Letter Sequence Draft Other |
---|
|
|
MONTHYEARML0829504322008-09-0101 September 2008 R. E. Ginna Draft - Section C Operating Exam (Folder 2) Project stage: Draft Other ML0829504252008-09-0101 September 2008 R. E. Ginna Draft - Section B Operating Exam (Folder 2) Project stage: Draft Other ML0829504222008-09-0101 September 2008 R. E. Ginna Draft - Section a Operating Exam (Folder 2) Project stage: Draft Other ML0829503892008-09-0101 September 2008 R. E. Ginna Draft - RO & SRO Written Exam (Folder 2) Project stage: Draft Other ML0829503842008-09-0101 September 2008 R. E. Ginna Draft - Outlines (Folder 2) Project stage: Draft Other ML0829503492008-09-17017 September 2008 NRC Comments on Draft Licensee-Developed Exam (Written & Operating Tests) (Folder 2) Project stage: Draft Other ML0831106652008-10-17017 October 2008 R. E. Ginna Final - Operating Exam, Sections a, B, and C (Folder 3) Project stage: Other ML0831106592008-10-17017 October 2008 R. E. Ginna Handouts to Applicants (Folder 3) Project stage: Other ML0831106192008-10-17017 October 2008 R. E. Ginna Final - RO & SRO Written Examination with Answer Key (401-5 Format) (Folder 3) Project stage: Other ML0831105902008-10-17017 October 2008 R. E. Ginna Final Outlines (Folder 3) Project stage: Other ML0835101112008-12-0505 December 2008 R. E. Ginna Nuclear Power Plant, LLC, NRC Operator Licensing Initial Exam Results, (Cover Letter Publicly Available; Enclosures Withheld from Public) Project stage: Other ML0836602532008-12-29029 December 2008 Final Qa/Related Operator Licensing Exam Forms (Folder 1) Project stage: Other 2008-12-05
[Table View] |
Similar Documents at Ginna |
---|
Category:License-Operator
MONTHYEARRS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23247A0092022-09-28028 September 2022 Final QA Related Forms RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations ML21012A2692021-01-12012 January 2021 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2021 ML20329A4322020-11-17017 November 2020 Final Qa/Related Forms (Folder 1) ML20329A4422020-09-17017 September 2020 Final Qa/Related Form - Form ES-401-6 (Folder 1) ML20329A1812020-09-17017 September 2020 NRC Comments on Draft Licensee-Developed Operating Test Outlines (Folder 2) ML20329A1412020-09-17017 September 2020 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML20322A3502020-09-17017 September 2020 Final Operating Test (Sections a, B, and C) (Folder 3) ML20321A2792020-09-17017 September 2020 Final Written Examination with Answer Key (Form 401-5 Format) (Folder 3) ML20328A1622020-09-17017 September 2020 Final Written Examination and Operating Test Outlines (Folder 3) ML20328A2792020-09-17017 September 2020 Handouts to Applicants (Folder 3) ML20328A2912020-09-17017 September 2020 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) ML20329A2002020-08-26026 August 2020 Draft Written Examination and Operating Test Outlines (Folder 2) ML22103A2232020-08-26026 August 2020 Revised Draft Written Examination and Operating Test Outlines (2022 Regional Audit Corrective Action) (Folder 2) ML20329A2392020-07-22022 July 2020 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML20329A2232020-07-22022 July 2020 Draft Written Examination (Folder 2) ML20329A3542020-07-22022 July 2020 Licensee 75-Day Letter Transmitting the Draft Written Exam and Operating Test Material (Folder 2) ML19352D6572019-12-16016 December 2019 Announcement 0f Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2020 ML19323D1722019-11-18018 November 2019 R. E. Ginna Nuclear Power Plant - Senior Reactor and Reactor Operator Initial License Examinations ML21041A2942019-10-0303 October 2019 Original Questions for Modified Written Exam Questions RS-19-053, Response to NRC Regulatory Issue Summary 2019-02, Preparation and Scheduling of Operator Licensing Examinations2019-05-16016 May 2019 Response to NRC Regulatory Issue Summary 2019-02, Preparation and Scheduling of Operator Licensing Examinations ML19045A3702019-02-12012 February 2019 March 2019 GFE Cover Letter Ri ML18353A6082018-12-18018 December 2018 Senior Reactor Operator Retake License Examinations ML18344A5852018-12-10010 December 2018 R. E. Ginna - Reactor Operator Retake License Examinations ML19119A1472018-10-30030 October 2018 Final Qa/Related Forms (Folder 1) ML19156A1482018-08-27027 August 2018 Final Qa/Related Form - ES-201-1 (Folder 1) ML18233A5092018-08-21021 August 2018 Operator Licensing Operating Test Approval RS-18-057, Response to NRC Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations2018-04-25025 April 2018 Response to NRC Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations ML18005A4202018-01-0303 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML17272A3242017-09-28028 September 2017 R. E. Ginna - Senior Reactor and Reactor Operator Initial License Examinations RS-17-070, Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations2017-05-0303 May 2017 Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations ML17114A2862017-04-21021 April 2017 Miscellaneous Exam Material (Folder 1) ML17114A2172017-04-21021 April 2017 Final Qa/Related Forms (Folder 1) ML17114A3172017-04-21021 April 2017 Handouts to Applicants (Folder 3) ML17123A1722017-04-14014 April 2017 Post Exam Comments Resolution References (Folder 1) ML17114A3752017-03-0909 March 2017 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) ML17114A1562017-03-0909 March 2017 Final Qa/Related Forms - ES-401 (Folder 1) ML17114A3812017-03-0909 March 2017 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML17066A2272017-03-0707 March 2017 Initial Operator Licensing Operating Test Approval: R. E. Ginna Nuclear Power Plant ML17104A2162017-03-0707 March 2017 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML17104A2012017-03-0303 March 2017 Final Operating Test (Sections a, B, and C) (Folder 3) ML17114A4232017-01-19019 January 2017 Draft Written Exam (Folder 2) ML17114A4372017-01-19019 January 2017 Draft Operating Exam (Section a, Section B, Section C) (Folder 2) ML17114A3522017-01-19019 January 2017 Final Outlines (Folder 3) ML17018A2822017-01-17017 January 2017 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2017 ML17114A4112016-12-0909 December 2016 Draft - Outlines (Folder 2), (Facility Letter. Dtd ML16286A4132016-10-11011 October 2016 Senior Reactor and Reactor Operator Initial License Examinations - )R.E. Ginna Nuclear Power Plant) ML15156A5522015-01-21021 January 2015 Final Qa/Related Forms (Folder 1) ML15043A6812014-12-16016 December 2014 Final Operating Exam (Sections a, B, and C) (Folder 3) 2023-06-16
[Table view] Category:Part 55 Examination Related Material
MONTHYEARRS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23247A0092022-09-28028 September 2022 Final QA Related Forms RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations ML21012A2692021-01-12012 January 2021 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2021 ML20329A4322020-11-17017 November 2020 Final Qa/Related Forms (Folder 1) ML20329A4422020-09-17017 September 2020 Final Qa/Related Form - Form ES-401-6 (Folder 1) ML20329A1812020-09-17017 September 2020 NRC Comments on Draft Licensee-Developed Operating Test Outlines (Folder 2) ML20329A1412020-09-17017 September 2020 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML20328A2792020-09-17017 September 2020 Handouts to Applicants (Folder 3) ML20321A2792020-09-17017 September 2020 Final Written Examination with Answer Key (Form 401-5 Format) (Folder 3) ML20322A3502020-09-17017 September 2020 Final Operating Test (Sections a, B, and C) (Folder 3) ML20328A1622020-09-17017 September 2020 Final Written Examination and Operating Test Outlines (Folder 3) ML20328A2912020-09-17017 September 2020 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) ML22103A2232020-08-26026 August 2020 Revised Draft Written Examination and Operating Test Outlines (2022 Regional Audit Corrective Action) (Folder 2) ML20329A2002020-08-26026 August 2020 Draft Written Examination and Operating Test Outlines (Folder 2) ML20329A2392020-07-22022 July 2020 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML20329A2232020-07-22022 July 2020 Draft Written Examination (Folder 2) ML20329A3542020-07-22022 July 2020 Licensee 75-Day Letter Transmitting the Draft Written Exam and Operating Test Material (Folder 2) ML19352D6572019-12-16016 December 2019 Announcement 0f Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2020 ML19323D1722019-11-18018 November 2019 R. E. Ginna Nuclear Power Plant - Senior Reactor and Reactor Operator Initial License Examinations ML21041A2942019-10-0303 October 2019 Original Questions for Modified Written Exam Questions RS-19-053, Response to NRC Regulatory Issue Summary 2019-02, Preparation and Scheduling of Operator Licensing Examinations2019-05-16016 May 2019 Response to NRC Regulatory Issue Summary 2019-02, Preparation and Scheduling of Operator Licensing Examinations ML18353A6082018-12-18018 December 2018 Senior Reactor Operator Retake License Examinations ML18344A5852018-12-10010 December 2018 R. E. Ginna - Reactor Operator Retake License Examinations ML19119A1472018-10-30030 October 2018 Final Qa/Related Forms (Folder 1) ML19156A1482018-08-27027 August 2018 Final Qa/Related Form - ES-201-1 (Folder 1) ML18233A5092018-08-21021 August 2018 Operator Licensing Operating Test Approval RS-18-057, Response to NRC Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations2018-04-25025 April 2018 Response to NRC Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations ML18005A4202018-01-0303 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML17272A3242017-09-28028 September 2017 R. E. Ginna - Senior Reactor and Reactor Operator Initial License Examinations RS-17-070, Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations2017-05-0303 May 2017 Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations ML17114A2862017-04-21021 April 2017 Miscellaneous Exam Material (Folder 1) ML17114A2172017-04-21021 April 2017 Final Qa/Related Forms (Folder 1) ML17114A3172017-04-21021 April 2017 Handouts to Applicants (Folder 3) ML17123A1722017-04-14014 April 2017 Post Exam Comments Resolution References (Folder 1) ML17114A3752017-03-0909 March 2017 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) ML17114A1562017-03-0909 March 2017 Final Qa/Related Forms - ES-401 (Folder 1) ML17114A3812017-03-0909 March 2017 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML17104A2162017-03-0707 March 2017 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML17066A2272017-03-0707 March 2017 Initial Operator Licensing Operating Test Approval: R. E. Ginna Nuclear Power Plant ML17104A2012017-03-0303 March 2017 Final Operating Test (Sections a, B, and C) (Folder 3) ML17114A4232017-01-19019 January 2017 Draft Written Exam (Folder 2) ML17114A4372017-01-19019 January 2017 Draft Operating Exam (Section a, Section B, Section C) (Folder 2) ML17114A3522017-01-19019 January 2017 Final Outlines (Folder 3) ML17018A2822017-01-17017 January 2017 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2017 ML17114A4112016-12-0909 December 2016 Draft - Outlines (Folder 2), (Facility Letter. Dtd ML16286A4132016-10-11011 October 2016 Senior Reactor and Reactor Operator Initial License Examinations - )R.E. Ginna Nuclear Power Plant) ML15156A5522015-01-21021 January 2015 Final Qa/Related Forms (Folder 1) ML15043A6792014-12-16016 December 2014 Final Written Examination with Answer Key (401-5 Format) (Folder 2) ML15043A6802014-12-16016 December 2014 Handouts to Applicants (Folder 3) 2023-06-16
[Table view] |
Text
Form ES-401-9 ES-401 Written Examination Review Worksheet
- 1. 2. 3. Enter the level of knowlerlrp
!I OK! nf e& quer?inr!
8s either (F)u~dem~n!n!
cr <U)ighc: cogni:ivs
!=;el. Enter the level of difficulty (LOD) of each question using a 1 - 5 (easy - difficult) rating scale (questions in the 2 - 4 range are acceptable).
Check the appropriate box if a psychometric flaw is identified: . 0 . 0 . The stem lacks sufficient focus to elicit the correct answer (e.g., unclear intent, more information is needed, or too much needless information).
The stem or distractors contain cues (Le., clues, specific determiners, phrasing, length, etc). The distractors are not credible; single implausible distractors should be repaired, more than one is unacceptable.
One or more distractors is (are) partially correct (e.g., if the applicant can make unstated assumptions that are not contradicted by stem). The question is not linked to the job requirements (i.e., the question has a valid WA but, as written, is not operational in content). The question requires the recall of knowledge that is too specific for the closed reference test mode (i.e., it is not required to be known from memory). The question contains data with an unrealistic level of accuracy or inconsistent units (e.g., panel meter in percent with question in gallons). The question requires reverse logic or application compared to the job requirements.
The answer choices are a collection of unrelated true/false statements.
- 4. Check the appropriate box if a job content error is identified:
0 0 . . 5. 6. 7. 8. Check questions that are sampled for conformance with the approved WA and those that are designated SRO-only (WA and license level mismatches are unacceptable).
Enter question source: (B)ank, (M)odified, or (N)ew. Check that (M)odified questions meet criteria of ES-401 Section D.2.f. Based on the reviewer's judgment, is the question as written (U)nsatisfactory (requiring repair or replacement), in need of (E)ditorial enhancement, or (S)atisfactory?
At a minimum, explain any "U ratings (e.g., how the Appendix B psychometric attributes are not being met).
ES-401 2 Form ES-401-9
2008 Ginna NRC Exam: JPM/Si mulator Scenario Comments and Resolutions The following are comments made during validation and the corrections incorporated.
I. JPMs A. Simulator/Plant JPMs
- 1. JPM A: Added to initial cue the plant has been operating for 16 months at rated power and reshot I/C with an EOL core to support the 100 gallon water addition.
Step 9 no longer a critical step.
- 2. JPM B: Added notes for the Evaluator and Booth Operator to keep the simulator in Freeze until the candidate has the watch to prevent the depletion of the RWST. Inserted evaluator cue for steps 15 and 16 to inform candidate of SW and CCW flows and alignments.
- 3. JPM C: At NRC's request added (1) critical step for the candidate to determine that accumulator nitrogen pressure is low and identify corrective actions.
Added examiners note for information only, the setpoint of the accumulator low pressure alarm. 4. JPM D: Condensed initiating cue.
- 5. JPM E: At NRC's request altered initiation of JPM and requested recommendation from candidate on procedure use due to plant conditions.
Added information to Examiners Notes, candidate may perform actions from memory but must verify actions with the procedure.
- 6. JPM F: Changed steps 11 and 1 3 to non-critical steps and changed step 19 to be a critical step. Rearranged cues in step 2. Clarified performance step
- 3. Removed cue from step 19.
- 7. JPM G: None. 8. JPM H: None. 9. JPM I: None. 10. JPM J: None. 11. JPM K: None.
B. Admin JPMs
- 1. RA-1: Added note for examiner concerning rod control. Added amplifying cue if needed at the end of the JPM, included bank and step if Bank B is used. 2. RA-2: Added note to examiner concerning correct usage of data sheet. Changed acceptance criteria based on feedback during validation.
Changed to a simulator admin JPM based on readabilitjr of meters required to perform JPM. 3. RA-3: Changed all references from "tagout" to "holds". Added Cues and Notes for examiner to clarify responses arid required tasks. Added other possible vent path. Added "No Tag" as an option on vents and drains. 4. RA-4: Added procedure numbers to standard blocks where applicable.
Added additional clarification in Initiating Cue.
- 5. SA-1: None. 6. SA-2: None.
- 7. SA-3: Changed all references from "tagout" to "holds". Added Cues and Notes for examiner to clarify responses arid required tasks.
- 8. SA-4: Changed "Delay" to "Decay", changed to "A" GDT and added procedure S-4.2.5, Release of Gas Decay Tank.
- 9. SA-5: None.
- 11. Simulator Scenarios A. Scenario 1 1. Event 1 - Removed BOP credit for Instrument malfunction reclassified Event Type to I-SRO. 2. Event 5 - Ensured RCP Vibration ramped to allow for candidate evaluation of tripping the Reactor and RCP. B. Scenario 2 1. Rearranged first four events to allow better evaluation of RCS leak rate.
- 2. Changed letdown setup from 60 gals to 40 gals to ensure makeup capacity to VCT was not exceeded with the given RCS leak rate.
- 3. Put ramp on PRZR Pressure controller failure to ensure candidates would respond prior to needing a reactor trip.
- 4. Removed ATC credit for component malfunction for RCS leak. Changed event type to C-SRO and TS-SRO. 5. Added malfunction of RWST level post EOP entry to evaluate candidate awareness of actual ES- 1.3 entry conditions vs. instrument failure.
- 6. Event 5 - Ensured ramp of malfunction provided enough opportunity for candidate intervention prior to reactor trip on S/G level. C. Scenario 3 1. Event 3 - Reclassified from C-SRO and TS-SRO to TS-SRO.
- 2. Event 5 - Ensured ramp rate allowed for candidate response prior to reactor trip on S/G level. Added steps for SRO determination not to trip second channel and removed defeat steps.
D. Scenario4
- 1. Event 6 - Added Auto Failure of TDAFW Pump to start and then later after one S/G > 7% NR, fails TDAFW Pump Speed to zero. Added Event Type C-BOP. E. Scenario 5 1. No comments, spare scenario.