MONTHYEARRS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23247A0092022-09-28028 September 2022 Final QA Related Forms RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations ML21012A2692021-01-12012 January 2021 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2021 ML20329A4322020-11-17017 November 2020 Final Qa/Related Forms (Folder 1) ML20329A4422020-09-17017 September 2020 Final Qa/Related Form - Form ES-401-6 (Folder 1) ML20329A1812020-09-17017 September 2020 NRC Comments on Draft Licensee-Developed Operating Test Outlines (Folder 2) ML20329A1412020-09-17017 September 2020 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML20322A3502020-09-17017 September 2020 Final Operating Test (Sections a, B, and C) (Folder 3) ML20321A2792020-09-17017 September 2020 Final Written Examination with Answer Key (Form 401-5 Format) (Folder 3) ML20328A1622020-09-17017 September 2020 Final Written Examination and Operating Test Outlines (Folder 3) ML20328A2792020-09-17017 September 2020 Handouts to Applicants (Folder 3) ML20328A2912020-09-17017 September 2020 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) ML20329A2002020-08-26026 August 2020 Draft Written Examination and Operating Test Outlines (Folder 2) ML22103A2232020-08-26026 August 2020 Revised Draft Written Examination and Operating Test Outlines (2022 Regional Audit Corrective Action) (Folder 2) ML20329A2392020-07-22022 July 2020 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML20329A2232020-07-22022 July 2020 Draft Written Examination (Folder 2) ML20329A3542020-07-22022 July 2020 Licensee 75-Day Letter Transmitting the Draft Written Exam and Operating Test Material (Folder 2) ML19352D6572019-12-16016 December 2019 Announcement 0f Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2020 ML19323D1722019-11-18018 November 2019 R. E. Ginna Nuclear Power Plant - Senior Reactor and Reactor Operator Initial License Examinations ML21041A2942019-10-0303 October 2019 Original Questions for Modified Written Exam Questions RS-19-053, Response to NRC Regulatory Issue Summary 2019-02, Preparation and Scheduling of Operator Licensing Examinations2019-05-16016 May 2019 Response to NRC Regulatory Issue Summary 2019-02, Preparation and Scheduling of Operator Licensing Examinations ML19045A3702019-02-12012 February 2019 March 2019 GFE Cover Letter Ri ML18353A6082018-12-18018 December 2018 Senior Reactor Operator Retake License Examinations ML18344A5852018-12-10010 December 2018 R. E. Ginna - Reactor Operator Retake License Examinations ML19119A1472018-10-30030 October 2018 Final Qa/Related Forms (Folder 1) ML19156A1482018-08-27027 August 2018 Final Qa/Related Form - ES-201-1 (Folder 1) ML18233A5092018-08-21021 August 2018 Operator Licensing Operating Test Approval RS-18-057, Response to NRC Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations2018-04-25025 April 2018 Response to NRC Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations ML18005A4202018-01-0303 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML17272A3242017-09-28028 September 2017 R. E. Ginna - Senior Reactor and Reactor Operator Initial License Examinations RS-17-070, Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations2017-05-0303 May 2017 Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations ML17114A2862017-04-21021 April 2017 Miscellaneous Exam Material (Folder 1) ML17114A2172017-04-21021 April 2017 Final Qa/Related Forms (Folder 1) ML17114A3172017-04-21021 April 2017 Handouts to Applicants (Folder 3) ML17123A1722017-04-14014 April 2017 Post Exam Comments Resolution References (Folder 1) ML17114A3752017-03-0909 March 2017 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) ML17114A1562017-03-0909 March 2017 Final Qa/Related Forms - ES-401 (Folder 1) ML17114A3812017-03-0909 March 2017 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML17066A2272017-03-0707 March 2017 Initial Operator Licensing Operating Test Approval: R. E. Ginna Nuclear Power Plant ML17104A2162017-03-0707 March 2017 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML17104A2012017-03-0303 March 2017 Final Operating Test (Sections a, B, and C) (Folder 3) ML17114A4232017-01-19019 January 2017 Draft Written Exam (Folder 2) ML17114A4372017-01-19019 January 2017 Draft Operating Exam (Section a, Section B, Section C) (Folder 2) ML17114A3522017-01-19019 January 2017 Final Outlines (Folder 3) ML17018A2822017-01-17017 January 2017 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2017 ML17114A4112016-12-0909 December 2016 Draft - Outlines (Folder 2), (Facility Letter. Dtd ML16286A4132016-10-11011 October 2016 Senior Reactor and Reactor Operator Initial License Examinations - )R.E. Ginna Nuclear Power Plant) ML15156A5522015-01-21021 January 2015 Final Qa/Related Forms (Folder 1) ML15043A6812014-12-16016 December 2014 Final Operating Exam (Sections a, B, and C) (Folder 3) 2023-06-16
[Table view] Category:Part 55 Examination Related Material
MONTHYEARRS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23247A0092022-09-28028 September 2022 Final QA Related Forms RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations ML21012A2692021-01-12012 January 2021 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2021 ML20329A4322020-11-17017 November 2020 Final Qa/Related Forms (Folder 1) ML20329A4422020-09-17017 September 2020 Final Qa/Related Form - Form ES-401-6 (Folder 1) ML20329A1812020-09-17017 September 2020 NRC Comments on Draft Licensee-Developed Operating Test Outlines (Folder 2) ML20329A1412020-09-17017 September 2020 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML20328A2792020-09-17017 September 2020 Handouts to Applicants (Folder 3) ML20321A2792020-09-17017 September 2020 Final Written Examination with Answer Key (Form 401-5 Format) (Folder 3) ML20322A3502020-09-17017 September 2020 Final Operating Test (Sections a, B, and C) (Folder 3) ML20328A1622020-09-17017 September 2020 Final Written Examination and Operating Test Outlines (Folder 3) ML20328A2912020-09-17017 September 2020 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) ML22103A2232020-08-26026 August 2020 Revised Draft Written Examination and Operating Test Outlines (2022 Regional Audit Corrective Action) (Folder 2) ML20329A2002020-08-26026 August 2020 Draft Written Examination and Operating Test Outlines (Folder 2) ML20329A2392020-07-22022 July 2020 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML20329A2232020-07-22022 July 2020 Draft Written Examination (Folder 2) ML20329A3542020-07-22022 July 2020 Licensee 75-Day Letter Transmitting the Draft Written Exam and Operating Test Material (Folder 2) ML19352D6572019-12-16016 December 2019 Announcement 0f Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2020 ML19323D1722019-11-18018 November 2019 R. E. Ginna Nuclear Power Plant - Senior Reactor and Reactor Operator Initial License Examinations ML21041A2942019-10-0303 October 2019 Original Questions for Modified Written Exam Questions RS-19-053, Response to NRC Regulatory Issue Summary 2019-02, Preparation and Scheduling of Operator Licensing Examinations2019-05-16016 May 2019 Response to NRC Regulatory Issue Summary 2019-02, Preparation and Scheduling of Operator Licensing Examinations ML18353A6082018-12-18018 December 2018 Senior Reactor Operator Retake License Examinations ML18344A5852018-12-10010 December 2018 R. E. Ginna - Reactor Operator Retake License Examinations ML19119A1472018-10-30030 October 2018 Final Qa/Related Forms (Folder 1) ML19156A1482018-08-27027 August 2018 Final Qa/Related Form - ES-201-1 (Folder 1) ML18233A5092018-08-21021 August 2018 Operator Licensing Operating Test Approval RS-18-057, Response to NRC Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations2018-04-25025 April 2018 Response to NRC Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations ML18005A4202018-01-0303 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML17272A3242017-09-28028 September 2017 R. E. Ginna - Senior Reactor and Reactor Operator Initial License Examinations RS-17-070, Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations2017-05-0303 May 2017 Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations ML17114A2862017-04-21021 April 2017 Miscellaneous Exam Material (Folder 1) ML17114A2172017-04-21021 April 2017 Final Qa/Related Forms (Folder 1) ML17114A3172017-04-21021 April 2017 Handouts to Applicants (Folder 3) ML17123A1722017-04-14014 April 2017 Post Exam Comments Resolution References (Folder 1) ML17114A3752017-03-0909 March 2017 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) ML17114A1562017-03-0909 March 2017 Final Qa/Related Forms - ES-401 (Folder 1) ML17114A3812017-03-0909 March 2017 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML17104A2162017-03-0707 March 2017 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML17066A2272017-03-0707 March 2017 Initial Operator Licensing Operating Test Approval: R. E. Ginna Nuclear Power Plant ML17104A2012017-03-0303 March 2017 Final Operating Test (Sections a, B, and C) (Folder 3) ML17114A4232017-01-19019 January 2017 Draft Written Exam (Folder 2) ML17114A4372017-01-19019 January 2017 Draft Operating Exam (Section a, Section B, Section C) (Folder 2) ML17114A3522017-01-19019 January 2017 Final Outlines (Folder 3) ML17018A2822017-01-17017 January 2017 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2017 ML17114A4112016-12-0909 December 2016 Draft - Outlines (Folder 2), (Facility Letter. Dtd ML16286A4132016-10-11011 October 2016 Senior Reactor and Reactor Operator Initial License Examinations - )R.E. Ginna Nuclear Power Plant) ML15156A5522015-01-21021 January 2015 Final Qa/Related Forms (Folder 1) ML15043A6792014-12-16016 December 2014 Final Written Examination with Answer Key (401-5 Format) (Folder 2) ML15043A6802014-12-16016 December 2014 Handouts to Applicants (Folder 3) 2023-06-16
[Table view] |
Text
Form 2.1-1 Examination Preparation Checklist Facility Ginna OPERATING Exam START Date: 10/17/2022 WRITTEN Exam Developed By: Facility OPERATING Exam Developed By: Facility WRITTEN Exam Date: 10/25/2022 OPERATING Exam COMPLT Date: 10/21/2022 Exam Date Date Target Date Task Description Complete
-240 2/19/2022 1. Examination administration date confirmed (A.1-5). For 12/6/2021 NRC-prepared examinations, arrangements are made for the facility licensee to submit reference materials (B.4, C.4.g and F).
-210 3/21/2022 2. NRC examiners and facility licensee contact assigned (B.1 and 12/6/2021 C.1-3).
-210 3/21/2022 3. Facility licensee contact briefed on examination security and 12/6/2021 other requirements (D.4). As applicable, the facility licensee contact submits to the NRC any prescreened K/As for elimination from the written examination outline, with a description of the facility licensees prescreening process (ES-4.1 A.1.a and ES-4.1 B.2).
-210 3/21/2022 4. Reference material due for NRC-prepared examinations (F). N/A
-210 3/21/2022 5. Examination kick-off call held (C.4). The NRC sends the 1/19/2022 corporate notification letter (A.5).
-195 4/5/2022 6. Written examination outline developed by the NRC and 12/6/2021 sent to the facility licensee contact (must be on the examination security agreement) (B.2, ES-4.1 A.1.b and ES-4.1
-150 5/20/2022 7. Operating test outlines and checklists due: Forms 1.3-1, 2.3- 5/19/2022 1, 3.2-1, 3.2-2, 3.3-1, and 3.4-1, as applicable (B.6). Facility licensee provides a draft operating test administration schedule to the NRC (B.18).
-136 6/3/2022 8. Operating test outlines reviewed by the NRC and feedback 6/2/2022 provided to the facility licensee (ES-2.3).
-100 7/9/2022 9. NRC-prepared examinations approved by the NRC N/A supervisor and forwarded for facility licensee review (ES-2.3).
-75 8/3/2022 10. Proposed examinations (written, JPMs, and scenarios, as 7/21/2022 applicable) and outline forms; quality checklists and supporting documentation (including Forms 2.3-2 and 2.3-4 and any Form 2.3-1, 1.3-1, and 3.4-1 updates); and reference materials due.
-60 8/18/2022 11. Preliminary waiver/excusal requests due (ES-2.2 E.1). 8/18/2022
-50 8/28/2022 12. Written examination and operating test reviews completed 8/12/2022 (ES-2.3). The NRC supervisors authorization to proceed with the facility review granted (ES-2.3 D).
-50 8/28/2022 13. Examination review results discussed between the NRC 8/23/2022 and the facility licensee (B.14).
Page 1 of 2
Form 2.1-1 Examination Preparation Checklist Facility Ginna OPERATING Exam START Date: 10/17/2022 WRITTEN Exam Developed By: Facility OPERATING Exam Developed By: Facility WRITTEN Exam Date: 10/25/2022 OPERATING Exam COMPLT Date: 10/21/2022 Exam Date Date Target Date Task Description Complete
-35 9/12/2022 14. Examination preparatory week conducted by the NRC and 8/29/2022 the facility licensee (I).
-30 9/17/2022 15. Preliminary license applications, including any 9/16/2022 waiver/excusal requests, due (ES-2-2 C.1).
-14 10/3/2022 16. Final license applications, including any waiver/excusal 10/3/2022 requests, due and Form 2.2-1 prepared (ES-2.2 C and E).
-7 10/10/2022 17. Written examinations and operating tests approved by the 9/29/2022 NRC supervisor (C.9)
-7 10/10/2022 18. Facility licensee management feedback on the 9/28/2022 examination requested by the NRC supervisor (C.10).
-7 10/10/2022 19. Final applications reviewed; 10% of applications audited 10/3/2022 to confirm qualifications/eligibility (ES-2.2 G); and examination approval letter (Letter 2.3-1) and waiver/excusal letters sent.
-7 10/10/2022 20. Written examination administration guidelines reviewed 10/7/2022 with the facility licensee (D.14).
-7 10/10/2022 21. Approved scenarios and job performance measures 10/7/2022 distributed to NRC examiners (D.12).
- Target dates are based on facility licensee-prepared examinations and the examination date identified in the corporate notification letter. These dates are for planning purposes and may be adjusted in coordination with the facility licensee.
Page 2 of 2
Form 3.4-1 Events and Evolutions Checklist (Rev_091922)
Facility: Ginna Date of Exam: 10/2022 Operating Test No.: N22-1 A E Scenarios P V N22-1-1 N22-1-2 N22-1-3 T M P E (Day 1) (Day 2) (Day 3) O I L N T N I T CREW CREW CREW CREW A I C POSITION POSITION POSITION POSITION L M A T U N Y M(*)
T P S A B S A B S A B S A B R I U E R T O R T O R T O R T O O C P O C P O C P O C P RX 0 1 1 0 1 1 NOR 2 1 1 1 2, 3, 2, 3, 8 4 4 2 SROU-1 I/C 4, 5, 5 7
6 6 MAJ 2 2 2 1 MC 0 1 1 0 2, 3 TS 2 0 2 2 RX 0 1 1 0 1 1 NOR 2 1 1 1 2, 3, 2, 3, 11 4 4 2 SROU-2 I/C 4, 5, 4, 5, 7 7, 8 6 6 MAJ 2 2 2 1 MC 0 1 1 0 2, 3 2, 3 TS 4 0 2 2 RX 0 1 1 0 1
NOR 1 1 1 1 2, 3, 5 4 4 2 SROU-3 I/C 4, 5, 7
6 MAJ 1 2 2 1 MC 0 1 1 0 2, 3 TS 2 0 2 2 4
RX 1 1 1 0 1
NOR 1 1 1 1 2, 3, 2, 3, 2, 3, 12 4 4 2 SROI-1 I/C 7 4, 5, 4 7, 8 6 6 6 MAJ 3 2 2 1 2, 3, 2 MC 7 4 1 1 0 2, 3 TS 2 0 2 2 5
RX 1 1 1 0 NOR 0 1 1 1 3, 4, 1, 2, 10 4 4 2 SROI-2 I/C 7, 8 3, 4, 5, 7 6 6 MAJ 2 2 2 1 3, 4, MC 7 3 1 1 0 1, 4 TS 2 0 2 2
Form 3.4-1 Events and Evolutions Checklist (Rev_091922)
Facility: Ginna Date of Exam: 10/2022 Operating Test No.: N22-1 A E Scenarios P V N22-1-1 N22-1-2 N22-1-3 T M P E (Day 1) (Day 2) (Day 3) O I L N T N I T CREW CREW CREW CREW A I C POSITION POSITION POSITION POSITION L M A T U N Y M(*)
T P S A B S A B S A B S A B R I U E R T O R T O R T O R T O O C P O C P O C P O C P 4
RX 1 1 1 0 1
NOR 1 1 1 1 2, 3, 2, 3, 9 4 4 2 SROI-3 I/C 7 4, 5, 7, 8 6 6 MAJ 2 2 2 1 2, 3, MC 7 3 1 1 0 2, 3 TS 2 0 2 2 4
RX 1 1 1 0 1
NOR 1 1 1 1 2, 3, 2, 3, 6 4 4 2 RO-1 I/C 7 5 6 6 MAJ 2 2 2 1 2, 3, MC 7 3 1 1 0 TS 0 0 2 2 5
RX 1 1 1 0 1
NOR 1 1 1 1 4, 5 3, 4, 6 4 4 2 RO-2 I/C 7, 8 6 6 MAJ 2 2 2 1 5 3, 4, MC 7 4 1 1 0 TS 0 0 2 2 5
RX 1 1 1 0 1
NOR 1 1 1 1 4, 5 3, 4, 6 4 4 2 RO-3 I/C 7, 8 6 6 MAJ 2 2 2 1 5 3, 4, MC 7 4 1 1 0 TS 0 0 2 2 3
RX 1 1 1 0 1 1 NOR 2 1 1 1 4, 5 2, 3, 1, 4, 9 4 4 2 RO-4 I/C 5 5, 7 6 6 6 MAJ 3 2 2 1 5
MC 1 1 1 0 TS 0 0 2 2
Form 3.4-1 Events and Evolutions Checklist (Rev_091922)
Form 3.4-1 Instructions for the Events and Evolutions Checklist
- 1. Mark the applicant license level for each simulator operating test number.
- 2. For the set of scenario columns, fill in the associated event number from Form 3.3-1, Scenario Outline, to show the specific event types being used for the applicant while in the assigned crew position for that scenario.
- Minimums are subject to the instructions in Section C.2, License Level Criteria.
KEY: RX = Reactivity Manipulation; NOR = Normal Evolution; I/C = Instrument/Component Failure; MAJ = Major Transient; Man. Ctrl = Manual Control of Automatic Function; TS = Technical Specification Evaluation; RO = Reactor Operator; SRO-I or I = Instant Senior Reactor Operator; SRO-U or U = Upgrade Senior Reactor Operator; SRO = Senior Reactor Operator; ATC = At the Controls; and BOP = Balance of Plan