Facility 10/17/2022 Facility 10/21/2022 Exam Date Target Date Date Complete
-240 2/19/2022 12/6/2021
-210 3/21/2022 12/6/2021
-210 3/21/2022 12/6/2021
-210 3/21/2022 N/A
-210 3/21/2022 1/19/2022
-195 4/5/2022 12/6/2021
-150 5/20/2022 5/19/2022
-136 6/3/2022 6/2/2022
-100 7/9/2022 N/A
-75 8/3/2022 7/21/2022
-60 8/18/2022 8/18/2022
-50 8/28/2022 8/12/2022
-50 8/28/2022 8/23/2022 Form 2.1-1 Examination Preparation Checklist OPERATING Exam COMPLT Date:
- 6. Written examination outline developed by the NRC and sent to the facility licensee contact (must be on the examination security agreement) (B.2, ES-4.1 A.1.b and ES-4.1
- 7. Operating test outlines and checklists due: Forms 1.3-1, 2.3-1, 3.2-1, 3.2-2, 3.3-1, and 3.4-1, as applicable (B.6). Facility licensee provides a draft operating test administration schedule to the NRC (B.18).
Ginna Facility 10/25/2022 Task Description OPERATING Exam START Date:
- 1. Examination administration date confirmed (A.1-5). For NRC-prepared examinations, arrangements are made for the facility licensee to submit reference materials (B.4, C.4.g and F).
- 8. Operating test outlines reviewed by the NRC and feedback provided to the facility licensee (ES-2.3).
- 9. NRC-prepared examinations approved by the NRC supervisor and forwarded for facility licensee review (ES-2.3).
- 10. Proposed examinations (written, JPMs, and scenarios, as applicable) and outline forms; quality checklists and supporting documentation (including Forms 2.3-2 and 2.3-4 and any Form 2.3-1, 1.3-1, and 3.4-1 updates); and reference materials due.
- 11. Preliminary waiver/excusal requests due (ES-2.2 E.1).
- 2. NRC examiners and facility licensee contact assigned (B.1 and C.1-3).
- 3. Facility licensee contact briefed on examination security and other requirements (D.4). As applicable, the facility licensee contact submits to the NRC any prescreened K/As for elimination from the written examination outline, with a description of the facility licensees prescreening process (ES-4.1 A.1.a and ES-4.1 B.2).
- 4. Reference material due for NRC-prepared examinations (F).
- 5. Examination kick-off call held (C.4). The NRC sends the corporate notification letter (A.5).
WRITTEN Exam Developed By:
WRITTEN Exam Date:
OPERATING Exam Developed By:
- 12. Written examination and operating test reviews completed (ES-2.3). The NRC supervisors authorization to proceed with the facility review granted (ES-2.3 D).
- 13. Examination review results discussed between the NRC and the facility licensee (B.14).
Page 1 of 2
Facility 10/17/2022 Facility 10/21/2022 Exam Date Target Date Date Complete
-35 9/12/2022 8/29/2022
-30 9/17/2022 9/16/2022
-14 10/3/2022 10/3/2022
-7 10/10/2022 9/29/2022
-7 10/10/2022 9/28/2022
-7 10/10/2022 10/3/2022
-7 10/10/2022 10/7/2022
-7 10/10/2022 10/7/2022
- 20. Written examination administration guidelines reviewed with the facility licensee (D.14).
- 21. Approved scenarios and job performance measures distributed to NRC examiners (D.12).
- Target dates are based on facility licensee-prepared examinations and the examination date identified in the corporate notification letter. These dates are for planning purposes and may be adjusted in coordination with the facility licensee.
Form 2.1-1 Examination Preparation Checklist Ginna OPERATING Exam START Date:
WRITTEN Exam Developed By:
Facility OPERATING Exam Developed By:
WRITTEN Exam Date:
- 14. Examination preparatory week conducted by the NRC and the facility licensee (I).
- 15. Preliminary license applications, including any waiver/excusal requests, due (ES-2-2 C.1).
- 16. Final license applications, including any waiver/excusal requests, due and Form 2.2-1 prepared (ES-2.2 C and E).
- 17. Written examinations and operating tests approved by the NRC supervisor (C.9)
- 18. Facility licensee management feedback on the examination requested by the NRC supervisor (C.10).
- 19. Final applications reviewed; 10% of applications audited to confirm qualifications/eligibility (ES-2.2 G); and examination approval letter (Letter 2.3-1) and waiver/excusal letters sent.
10/25/2022 OPERATING Exam COMPLT Date:
Task Description Page 2 of 2
Form 3.4-1 Events and Evolutions Checklist (Rev_091922)
Facility:
Ginna Date of Exam:
10/2022 Operating Test No.:
N22-1 A
P P
L I
C A
N T
E V
E N
T T
Y P
E Scenarios N22-1-1 (Day 1)
N22-1-2 (Day 2)
N22-1-3 (Day 3)
T O
T A
L M
I N
I M
U M(*)
CREW POSITION CREW POSITION CREW POSITION CREW POSITION S
R O
A T
C B
O P
S R
O A
T C
B O
P S
R O
A T
C B
O P
S R
O A
T C
B O
P R
I U
RX 0
1 1
0 NOR 1
1 2
1 1
1 SROU-1 I/C 2, 3, 4, 5, 7
2, 3, 5
8 4
4 2
MAJ 6
6 2
2 2
1 MC 0
1 1
0 TS 2, 3 2
0 2
2 RX 0
1 1
0 NOR 1
1 2
1 1
1 SROU-2 I/C 2, 3, 4, 5, 7
2, 3, 4, 5, 7, 8 11 4
4 2
MAJ 6
6 2
2 2
1 MC 0
1 1
0 TS 2, 3 2, 3 4
0 2
2 RX 0
1 1
0 NOR 1
1 1
1 1
SROU-3 I/C 2, 3, 4, 5, 7
5 4
4 2
MAJ 6
1 2
2 1
MC 0
1 1
0 TS 2, 3 2
0 2
2 RX 4
1 1
1 0
NOR 1
1 1
1 1
SROI-1 I/C 2, 3, 7
2, 3, 4, 5, 7, 8 2, 3, 4
12 4
4 2
MAJ 6
6 6
3 2
2 1
MC 2, 3, 7
2 4
1 1
0 TS 2, 3 2
0 2
2 RX 5
1 1
1 0
NOR 0
1 1
1 SROI-2 I/C 3, 4, 7, 8 1, 2, 3, 4, 5, 7 10 4
4 2
MAJ 6
6 2
2 2
1 MC 3, 4, 7
3 1
1 0
TS 1, 4 2
0 2
2
Form 3.4-1 Events and Evolutions Checklist (Rev_091922)
Facility:
Ginna Date of Exam:
10/2022 Operating Test No.:
N22-1 A
P P
L I
C A
N T
E V
E N
T T
Y P
E Scenarios N22-1-1 (Day 1)
N22-1-2 (Day 2)
N22-1-3 (Day 3)
T O
T A
L M
I N
I M
U M(*)
CREW POSITION CREW POSITION CREW POSITION CREW POSITION S
R O
A T
C B
O P
S R
O A
T C
B O
P S
R O
A T
C B
O P
S R
O A
T C
B O
P R
I U
RX 4
1 1
1 0
NOR 1
1 1
1 1
SROI-3 I/C 2, 3, 7
2, 3, 4, 5, 7, 8 9
4 4
2 MAJ 6
6 2
2 2
1 MC 2, 3, 7
3 1
1 0
TS 2, 3 2
0 2
2 RX 4
1 1
1 0
NOR 1
1 1
1 1
RO-1 I/C 2, 3, 7
2, 3, 5
6 4
4 2
MAJ 6
6 2
2 2
1 MC 2, 3, 7
3 1
1 0
TS 0
0 2
2 RX 5
1 1
1 0
NOR 1
1 1
1 1
RO-2 I/C 4, 5 3, 4, 7, 8 6
4 4
2 MAJ 6
6 2
2 2
1 MC 5
3, 4, 7
4 1
1 0
TS 0
0 2
2 RX 5
1 1
1 0
NOR 1
1 1
1 1
RO-3 I/C 4, 5 3, 4, 7, 8 6
4 4
2 MAJ 6
6 2
2 2
1 MC 5
3, 4, 7
4 1
1 0
TS 0
0 2
2 RX 3
1 1
1 0
NOR 1
1 2
1 1
1 RO-4 I/C 4, 5 2, 3, 5
1, 4, 5, 7 9
4 4
2 MAJ 6
6 6
3 2
2 1
MC 5
1 1
1 0
TS 0
0 2
2
Form 3.4-1 Events and Evolutions Checklist (Rev_091922)
Form 3.4-1 Instructions for the Events and Evolutions Checklist
- 1.
Mark the applicant license level for each simulator operating test number.
- 2.
For the set of scenario columns, fill in the associated event number from Form 3.3-1, Scenario Outline, to show the specific event types being used for the applicant while in the assigned crew position for that scenario.
- Minimums are subject to the instructions in Section C.2, License Level Criteria.
KEY: RX = Reactivity Manipulation; NOR = Normal Evolution; I/C = Instrument/Component Failure; MAJ = Major Transient; Man. Ctrl = Manual Control of Automatic Function; TS = Technical Specification Evaluation; RO = Reactor Operator; SRO-I or I = Instant Senior Reactor Operator; SRO-U or U = Upgrade Senior Reactor Operator; SRO = Senior Reactor Operator; ATC = At the Controls; and BOP = Balance of Plan