ML19156A148

From kanterella
Jump to navigation Jump to search

Final Qa/Related Form - ES-201-1 (Folder 1)
ML19156A148
Person / Time
Site: Ginna Constellation icon.png
Issue date: 08/27/2018
From: Peter Presby
Operations Branch I
To:
Shared Package
ML17234A729 List:
References
CAC U01977
Download: ML19156A148 (1)


Text

ES-201 Examination Preparation Checklist Form ES-201-1 Facility:

R. E. Ginna Nuclear Power Plant Date of Examination:

0812712018 Developed by: Written: Facility D NRC

~ II Operating:

Facility

~ NRC

~

Target Task Description (Reference)

Chief Examiner's Date*

Initials

-240

1.

Examination administration date confirmed (C.1.a; C.2.a-b). For NRC-prepared exams, arrangements are made for the facility to submit reference materials (C.1.e; C.3.c; Attachment 3).

-210

2.

NRC examiners and facility contact assigned (C.1.d; C.2.f).

~

3.

Facility contact briefed on security and other requirements (C.2.c). As applicable, the facility

-210 contact submits to the NRC any prescreened K/As for elimination from the written examination

~

outline, with a description of the facility's prescreening process (ES-401, D.1.b).

-343

4.

Reference material due for NRC-prepared exams (C.1.e; C.3.c; Attachment 3). 0

~

-210

5.

Corporate notification letter sent (C.2.e).

~

6.

NRC-developed written examination outline (ES-401-1/2 or ES-401N-1/2 and ES-401-3 or

-195 ES-401N-3) sent to facility contact (must be on the exam security agreement) (C.1.e-f; C.2.h;

~

c.3.d-e).

-150

7.

Operating test outline(s) and other checklists due, including Forms ES-201-2, ES-201-3, ES-301-1,

~

ES-301-2, ES-301-5, and ES-D-1, as applicable (C.1.e-f; C.3.d-e).

-136

8.

Operating test outline(s) reviewed by the NRC and feedback provided to facility licensee (C.2.h; N/A C.3.d-e).

9.

Proposed examinations (written, JPMs, and scenarios, as applicable) and outlines (Forms ES-301-1,

-75 ES-301-2, ES-D-1, ES-401-1/2 or ES-401N-1/2, and ES-401-3 or ES-401N-3); supporting documentation (including Forms ES-301-3, ES-301-4, ES-301-5, ES-301-6, ES-401-6, ES-401N-6, and

./~

any Form ES-201-2 and ES-201-3 updates); and reference materials due (C.1.e-h; C.3.d).

-75

10. Examinations prepared by the NRC are approved by the NRC supervisor and forwarded for facility A--?

licensee review (C.1.i; C.2.h; C.3.f-g).

-60

11. Preliminary waiver/excusal requests due (C.1.m; C.2.c; ES-202).

/o

-50

12. Written exam and operating test reviews completed (C.3.f).

JI?_,,..,

-35

13. Examination review results discussed between the NRC and facility licensee (C.1.i; C.1.k-1; C.2.h;

~

C.3.g). The NRC and the facility licensee conduct exam preparatory week.

-30

14. Preliminary license applications and waiver/excusal requests, as applicable (NRC Form 398) due

~

(C.1.m; C.2.i; ES-202).

-14

15. Final license applications and waiver/excusal requests, as applicable (NRC Form 398), due and

~

Form ES-201-4 prepared (C.1.m; C.2.k; ES-202).

-7

16. Written examinations and operating tests approved by the NRC supervisor (C.2.j-k; C.3.h).

~

-7

17. Request facility licensee management feedback on the examination (C.2.1).

~

18. Final applications reviewed; one or two (if more than 10) applications audited to confirm

-7 qualifications/eligibility; and examination approval and waiver/excusal letters sent (C.2.k;

~ ; ES-202, C.3.j; ES-204).

-7

19. Proctoring/written exam administration guidelines reviewed with facility licensee (C.3.k).

~

-7

20. Approved scenarios and job performance measures distributed to NRC examiners (C.3.i).

~

  • Target dates are based on facility-prepared examinations and the examination date identified in the corporate notification letter. These dates are for planning purposes and may be adjusted on a case-by-case basis in coordination with the facility licensee.

\\