application of Creditors' Committee Members ML0326810702003-09-16016 September 2003 Declaration of Michael J. Donnelly in Support of Debtor'S Notice of Motion and Motion for Order Approving Debtor'S Execution and Performance Under the Amendment to First Amended and Restated Summary of Terms with Respect to Forbearance and ML0325412082003-09-11011 September 2003 Order Re Ex Parte Application of Pacific Gas and Electric Company Authorizing Settlement and Withdrawal of Claim of Laguna Irrigation District ML0325911092003-09-0505 September 2003 Declaration of Joshua Bar-Lev in Support of Debtor'S Motion for Order Authorizing Pacific Gas and Electric Company to Compromise Claims Against El Paso Natural Gas Company Et Alla and to Enter Into Agreements Resolving the Claims ML0325411442003-09-0404 September 2003 Relief from Stay Cover Sheet - Motion & Notice of Motion of Smud for Relief from Automatic Stay in Litigation ML0325213432003-08-29029 August 2003 Declaration of Joseph Sauvage in Support of Motion for Authority to Enter Into Certain Hedging Transactions in Connection with Financing Under Proposed Plan of Reorganization, and to Incur Secured Debt Related Thereto 2024-06-07
[Table view] Category:Letter
MONTHYEARML24302A2622024-11-0101 November 2024 Letter to CA SHPO Regarding DCPP Dseis ML24302A2612024-11-0101 November 2024 Letter to Achp Re DCPP Dseis ML24275A0622024-10-30030 October 2024 NRC to NMFS Request Initiate Formal Endangered Species Act Consultation and Abbreviated Essential Fish Habitat for Proposed License Renewal of DCP Plant Units 1, 2 ML24269A0122024-10-29029 October 2024 OEDO-24-00083 2.206 Petition Diablo Canyon Seismic CDF - Response to Petitioner Letter ML24261B9492024-10-24024 October 2024 Issuance of Amendment Nos. 246 and 248 Revision to Technical Specification 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR) DCL-24-103, Pg&Es Voluntary Submittal of Information Related to 10 CFR 2.206 Petition Regarding Seismic Core Damage Frequency for DCPP, Units 1 and 22024-10-24024 October 2024 Pg&Es Voluntary Submittal of Information Related to 10 CFR 2.206 Petition Regarding Seismic Core Damage Frequency for DCPP, Units 1 and 2 IR 05000275/20244042024-10-23023 October 2024 Security Baseline Inspection Report 05000275/2024404 and 05000323/2024404 ML24277A0292024-10-18018 October 2024 NRC to Fws Req. for Concurrence W. Endangered Species Act Determinations for Diablo Canyon Power Plant Units 1,2, ISFSI Proposed License Renewals in San Luis Obispo Co., CA DCL-24-092, Supplement and Annual Update License Renewal Application, Amendment 12024-10-14014 October 2024 Supplement and Annual Update License Renewal Application, Amendment 1 DCL-24-098, Material Status Report for the Period Ending August 31, 20242024-10-0909 October 2024 Material Status Report for the Period Ending August 31, 2024 DCL-24-091, Response to Request for Additional Information by the Office of Nuclear Reactor Regulation2024-10-0303 October 2024 Response to Request for Additional Information by the Office of Nuclear Reactor Regulation IR 05000275/20253012024-10-0303 October 2024 Notification of NRC Initial Operator Licensing Examination 05000275/2025301; 05000323/2025301 ML24240A0222024-09-20020 September 2024 Letter to A. Peck Environmental Impact Statement Scoping Summary Report for Diablo Canyon Nuclear Power Plant Units 1 and 2 ML24260A1222024-09-14014 September 2024 14 Sept 2024 Ltr - California Coastal Commission to Pg&E, Incomplete Consistency Certification for Requested Nuclear Regulatory Commission License Renewal for Diablo Canyon Power Plant DCL-24-087, License Renewal - Historic and Cultural Resources Reference Documents (Redacted)2024-09-12012 September 2024 License Renewal - Historic and Cultural Resources Reference Documents (Redacted) ML24262A2462024-09-11011 September 2024 10 CFR 2.206 - Diablo Canyon Units 1 and 2 Seismic - Petitioner Response to Acknowledgement Letter - DCL-24-083, CFR Part 21 Notification: Commercially Dedicated Snubber Valve Not Properly Heat Treated2024-09-0909 September 2024 CFR Part 21 Notification: Commercially Dedicated Snubber Valve Not Properly Heat Treated DCL-24-078, Pre-Notice of Disbursement from Decommissioning Trust2024-09-0303 September 2024 Pre-Notice of Disbursement from Decommissioning Trust DCL-24-082, Decommissioning Draft Biological Assessment and Draft Essential Fish Habitat Assessment2024-08-28028 August 2024 Decommissioning Draft Biological Assessment and Draft Essential Fish Habitat Assessment ML24205A0662024-08-27027 August 2024 OEDO-24-00083 - 10 CFR 2.206 - Ack Letter - Diablo Canyon Units 1 and 2 Seismic Core Damage Frequency - IR 05000275/20243012024-08-26026 August 2024 NRC Examination Report 05000275/2024301; 05000323/2024301 IR 05000275/20240052024-08-22022 August 2024 Updated Inspection Plan for Diablo Canyon Power Plant, Units 1 and 2 (Report 05000275/2024005 and 05000323/2024005) DCL-24-077, Responses to NRC Requests for Additional Information on Diablo Canyon Power License Renewal Application Severe Accident2024-08-15015 August 2024 Responses to NRC Requests for Additional Information on Diablo Canyon Power License Renewal Application Severe Accident DCL-24-075, Response to Request for Additional Information for License Amendment Request 23-02, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power React2024-08-0808 August 2024 Response to Request for Additional Information for License Amendment Request 23-02, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power React IR 05000275/20240022024-08-0606 August 2024 Integrated Inspection Report 05000275/2024002 and 05000323/2024002 DCL-24-079, DC-2024-07 Post Exam Comments Analysis2024-08-0202 August 2024 DC-2024-07 Post Exam Comments Analysis DCL-24-070, License Amendment Request 24-03 Revision to Technical Specification 5.5.16 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies2024-07-31031 July 2024 License Amendment Request 24-03 Revision to Technical Specification 5.5.16 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies DCL-24-071, Core Operating Limits Report for Unit 2 Cycle 252024-07-22022 July 2024 Core Operating Limits Report for Unit 2 Cycle 25 DCL-2024-523, Submittal of Report on Discharge Self-Monitoring2024-07-18018 July 2024 Submittal of Report on Discharge Self-Monitoring ML24187A1352024-07-16016 July 2024 Letter to Paula Gerfen - Diablo Canyon Units 1 and 2 - Summary of June 2024 Audit Related to the License Renewal Application Severe Accident Mitigation Alternatives Review IR 05000275/20240142024-07-11011 July 2024 Age-Related Degradation Inspection Report 05000275/2024014 and 05000323/2024014 ML24190A0812024-07-10010 July 2024 NRC Initial Operator Licensing Examination Approval 05000275/2024301; 05000323/2024301 IR 05000275/20244012024-07-0808 July 2024 Security Baseline Inspection Report 05000275/2024401 and 05000323/2024401 (Full Report) IR 05000323/20240112024-07-0303 July 2024 License Renewal Phase Report 05000323/2024011 DCL-2024-527, Sea Turtle Stranding Report (Loggerhead Sea Turtle) Diablo Canyon Power Plant2024-07-0101 July 2024 Sea Turtle Stranding Report (Loggerhead Sea Turtle) Diablo Canyon Power Plant DCL-24-066, Request to Extend the Nrg Approval of Alternative for Use of Full Structural Weld Overlay, REP-RHR-SWOL2024-06-27027 June 2024 Request to Extend the Nrg Approval of Alternative for Use of Full Structural Weld Overlay, REP-RHR-SWOL ML24155A2182024-06-18018 June 2024 OEDO-23-00350-NRR - (LTR-23-0228-1) - Closure Letter - 10 CFR 2.206 Petition from Mothers for Peace and Friends of the Earth Regarding Diablo Canyon ML24129A1762024-06-14014 June 2024 National Historic Preservation Act Section 106 Consultation – Results of Identification and Evaluation (Docket Number: 72-026) ML24200A2052024-06-0707 June 2024 Fws to NRC, List of Threatened and Endangered Species That May Occur in Your Proposed Project Location or May Be Affected by Your Proposed Project for Diablo Canyon License Renewal ML24099A2192024-05-29029 May 2024 Issuance of Amendment Nos. 245 and 247 Revision to TSs to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML24117A0132024-05-20020 May 2024 Letter to Paula Gerfen-Diablo Canyon Units 1 and 2-Regulatory Audit Regarding Severe Accident Mitigation Alternatives for the License Renewal Application 05000323/LER-2024-001, LCO 3.0.3 Completion Time Limits2024-05-17017 May 2024 LCO 3.0.3 Completion Time Limits DCL-24-052, Responses to NRC Requests for Additional Information on the Diablo Canyon Power Plant License Renewal Application Environmental Report2024-05-16016 May 2024 Responses to NRC Requests for Additional Information on the Diablo Canyon Power Plant License Renewal Application Environmental Report DCL-24-051, One Hundred Eighty Day Steam Generator Report for Twenty-Fourth Refueling Outage2024-05-0808 May 2024 One Hundred Eighty Day Steam Generator Report for Twenty-Fourth Refueling Outage ML24127A2042024-05-0202 May 2024 02May2024 Ltr - California Coastal Commission to Pg&E, Coastal Development Permit Needed for Pg&E’S Proposed Relicensing of Diablo Canyon Nuclear Power Plant DCL-24-047, 2023 Annual Non-radiological Environmental Operating Report2024-05-0101 May 2024 2023 Annual Non-radiological Environmental Operating Report DCL-24-049, 2023 Annual Radiological Environmental Operating Report2024-05-0101 May 2024 2023 Annual Radiological Environmental Operating Report L-24-004, Independent Spent Fuel Storage Installation - Responses to NRC Requests for Additional Information on the Diablo Canyon Independent Spent Fuel Storage Installation License Renewal Application (Cac/Epid 001028/L-2022-RNW-0007)2024-04-30030 April 2024 Independent Spent Fuel Storage Installation - Responses to NRC Requests for Additional Information on the Diablo Canyon Independent Spent Fuel Storage Installation License Renewal Application (Cac/Epid 001028/L-2022-RNW-0007) DCL-24-048, O CFR 50.59 and 1 O CFR 72.48 Summary Report for the Period of January 1, 2022, Through December 31, 20232024-04-30030 April 2024 O CFR 50.59 and 1 O CFR 72.48 Summary Report for the Period of January 1, 2022, Through December 31, 2023 DCL-24-027, 2023 Annual Radioactive Effluent Release Report2024-04-28028 April 2024 2023 Annual Radioactive Effluent Release Report 2024-09-09
[Table view] |
Text
OWestinghouse WWestinghouse Electric Company Nuclear Services P.O. Box 355 Pittsburgh, Pennsylvania 15230-0355 USA U.S. Nuclear Regulatory Commission Direct tel: (412) 374-4643 Document Control Desk Direct fax: (412) 374-4011 Washington, DC 20555-0001 e-mail: greshaja@westinghouse.com Our ref: LTR-NRC-07-28 May 23, 2007
Subject:
SER Compliance with WCAP-16260-P-A "The Spatially Corrected Inverse Count Rate (SCICR)Method for Subcritical Reactivity Measurement" (Proprietary/Non-Proprietary)
Enclosed are copies of the Proprietary/Non-Proprietary SER Compliance with WCAP- 16260-P-A "The Spatially Corrected Inverse Count Rate (SCICR) Method for Subcritical Reactivity Measurement." Per SER Limitations and Conditions documented in the NRC's SER for WCAP-16260, Limitation and Condition
- 2 specifies the following:
"2. Reactivity-sensitivity analyses must be conducted and submitted to the NRC staff for review/audit on a plant-specific basis to predetermine the masking effect (biases) so that they can be accounted for in SCICR applications to the plant." The first application of this methodology for Diablo Canyon Unit 1 is planned for Cycle 15. Enclosed are the reactivity-sensitivity analyses to determine the plant-specific masking effect for Diablo Canyon Unit 1 discussed in the enclosure.
Also enclosed is: 1. One (1) copy of the Application for Withholding, AW-07-2286 (Non-Proprietary) with Proprietary Information Notice.2. One (1) copy of Affidavit (Non-Proprietary).
This submittal contains proprietary information of Westinghouse Electric Company LLC. In conformance with the requirements of 10 CFR Section 2.390, as amended, of the Commission's regulations, we are enclosing with this submittal an Application for Withholding from Public Disclosure and an affidavit.
The affidavit sets forth the basis on which the information identified as proprietary may be withheld from public disclosure by the Commission.
Correspondence with respect to this affidavit or Application for Withholding should reference AW-07-2286 and should be addressed to J. A. Gresham, Manager, Regulatory Compliance and Plant Licensing, Westinghouse Electric Company LLC, P.O. Box 355, Pittsburgh, Pennsylvania 15230-0355.
f ey rly rs, 1 J.A. Gresham, Manager Regulatory Compliance and Plant Licensing Enclosures cc: A. Mendiola, NRR A. Attard, NRR J. Thompson, NRR H. Cruz, NRR L. M. Feizollahi, NRR Pacific Gas & Electric c/o Diablo Canyon Unit 1 i W estinghouse Westinghouse Electric Company Nuclear Services P.O. Box 35 5 Pittsburgh, Pennsylvania 15230-0355 USA U.S. Nuclear Regulatory Commission Direct tel: 412/374-4643 ATTN: Document Control Desk Direct fax: 412/374-4011 Washington, DC 20555 e-mail: greshaja@westinghouse.com Our ref: AW-07-2286 May 23, 2007 APPLICATION FOR WITHHOLDING PROPRIETARY INFORMATION FROM PUBLIC DISCLOSURE
Subject:
LTR-NRC-07-28 P-Attachment, SER Compliance with WCAP-l 6260-P-A "The Spatially Corrected Inverse Count Rate (SCICR) Method for Subcritical Reactivity Measurement" (Proprietary)
The application for withholding is submitted by Westinghouse Electric Company LLC (Westinghouse) pursuant to the provisions of paragraph (b)(1) of Section 2.390 of the Commission's regulations.
It contains commercial strategic information proprietary to Westinghouse and customarily held in confidence.
The proprietary material for which withholding is being requested is identified in the proprietary version of the subject report. In conformance with 10 CFR Section 2.390, Affidavit AW-07-2286 accompanies this application for withholding, setting forth the basis on which the identified proprietary information may be withheld from public disclosure.
Accordingly, it is respectfully requested that the subject information which is proprietary to Westinghouse be withheld from public disclosure in accordance with 10 CFR Section 2.390 of the Commission's regulations.
Correspondence with respect to this application for withholding or the accompanying affidavit should reference AW-07-2286 and should be addressed to J. A. Gresham, Manager of Regulatory Compliance and Plant Licensing, Westinghouse Electric Company LLC, P. 0. Box 355, Pittsburgh, Pennsylvania 15230-0355.
'Manager Regulatory Compliance and Plant Licensing cc: A. Mendiola, NRR A. Attard, NRR J. Thompson, NRR H. Cruz, NRR L. M. Feizollahi, NRR Pacific Gas & Electric c/o Diablo Canyon Unit 1 AW-07-2286 AFFIDAVIT COMMONWEALTH OF PENNSYLVANIA:
ss COUNTY OF ALLEGHENY:
Before me, the undersigned authority, personally appeared J. A. Gresham, who, being by me duly sworn according to law, deposes and says that he is authorized to execute this Affidavit on behalf of Westinghouse Electric Company LLC (Westinghouse) and that the averments of fact set forth in this Affidavit are true and correct to the best of his knowledge, information, and belief: JJ. A. Gresham, Manager Regulatory Compliance and Plant Licensing Sworn to and subscribed before me this 4 day of ,2007 Notary Public COMMONWEALTH OF PENNSYLVANIA Notarial Seal Sharon L. Marlde, Notary Public Monroeville Boro, Allegheny County My Commission Expires Jan. 29,2011 Member, Pennsylvania Association of Notaries 2 AW-07-2286 (1) 1 am Manager, Regulatory Compliance and Plant Licensing, in Nuclear Services, Westinghouse Electric Company LLC (Westinghouse) and as such, I have been specifically delegated the function of reviewing the proprietary information sought to be withheld from public disclosure in connection with nuclear power plant licensing and rulemaking proceedings, and am authorized to apply for its withholding on behalf of Westinghouse.
(2) 1 am making this Affidavit in conformance with the provisions of 10 CFR Section 2.390 of the Commission's regulations and in conjunction with the Westinghouse "Application for Withholding" accompanying this Affidavit.
(3) I have personal knowledge of the criteria and procedures utilized by Westinghouse in designating information as a trade secret, privileged or as confidential commercial or financial information.
(4) Pursuant to the provisions of paragraph (b)(4) of Section 2.390 of the Commission's regulations, the following is furnished for consideration by the Commission in determining whether the information sought to be withheld from public disclosure should be withheld.(i) The information sought to be withheld from public disclosure is owned and has been held in confidence by Westinghouse.(ii) The information is of a type customarily held in confidence by Westinghouse and not customarily disclosed to the public. Westinghouse has a rational basis for determining the types of information customarily held in confidence by it and, in that connection, utilizes a system to determine when and whether to hold certain types of information in confidence.
The application of that system and the substance of that system constitutes Westinghouse policy and provides the rational basis required.Under that system, information is held in confidence if it falls in one or more of several types, the release of which might result in the loss of an existing or potential competitive advantage, as follows: (a) The information reveals the distinguishing aspects of a process (or component, structure, tool, method, etc.) where prevention of its use by any of Westinghouse's competitors without license from Westinghouse constitutes a competitive economic advantage over other companies.(b) It consists of supporting data, including test data, relative to a process (or component, structure, tool, method, etc.), the application of which data secures a competitive economic advantage, e.g., by optimization or improved marketability.(c) Its use by a competitor would reduce his expenditure of resources or improve his competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing a similar product.
3 AW-07-2286 (d) It reveals cost or price information, production capacities, budget levels, or commercial strategies of Westinghouse, its customers or suppliers.(e) It reveals aspects of past, present, or future Westinghouse or customer funded development plans and programs of potential commercial value to Westinghouse.(f) It contains patentable ideas, for which patent protection may be desirable.
There are sound policy reasons behind the Westinghouse system which include the following: (a) The use of such information by Westinghouse gives Westinghouse a competitive advantage over its competitors.
It is, therefore, withheld from disclosure to protect the Westinghouse competitive position.b) It is information which is marketable in many ways. The extent to which such information is available to competitors diminishes the Westinghouse ability to sell products and services involving the use of the information.
c) Use by our competitor would put Westinghouse at a competitive disadvantage by reducing his expenditure of resources at our expense.(d) Each component of proprietary information pertinent to a particular competitive advantage is potentially as valuable as the total competitive advantage.
If competitors acquire components of proprietary information, any one component may be the key to the entire puzzle, thereby depriving Westinghouse of a competitive advantage.(e) Unrestricted disclosure would jeopardize the position of prominence of Westinghouse in the world market, and thereby give a market advantage to the competition of those countries.(f) The Westinghouse capacity to invest corporate assets in research and development depends upon the success in obtaining and maintaining a competitive advantage.(iii) The information is being transmitted to the Commission in confidence and, under the provisions of 10 CFR Section 2.390, it is to be received in confidence by the Commission.(iv) The information sought to be protected is not available in public sources or available information has not been previously employed in the same original manner or method to the best of our knowledge and belief.
4 AW-07-2286 (v) The proprietary information sought to be withheld in this submittal is that which is appropriately marked in LTR-NRC-07-28 P-Attachment, SER Compliance with WCAP-16260-P-A "The Spatially Corrected Inverse Count Rate (SCICR) Method for Subcritical Reactivity Measurement," (Proprietary), for submittal to the Commission, being transmitted by Westinghouse letter (LTR- NRC-07-28) and Application for Withholding Proprietary Information from Public Disclosure, to the Document Control Desk. The proprietary information as submitted by Westinghouse Electric Company is for NRC review/audit.
This information is part of that which will enable Westinghouse to: (a) Demonstrate the applicability of the SC]CR Methodology for a specific plant.(b) Assist customers in implementing an improved measurement technique.
Further this information has substantial commercial value as follows: (a) Westinghouse can use this methodology to further enhance their licensing position over their competitors.(b) Assist customers to obtain license changes.Public disclosure of this proprietary information is likely to cause substantial harm to the competitive position of Westinghouse because it would enhance the ability of competitors to provide similar methodology and licensing defense services for commercial power reactors without commensurate expenses.
Also, public disclosure of the information would enable others to use the information to meet NRC requirements for licensing documentation without purchasing the right to use the information.
The development of the technology described in part by the information is the result of applying the results of many years of experience in an intensive Westinghouse effort and the expenditure of a considerable sum of money.In order for competitors of Westinghouse to duplicate this information, similar technical programs would have to be performed and a significant manpower effort, having the requisite talent and experience, would have to be expended for developing the enclosed improved core thermal performance methodology.
Further the deponent sayeth not.
PROPRIETARY INFORMATION NOTICE Transmitted herewith are proprietary and/or non-proprietary versions of documents furnished to the NRC in connection with requests for generic and/or plant-specific review and approval.In order to conform to the requirements of 10 CFR 2.390 of the Commission's regulations concerning the protection of proprietary information so submitted to the NRC, the information which is proprietary in the proprietary versions is contained within brackets, and where the proprietary information has been deleted in the non-proprietary versions, only the brackets remain (the information that was contained within the brackets in the proprietary versions having been deleted).
The justification for claiming the information so designated as proprietary is indicated in both versions by means of lower case letters (a) through (f) located as a superscript immediately following the brackets enclosing each item of information being identified as proprietary or in the margin opposite such information.
These lower case letters refer to the types of information Westinghouse customarily holds in confidence identified in Sections (4)(ii)(a) through (4)(ii)(f) of the affidavit accompanying this transmittal pursuant to 10 CFR 2.390(b)(1).
COPYRIGHT NOTICE The reports transmitted herewith each bear a Westinghouse copyright notice. The NRC is permitted to make the number of copies of the information contained in these reports which are necessary for its internal use in connection with generic and plant-specific reviews and approvals as well as the issuance, denial, amendment, transfer, renewal, modification, suspension, revocation, or violation of a license, permit, order, or regulation subject to the requirements of 10 CFR 2.390 regarding restrictions on public disclosure to the extent such information has been identified as proprietary by Westinghouse, copyright protection notwithstanding.
With respect to the non-proprietary versions of these reports, the NRC is permitted to make the number of copies beyond those necessary for its internal use which are necessary in order to have one copy available for public viewing in the appropriate docket files in the public document room in Washington, DC and in local public document rooms as may be required by NRC regulations if the number of copies submitted is insufficient for this purpose. Copies made by the NRC must include the copyright notice in all instances and the proprietary notice if the original was identified as proprietary.
Westinghtus.e Non-Proprietary Class 3 LTR-NRC-07-:28NP-Attachment SER Compliance with WCAP-16260-P-A"The Spatially Corrected Inverse Count-Rate (SCICR)Method for Subcritical Reactivity Measurement" (Non-Proprietary)
Westinghouse Electric Company P.O: Box 355 Pittsburgh, Pennsylvania 15230-0355
© 2007 Westinghouse Electric Company-LLC AlI.Rights Reserved Page 1 of 3 WestinghoUse Non-Proprietary Class 3 Reactivity-Sensitivity Analyses ofSCICR Applicati6n attDiablo Canyon Unit 1 The first application of the spatially corrected inverse-counrtrate (SCICR) method for subcritical reactivity, measurement is planned for Diablo Canyon Unit 1. This method of reactivity measurement is described in the approved Westinghouse Topical Report (TR) WCAP-,16260-P-A.
The final safety evaluation performed by the NRC staff (TAC No. MC3,065) included the condition that reactidvity-sensitivity analyses must be conducted and submitted to the NRC' staff for review/auditon a plant-specific, basis to predetermine any masking effect(biases) in the SC!CR applications at each plant. Note that Unit ahas a different control rod pattern than Unit 2, which has had complete reactivity-sensitivity analyses previously provided to the NRC slif., The sensitivity calculations.
were performed
- in the, sa -me manner as described in Section 5.3 of WCAP- l6260-P-A.
The results of the core reactivity, bias and control rod constant bias cases are presented below. These are equivalent t: Tables 5-2 and 5-4 of WcAP-i6260-PA.
Diablo Canyon Unit 1 Quality of the SCICR Line Fit in the Simulated Cases With Core Reactivity and Control Rod Constants Biases.(RMS =Root Mean Squared, pem 10 -.5) a, c Two types of reactivity-sensitivity conditions Were performnedfor Diablo Canyon Unit 1 (Section .5.3 of the original Westinghouse WCAP- 16260-P submittal).
As required :in, the SER, .this is -consistent with all initial plant SCICR applications subsequent.
to the review and approval of WCAP-16260[P."I C , LTR-NRC-07-28 NP-Attachm ent Page.2 of 3 Westinghouse Non-Proprietary Class 3 I In understanding the] ~ is the same as other recent SCICR applications
[H, C, again confirming that. these plants also exhibited Mean,/RMS values [ ] ' in their reactivity-sensitivity analyses for first SCICR application.
["I C.C C will be used for SCICR applications at Diablo Canyon Unit, 1 as the threshold for review of a potential reactivity bias. Like the database of plants provided %in: WCAP-16260-P, a, c.LTR-NRC-07-28 NP-Attachment Page 3 of 3