The CD in Attachment 3 of the Enclosure Contains Proprietary Information Withhold from public disclosure under 10 CFR 2.390

.1 Pacific Gas and Electric Company° James M. Welsch Diablo Canyon Power Plant Vice President, Nuclear Generation P.C. Box 56 Anila Beach, CA 93424 805.545.3242 E-Mail: JMWllgpge.corm February 11, 2016 PG&E Letter DCL-16-020 U.S. Nuclear Regulatory Commission 10 CFR 50.90 ATTN: Document Control Desk Washington, DC 20555-0001 Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo Canyon Units 1 and 2.

.Submittal of Tricon Phase 2 Documents for the License Amendment Request for Process Protection System Replacement

References:

1. PG&E Letter DCL-1 1-104, "License Amendment Request-11-07, Process Protection System Replacement," dated October 26, 2011 (ADAMS Accession No. ML11307A331)
2. NRC Letter, "Summary of August 5, 2015, Teleconference Meeting with Pacific Gas and Electric Company on Digital Replacement of the Process Protection System Portion of the Reactor Trip System and Engineered Safety Features Actuation System at Diablo Canyon Power Plant, Unit Nos. I and 2 (TAC NOS. ME7522 AND ME7523),"

dated September 10, 2015 (ADAMS Accession No. ML15233A006)

Dear Commissioners and Staff:

In Reference 1, Pacific Gas and Electric Company (PG&E) submitted License Amendment Request 11-07 to request the NRC Staff (Staff) approval to replace the Diablo Canyon Power Plant (DCPP) Eagle 21 digital process protection system (PPS) with a new digital PPS that is based on the Invensys Operations Management Tricon Programmable Logic Controller, Version 10, and the Westinghouse Electric Company Advanced Logic System. This letter submits the remaining Invensys Tricon Interim Staff Guidance 6 Phase 2 documents.

This letter includes the PPS Replacement Project documents in the following Attachments to the Enclosure in this letter:

Attachment I -Ilnvensys/Schneider Electric Affidavit 993754-AFF-173T The C D in Attachment 3 of the Enclosure Contains Proprietary Information/-

Withhold from public disclosure under 10 CFR 2.390 When separated from the CD in Attachment 3 to the Enclosure, this document is decontrolled A member of the STARS (Strategic Teaming and Resource Sharing)

Aliance*

iI1,.

Caltaway

  • Diabto Canyon
  • Palo Verde
    • Wolf Creek

The CD in Attachment 3 of the Enclosure Contains Proprietary Information Withhold from public disclosure under 10 CFR 2.390 SDocument Control Desk PG&E Letter DCL-16-020 February11, 2016 Page 2 - Compact Disc - "Tricon Phase 2 Documents - Non-Proprietary' - Compact Disc -"'Tricon Phase 2 Documents - Proprietary" The Staff requested that the documents contained in Attachment 3 be submitted in Open Item 145 contained in Enclosure 2 of Reference 2.

The lnvensys/Schneider Electric documents contained on the compact disc (CD),

labeled, "Tricon Phase 2 Documents - Non-Proprietary," in Attachment 2 are listed in Table 1 in the Enclosure to this letter. The documents contained on the CD, labeled "Tricon Phase 2 Documents - Proprietary," in Attachment 3, are listed in Table 2 in the Enclosure. The CD contents are in Adobe Acrobat portable document format. The Tricon documents that are proprietary have (-P) at the end of the filename.

The Invensys/Schneider Electric Tricon documents on the CD in Attachment 3 contain proprietary information as identified by Invensys/Schneider Electric. Accordingly, includes a Invensys/Schneider Electric request for withholding proprietary information, Affidavit No. 993754-AFF-1 73T. PG&E requests that the Invensys/Schneider. Electric proprietary information be withheld from public disclosure in accordance with 10 CFR 2.390. Correspondence with respect to the I nvensys/Sch neider Electric affidavit for with holding the I nvensys/Schneider Electric proprietary information provided in Attachment 3 should reference Invensys/Schneider Electric Letter 993754-AFF-173T, and should be forwarded to:

Brian Haynes Senior Director, Global Nuclear Delivery Invensys/Schneider Electric 26561 Rancho Parkway South

.Lake Forest, California 92630 A copy of the proprietary CD will be provided to the following individuals:

Regional Administrator, Region IV DCPP Nuclear Reactor Regulation Project Manager DCPP NRC Senior Resident Inspector Branch Chief, California Department of Public Health The information in the Enclosure in this submittal does not affect the results of the technical evaluation or the significant hazards consideration determination previously transmitted in Reference 1.

The CD in Attachment 3 of the Enclosure Contains Proprietary Information Withhold from public disclosure under 10 CFR 2.390 When separated from the CD in Attachment 3 to the Enclosure, this document is decontrolled A

member of the STARS (Strategic Teaming and Resource Sharing)

Atliance Cattaway

  • Diab~o Canyon
  • Pa~o Verde
  • Wolf Creek

The CD in Attachment 3 of the Enciosure Contains Proprietary Information Withhold from public disclosure under 10 CFR 2.390 SDocument Control Desk PG&E Letter DCL-16-020 February 11, 2016 Page 3 PG&E makes no new or revised regulatory commitments (as defined by NEI 99-04) in this letter.

If you have any questions, or require additional information, please contact Mr. Hossein Hamzehee at (805) 545-4720.

I state under penalty of perjury that the foregoing is true and correct.

Executed on February 11, 2016.

Sincerely,

  • esM.Welsch Vice President, Nuclear Generation kjse/4328/50271 918 Enclosure cc:

Diablo Distribution cc/enc:

Marc L. Dapas, NRC Region IV Siva P. Lingam, NRR Project Manager Gonzalo L. Perez, Branch Chief, California Department of Public Health Binesh K. Tharakan, Acting NRC Senior Resident Inspector The CD in Attachment 3 of the Enclosure Contains Proprietary Information Withhold from public disclosure under 10 CFR 2.390 When separated from the CD in Attachment 3 to the Enclosure, this document is decontrolled A

member of the STARS (Strategic Teaming and Resource Sharing)

Attiance Callaway

  • DiabLo Canyon
  • Pal~o Verde
  • WoLf Creek

The CD in Attachment 3 of the Enclosure Contains Proprietary Information Withhold from public disclosure under 10 CFR 2.390 Enclosure PG&E Letter DCL-16-020 Submittal of Tricon Phase 2 Documents for the License Amendment Request for Process Protection System Replacement Pacific Gas and Electric Company (PG&E) Letter DCL-1 1-104, "License Amendment Request 11-07, Process Protection System Replacement," dated October 26, 2011, submitted License Amendment Request (LAR) 11-07 to request NRC Staff (Staff) approval to replace the Diablo Canyon Power Plant Eagle 21 digital process protection system (PPS) with a new digital PPS that is based on the Invensys Tricon Programmable Logic Controller, Version 10, and the Westinghouse Electric Company Field Programmable Gate Array based Advanced Logic System.

The remaining outstanding Invensys/Schneider Electric Tricon Interim Staff Guidance 6 Phase 2 documents are submitted in this letter. The non-proprietary versions of the documents are listed in Table 1 below and contained on one compact disc (CD),

labeled, "Tricon Phase 2 Documents - Non-Proprietary," contained in Attachment 2 to the Enclosure of this letter. The proprietary versions of the documents are listed in Table 2 below and contained on one CD, labeled, "Tricon Phase 2 Documents -

Proprietary," contained in Attachment 3 to the Enclosure of this letter.

Table 1 Enclosure Listing - CD Content "Tricon Phase 2 Documents - Non-Proprietary" File Description Proprietary Filename [size MB]

System Time Response Confirmation No 993754-11-818-NP Report PPS I, 993-754-11-818 (-NP),

[1.3]

Revision 0 System Time Response Confirmation No 993754-12-818-NP Report PPS II, 993754-12-818 (-NP),

[2.1]

Revision 0 System Time Response Confirmation No 993754-13-818-NP Report PPS III, 993754-13-818 (-NP),

[2.2]

Revision 0 System Time Response Confirmation No 993754-14-818-NP Report PPS IV, 993754-14-818 (-NP),

[2.1]

Revision 0 HVT Report PPS I, 993754-11-854-0 (-NP),

No 993754-11-854-0-NP Revision 1

[1.1]

HVT Report PPS II, 993754-12-854-0 No 993754-12-854-0-NP

(-NP), Revision 0

[1.1]

HVT Report PPS III, 993754-13-854-0 No 993754-13-854-0-NP

(-NP), Revision 0

[1.1]

1 The CD in Attachment 3 of the Enclosure Contains Proprietary Information Withhold from public disclosure under 10 CFR 2.390 When separated from the CD in Attachment 3 to the Enclosure, this document is decontrolled

The CD in Attachment 3 of the Enclosure Contains Proprietary Information Withhold from public disclosure under 10 CFR 2.390 Enclosure PG&E Letter DCL-16-020 Table 1 (continued)

Enclosure Listing.- CD Content "Tricon Phase 2 Documents - Non-Proprietary" File Description Proprietary Filename [size MB]

HVT Report PPS IV, 993754-14-854-0 No 993754-14-854-0-NP

(-NP), Revision 0

[1.1]

Factory Acceptance Report PPS I, No 993754-11-854-1-NP 993754-11-854-1 (-NP), Revision 3

[2.2]

Factory Acceptance Report PPS II, No 993754-12-854-1-NP

  • 993754-12-854-1 (-NP), Revision 0

[2.3]

Factory Acceptance Report PPS Ill, No 993754-13-854-1-NP 993754-13-854-1 (-NP), Revision 0

[2.1]

Factory Acceptance Report PPS IV, No 993754-14-854-1-NP 993754-14-854-1 (-NP), Revision 0

[2.3]

V&V Design Phase Summary Report PPS No 993754-11-861-NP I, 993754-11-861 (-NP), Revision 3

[1.5]

V&V Design Phase Summary Report PPS No 993754-12-861-NP II-IV, 993754-12-861 (-NP), Revision 0

[1.3]

V&V Implementation Phase Summary No 993754-11-862-NP Report PPS I, 993754-11-862 (-NP),

[1.5]

Revision 1 V&V Implementation Phase Summary No 993754-12-862-NP Report PPS II-IV, 993754-12-862 (-NP),

[1.3]

Revision 1 Safety Analysis, 993754-1-915 (-NP),

No 993754-1-915-NP Revision 9

[3.7]

Table 2 Enclosure Listing - CD Content "Tricon Phase 2 Documents - Proprietary" File Description Proprietary Filename [size MB]

System Time Response Confirmation Yes 993754-11-818-P Report PPS I, 993754-11-818 (-P),

[2.5]

Revision 0 System Time Response Confirmation Yes 993754-12-818-P Report PPS II, 993754-12-818 (-P),

[0.8]

Revision 0 System Time Response Confirmation Yes 993754-13-818-P Report PPS III, 993754-13-818 (-P),

[0.8]

Revision 0 2

The CD in Attachment 3 of the Enclosure Contains Proprietary Information Withhold from public disclosure under 10 CFR 2.390 When separated from the CD in Attachment 3 to the Enclosure, this document is decontrolled

The CD in Attachment 3 of the Enclosure Contains Proprietary Information Withhold from public disclosure under 10 CFR 2.390 Enclosure PG&E Letter DCL-16-020 Table 2 (continued)

Enclosure Listing - CD Content "Tricon Phase 2 Documents - Proprietary" File Description Proprietary Filename [size MB]

System Time Response Confirmation Yes 993754-14-818-P Report PPS IV, 993754-14-818 (-P),

[0.7]

Revision 0 HVT Report PPS I, 993754-11-854-0 (-P),

Yes 993754-11-854-0-P Revision 1

[0.7]

HV/T Report PPS II, 993754-12-854-0 (-P),

Yes 993754-12-854-0-P Revision 0

[0.7]

HVT Report PPS III, 993754-13-854-0 (-P),

Yes 993754-13-854-0-P Revision 0

_______[0.7]

HVT Report PPS IV, 993754-14-854-0 (-P),

Yes 993754-14-854-0-P Revision 0

[0.7]

Factory Acceptance Report PPS I, 993754-Yes 993754-11-854-1-P 11-854-1 (-P), Revision 3

[1.0]

Factory Acceptance Report PPS II, Yes 993754-12-854-1-P 993754-12-854-1 (-P), Revision 0

[1.0]

Factory Acceptance Report PPS III, Yes 993754-13-854-1-P

-993754-1 3-854-1 (-P), Revision 0

[0.9]

Factory Acceptance Report PPS IV, Yes 993754-14-854-1-P 993754-14-854-1 (-P), Revision 0

[1.0]

V&V Design Phase Summary Report PPS Yes 993754-11-861-P 1, 993754-11-861 (-P), Revision 3

[1.2]

V&V Design Phase Summary Report PPS Yes 993754-12-861-P II-IV, 993754-12-861 (-P), Revision 0

[1.1]

V&V Implementation Phase Summary Yes 993754-11-862-P Report PPS I, 993754-11-862 (-P),

[1.3]

Revision 1 V&V Implementation Phase Summary Yes 993754-12-862-P Report PPS lI-IV, 993754-12-862 (-P),

[1.1]

Revision 1 Safety Analysis, 993754-1-915 (-P),

Yes 993754-1-915-P Revision 9

[3.1]

3 The CD in Attachment 3 of the Enclosure Contains Proprietary Information Withhold from public disclosure under 10 CFR 2.390 When separated from the CD in Attachment 3 to the Enclosure, this document is decontrolled

The CD in Attachment 3 of the Enclosure Contains Proprietary Information Withhold from public disclosure under 10 CFR 2.390 Enclosure PG&E Letter DCL-16-020 Invensys/Schneider Electric Affidavit 993754-AFF-173T The CD in Attachment 3 of the Enclosure Contains Proprietary Information Withhold from public disclosure under 10 CFR 2.390 When separated from the CD in Attachment 3 to the Enclosure, this document is decontrolled

993754-AFF-173T AFFIDAVIT Nog. 993754-AFF:-173T Re: Request for Withholding fro~m Public Disclosure per 10CFR2.390 STATE OF CALIFORNIA

)

) ss COUNTY OF ORANGE

)

I, B'rian ilaynes, being 'duly sworn, hereby say and depose:

1.Iam the SeniorDirector, Global.Nuclear Delivery for Invensys; and' as such.I have been specifically

.delegated the func~tion of reviewing company proprietary information sought to be Withheld from public

,disclosure, in connection with nuclear,iE qualification and application of the TRICON Programmable Logic Controller (PLC). and am~authorized to apply, for itswithiholding on behalf of the Nuclear Delivery Unit of Irnvensys!Schneider Electi-ic*

2..

The information sought to be withheld is contained in the document(s) described below:

(1). System Time Response Confirmation Report PPS.1,993 754-11-818, Rev 0 (2) System Timle Response Confirmation Report PPS11I, 993754-12-81:8, Rev 0 (3,) System Time Response.Confirmation Report P*PS III, 9*93 754-13-818, Rev 0.

(4~) System Time Response Confirmation Report PPS lI, 993754-14-818,, Rev 0 (5) I-I T Rieport PP'S I1, 993 7j54'-11-854-0, Rev 1 (6,) H-VTR~port*PPSIL, 993 754-12*854-0, Rev.O0 (7). HVTeport P1'

PII, 993754-13-8,5 4-0, iev O)

(8). HVTRepo-t. P1'S IV. 993754-14-854-0, Rev 0

,(9) lFactory Acceptance Report PPS l1 993754-11-854i-1, Rev.3

(10) Factory Acceptance Report PPSII,.993754-12-854-i Rev 0

.(11",Factory Acceptance Report P1'S III,, 993 754-13*8S4:!1. Rev.0

'(12) Factory Acceptance Report PPS IV, 993 754-14-854-1, Rev 0 (13) V&V Design Phase Summajy Report P'S], :993754-11-861, Rev 3

.(14) V&VDesign Phase Summary Report PPS ll-tI V.993754-12-861, Rev 0 (15) V&Vglmplementation P~hase Summary Report PESI1, 993 754-11-8 62, Rev]1 (16). V&Vlhnplementation Phase Summary Report.PPS1-1V, 993754-12-8 62, Rev 1 (17) Safety Analysis, 993 754-1-915, Rev 9 The indicated document(s) contain information considered to be proprietary. Proprietary material in the enclosed documents is indicated by brackets [ ] or other s**i'ilar markings as required by 10CFR2.390(b)(I)(i)(B.). As indicated in the associated transmittal letter, non-proprietary versions of the doctument(s),.m ay or may no~t be provided, consistent With the level of proprietary content.

Page 1 of 3

.993754-AFF-1 73T This information is associated with.thie Diahlo Canyon Power Plant (DCPP): Process Protection:System Replacement Project; which incorporates Invensys TRICON Systems and delegated digital application project. integration services. This will allow the, NRC'to verify compliance with current regulatory requirements -for certain Tnvensys activiti'es in support of the DCPP PP-S Replacement Project.

3.

I am making this affidavit in conformance with the provisions of I 0CFR Part 2.3 90 of the Commission's regulations and in conjunction with the Invensys application for withholding, accompanying thifs affidavit,

4.

I have -personal knowledge of the criteria and procedures utilized by the Nuclear Delivery Unit of Invensys in-designating information as a trade secret, privileged, oras confidential commercial or financial infornation. Some examples of categories of information which fit into the definition of proprietary information are:

a)

Information which discloses process, method, or apparatus, including supporting data and analyses, where prevention of its use by Invensys';s competitors without license or contractfrom Inyvensys constitutes a competitive, economic advantage over other companies in the industry.

b) hIformation,* which if used by competitors, would reduce their expenditure of resources or improve *their competitiveposition.in the-design;, manufacture, shipment, application, installation, assurance of quality, or licensingoQf a similar-product.

c) lIfformation which reveals cost or price information, production capacities, budget levels, or commercial strategies of Invensys, its customers, its partners, or, its suppliers.

d) hIformnation which reveals aspects of past, present, or future Invensys customer-funded development plans or programs, of potential commercial value to Invensys.

e)

Iriforn2iation~ which discloses patentable subject matter for which it may be desirable to obtain patent progtection.

f)

Inforiation obtafined through-Ii1vehgys actions which.could rev~eal, additional insights into :nuclear equipment qualifcation proceSSes, customer 4ippicatkmns, and regulatory proceedings, and which aite not-other~se r~eadily ob~tainable by a coinpetitor,.

Information to be wi'thhleld is considered to bhe proprietary based on 10CFR2.390.(a)(4), with consideration if-the reasons set foit *ra bove.

5.

These documients describe the details of a propgram to qtualify Invensys Triconex equipment for lE

  • application, product design details_,and/o~r customer applicationi approaches. Invensys Triconex :is the firts manufacturer of a PLC to fully :implement thae requietefents set forth in the _EPRI TPR-107330,. which,has.

been endorsed by the Commission in an SER. Invensys Triconex has expended a significant amount of money and effort involving numerous contractors over more. than'l 15.years to develop and' implement an

onigoing successful approach to its test programfl arid miuclear-applications.
Information developed relating

.to test plans, approaches,, equipment, specific problems encountered,, licensing, perspectives, application.

.approaches,-and.lessons learned has significant value because of thne resources expended-to-successfully

  • accomplish this process and the~usefulness~of -this knowledge to potential' competitors.

'Specific data showing-compliance with requirements and demonstrating technical capability of the equipment has-substantial commercial value because it provides the basis for qualifying Invensys Triconex equipment-and 'implementing safety-related digital upgrades to nuclear facilities. Existing options for

digital upgrades in :the nuclear industry are limited. We. believe that ongoing successful 1E :qualification upgrades of the-TRICON PLC products and implementation of-nuclear application projects will continue to give Invensys a competitive advantage 'in this field.

Disclosure of information in these documents would cause substantial harm to the competitive position of Invensys, as there are other competing companies who wish to qualify digital PLC controllers and apply them in safety related applications in nuclear facilities. Competing firms could use our experience, Successful app~roadhes, and techinical information to facilitate their own equipment qualification efforts, application approaches, and/or product design without compensating Invensys.

Page 2 of 3

993754-AF-I 173T

6.

Pursuant to the provisions ofparagraph (b)(4) of Section 2.390 of the Commission's regulations, the following is furnished for consideration by the Commission in determinin g whether the information sought to be withheld from public disclosure should be withheld.

(i)

The information sought to be withheld from public disclosure is owned and has been held in confidence by Invensys.

(ii)

The information is of a type customarily held in confidence by Invensys and not customarily disclosed to the public. Invensys has a rational basis for detemiin the types of information customarily held in confidence by it and, in that connection, utilizes a system to determine when and whether to hold certain types of information in confidence. The application of that system and the substance of that system constitute Invensys policy and provide the rational basis required.

(iii)

The information is being transmitted to the Commission in confidence and, under the provisions of 10CFR Part 2.390, it is to be received in confidence by the Commission.

(iv)

This information is not readily available in public sources.

(v)

Public disclosure of this proprietary information is likely to cause substantial harm to the competitive position of Invensys because it would enhance the ability of competitors to provide similar design and qualification of PLC systems and associated applications using similar project methods, equipment, testing approach, contractors, or licensing approaches.

7. The foregoing statements are true and correct to the best of my knowledge, information, and belief.

SeniorD or, Global Nuclear Delivery Invensys/Scirneider Electric State of California Subscribed and sworn to (or afired) before me on this County of___________

____day of

, 2016 by xS*

Nw of Sinu

":: 1/proved to me on the basis of satisfactory evidence to be the person(s) who appeared before me.

Signature _________________

slgugwcof~cmy Poblic Place Notmry Seal Ahovw Page 3 of 3

JURAT A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.

State of California County of O Subscribed and sworn to (or affirmed) before me on this..L day of /-'.*

20J~.... by proved to me on the basis of satisfactory evidence to be the person(s) who appeared before me.____________

Signat re 1

,/Sea)

  • \\COMM. # 2040 U*cO7XA*ECUNTY201 OPTIONAL INFORMATION DESCRIPTION OF THE ATTACHED DOCUMENT (Tikor desc-lplon of attadied docuwnni (Till or desciiglo of attadie docwnmntc¢onlinued)

NumerofPaes 1~ Dcuen Dae INSTRUCTIONS The wvio(atI AMtJ~ats coqnp,*d Cafoe alartuw

  • 1, 2015 n,,..V be hi the bonn nonwd wonlh or af~rhg a ae~e jurat binn aid as Oti one sth does comta4, Use tawe.vodh In ad**!* te notay custd u as oath or amna fb m benth doaonqrtsiser regaedhsg e b/uEMsds fte ilnsof se doamwt The
  • State and county hfnainmust bethe stateand county wiee hem document signr(s) personall appeared before the notar public
  • Date of notardzation must be the date the signer(s) personally appeared which must also be the same date the jurat process is completed.
  • Print the nmae(s) of the docuament signer(s) whio personally appear at the time of notarization.
  • Signature of the notary public must match the signature on flte with the ofile of the county dark.
  • The notary seal impression must be dear and photogmpfrically reproducible. Impression must not covner text or lines. If seal impression smnudges, resa if. s uflicient area permits, othetwise complete a differnt jurat form.
  • Additional information Is not required but could help to ensure this jurat is not misused or attached to a different document.

Indicate title or type of attached document. number of pages and date.

  • Securely attach thlis document to the signed document with a staple.

Additonatlinbforation 2015 Version wwvw Nolarv~tsses~con 800l-823-9865

The CD in Attachment 3 of the Enclosure Contains Proprietary Information Withhold from public disclosure under 10 CFR 2.390 Enclosure PG&E Letter DCL-16-020 Compact Disc "Tricon Phase 2 Documents - Non-Proprietary" The CD in Attachment 3 of the Enqclosure Contains Proprietary Information Withhold from public disclosure under 10 CFR 2.390 When separated from the CD in Attachment 3 to the Enclosure, this document is decontrolled

The CD in Attachment 3 of the Enclosure Contains Proprietary Information Withhold from public disclosure under 10 CFR 2.390 Enclosure PG&E Letter DCL-16-020 Compact Disc "Tricon Phase 2 Documents - Proprietary I

/

The CD in Attachment 3 of the Enclosure Contains Proprietary Information Withhold from public disclosure under 10 CFR 2.390

The CD in Attachment 3 of the Enclosure Contains Proprietary Information Withhold from public disclosure under 10 CFR 2.390

.1 Pacific Gas and Electric Company° James M. Welsch Diablo Canyon Power Plant Vice President, Nuclear Generation P.C. Box 56 Anila Beach, CA 93424 805.545.3242 E-Mail: JMWllgpge.corm February 11, 2016 PG&E Letter DCL-16-020 U.S. Nuclear Regulatory Commission 10 CFR 50.90 ATTN: Document Control Desk Washington, DC 20555-0001 Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo Canyon Units 1 and 2.

.Submittal of Tricon Phase 2 Documents for the License Amendment Request for Process Protection System Replacement

References:

1. PG&E Letter DCL-1 1-104, "License Amendment Request-11-07, Process Protection System Replacement," dated October 26, 2011 (ADAMS Accession No. ML11307A331)
2. NRC Letter, "Summary of August 5, 2015, Teleconference Meeting with Pacific Gas and Electric Company on Digital Replacement of the Process Protection System Portion of the Reactor Trip System and Engineered Safety Features Actuation System at Diablo Canyon Power Plant, Unit Nos. I and 2 (TAC NOS. ME7522 AND ME7523),"

dated September 10, 2015 (ADAMS Accession No. ML15233A006)

Dear Commissioners and Staff:

In Reference 1, Pacific Gas and Electric Company (PG&E) submitted License Amendment Request 11-07 to request the NRC Staff (Staff) approval to replace the Diablo Canyon Power Plant (DCPP) Eagle 21 digital process protection system (PPS) with a new digital PPS that is based on the Invensys Operations Management Tricon Programmable Logic Controller, Version 10, and the Westinghouse Electric Company Advanced Logic System. This letter submits the remaining Invensys Tricon Interim Staff Guidance 6 Phase 2 documents.

This letter includes the PPS Replacement Project documents in the following Attachments to the Enclosure in this letter:

Attachment I -Ilnvensys/Schneider Electric Affidavit 993754-AFF-173T The C D in Attachment 3 of the Enclosure Contains Proprietary Information/-

Withhold from public disclosure under 10 CFR 2.390 When separated from the CD in Attachment 3 to the Enclosure, this document is decontrolled A member of the STARS (Strategic Teaming and Resource Sharing)

Aliance*

iI1,.

Caltaway

  • Diabto Canyon
  • Palo Verde
    • Wolf Creek

The CD in Attachment 3 of the Enclosure Contains Proprietary Information Withhold from public disclosure under 10 CFR 2.390 SDocument Control Desk PG&E Letter DCL-16-020 February11, 2016 Page 2 - Compact Disc - "Tricon Phase 2 Documents - Non-Proprietary' - Compact Disc -"'Tricon Phase 2 Documents - Proprietary" The Staff requested that the documents contained in Attachment 3 be submitted in Open Item 145 contained in Enclosure 2 of Reference 2.

The lnvensys/Schneider Electric documents contained on the compact disc (CD),

labeled, "Tricon Phase 2 Documents - Non-Proprietary," in Attachment 2 are listed in Table 1 in the Enclosure to this letter. The documents contained on the CD, labeled "Tricon Phase 2 Documents - Proprietary," in Attachment 3, are listed in Table 2 in the Enclosure. The CD contents are in Adobe Acrobat portable document format. The Tricon documents that are proprietary have (-P) at the end of the filename.

The Invensys/Schneider Electric Tricon documents on the CD in Attachment 3 contain proprietary information as identified by Invensys/Schneider Electric. Accordingly, includes a Invensys/Schneider Electric request for withholding proprietary information, Affidavit No. 993754-AFF-1 73T. PG&E requests that the Invensys/Schneider. Electric proprietary information be withheld from public disclosure in accordance with 10 CFR 2.390. Correspondence with respect to the I nvensys/Sch neider Electric affidavit for with holding the I nvensys/Schneider Electric proprietary information provided in Attachment 3 should reference Invensys/Schneider Electric Letter 993754-AFF-173T, and should be forwarded to:

Brian Haynes Senior Director, Global Nuclear Delivery Invensys/Schneider Electric 26561 Rancho Parkway South

.Lake Forest, California 92630 A copy of the proprietary CD will be provided to the following individuals:

Regional Administrator, Region IV DCPP Nuclear Reactor Regulation Project Manager DCPP NRC Senior Resident Inspector Branch Chief, California Department of Public Health The information in the Enclosure in this submittal does not affect the results of the technical evaluation or the significant hazards consideration determination previously transmitted in Reference 1.

The CD in Attachment 3 of the Enclosure Contains Proprietary Information Withhold from public disclosure under 10 CFR 2.390 When separated from the CD in Attachment 3 to the Enclosure, this document is decontrolled A

member of the STARS (Strategic Teaming and Resource Sharing)

Atliance Cattaway

  • Diab~o Canyon
  • Pa~o Verde
  • Wolf Creek

The CD in Attachment 3 of the Enciosure Contains Proprietary Information Withhold from public disclosure under 10 CFR 2.390 SDocument Control Desk PG&E Letter DCL-16-020 February 11, 2016 Page 3 PG&E makes no new or revised regulatory commitments (as defined by NEI 99-04) in this letter.

If you have any questions, or require additional information, please contact Mr. Hossein Hamzehee at (805) 545-4720.

I state under penalty of perjury that the foregoing is true and correct.

Executed on February 11, 2016.

Sincerely,

  • esM.Welsch Vice President, Nuclear Generation kjse/4328/50271 918 Enclosure cc:

Diablo Distribution cc/enc:

Marc L. Dapas, NRC Region IV Siva P. Lingam, NRR Project Manager Gonzalo L. Perez, Branch Chief, California Department of Public Health Binesh K. Tharakan, Acting NRC Senior Resident Inspector The CD in Attachment 3 of the Enclosure Contains Proprietary Information Withhold from public disclosure under 10 CFR 2.390 When separated from the CD in Attachment 3 to the Enclosure, this document is decontrolled A

member of the STARS (Strategic Teaming and Resource Sharing)

Attiance Callaway

  • DiabLo Canyon
  • Pal~o Verde
  • WoLf Creek

The CD in Attachment 3 of the Enclosure Contains Proprietary Information Withhold from public disclosure under 10 CFR 2.390 Enclosure PG&E Letter DCL-16-020 Submittal of Tricon Phase 2 Documents for the License Amendment Request for Process Protection System Replacement Pacific Gas and Electric Company (PG&E) Letter DCL-1 1-104, "License Amendment Request 11-07, Process Protection System Replacement," dated October 26, 2011, submitted License Amendment Request (LAR) 11-07 to request NRC Staff (Staff) approval to replace the Diablo Canyon Power Plant Eagle 21 digital process protection system (PPS) with a new digital PPS that is based on the Invensys Tricon Programmable Logic Controller, Version 10, and the Westinghouse Electric Company Field Programmable Gate Array based Advanced Logic System.

The remaining outstanding Invensys/Schneider Electric Tricon Interim Staff Guidance 6 Phase 2 documents are submitted in this letter. The non-proprietary versions of the documents are listed in Table 1 below and contained on one compact disc (CD),

labeled, "Tricon Phase 2 Documents - Non-Proprietary," contained in Attachment 2 to the Enclosure of this letter. The proprietary versions of the documents are listed in Table 2 below and contained on one CD, labeled, "Tricon Phase 2 Documents -

Proprietary," contained in Attachment 3 to the Enclosure of this letter.

Table 1 Enclosure Listing - CD Content "Tricon Phase 2 Documents - Non-Proprietary" File Description Proprietary Filename [size MB]

System Time Response Confirmation No 993754-11-818-NP Report PPS I, 993-754-11-818 (-NP),

[1.3]

Revision 0 System Time Response Confirmation No 993754-12-818-NP Report PPS II, 993754-12-818 (-NP),

[2.1]

Revision 0 System Time Response Confirmation No 993754-13-818-NP Report PPS III, 993754-13-818 (-NP),

[2.2]

Revision 0 System Time Response Confirmation No 993754-14-818-NP Report PPS IV, 993754-14-818 (-NP),

[2.1]

Revision 0 HVT Report PPS I, 993754-11-854-0 (-NP),

No 993754-11-854-0-NP Revision 1

[1.1]

HVT Report PPS II, 993754-12-854-0 No 993754-12-854-0-NP

(-NP), Revision 0

[1.1]

HVT Report PPS III, 993754-13-854-0 No 993754-13-854-0-NP

(-NP), Revision 0

[1.1]

1 The CD in Attachment 3 of the Enclosure Contains Proprietary Information Withhold from public disclosure under 10 CFR 2.390 When separated from the CD in Attachment 3 to the Enclosure, this document is decontrolled

The CD in Attachment 3 of the Enclosure Contains Proprietary Information Withhold from public disclosure under 10 CFR 2.390 Enclosure PG&E Letter DCL-16-020 Table 1 (continued)

Enclosure Listing.- CD Content "Tricon Phase 2 Documents - Non-Proprietary" File Description Proprietary Filename [size MB]

HVT Report PPS IV, 993754-14-854-0 No 993754-14-854-0-NP

(-NP), Revision 0

[1.1]

Factory Acceptance Report PPS I, No 993754-11-854-1-NP 993754-11-854-1 (-NP), Revision 3

[2.2]

Factory Acceptance Report PPS II, No 993754-12-854-1-NP

  • 993754-12-854-1 (-NP), Revision 0

[2.3]

Factory Acceptance Report PPS Ill, No 993754-13-854-1-NP 993754-13-854-1 (-NP), Revision 0

[2.1]

Factory Acceptance Report PPS IV, No 993754-14-854-1-NP 993754-14-854-1 (-NP), Revision 0

[2.3]

V&V Design Phase Summary Report PPS No 993754-11-861-NP I, 993754-11-861 (-NP), Revision 3

[1.5]

V&V Design Phase Summary Report PPS No 993754-12-861-NP II-IV, 993754-12-861 (-NP), Revision 0

[1.3]

V&V Implementation Phase Summary No 993754-11-862-NP Report PPS I, 993754-11-862 (-NP),

[1.5]

Revision 1 V&V Implementation Phase Summary No 993754-12-862-NP Report PPS II-IV, 993754-12-862 (-NP),

[1.3]

Revision 1 Safety Analysis, 993754-1-915 (-NP),

No 993754-1-915-NP Revision 9

[3.7]

Table 2 Enclosure Listing - CD Content "Tricon Phase 2 Documents - Proprietary" File Description Proprietary Filename [size MB]

System Time Response Confirmation Yes 993754-11-818-P Report PPS I, 993754-11-818 (-P),

[2.5]

Revision 0 System Time Response Confirmation Yes 993754-12-818-P Report PPS II, 993754-12-818 (-P),

[0.8]

Revision 0 System Time Response Confirmation Yes 993754-13-818-P Report PPS III, 993754-13-818 (-P),

[0.8]

Revision 0 2

The CD in Attachment 3 of the Enclosure Contains Proprietary Information Withhold from public disclosure under 10 CFR 2.390 When separated from the CD in Attachment 3 to the Enclosure, this document is decontrolled

The CD in Attachment 3 of the Enclosure Contains Proprietary Information Withhold from public disclosure under 10 CFR 2.390 Enclosure PG&E Letter DCL-16-020 Table 2 (continued)

Enclosure Listing - CD Content "Tricon Phase 2 Documents - Proprietary" File Description Proprietary Filename [size MB]

System Time Response Confirmation Yes 993754-14-818-P Report PPS IV, 993754-14-818 (-P),

[0.7]

Revision 0 HVT Report PPS I, 993754-11-854-0 (-P),

Yes 993754-11-854-0-P Revision 1

[0.7]

HV/T Report PPS II, 993754-12-854-0 (-P),

Yes 993754-12-854-0-P Revision 0

[0.7]

HVT Report PPS III, 993754-13-854-0 (-P),

Yes 993754-13-854-0-P Revision 0

_______[0.7]

HVT Report PPS IV, 993754-14-854-0 (-P),

Yes 993754-14-854-0-P Revision 0

[0.7]

Factory Acceptance Report PPS I, 993754-Yes 993754-11-854-1-P 11-854-1 (-P), Revision 3

[1.0]

Factory Acceptance Report PPS II, Yes 993754-12-854-1-P 993754-12-854-1 (-P), Revision 0

[1.0]

Factory Acceptance Report PPS III, Yes 993754-13-854-1-P

-993754-1 3-854-1 (-P), Revision 0

[0.9]

Factory Acceptance Report PPS IV, Yes 993754-14-854-1-P 993754-14-854-1 (-P), Revision 0

[1.0]

V&V Design Phase Summary Report PPS Yes 993754-11-861-P 1, 993754-11-861 (-P), Revision 3

[1.2]

V&V Design Phase Summary Report PPS Yes 993754-12-861-P II-IV, 993754-12-861 (-P), Revision 0

[1.1]

V&V Implementation Phase Summary Yes 993754-11-862-P Report PPS I, 993754-11-862 (-P),

[1.3]

Revision 1 V&V Implementation Phase Summary Yes 993754-12-862-P Report PPS lI-IV, 993754-12-862 (-P),

[1.1]

Revision 1 Safety Analysis, 993754-1-915 (-P),

Yes 993754-1-915-P Revision 9

[3.1]

3 The CD in Attachment 3 of the Enclosure Contains Proprietary Information Withhold from public disclosure under 10 CFR 2.390 When separated from the CD in Attachment 3 to the Enclosure, this document is decontrolled

The CD in Attachment 3 of the Enclosure Contains Proprietary Information Withhold from public disclosure under 10 CFR 2.390 Enclosure PG&E Letter DCL-16-020 Invensys/Schneider Electric Affidavit 993754-AFF-173T The CD in Attachment 3 of the Enclosure Contains Proprietary Information Withhold from public disclosure under 10 CFR 2.390 When separated from the CD in Attachment 3 to the Enclosure, this document is decontrolled

993754-AFF-173T AFFIDAVIT Nog. 993754-AFF:-173T Re: Request for Withholding fro~m Public Disclosure per 10CFR2.390 STATE OF CALIFORNIA

)

) ss COUNTY OF ORANGE

)

I, B'rian ilaynes, being 'duly sworn, hereby say and depose:

1.Iam the SeniorDirector, Global.Nuclear Delivery for Invensys; and' as such.I have been specifically

.delegated the func~tion of reviewing company proprietary information sought to be Withheld from public

,disclosure, in connection with nuclear,iE qualification and application of the TRICON Programmable Logic Controller (PLC). and am~authorized to apply, for itswithiholding on behalf of the Nuclear Delivery Unit of Irnvensys!Schneider Electi-ic*

2..

The information sought to be withheld is contained in the document(s) described below:

(1). System Time Response Confirmation Report PPS.1,993 754-11-818, Rev 0 (2) System Timle Response Confirmation Report PPS11I, 993754-12-81:8, Rev 0 (3,) System Time Response.Confirmation Report P*PS III, 9*93 754-13-818, Rev 0.

(4~) System Time Response Confirmation Report PPS lI, 993754-14-818,, Rev 0 (5) I-I T Rieport PP'S I1, 993 7j54'-11-854-0, Rev 1 (6,) H-VTR~port*PPSIL, 993 754-12*854-0, Rev.O0 (7). HVTeport P1'

PII, 993754-13-8,5 4-0, iev O)

(8). HVTRepo-t. P1'S IV. 993754-14-854-0, Rev 0

,(9) lFactory Acceptance Report PPS l1 993754-11-854i-1, Rev.3

(10) Factory Acceptance Report PPSII,.993754-12-854-i Rev 0

.(11",Factory Acceptance Report P1'S III,, 993 754-13*8S4:!1. Rev.0

'(12) Factory Acceptance Report PPS IV, 993 754-14-854-1, Rev 0 (13) V&V Design Phase Summajy Report P'S], :993754-11-861, Rev 3

.(14) V&VDesign Phase Summary Report PPS ll-tI V.993754-12-861, Rev 0 (15) V&Vglmplementation P~hase Summary Report PESI1, 993 754-11-8 62, Rev]1 (16). V&Vlhnplementation Phase Summary Report.PPS1-1V, 993754-12-8 62, Rev 1 (17) Safety Analysis, 993 754-1-915, Rev 9 The indicated document(s) contain information considered to be proprietary. Proprietary material in the enclosed documents is indicated by brackets [ ] or other s**i'ilar markings as required by 10CFR2.390(b)(I)(i)(B.). As indicated in the associated transmittal letter, non-proprietary versions of the doctument(s),.m ay or may no~t be provided, consistent With the level of proprietary content.

Page 1 of 3

.993754-AFF-1 73T This information is associated with.thie Diahlo Canyon Power Plant (DCPP): Process Protection:System Replacement Project; which incorporates Invensys TRICON Systems and delegated digital application project. integration services. This will allow the, NRC'to verify compliance with current regulatory requirements -for certain Tnvensys activiti'es in support of the DCPP PP-S Replacement Project.

3.

I am making this affidavit in conformance with the provisions of I 0CFR Part 2.3 90 of the Commission's regulations and in conjunction with the Invensys application for withholding, accompanying thifs affidavit,

4.

I have -personal knowledge of the criteria and procedures utilized by the Nuclear Delivery Unit of Invensys in-designating information as a trade secret, privileged, oras confidential commercial or financial infornation. Some examples of categories of information which fit into the definition of proprietary information are:

a)

Information which discloses process, method, or apparatus, including supporting data and analyses, where prevention of its use by Invensys';s competitors without license or contractfrom Inyvensys constitutes a competitive, economic advantage over other companies in the industry.

b) hIformation,* which if used by competitors, would reduce their expenditure of resources or improve *their competitiveposition.in the-design;, manufacture, shipment, application, installation, assurance of quality, or licensingoQf a similar-product.

c) lIfformation which reveals cost or price information, production capacities, budget levels, or commercial strategies of Invensys, its customers, its partners, or, its suppliers.

d) hIformnation which reveals aspects of past, present, or future Invensys customer-funded development plans or programs, of potential commercial value to Invensys.

e)

Iriforn2iation~ which discloses patentable subject matter for which it may be desirable to obtain patent progtection.

f)

Inforiation obtafined through-Ii1vehgys actions which.could rev~eal, additional insights into :nuclear equipment qualifcation proceSSes, customer 4ippicatkmns, and regulatory proceedings, and which aite not-other~se r~eadily ob~tainable by a coinpetitor,.

Information to be wi'thhleld is considered to bhe proprietary based on 10CFR2.390.(a)(4), with consideration if-the reasons set foit *ra bove.

5.

These documients describe the details of a propgram to qtualify Invensys Triconex equipment for lE

  • application, product design details_,and/o~r customer applicationi approaches. Invensys Triconex :is the firts manufacturer of a PLC to fully :implement thae requietefents set forth in the _EPRI TPR-107330,. which,has.

been endorsed by the Commission in an SER. Invensys Triconex has expended a significant amount of money and effort involving numerous contractors over more. than'l 15.years to develop and' implement an

onigoing successful approach to its test programfl arid miuclear-applications.
Information developed relating

.to test plans, approaches,, equipment, specific problems encountered,, licensing, perspectives, application.

.approaches,-and.lessons learned has significant value because of thne resources expended-to-successfully

  • accomplish this process and the~usefulness~of -this knowledge to potential' competitors.

'Specific data showing-compliance with requirements and demonstrating technical capability of the equipment has-substantial commercial value because it provides the basis for qualifying Invensys Triconex equipment-and 'implementing safety-related digital upgrades to nuclear facilities. Existing options for

digital upgrades in :the nuclear industry are limited. We. believe that ongoing successful 1E :qualification upgrades of the-TRICON PLC products and implementation of-nuclear application projects will continue to give Invensys a competitive advantage 'in this field.

Disclosure of information in these documents would cause substantial harm to the competitive position of Invensys, as there are other competing companies who wish to qualify digital PLC controllers and apply them in safety related applications in nuclear facilities. Competing firms could use our experience, Successful app~roadhes, and techinical information to facilitate their own equipment qualification efforts, application approaches, and/or product design without compensating Invensys.

Page 2 of 3

993754-AF-I 173T

6.

Pursuant to the provisions ofparagraph (b)(4) of Section 2.390 of the Commission's regulations, the following is furnished for consideration by the Commission in determinin g whether the information sought to be withheld from public disclosure should be withheld.

(i)

The information sought to be withheld from public disclosure is owned and has been held in confidence by Invensys.

(ii)

The information is of a type customarily held in confidence by Invensys and not customarily disclosed to the public. Invensys has a rational basis for detemiin the types of information customarily held in confidence by it and, in that connection, utilizes a system to determine when and whether to hold certain types of information in confidence. The application of that system and the substance of that system constitute Invensys policy and provide the rational basis required.

(iii)

The information is being transmitted to the Commission in confidence and, under the provisions of 10CFR Part 2.390, it is to be received in confidence by the Commission.

(iv)

This information is not readily available in public sources.

(v)

Public disclosure of this proprietary information is likely to cause substantial harm to the competitive position of Invensys because it would enhance the ability of competitors to provide similar design and qualification of PLC systems and associated applications using similar project methods, equipment, testing approach, contractors, or licensing approaches.

7. The foregoing statements are true and correct to the best of my knowledge, information, and belief.

SeniorD or, Global Nuclear Delivery Invensys/Scirneider Electric State of California Subscribed and sworn to (or afired) before me on this County of___________

____day of

, 2016 by xS*

Nw of Sinu

":: 1/proved to me on the basis of satisfactory evidence to be the person(s) who appeared before me.

Signature _________________

slgugwcof~cmy Poblic Place Notmry Seal Ahovw Page 3 of 3

JURAT A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.

State of California County of O Subscribed and sworn to (or affirmed) before me on this..L day of /-'.*

20J~.... by proved to me on the basis of satisfactory evidence to be the person(s) who appeared before me.____________

Signat re 1

,/Sea)

  • \\COMM. # 2040 U*cO7XA*ECUNTY201 OPTIONAL INFORMATION DESCRIPTION OF THE ATTACHED DOCUMENT (Tikor desc-lplon of attadied docuwnni (Till or desciiglo of attadie docwnmntc¢onlinued)

NumerofPaes 1~ Dcuen Dae INSTRUCTIONS The wvio(atI AMtJ~ats coqnp,*d Cafoe alartuw

  • 1, 2015 n,,..V be hi the bonn nonwd wonlh or af~rhg a ae~e jurat binn aid as Oti one sth does comta4, Use tawe.vodh In ad**!* te notay custd u as oath or amna fb m benth doaonqrtsiser regaedhsg e b/uEMsds fte ilnsof se doamwt The
  • State and county hfnainmust bethe stateand county wiee hem document signr(s) personall appeared before the notar public
  • Date of notardzation must be the date the signer(s) personally appeared which must also be the same date the jurat process is completed.
  • Print the nmae(s) of the docuament signer(s) whio personally appear at the time of notarization.
  • Signature of the notary public must match the signature on flte with the ofile of the county dark.
  • The notary seal impression must be dear and photogmpfrically reproducible. Impression must not covner text or lines. If seal impression smnudges, resa if. s uflicient area permits, othetwise complete a differnt jurat form.
  • Additional information Is not required but could help to ensure this jurat is not misused or attached to a different document.

Indicate title or type of attached document. number of pages and date.

  • Securely attach thlis document to the signed document with a staple.

Additonatlinbforation 2015 Version wwvw Nolarv~tsses~con 800l-823-9865

The CD in Attachment 3 of the Enclosure Contains Proprietary Information Withhold from public disclosure under 10 CFR 2.390 Enclosure PG&E Letter DCL-16-020 Compact Disc "Tricon Phase 2 Documents - Non-Proprietary" The CD in Attachment 3 of the Enqclosure Contains Proprietary Information Withhold from public disclosure under 10 CFR 2.390 When separated from the CD in Attachment 3 to the Enclosure, this document is decontrolled

The CD in Attachment 3 of the Enclosure Contains Proprietary Information Withhold from public disclosure under 10 CFR 2.390 Enclosure PG&E Letter DCL-16-020 Compact Disc "Tricon Phase 2 Documents - Proprietary I

/

The CD in Attachment 3 of the Enclosure Contains Proprietary Information Withhold from public disclosure under 10 CFR 2.390