Similar Documents at Ginna |
---|
Category:Letter
MONTHYEARIR 05000244/20243012024-10-22022 October 2024 Initial Operator Licensing Examination Report 05000244/2024301 ML24286A0022024-10-11011 October 2024 Core Operating Limits Report Cycle 45, Revision 0 RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing RS-24-092, Revised Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-09-25025 September 2024 Revised Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000244/20245012024-09-24024 September 2024 LLC - Emergency Preparedness Biennial Exercise Inspection Report 05000244/2024501 IR 05000244/20240052024-08-29029 August 2024 Updated Inspection Plan for R.E. Ginna Nuclear Power Plant (Report 05000244/2024005) ML24234A0922024-08-21021 August 2024 Requalification Program Inspection IR 05000244/20240102024-08-19019 August 2024 Biennial Problem Identification and Resolution Inspection Report 05000244/2024010 ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition IR 05000244/20240022024-08-0505 August 2024 LLC - Integrated Inspection Report 05000244/2024002 and Independent Spent Fuel Storage Installation Report 07200067/2024001 ML24179A3262024-07-23023 July 2024 LTR - Constellation - SG Welds and Nozzles (L-2023-LLR-0053, L-2023-LLR-0054, L-2023-LLR-0055, L-2023-LLR-0056) ML24170A3852024-07-16016 July 2024 R. E. Ginna Nuclear Power Plant - Alternative Associated with Inservice Testing of B Auxiliary Feedwater Pump - PR-03 ML24197A0302024-07-15015 July 2024 LLC - Operator Licensing Examination Approval RS-24-070, Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions2024-07-12012 July 2024 Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions IR 05000244/20244022024-06-20020 June 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000244/2024402 RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 ML24143A0752024-05-22022 May 2024 Re. Ginna Nuclear Power Plant and Independent Spent Fuel Storage Installation (ISFSI) Registration for Use of General License ISFSI Casks ML24136A1692024-05-14014 May 2024 And Independent Spent Fuel Storage Installation (ISFSI) - 2023 Annual Radioactive Effluent Release Report and 2023 Annual Radiological Environmental Operating Report ML24134A0042024-05-13013 May 2024 Request for Information for a Biennial Problem Identification and Resolution Inspection; Inspection Report 05000244/2024010 RS-24-049, Updated Notice of Intent to Pursue Subsequent License Renewal Applications2024-05-0909 May 2024 Updated Notice of Intent to Pursue Subsequent License Renewal Applications RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests IR 05000244/20240012024-04-24024 April 2024 LLC - Integrated Inspection Report 05000244/2024001 ML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition ML24101A0432024-04-10010 April 2024 2024 10 CFR 50.46 Annual Report IR 05000244/20240112024-04-10010 April 2024 LLC - Fire Protection Team Inspection Report 05000244/2024011 RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report ML24088A2042024-03-28028 March 2024 R. E. Ginna Nuclear Power Plant - Response to NRC Request for Additional Information Regarding Relief Request Associated with Inservice Testing of ‘B’ Auxiliary Feedwater Pump ML24110A0122024-03-28028 March 2024 2023 Report of Individual Monitoring for R.E. Ginna Nuclear Power Plant LLC, License DPR-18 05000244/LER-2023-003-01, Re. Ginna Nuclear Power Plant, Manual Reactor Trip Due to Degraded Condenser Vacuum from Lowering Main Steam to Air Ejectors and Auxiliary Feedwater Actuation Due to Low Steam2024-03-0707 March 2024 Re. Ginna Nuclear Power Plant, Manual Reactor Trip Due to Degraded Condenser Vacuum from Lowering Main Steam to Air Ejectors and Auxiliary Feedwater Actuation Due to Low Steam IR 05000244/20230062024-02-28028 February 2024 Annual Assessment Letter for R.E. Ginna Nuclear Power Plant, LLC, (Report 05000244/2023006) IR 05000244/20230042024-02-0505 February 2024 LLC - Integrated Inspection Report 05000244/2023004 ML24026A0112024-01-26026 January 2024 R. E. Ginna Nuclear Power Plant, Relief Request Associated with Inservice Testing of ‘B’ Auxiliary Feedwater Pump IR 05000244/20230102023-12-19019 December 2023 LLC - Age-Related Degradation Inspection Report 05000244/2023010 ML23348A0992023-12-15015 December 2023 R. E. Ginna Nuclear Power Plant – Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0029 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML23347A0092023-12-13013 December 2023 Annual Commitment Change Notification ML23346A0142023-12-12012 December 2023 LLC - Senior Reactor and Reactor Operator Initial License Examinations 05000244/LER-2023-003, Manual Reactor Trip Due to Degraded Condenser Vacuum from Lowering Main Steam to Air Ejectors and Auxiliary Feedwater Actuation Due to Low Steam Generator Level2023-12-11011 December 2023 Manual Reactor Trip Due to Degraded Condenser Vacuum from Lowering Main Steam to Air Ejectors and Auxiliary Feedwater Actuation Due to Low Steam Generator Level ML23341A1252023-12-0707 December 2023 Supplemental Response to Part 73 Exemption Request - Withdrawal of Request for Exemption from 10 CFR 73, Subpart B, Preemption Authority Requirements ML23321A1392023-11-17017 November 2023 Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information and Request for Additional Information ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums 05000244/LER-2023-002, Overtemperature Delta Temperature Reactor Protection System and Auxiliary Feedwater System Actuations on Due to 100% Load Rejection Caused by Turbine Overspeed Circuit Card Failure2023-11-0808 November 2023 Overtemperature Delta Temperature Reactor Protection System and Auxiliary Feedwater System Actuations on Due to 100% Load Rejection Caused by Turbine Overspeed Circuit Card Failure. IR 05000244/20230032023-10-25025 October 2023 LLC - Integrated Inspection Report 05000244/2023003 ML23292A0282023-10-19019 October 2023 LLC - Notification of Conduct of a Fire Protection Team Inspection RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans RS-23-108, Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles2023-10-11011 October 2023 Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles RS-23-105, Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections2023-10-10010 October 2023 Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections ML23258A1382023-09-18018 September 2023 Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000244/2023010 IR 05000244/20230052023-08-31031 August 2023 Updated Inspection Plan for R.E. Ginna Nuclear Power Plant, LLC (Report 05000244/2023005) 2024-09-25
[Table view] Category:License-Operator
MONTHYEARML24234A0922024-08-21021 August 2024 Requalification Program Inspection RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23013A1362022-12-0808 December 2022 Post Exam Comments and NRC Resolutions ML23247A0102022-11-0404 November 2022 Miscellaneous Exam Material ML23013A0432022-10-14014 October 2022 Administered Operating Test ML23247A0032022-10-14014 October 2022 Handouts to Applicants ML23012A0772022-10-14014 October 2022 Administered Written Examination with Answer Key ML23247A0092022-09-28028 September 2022 Final QA Related Forms ML23247A0082022-09-28028 September 2022 NRC Comments on Draft Licensee-Developed Written Exam ML23247A0072022-09-28028 September 2022 NRC Comments on Draft Licensee-Developed Operating Test ML23247A0012022-09-21021 September 2022 Final Written Examination and Operating Test Outlines ML23247A0062022-09-21021 September 2022 NRC Comments on Draft Licensee-Developed Operating Test Outlines ML23247A0022022-09-21021 September 2022 Modified Question Source Information ML23247A0052022-07-21021 July 2022 Draft Written Examination ML23233A0472022-07-21021 July 2022 Draft Operating Test ML23247A0042022-05-19019 May 2022 Draft Written Examination and Operating Test Outlines RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations ML21012A2692021-01-12012 January 2021 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2021 ML20329A4322020-11-17017 November 2020 Final Qa/Related Forms (Folder 1) ML20329A4422020-09-17017 September 2020 Final Qa/Related Form - Form ES-401-6 (Folder 1) ML20328A1622020-09-17017 September 2020 Final Written Examination and Operating Test Outlines (Folder 3) ML20328A2792020-09-17017 September 2020 Handouts to Applicants (Folder 3) ML20328A2912020-09-17017 September 2020 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) ML20321A2792020-09-17017 September 2020 Final Written Examination with Answer Key (Form 401-5 Format) (Folder 3) ML20322A3502020-09-17017 September 2020 Final Operating Test (Sections a, B, and C) (Folder 3) ML20329A1412020-09-17017 September 2020 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML20329A1812020-09-17017 September 2020 NRC Comments on Draft Licensee-Developed Operating Test Outlines (Folder 2) ML20329A2002020-08-26026 August 2020 Draft Written Examination and Operating Test Outlines (Folder 2) ML22103A2232020-08-26026 August 2020 Revised Draft Written Examination and Operating Test Outlines (2022 Regional Audit Corrective Action) (Folder 2) ML20329A2232020-07-22022 July 2020 Draft Written Examination (Folder 2) ML20329A3542020-07-22022 July 2020 Licensee 75-Day Letter Transmitting the Draft Written Exam and Operating Test Material (Folder 2) ML20329A2392020-07-22022 July 2020 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML19352D6572019-12-16016 December 2019 Announcement 0f Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2020 ML19323D1722019-11-18018 November 2019 R. E. Ginna Nuclear Power Plant - Senior Reactor and Reactor Operator Initial License Examinations ML21041A2942019-10-0303 October 2019 Original Questions for Modified Written Exam Questions RS-19-053, Response to NRC Regulatory Issue Summary 2019-02, Preparation and Scheduling of Operator Licensing Examinations2019-05-16016 May 2019 Response to NRC Regulatory Issue Summary 2019-02, Preparation and Scheduling of Operator Licensing Examinations ML19045A3702019-02-12012 February 2019 March 2019 GFE Cover Letter Ri ML18353A6082018-12-18018 December 2018 Senior Reactor Operator Retake License Examinations ML18344A5852018-12-10010 December 2018 R. E. Ginna - Reactor Operator Retake License Examinations ML19119A1472018-10-30030 October 2018 Final Qa/Related Forms (Folder 1) ML19156A1482018-08-27027 August 2018 Final Qa/Related Form - ES-201-1 (Folder 1) ML18233A5092018-08-21021 August 2018 Operator Licensing Operating Test Approval RS-18-057, Response to NRC Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations2018-04-25025 April 2018 Response to NRC Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations ML18005A4202018-01-0303 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML17272A3242017-09-28028 September 2017 R. E. Ginna - Senior Reactor and Reactor Operator Initial License Examinations RS-17-070, Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations2017-05-0303 May 2017 Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations ML17114A3172017-04-21021 April 2017 Handouts to Applicants (Folder 3) ML17114A2862017-04-21021 April 2017 Miscellaneous Exam Material (Folder 1) ML17114A2172017-04-21021 April 2017 Final Qa/Related Forms (Folder 1) ML17123A1722017-04-14014 April 2017 Post Exam Comments Resolution References (Folder 1) 2024-08-21
[Table view] Category:Part 55 Examination Related Material
MONTHYEARRS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23013A1362022-12-0808 December 2022 Post Exam Comments and NRC Resolutions ML23247A0102022-11-0404 November 2022 Miscellaneous Exam Material ML23013A0432022-10-14014 October 2022 Administered Operating Test ML23012A0772022-10-14014 October 2022 Administered Written Examination with Answer Key ML23247A0032022-10-14014 October 2022 Handouts to Applicants ML23247A0082022-09-28028 September 2022 NRC Comments on Draft Licensee-Developed Written Exam ML23247A0092022-09-28028 September 2022 Final QA Related Forms ML23247A0072022-09-28028 September 2022 NRC Comments on Draft Licensee-Developed Operating Test ML23247A0012022-09-21021 September 2022 Final Written Examination and Operating Test Outlines ML23247A0062022-09-21021 September 2022 NRC Comments on Draft Licensee-Developed Operating Test Outlines ML23247A0022022-09-21021 September 2022 Modified Question Source Information ML23247A0052022-07-21021 July 2022 Draft Written Examination ML23233A0472022-07-21021 July 2022 Draft Operating Test ML23247A0042022-05-19019 May 2022 Draft Written Examination and Operating Test Outlines RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations ML21012A2692021-01-12012 January 2021 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2021 ML20329A4322020-11-17017 November 2020 Final Qa/Related Forms (Folder 1) ML20322A3502020-09-17017 September 2020 Final Operating Test (Sections a, B, and C) (Folder 3) ML20321A2792020-09-17017 September 2020 Final Written Examination with Answer Key (Form 401-5 Format) (Folder 3) ML20328A2792020-09-17017 September 2020 Handouts to Applicants (Folder 3) ML20329A1412020-09-17017 September 2020 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML20329A1812020-09-17017 September 2020 NRC Comments on Draft Licensee-Developed Operating Test Outlines (Folder 2) ML20328A1622020-09-17017 September 2020 Final Written Examination and Operating Test Outlines (Folder 3) ML20328A2912020-09-17017 September 2020 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) ML20329A4422020-09-17017 September 2020 Final Qa/Related Form - Form ES-401-6 (Folder 1) ML20329A2002020-08-26026 August 2020 Draft Written Examination and Operating Test Outlines (Folder 2) ML22103A2232020-08-26026 August 2020 Revised Draft Written Examination and Operating Test Outlines (2022 Regional Audit Corrective Action) (Folder 2) ML20329A3542020-07-22022 July 2020 Licensee 75-Day Letter Transmitting the Draft Written Exam and Operating Test Material (Folder 2) ML20329A2392020-07-22022 July 2020 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML20329A2232020-07-22022 July 2020 Draft Written Examination (Folder 2) ML19352D6572019-12-16016 December 2019 Announcement 0f Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2020 ML19323D1722019-11-18018 November 2019 R. E. Ginna Nuclear Power Plant - Senior Reactor and Reactor Operator Initial License Examinations ML21041A2942019-10-0303 October 2019 Original Questions for Modified Written Exam Questions RS-19-053, Response to NRC Regulatory Issue Summary 2019-02, Preparation and Scheduling of Operator Licensing Examinations2019-05-16016 May 2019 Response to NRC Regulatory Issue Summary 2019-02, Preparation and Scheduling of Operator Licensing Examinations ML18353A6082018-12-18018 December 2018 Senior Reactor Operator Retake License Examinations ML18344A5852018-12-10010 December 2018 R. E. Ginna - Reactor Operator Retake License Examinations ML19119A1472018-10-30030 October 2018 Final Qa/Related Forms (Folder 1) ML19156A1482018-08-27027 August 2018 Final Qa/Related Form - ES-201-1 (Folder 1) ML18233A5092018-08-21021 August 2018 Operator Licensing Operating Test Approval RS-18-057, Response to NRC Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations2018-04-25025 April 2018 Response to NRC Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations ML18005A4202018-01-0303 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML17272A3242017-09-28028 September 2017 R. E. Ginna - Senior Reactor and Reactor Operator Initial License Examinations RS-17-070, Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations2017-05-0303 May 2017 Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations ML17114A2862017-04-21021 April 2017 Miscellaneous Exam Material (Folder 1) ML17114A3172017-04-21021 April 2017 Handouts to Applicants (Folder 3) ML17114A2172017-04-21021 April 2017 Final Qa/Related Forms (Folder 1) ML17123A1722017-04-14014 April 2017 Post Exam Comments Resolution References (Folder 1) ML17114A3812017-03-0909 March 2017 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML17114A1562017-03-0909 March 2017 Final Qa/Related Forms - ES-401 (Folder 1) 2023-06-16
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD.
KING OF PRUSSIA, PA 19406-2713 December 10, 2018 Mr. Bryan C. Hanson Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO), Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555
SUBJECT:
R. E. GINNA NUCLEAR POWER PLANT - REACTOR OPERATOR RETAKE LICENSE EXAMINATIONS
Dear Mr. Hanson:
In a telephone conversations on November 26, 2018, between Mr. David Eckert, Initial License Training Lead Examination Developer, and Mr. David Silk, Senior Operations Engineer, arrangements were made for the administration of operator licensing re-examinations at the R. E. Ginna Nuclear Power Plant during the week of February 18, 2019. In addition, the U.S.
Nuclear Regulatory Commission (NRC) will make an examination validation visit to your facility the week of January 28, 2019.
As agreed upon during the telephone conversation, your staff will prepare the examinations based on the guidelines in Revision 11 to NUREG-1021, Operator Licensing Examination Standards for Power Reactors. The NRCs regional office will discuss with your staff any changes that might be necessary before the examinations are administered.
To meet the above schedule, it will be necessary for your staff to furnish the operating test outlines by the week of December 10, 2018. The operating tests, and the supporting reference materials discussed with Mr. Eckert will be due by the week of January 21, 2019. Pursuant to Title 10 of the Code of Federal Regulations (10 CFR) 55.40(b)(3), an authorized representative of the facility licensee shall approve the tests before they are submitted to the NRC for review and approval. All materials shall be complete and ready to use.
We request that any personal, proprietary, sensitive unclassified, or Safeguards Information in your response be contained in a separate enclosure and appropriately marked. Delays in receiving the required materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be cancelled or rescheduled.
To conduct the requested operating tests, it will be necessary for your staff to provide adequate space and accommodations and to make the simulation facility available on the dates noted above.
Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the operating tests are being administered.
B. Hanson 2 To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator waiver or excusal requests (if any) (Office of Management and Budget (OMB) control number 3150-0090) approximately 60 days before the first examination date (if possible).
Contact Mr. David Silk at 610-337-5372 to determine the method for submission of the waiver or excusal requests. Preliminary reactor operator license applications (OMB control number 3150-0090) and medical certifications (OMB control number 3150-0024) should be submitted at least 30 days before the first examination date. If the preliminary applications are not received at least 30 days before the examination date, a postponement may be necessary. Final signed applications certifying that all training has been completed and requesting any waivers or excusals, as applicable, should be submitted at least 14 days before the first examination date.
Although the guidelines for receiving waiver or excusal requests call for at least 30 days before the first examination date (preliminary) and 14 days before the first examination date (final), the requests should be submitted as early as possible in the process (see the 60-day guideline above). Resolutions resulting from verbal inquiries by the licensee to the NRC are not binding.
Submittals addressing waivers or excusals, or both, should be in writing (i.e., using NRC Form 398, Personal Qualifications Statement - Licensee, or as directed by Mr. Silk when contacting him to determine the method for submission). The NRC will document its final decision on whether to grant a waiver or excusal on the final (not preliminary) NRC Form 398 submitted for the applicant. The NRC will not provide its decision until the final application is submitted to the agency.
Paperwork Reduction Act Statement This letter contains information collection requirements that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0018.
The burden to the public for these mandatory information collections is estimated to average 2,250 hours0.00289 days <br />0.0694 hours <br />4.133598e-4 weeks <br />9.5125e-5 months <br /> per examination or response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the information collections. You may submit comments on any aspect of the information collections, including suggestions for reducing the burden, to FOIA, Privacy and Information Collections Branch (T-5F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by electronic mail to infocollects.resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503.
Public Protection Notification The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless the document requesting or requiring the collection displays a currently valid OMB control number.
In accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding, of the agencys Rules of Practice, a copy of this letter and its enclosures will be available electronically for public inspection through the Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible on the NRCs Web site at http://www.nrc.gov/reading-rm/adams.html.
B. Hanson 3 After you have been notified by the NRC Chief Examiner or Branch Chief that operator licenses have been issued, please direct any inquiries concerning a formal presentation of certificates to this office. Our goal is to have the operator certificates available for your celebration. At least one month advance notice of your celebration arrangements would be appreciated to plan our senior manager attendance and process the certificates.
Thank you for your cooperation in this matter. Mr. Eckert has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRCs examination procedures and guidelines, please contact David Silk at (610)-337-5372 or me at (610) 337-5306.
Sincerely,
/RA/
Donald E. Jackson, Chief Operations Branch Division of Reactor Safety Docket No.: 50-244 License No.: DPR-18 cc: Distribution via ListServ
B. Hanson 4
SUBJECT:
R. E. GINNA NUCLEAR POWER PLANT - REACTOR OPERATOR RETAKE LICENSE EXAMINATIONS DATED DECEMBER 10, 2018 Distribution w/encl: (via E-mail)
DLew, RA (R1ORAMAIL RESOURCE)
RLorson, DRA (R1ORAMAIL RESOURCE)
DPelton, DRP (R1DRPMAIL RESOURCE)
PKrohn, DRP (R1DRPMAIL RESOURCE)
JYerokun, DRS (R1DRSMAIL RESOURCE)
BWelling, DRS (R1DRSMAIL RESOURCE)
MFerdas, DRS ECarfang, DRP ARosebrook, DRP SObadina, DRP NPerry, DRP, SRI JSchussler, DRP, RI KTennity, DRP CCook, RI OEDO RidsNrrPMREGinna Resource RidsNrrDorlLpl1 Resource DOCUMENT NAME: G:\DRS\Operations Branch\SILK\Exam FY19-GinnaRetakeFeb2019\Ginna Rev11-CorpNotifyLtr.docx ADAMS PKG: ML18330A260 ADAMS ACCESSION NO.: ML18344A585 Publicly Available Non-Sensitive SUNSI Review Non-Publicly Sensitive Available OFFICE RI/DRS RI/DRS NAME DMSilk DEJackson DATE 11/30/2018 12/10/18 OFFICIAL RECORD COPY