ML082950422

From kanterella
Jump to navigation Jump to search

R. E. Ginna Draft - Section a Operating Exam (Folder 2)
ML082950422
Person / Time
Site: Ginna Constellation icon.png
Issue date: 09/01/2008
From:
NRC Region 1
To:
Hansell S
Shared Package
ML080030004 List:
References
TAC U01687
Download: ML082950422 (60)


Text

Appendix C Job Performance Measure Form ES-C-1 Worksheet Facility: Ginna Task No.: 001-008-01-01 TasWJPM

Title:

Critical Rod Position Calculation JPM NO.: 2008 NRC JPM N-RA-1 WA

Reference:

2.1.25 3.9 I 4.2 Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testina:

Simulated Performance: Actual Performance: X Classroom X Simulator Plant Applicability: RO/SRO SUBMllTED BY: Ted Coe DATE: 6/30/08 Developer REVIEWED BY: Art Vest DATE: 6/30/08 Training Techi iical Reviewe r REVIEWED BY: Don Dettman DATE: 6/30/08 Operations Technical Reviewer APPROVED BY: John Elrown DATE: 6/30/08 Training Management Page 1 of 7

Appendix C Job Performance Measure Form ES-C-1 Worksheet Task Standard: Critical Rod Position Calculation performed correctly and all critical tasks evaluated as satisfactory.

Required Materials: Calculator, Nomogragh Tables General

References:

0-1.2.2, Critical Rod Position Calculation, Rev. 06500 Handouts: 0-1.2.2, Critical Rod Position Calculation, Rev. 06500 Time Critical Task: NO Validation Time: 30 minutes Alternate Path: NO Instructor Notes: Have a copy of 0-1.2.2, Critical Rod Position Calculation, Rev. 06500, ready to give to the CRS during the Initiating Cue.

READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions: You are an extra RO.

The plant is in MODE 3.

0 The reactor is at normal operating temperature and pressure.

0 The Reactor tripped 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> ago.

0 The PPCS and PCNDR are unavailable.

Initiating Cue: The Shift Manager instructs you to calculate an Estimated Critical Position using 0-1.2.2 up to Step 5.7.1 using the given parameters.

CUE: Hand the Operator a copy of 0-1.2.2, Critical Rod Position Calculation, Rev. 06500.

Page 2 of 7

Appendix C Job Performance Measure Form ES-C-1 PERFORMANCE INFORMATION START TIME:

.I= CRITICAL STEP 0-1.2.2, section 1.O thru 4.0 Performance step: 1 Reviews sections 1.Othru 4.0.

Standard: Reviews and understands sections 1.O thru 4.0.

Initials for step 3.1.

Comment:

0-1.2.2, section 5.1

/, Performance Step: 2 Calculate the reactivity due to Power Defect.

Standard: Using the correct curves for time in life determine Power Defect within +/- !50PCM.

ACTUAL: 1150 PCM STUDENT: PCM See provided KEY for details.

Comment:

0-1.2.2, section 5.2

,/ Performance Step: 3 Calculate the reactivity due to Rod Worth.

Standard: Using correct Integral Rod Worth table for time in life determine Integral Rod Worth within +/- 20 PCM.

ACTUAL: 128.4 PCM STUDENT: PCM See provided KEY for details.

Comment:

Page 3 of 7

Appendix C Jol) Performance Measure Form ES-C-1 PERFORMANCE INFORMATION 0-1.2.2, section 5.3 4 Performance Step: 4 Calculate the reactivity due to Xenon.

Standard: Using correct Xenon Worth curve determine reactivity due to the change in Kenon within +/- 100 PCM.

ACTUAL: 1930 PCM STUDENT: PCM See provided KEY for details.

Comment:

0-1.2.2, section 5.4 4 Performance Step: 5 Calculate the reactivity due to Boron.

Standard: Differential Boron Concentration should de made without error.

Using correct Boron Worth curve determine Differential Boron Worth to within 4-0.1 PCM.

ACTUAL: -6.90 PCM STUDENT: PCM Reactivity added due to Boron Concentration change should be made without error. Discrepancies due to error carried forward are not considered an error in calculation.

ACTUAL: ;690 PCM STUDENT: PCM See provided KEY for details.

Comment:

0-1.2.2, selction 5.5 4 Performance Step: 6 Calculate the reactivity due to the change in effective Samarium.

Standard: Using the correct curve determine the reactivity added due to effective Samarium within +/- 12.5 PCM.

ACTUAL: :,35PCM STUDENT: PCM See provided KEY for details.

Comment:

Page 4 of 7

Appendix C Job Performance Measure Form ES-C-1 PERF13RMANCE INFORMATION 0-1.2.2, section 5.6 I/ Performance Step: 7 Calculate total reactivity change.

Standard: Total reactivity change should be within +/- 350 PCM.

ACTUAL: 2483.4 PCM STUDENT: PCM See provicled KEY for details.

Comment:

0-1.2.2, section 5.7.1 I/ Performance Step: 8 Estimate Critical Rod Position.

Standard: Estimated Critical Rod Position must be within the band of Bank C (34)Steps, +/- (30) steps CALCULATED VALUE ECP ACTUAL: BANK C STEPS 34 .

STUDENT: BANK STEPS See provided KEY for details.

Comment:

Terminating Cue: Evaluatiort on this JPM is complete.

STOP TIME: TIME CRlTlCAL STOP TIME:

Page 5 of 7

Appendix C Job Performance Measure Form ES-C-1

~ ~ ~~

VERIFICATION OF COMPLETION Job Performance Measure No.: 2008 PJRC JPM N-RA-1 Examinees Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

Result: UNSAT Examiners Signature: Date:

Page 6 of 7

Appendix C Job Performance Measure Form ES-C-1 JPM CUE SHEET Initial Conditions: You are an extra RO.

The plant is in MODE 3.

The reactor is at normal operating temperature and pressure.

The Reactor tripped 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> ago.

0 The PPCS and PCNDR are unavailable.

Initiating Cue: The Shift Manager instructs you to calculate an Estimated Critical Position using 0- 1.2.2 up to Step 5.7.1 using the given parameters.

Plant Status for Estimated Critical Rod Position Cvcle 34 Reactor power prior to reactor trip. 50 %

(Assume steady state power for > 50 hours5.787037e-4 days <br />0.0139 hours <br />8.267196e-5 weeks <br />1.9025e-5 months <br />)

Burnup 7,000 Mwd/mtu Time reactor subcritical to now 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> Last Boron sample prior to trip Performed 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> before trip, was 1300 ppm.

Boron/RMW added since last sample, prior to trip 14,000 BAST ppm 0 gal boric acid 0 gal RMW Rod position prior to shutdown D Bank 180 Steps Time from now to estimated criticality 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> Current boron concentration from sample 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> ago. 1400 ppm Page 7 of 7

Appendix C Jot) Performance Measure Form ES-C-1 Worksheet Facility: Ginna Task No.: 015-004-04-01A TasWJPM

Title:

Manually Calculate CIPTR JPM NO.: 2008 NRC JPM N-RA-2 WA

Reference:

2.1.7 4.4 14.7 Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testina:

Simulated Performance: Actual Performance: X Classroom X Simulator Plant ApplicabiI ity: RO/SRO SUBMITTED BY: Ted Coe DATE: 6/30/08 Developer REVIEWED BY: Art Vest DATE: 6/30/08 Training Technical Reviewer REVIEWED BY: Vince Fabrizio DATE: 6/30/08 Operations Technical Reviewer APPROVED BY: John Brown DATE: 6/30/08 Training Management Page 1 of 8

~ ~~ ~~ ~ ~

Appendix C Job Performance Measure Form ES-C-1 Worksheet Task Standard: QPTR correctly calculated and all critical tasks evaluated as satisfactory.

Required Materials: Volts/Mamp Values sheets Pictures of Power Range Nls 0-6.4 JPM N-RA-2 Key General

References:

0-6.4: Core Quadrant Power Tilt Calculation, Rev. 23 Handouts: 0-6.4: Core Quadrant Power Tilt Calculation, Rev. 23 Time Critical Task: NO Validation Time: 15 minutes Alternate Path: NO Instructor Notes: Ensure a marked up copy of 0-6.4: Core Quadrant Power Tilt Calculation, Rev. 23,Pictures of Power Range Nls and Volts/Mamp values sheets are ready to give to the operator during the Initiating Cue.

Use 0-6.4 JPM Nr-RA-2 Key for correct values.

READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions: You are the HCO.

I will be the CRS if you need one.

0 The plant was at 100% power when Control Rod G-9dropped.

AP-RCC.3, Dropped Rod Recovery was entered.

The plant is now at 92.5% and stable.

PPCS is out of service.

Initiating Cue: The CRS directs you to perform a QPTR per Attachment 1 of 0-6.4, Quadrant Power Tilt Ratio Calculation.

CUE: Hand the Operator marked up copies of 0-6.4: Core Quadrant Power Tilt Calculation, Rev. 23, Pictures of Power Range Nls and VoltdMamp values sheets, Page 2 of 8

Appendix C Job Performance Measure Form ES-C-1 Worksheet SIMULATOR SETUP For the 2008 ILT NRC Exam load I/C # 1'79 if simulator is used.

or Any 100% IC (IC-19).

0 The plant in a normal 100% power lineup.

In a normal 50/50electric lineup.

0 -

Insert Malf. ROD02 G9 Dropped Rod G-9 (Stationary Grippers).

0 Place rods in manual.

0 Ensure PPCS monitors are off.

Allow plant to stabilize and Freeze.

Page 3 of 8

Appendix C Job Performance Measure Form ES-C-1 PERFORMANCE INFORMATION START TIME:

4 = CRITICAL STEP 0-6.4, step 6.1.1 thru 6.1.3 Performance Step: 1 IF !one power range channel is inoperable, THEN EN~SUREthe QPTR Monitor alarm has been declared nonfunctional, AND PERFORM TSR 3.2.4.2. IF NOT, THEN MARK this Step N/A.

IF one power range channel is inoperable AND Thermal PoJver is less than 75% RTP, THEN CALCULATE the Quadrant Power Tilt Ratio using the remaining three power range channels. IF NOT, THEN MARK this Step N/A.

IF one power range channel is inoperable when greater than or equal to 75% RTP AND the channel is NOT expected to be returned to service within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />, THEN NOTIFY Reactor Engineering as soon as possible since a flux map may need to be performed. IF NOT, THEN MAF1K this Step N/A.

Standard: Marks all (3)steps N/A Comment:

0-6.4, step 6.1.4 Note Performance Step: 1 Volts/Mamp values for upper and lower detectors; determine if values are less than 3 months old.

Standard: 0 Looks on sheets provided for Volts/Mamp values for proiDer date.

0 Determines values are less than 3 months old.

Comment:

Page 4 of 8

Appendix C Job Performance Measure Form ES-C-1 PERFORMANCE INFORMATION

~~ ~

0-6.4, step 6.1.4 / Att. 1 step 1 4 Performance Step: 2 Records Nlamps and Volts/Mamps for each channel and calculates total volts for each power range channel.

Standard: Obtains Power Range detector currents from NI drawer pictures.

Obtains Volts/Mamp values from provided sheets.

Records all values on Attachment 1.

See 0-6.4 JPM N-RA-2 Key for correct values.

Critical criteria for values from sheets must be exactly correct.

Critical criteria for values from pictures must be +/- .015.

Initials for step completion.

Comment:

0-6.4, step 6.1.4 / Att. 1 step 2 Note

,/ Performance Step: 4 IF one power range channel inoperable, THEN the Highest (Total) in numerator of the equation below must be multiplied by three instead of four AND only the three operable channels are to be summed in the denominator.

Standard: Uses all four channels in QPTR calculation.

Comment:

0-6.4, step 6.1.4 / Att. 1 step 2

,/ Performance Step: 5 Calculate QPTR.

Standard: 0 Correctly calculates QPTR.

0 See 0-6.4 JPM N-RA-2 Key for correct values (QFTR = 1.08).

0 Critical criteria for calculated value must be +/- .015.

0 Initials for step completion.

Comment:

Page 5 of 8

Appendix C Job Performance Measure Form ES-C-1 PERFORMANCE INFORMATION Standard: 0 Asks for an independent verification.

CUE: No further actions are required.

Comment:

Terminating Cue: Evaluatioln on this JPM is complete.

STOP TIME: TIME CRITICAL STOP TIME:

Page 6 of 8

Appendix C Jot) Performance Measure Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.: 2008 NRC JPM N-RA-2 Examinees Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

Result: SAT -- UNSAT Examiners Signature: Date:

Page 7 of 8

Appendix C Job Performance Measure Form ES-C-1 JPM CUE SHEET Initial Conditions: 0 You are the HCO.

0 I will be th'e CRS if you need one.

0 The plant 'was at 100% power when Control Rod G-9dropped.

0 AP-RCC.3, Dropped Rod Recovery was entered.

0 The plant is now at 92.5% and stable.

0 PPCS is out of service.

Initiating Cue: The CRS directs you to perform a QPTR per Attachment 1 of 0-6.4, Quadrant Power Tilt Ratio Calculation.

Page 8 of 8

Appendix C Job Performance Measure Form ES-C-1 Worksheet Facility: Ginna Task No.: 1 1 9-014-03-01 TasklJPM

Title:

Tagout Boundary for " B Heater JPM NO.: 2008 NRC JPM N-RA-3 Drain Tank Pump WA

Reference:

2.2.13 4.1 I4.3 Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testina:

Simulated Performance: Actual Performance: X Classroom X Simulator Plant Applicability: RO/SRO SUBMITTED BY: Ted Coe DATE: 6/30/08 Developer REVIEWED BY: Art Vest DATE: 6/30/08 Training Techriical Reviewer REVIEWED BY: Vince Vabrizio DATE: 6/30/08 Operations Technical Reviewer APPROVED BY: John Brown DATE: 6/30/08 Training Management Page 1 of 6

Appendix C Job Performance Measure Form ES-C-1 Worksheet Task Standard: Provide adequate Tagout Boundary for B Heater Drain Tank Pump and all critical tasks evaluated as satisfactory.

Required Materials: None General

References:

A-1401, Station Holding Rules, Rev.06300 PID: 33013-1923, Rev. 22 PID: 10905-00358, Rev. 2 PID: 33013-0653 Rev. 13 Handouts: A-1401, Station Holding Rules, Rev.06300 PID: 33013-1923, Rev. 22 PID: 10905-00358, Rev. 2 PID: 33013-0653 Rev. 13 Time Critical Task: NO Validation Time: 20 minutes Alternate Path: NO Instructor Notes: Ensure a copy of A-1401, Station Holding Rules, Rev.06300, PID:

33013-1923, Rev. 22, Rev. 2 and PID: 33013-0653 Rev. 13 is ready to give to the operator during the Initiating Cue.

READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions: 0 The unit is aR 80% POWER.

0 You are an extra RO in the Work Control Center.

0 B Heater Drain Tank Pump is making noises and will require a lower pump bearing replacement.

The plant has down powered to 40% to make repairs to the 8 Heater Drain Tank Pump.

Heater Drairi Tank temperature is 305°F.

Heater Drain Tank pressure is 74 psig.

Initiating Cue: 0 The Shift Manager requests you to determine the Tagout Boundaries for the B Heater Drain Tank Pump.

0 Gland Seal and Service Water side holds will be held by a different tagout secticn.

0 On the request below, record Equipment Names/EIN, the Required Positions, type of tag to be hung and order tags are to be hung per A-1401, Station Holding Rules requirements.

0 When completed, provide list and any comments to the Shift Manager.

CUE: Hand the Operator a copy of A-1,401, Station Holding Rules, Rev.06300, PID: 33013-1923, Rev. 22 and Rev. 2, PID: 33013-0653 Rev. 13 Page 2 of 6

Appendix C Job Performance Measure Form ES-C-1 PERFORMANCE INFORMATION START TIME:

4 = CRITICAL STEP A-1401 Performance Step: 1 Refers to procedure, A-1401 as needed.

Standard: Uses A-14.01 as needed.

Comment:

Prints Performance step: 2 Refers to prints as needed:

0 PIC): 33013-1923, Rev. 22 0 PIC): 10905-00358, Rev. 2 0 PIC): 33013-0653 Rev. 13 Standard: Uses prints as needed:

0 PIC): 33013-1923, Rev. 22 0 PIC): 10905-00358, Rev. 2 0 PIC): 33013-0653 Rev. 13 CUE: Only if asked for provide PID: 10905-00358this can be done at any time.

Comment:

/, Performance Step: 3 Determines Tagout Boundary for "8" Heater Drain Tank Pump.

Standard: Set?Key on next page.

Equipment may be listed in any order.

To satisfy the critical step for V-3094D and V-3093F, either valve or both valves may be listed as drain paths.

Comment:

Page 3 of 6

Appendix C Job Performance Measure Form ES-C-1 PERFORMANCE INFORMATION KEY FOR PREFORMANCE STEP # 3 REQUEST 7

EQUIPMENT NAMES I IN FOR REQUIRED TYPE OF TAG ORDER ISOLATED WORK AREA POSITION REQUIRED TAGS TO BE HUNG Closed Hold 3 Closed Hold 3 V-4116 Closed Hold 3

4. V-4120 Closed Hold 3
5. V-3098 Open Hold 4
6. V-3094D
  • Open Hold 4
7. V-3093F
  • Open Hold 4
8. 8 Heater Drain Tank Pump MCB PulVStop Block 1 H/S l/HDPlB
9. 4160 Bus 11B/27 Racked out/Knife Hold 2 switch open 10.

I 11. I 15.

16.

1 17. I

  • To satisfy the critical step for V-3094D arid V-3093F, either valve or both valves may be listed as drain paths.

Comments:

1. Identifies (2) valve boundary (with bleed valve) cannot be provided per 5.6.a.2, for fluids greater than 200°F if unit stays at 40%)to perform work.
2. Identifies can work 8 Heater Drain Tiank Pump as an Exceptional Tagout at 40% or lower power as needed to lower HDT Wid temperature to less than 200°F.
3. For tag order, 1 and 2 must be first and second, any tag 3s can be in any order after 1 and 2 and before any 4s. Tag 4s can be in any order after all the 3s are hung.

Terminating Cue: Evaluation on this JPM is complete.

STOP TIME: TIME CRITICAL STOP TIME:

Page 4 of 6

Appendix C Job Performance Measure Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.: 2008 NRC JPM N-RA-3 Examinees Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

Result: SAT UNSAT Examiners Signature: Date:

Page 5 of 6

Appendix C Job Performance Measure Form ES-C-1 JPM CUE SHEET Initial Conditions: 0 The unit is at 80% POWER.

0 You are an extra RO in the Work Control Center.

0 8 Heater Drain Tank Pump is making noises and will require a lower pump bearing replacement.

The plant Pas down powered to 40% to make repairs to the B Heater Drain Tank Pump.

Heater Drain Tank temperature is 305°F.

Heater Drain Tank pressure is 74 psig.

Initiating Cue: The Shift Manager requests you to determine the Tagout Boundaries for the 9Heater Drain Tank Pump.

Gland Seal and Service Water side holds will be held by a different tagout sect1on.

On the request below, record Equipment NarnedEIN, the Required Positions, type of tag to be hung and order tags are to be hung per A-1401, Station Holding Rules requirements.

When completed, provide list and any comments to the Shift Manager.

REQUEST 3.

4.

5.

6.

I I 7.

a.

9.

10. ~~

11.

12.

13.

14.

115.

20.

1 Comments:

Page 6 of 6

Appendix C Jot) Performance Measure Form ES-C-1 Worksheet ~~

Facility: Ginna Task No.: 344-006-05-01 Task/JpM

Title:

Monitor Critical Safety Function JPM NO.: 2008 NRC JPM N-RA-4 Status Trees WA

Reference:

2.4.13 4.0 14.6 Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testina:

Simulated Performance: Actual Performance: X Classroom X Simulator Plant Applicability: RO/SRO SUBMITTED BY: Ted Coe DATE: 6/30/08 Developer REVIEWED BY: Art Vlest DATE: 6/30/08 Training Technical Reviewer REVIEWED BY: Vince Fabrizio DATE: 6/30/08 Operations Technical Reviewer APPROVED BY: John Birown DATE: 6/30/08 Training Management Page 1 of 7

1 Appendix C Jot) Performance Measure Form ES-C-1

- Worksheet Task Standard: Correctly monitor CSFSTs and reporVrecommend correct red path/procedure and all critical tasks evaluated as satisfactory.

Required Materials: CSFST Binder and Grease pencils or equivalent.

General

References:

F-0.1: SUBCRITICALITY CSFST F-0.2: CORE COOLING CSFST F-0.3: HEAT SINK CSFST F-0.4: INTEGRITY CSFST F-0.5: CONTAINIVIENT CSFST F-0.6: INVENTORY CSFST Handouts: CSFST Binder Time Critical Task: NO Validation Time: 10 minutes Alternate Path: NO Instructor Notes: Ensure CSFST Binder and Grease pencils or equivalent are available and data sheet # I .

READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions: 0 You are an extra RO.

0 The plant has experienced a Reactor Trip and a Safety Injection.

0 I will be the CRS.

0 The SM has d,rectedyou to monitor Critical Safety Function Status Trees.

0 It has been 65 minutes since the Reactor Tripped.

Initiating Cue: Monitor all the Critical Safety Function Status Trees using Data Sheet

  1. 1 and make a report to the CRS.

Page 2 of 7

Appendix C Job Performance Measure Form ES-C-1 PERFORMANCE INFORMATION START TIME:

.\I = CRITICAL STEP F-0.1 4 Performance Step: 1 Monitor Subcriticality and determine correct terminus.

Standard: MONITOR: (F-0.1)

Power Range Inkrmediate Range SUR Source Range energized Source Range SUR as necessary Correct terininus: Orange Comment:

F-0.2

.\I Performance Step: 2 Monitor Core Cooling and determine correct terminus.

Standard: MONITOR: (F-0.2)

Core Exit Thermocouples 0 RC!: Subcooling RCP status 0 RVLIS 0 Cnrnt Pressure 0 Cnrit Radiation as necessary Correct terrninus: Red Comment:

F-0.3

.\I Performance Step: 3 Monitor Heat Sink and determine correct terminus.

Standard: MONITOR: (F-0.3)

S/G Level 0 Feedwater Flow 0 S/G Pressure 0 Cnnit Pressure 0 Cnnit Radiation as necessary Correct terrninus: Green Comment:

Page 3 of 7

Appendix C Jot) Performance Measure Form ES-C-1 PERFORMANCE INFORMATION F-0.4 4 Performance Step: 4 Monitor INTEGRITY and determine correct terminus.

Standard: MONITOR: (F-0.4)

RCS Cold Leg Temperature decrease over last 60 mir Utes 0 RCS Cold Leg Temperature RCS Pressure, locate point on curve as necessary Correct terminus: Green Comment:

F-0.5

/, Performance Step: 5 Monitor CONTAINMENT and determine correct terminus.

Standard: MONITOR (F-0.5) 0 Cnrnt Pressure 0 Cnrnt Sump B Level 0 Cnrnt Radiation as necessary Correct terminus: Red Comment:

F-0.6

.,/ Performance Step: 6 Monitor INVENTORY and determine correct terminus.

Standard: MONITOR: (F-0.6)

SI Fump status Pressurizer Level 0 RCP status 0 RVL-IS as necessary Correct terrninus: Yellow Comment:

Page 4 of 7

Appendix C Job Performance Measure Form ES-C-1 PERFORMANCE INFORMATION Report to CRS 4 Performance Step: 7 identify highest priority Critical Safety Function.

Recommend procedure.

Standard: Identify highest priority. RED terminus: Core Cooling Recommend correct procedure: Enter FR-C.l.

Comment:

Terminating Cue: Evaluatiori on this JPM is complete.

STOP TIME: TIME CRITICAL STOP TIME:

Page 5 of 7

Appendix C Jot) Performance Measure Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.: 2008 NRC JPM N-RA-4 Examinees Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

Result: SAT UNSAT Examiners Signature: Date:

Page 6 of 7

Appendix C J o l ~Performance Measure Form ES-C-1 JPM CUE SHEET Initial Conditions: 0 You are an extra RO.

0 The plant has; experienced a Reactor Trip and a Safety Injection.

0 I will be the CRS.

0 The SM has directed you to monitor Critical Safety Function Status Trees.

It has been 6!5minutes since the Reactor Tripped.

initiating Cue: Monitor all the Cri:ical Safety Function Status Trees using Data Sheet

  1. 1 and make a report to the CRS.

Data Sheet # 1 I _

Reactor Power is 0%

All Reactor Trip Breakers are Open Intermediate Range indication is 3x10-l Intermediate Range SUR is (.1)

Source Range Indication is lx103 Source Range SUR is (.1)

RCS Pressure is 982 psig A RCS cold Leg Temperature is 495°F A RCS cold Leg Temperature is 490°F B RCS cold Leg Temperature is 493°F B RCS cold Leg Temperature is 491°F Pressurizer water level is 0%

RVLlS water level is 40%

CETs are 709 O F No SI pumps are running (2) RHR Pumps are running A RCP Pump is tripped 8 RCP Pump is tripped Cnmt Pressure is 62 psig R-29, Cnmt Radiation Monitor reads 1500 mrem/hr R-30, Cnmt Radiation Monitor reads 1600 mrem/hr Cnmt Sump A is 200 inches Cnmt Sump B is 120 inches A Stream Generator Water Level is 27%

6 Stream Generator Water Level is 28%

A Stream Generator Pressure is 922 psig B Stream Generator Pressure is 920 psig TDAFW Pump is not running A MDAFW Pump is running B MDAFW Pump is running A MDAFW Pump flow is 100 gpm 6MDAFW Pump flow is 105 gpm Page 7 of 7

Appendix C Job Performance Measure Form ES-C-1 Worksheet Facility: Ginna Task No.: 001-008-01-02 TasWJPM

Title:

Verify Estimated Critical Rod JPM NO.: 2008 NRC JPM N-SA-1 Position Calculation WA

Reference:

2.1.37 4.6 Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testina:

Simulated Performance: Actual Performance: X Classroom X Simulalor Plant Applicability: SRO SUBMITTED BY: Ted ICoe DATE: 6/30/08 Developer REVIEWED BY: Art Vest DATE: 6/30/08 Training Technical Reviewer REVIEWED BY: Doua Ciomez DATE: 6/30/08 Operations Technical Reviewer APPROVED BY: John Brown DATE: 6/30/08 Training Management Page 1 of 8

Appendix C Joli Performance Measure Form ES-C-1 Worksheet Task Standard: Critical Rod Positilm Calculation verification performed correctly finding all errors and all critical tasks evaluated as satisfactory.

Required Materials: Calculator, Nomogragh Tables General

References:

0-1.2.2, Critical R4DdPosition Calculation, Rev. 06500 Handouts: Completed 0-1.22, Critical Rod Position Calculation, Rev. 06500 Time Critical Task: NO Validation Time: 30 minutes Alternate Path: NO Instructor Notes: Have a copy of a completed copy of 0-1.2.2, Critical Rod Position Calculation, Rev. 06500, ready to give to the CRS during the Initiating Cue.

READ TO THE EXAMINEE I will explain the initial conditions, which sleps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions: 0 You are the Control Room Supervisor.

0 The plant is in MODE 3.

0 The reactoi is at normal operating temperature and pressure.

The Reactor tripped 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> ago.

0 The PPCS and PCNDR are unavailable.

0 The HCO has completed an Estimated Critical Position using 0-12.2.

Initiating Cue: The Shift Manager instructs you to perform the independent verification of 0-1.2.2, Critical Rod Position Calculation, up thru Step 5.7.1, using the given parameters.

Report all results to the Shift Manager.

CUE: Hand the Operator a marked up copy of 0-1.2.2, Critical Rod Position Calculation, Rev. 06500.

Page 2 of 8

Appendix C Jot) Performance Measure Form ES-C-1 PERFORMANCE INFORMATION START TIME:

\I = CRITICAL STEP 0-1.2.2, section 1.O thru 4.0 Performance Step: 1 Reviews sections 1.Othru 4.0.

Standard: Reviews arid understands sections 1.O thru 4.0.

Verifies initials on step 3.1.

Comment:

0-1.2.2, section 5.1 Performance Step: 2 Verifies correct calculation of the reactivity due to Power Defect.

Standard: Discovers no errors.

Using the correct curves for time in life determine Power Defect.

Comment: ACTUAL: 1150 PCM HCO: 1150 PCM 0-1.2.2, section 5.2

/, Performance Step: 3 Verifies correct calculation of the reactivity due to Rod Worth.

Standard: Discovers error in Rod Worth reactivity calculation.

Using correct Integral Rod Worth table for time in life determines reactivity due to Rod Worth.

Comment: ACTUAL: j28.5 PCM HCO: 194 PCM Page 3 of 8

Appendix C Job Performance Measure Form ES-C-1 PERFORMANCE INFORMATION 0-1.2.2, section 5.3 Performance Step: 4 Verifies correct calculation of the reactivity due to Xenon.

Standard: Discovers no errors.

Using correct Xenon Worth curve determine reactivity due to the change in Xenon.

Comment: ACTUAL: 1930 PCM HCO: 1930 PCM 0-1.2.2, section 5.4 Performance Step: 5 Verifies correct calculation of the reactivity due to Boron.

Standard: Discovers no errors.

Using correct Boron Worth curve determine Differential Boron.

Reactivity added due to Boron Concentration change should be made without error.

Comment: Differential Boron: ACTUAL: -6.90 PCM HCO: -6.90PCM Boron Con. Change: ACTUAL: -690 PCM HCO: -690 PCM 0-1.2.2, section 5.5

/, Performance Step: 6 Verifies correct calculation of the reactivity due to the change in "effective" Samarium.

Standard: Discovers error in reactivity added due Samarium calculation.

Using the correct curve determine the reactivity added due to effective Samarium.

Comment: ACTUAL: 135 PCM HCO: -185 PCM Page 4 of 8

Appendix C Job Performance Measure Form ES-C-1 PERFORMANCE INFORMATION 0-1.2.2, section 5.6 I/ Performance Step: 7 Verifies correct calculation of total reactivity change.

Standard: Discovers error in total reactivity change.

Total reactivity change calculated.

Comment: ACTUAL: 2483.4 PCM HCO: 2399 PCM 0-1.2.2, section 5.7 4 Performance Step: 8 Verifies coirect Estimate Critical Rod Position.

Standard: Discovers error in calculated value for ECP.

Determines Estimated Critical Rod Position.

Comment: ACTUAL: BANK C STEPS 34 .

HCO: BANK C STEPS 39 .

Page 5 of 8

Appendix C Jot) Performance Measure Form ES-C-1 PERFORMANCE INFORMATION Standard: Informs the SM of the following errors:

Reactivity due to Integral Rod Worth.

Reactivity due to Samarium.

0 Total Reactivity Change.

0 Estimated Critical Rod Position.

Informs the SM that the ECP will have to be reperformed (or words to that effect).

Cue: Acknowledge report.

Comment:

Terminating Cue: Evaluatiori on this JPM is complete.

STOP TIME: TIME CRITICAL STOP TIME:

Page 6 of 8

Appendix C Job Performance Measure Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.: 2008 NFC JPM N-SA-1 Examinees Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

Resutt: SAT -- UNSAT Examiners Signature: Date:

Page 7 of 8

Appendix C Jol) Performance Measure Form ES-C-1 JPM CUE SHEET Initial Conditions: 0 You are this Control Room Supervisor.

0 The plant is in MODE 3.

0 The reactor is at normal operating temperature and pressure.

The Reactor tripped 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> ago.

0 The PPCS and PCNDR are unavailable.

0 The HCO has completed an Estimated Critical Position using 0-12.2.

Initiating Cue: The Shift Manager instructs you to perform the independent verification of 0-1.2.2, Critical Rod Position Calculation, up thru Step 5.7.1, using the given parameters.

Report all results to the Shift Manager.

Plant Status for Estimated Critical Rod Position Cvcle 34 Reactor power prior to reactor trip. 50 o/'

(Assume steady state power for > 50 hours5.787037e-4 days <br />0.0139 hours <br />8.267196e-5 weeks <br />1.9025e-5 months <br />)

Burnup 7,000 Mwd/mtu Time reactor subcritical to now 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> Last Boron sample prior to trip Performed 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> before trip, was 1300 ppm.

Boron/RMW added since last sample, prior to trip 14,000 BAST ppm 0 gal boric acid 0 gal RMW Rod position prior to shutdown D Bank 180 Steps Time from now to estimated criticality 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> Current boron concentration from sample 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> ago. 1400ppm

['age 8 of a

Appendix C Job Performance Measure Form ES-C-1

~~ ~ ~ ~

Worksheet Facility: Ginna Task No.: 341-030-03-02A Task/JPM

Title:

A-52-12, Nonfunctiorlal Equipment JPM No.: 2008 NRC N-SA-2 Important to Safety WA

Reference:

2.1.18 3.8 Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testina:

Simulated Performance: Actual Performance: X Classroom X Simulator Plant Applicability: SRO SUBMITTED BY: Ted Coe DATE: 6/30/08 Developer REVIEWED BY: Art Vest DATE: 6/30/08 Training Technical Reviewer REVIEWED BY: Vince Fabrizio DATE: 6/30/08 Operations Technical Reviewer APPROVED BY: John Brown DATE: 6/30/08 Training Management Page 1 of 7

Appendix C Job Performance Measure Form ES-C-1 Worksheet Task Standard: Determined the OPTR Monitor Alarm is inoperable, fill out A-52.12, Attachment 1 correctly and all critical tasks evaluated as satisfactory.

Required Materials: Attached Key.

General

References:

A-52.12 Nonfunctional Equipment Important to Safety, Rev. 05900 Technical Requirements Manual (TRM) Rev. 35 Handouts: A-52.12 Nonfunctional Equipment Important to Safety, Rev. 05900 A-52.12 att. 1 (4 pages), A-52.12 att. 2 (1 page)

Time Critical Task: NO Validation Time: 20 minutes Alternate Path: NO Instructor Notes: Have a copy of A-52.12 Nonfunctional Equipment Important to Safety, Rev. 05900 and PI-52.12 att. 1 (4 pages), ready to give to the CRS when cued.

READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions: You are the CRS.

The plant is at 98% power, no equipment is out of service.

Initiating Cue: The CO has just completed S-26.1, Computer Program Check.

All sections were performed sat, except the QPTR Monitor Alarm did not alarm.

Page 2 of 7

Appendix C Job Performance Measure Form ES-C-1 PERFORMANCE INFORMATION START TIME:

.I= CRITICAL STEP Notifications Performance Step: 1 May notify the following people:

SM, WGC, Maintenance, WWM, Operations and Plant Supervision Standard: Notifies SIbl and others as time permits. (May be done at any time.)

Cue: Acknowledge reports.

Comment:

TRM - TR 3.2.4 Condition 4 Performance Step: 2 QPTR Monitor Alarm is inoperable IAW TR 3.2.4 - The QPTR monitor alarm shall be OPERABLE when in MODE 1 with THERMAL. POWER > 50% RTP Standard: QPTR Monitor Alarm is inoperable IAW TR 3.2.4 due to alarm not alarming and Thermal Power is at 98%.

Comment:

TRM TR 3.2.4 Required Action and Completion Time

/, Performance step: 3 Required Action A.l or A.2 needs to be completed.

Standard: Determines Required Action A.l or A.2 needs to be completed once withiri 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> and every 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> there after.

Cue: After examinee determines QPTR Monitor Alarm is inoperable, as the SM tell the examinee to fill out the appropriate paper work.

Comment :

CUE: Hand the examinee a copy of A-!j2.12 Nonfunctional Equipment Important to Safety, Rev. 05900 and Attachment 1 (4 pages).

Page 3 of 7

Appendix C Job Performance Measure Form ES-C-1 PERFORMANCE INFORMATION A-52.12 Attachment I page 1 4 Performance Step: 4 Properly fill in appropriate data on A-52.12 Att. I, Page 1 of 4.

Standard: See attached Key for requirements.

Critical task is to determine correct REQUIRED COMPLETION DATWIMEI in Step 6.6.1(10).

CUE :When requested provide the lollowing information:

0 The CR number is CR-2008-000792.

0 The work order number is: W02344561.

The HCO has determined witlh the QPTR Monitor Alarm OOS, EOOS PRF color is GREEN and EOOS Top Level System Status is GREEN.

Comment:

A-52.12 Attachment Ipage 2 Performance Step: 5 Properly fill in appropriate data on A-52.12 Att. I, Page 2 of 4.

Standard: See attached Key for requirements.

CUE when CRS determines an A-52.16 is required: The WCC will fill out the A-52.16.

Comment:

A-52.12 Attachment I page 3 Performance Step: 6 Properly fill in appropriate data on A-52.12 Att. I, Page 3 of 4.

Standard: See attached Key for requirements.

Comment:

A-52.12 Attachment Ipage 4 Performance Step: 7 Properly fill iii appropriate data on A-52.12 Att. I , Page 4 of 4.

Standard: See attached Key for requirements.

Comment:

Page 4 of 7

Appendix C Job Performance Measure Form ES-C-1 PERFORMANCE INFORMATION A-52.12 Attachment 2 page 1 Performance Step: 8 Properly fill in appropriate data on A-52.12 Att. 2, Page 1 of 1.

Standard: See attached "Key" for requirements. This is a non-critical step.

Performance is optional and is not required at this time but is required when required action is performed.

Candidate may or may not fill this page out.

CUE: If requested provide A-52.12 Attachment 2, to candidate.

Comment:

Terminating Cue: Evaluation on this JPM is complete.

STOP TIME: TIME CRITICAL STOP TIME:

Page 5 of 7

I Appendix C Jo13 Performance Measure Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.: 2008 NRC N-SA-2 Examinee's Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

Result: SAT UNSAT Examiner's Signature: Date:

Page 6 of 7

Appendix C Job Performance Measure Form ES-C-1 JPM CUE SHEET Initial Conditions: 0 You are the CRS.

0 The plant is at 98% power, no equipment is out of service.

Initiating Cue: The CO has just completed S-26.1, Computer Program Check.

All sections were performed sat, except the QPTR Monitor Alarm did not alarm.

Page 7 of 7

Appendix C Job Performance Measure Form ES-C-1 Worksheet Facility: Ginna Task No.: 342-004-03-02A TasMJPM

Title:

Review the Tagout t3oundary for B JPM No.: 2008 NRC JPM N-SA-3 Heater Drain Tank Pump WA

Reference:

2.2.1 3 4.3 Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testing:

Simulated Performance: Actual Performance: X Classroom X Simulator Plant Applicability: SRO SUBMllTED BY: Ted Coe DATE: 6/30/08 Developer REVIEWED BY: Art Vest DATE: 6/30/08 Training Techriical Reviewer REVIEWED BY: Vince Fabrizio DATE: 6/30/08 Operations Tectinical Reviewer APPROVED BY: John Brown DATE: 6/30/08 Training Management Page 1 of 6

Appendix C Job Performance Measure Form ES-C-1 Worksheet Task Standard: Identify Tagout Boundary for W Heater Drain Tank Pump is inadequate and all critical tasks evaluated as satisfactory.

Required Materials: None General

References:

A-1401, Station Holding Rules, Rev.06300 PID: 33013-1923, Rev. 22 PID: 10905-00358, Rev. 2 PID: 33013-0653 Rev. 13 Handouts: A-1401, Station Holding Rules, Rev.06300 PID: 33013-1923, Rev. 22 PID: 10905-00359, Rev. 2 PID: 33013-0653 Rev. 13 Time Critical Task: NO Validation Time: 20 minutes Alternate Path: NO Instructor Notes: Ensure a copy of A-1401, Station Holding Rules, Rev.06300, PID:

33013-1923, Rev. 22, Rev. 2 and PID: 33013-0653 Rev. 13 is ready to give to the operator during the InitiatingCue.

READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions: e The unit is at 80% POWER.

e You are an extra SRO in the Work Control Center.

e 8Heater Clrain Tank Pump is making noises and will require a lower pump bearing replacement.

0 The plant has down powered to 40% to make repairs to the 6Heater Drain Tank Pump.

e Heater Drair Tank temperature is 305°F.

e Heater Drain Tank pressure is 74 psig.

Initiating Cue: e The Shift Manager requests you to review the Tagout Boundaries for the 6Heater Drain Tank Pump.

e Gland Seal and Service Water side holds will be held by a different tagout section.

e On the request below, an extra RO has recorded the Equipment Names/EIN, the Required Positions, type of tags to be hung and order tags are to bt?hung per A-1401, Station Holding Rules requirements to perform the work.

When completed, provide an update to the Shift Manager.

CUE: Hand the Operator a copy of A-14\01, Station Holding Rules, Rev.06300, PID: 33013-1923, Rev. 22 and Rev. 2, PID: 33013-0653 Rev.

fage 2 of 6

Appendix C Job Performance Measure Form ES-C-1 PERFORMANCE INFORMATION START TIME:

.I= CRITICAL STEP A-1401 Performance Step: 1 Refers to procedure, A-1401 s ne ded.

Standard: Uses A- 1401 as needed.

Comment:

Prints Performance step: 2 Refers to prints as needed:

0 PI[): 33013-1923, Rev. 22 PIB: 10905-00356, Rev. 2 PI[>: 33013-0653 Rev. 13 Standard: Uses prints as needed:

0 PIC): 33013-1923, Rev. 22 0 PIC): 10905-00356, Rev. 2 0 PIC): 33013-0653 Rev. 13 CUE: Only if asked for, provide FID: 10905-00356, this can be done at any time.

Comment:

Page 3 of 6

Appendix C Job Performance Measure Form ES-C-1 PERFORMANCE INFORMATION

/, Performance Step: 3 Determines Tagout Boundary for 6 Heater Drain Tank Pump.

Standard: Tagout boundary is inadequate for the following reasons:

V-3098 should be Open not Closed and should be a 4 for orcler.

0 V-4120 should be Closed not Open and should be a 3 for orcler.

0 V-4116 must be added as a Hold tag, Closed and order should be a 3.

V-3094C is for the A HDT pump and should not be listed.

V-3093F should be listed as Open/Hold/4.

Identifies ONE of the following issues associated with fluids gresater than 200°F.

1. Identifies (2) valve boundary (with bleed valve) is not provided per 5.6.a.2, for fluids greater than 200°F if unit stays at 40% to perform work.
2. Identifies can work 6 Heater Drain Tank Pump as an Exceptional Tagout at 40%.
3. Lower Power as needed to lower HDT fluid temperature to less than 200°F.

Comment:

Terminating Cue: Evaluatiori on this JPM is complete.

STOP TIME: TIME CRITICAL STOP TIME:

Page 4 of 6

Appendix C Job Performance Measure Form ES-C-1 VERIF'ICATION OF COMPLETION Job Performance Measure No.: 2008 IVRC JPM N-SA-3 Examinee's Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

Result: SAT UNSAT Examiner's Signature: Date:

Page 5 of 6

Appendix C Job Performance Measure Form ES-C-1 JPM CUE SHEET Initial Conditions: 0 The unit is at 80% POWER.

0 You are an extra SRO in the Work Control Center.

0 B Heater Drain Tank Pump is making noises and will require a lower pump bearing replacement.

The plant has down powered to 40% to make repairs to the B Heater Drain Tank Pump.

Heater Drain Tank temperature is 305°F.

Heater Dra.in Tank pressure is 74 psig.

Initiating Cue: The Shift Manager requests you to review the Tagout Boundaries for the 6 Heater Drain Tank Pump.

Gland Seal and Service Water side holds will be held by a different tagout section.

On the request below, an extra RO has recorded the Equipment NameslEllrl, the Required Positions, type of tags to be hung and order tags are to be hung per A-1401, Station Holding Rules requirements to perform the work.

When completed, provide an update to the Shift Manager.

REQUEST Comments: None.

Page 6 of 6

Appendix C Job Performance Measure Form ES-C-1

~~ ~

Worksheet Facility: Ginna TasWJPM

Title:

Implement the requirements of JPM NO.: 2008 NRC JPM N-SA-4 ODCM for RMS Operability.

WA

Reference:

2.3.15 3.1 Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testina:

Simulated Performance: Actual Performance: X Classroom X Simulator Plant Applicability SRO SUBMITTED BY: Ted Coe DATE: 6/30/08 Developer REVIEWED BY: Art Vest DATE: 6/30/08 Training Techrrical Reviewer REVIEWED BY: Don Dettman DATE: 6/30/08 Operations Technical Reviewer APPROVED BY: John Brown DATE: 6/30/08 Training Management Page 1 of 6

Appendix C Job Performance Measure Form ES-C-1 Worksheet Task Standard: Identify Gas Delay Tank release must be secured and Aux Building ventilation may continue provided (8) hour samples are taken and all critical tasks evaluated as satisfactory.

Required Materials: None General

References:

Offsite Dose Calculation Manual (ODCM), Rev. 21 Handouts: Offsite Dose Calculation Manual (ODCM), Rev. 21 Time Critical Task: NO Validation Time: 15 minutes Alternate Path: NO Instructor Notes: None READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task succossfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions: You are the C:RS.

0 The plant is in MODE 1 with a normal at power lineup.

0 R-14A5 has bleen out of service for the past week.

"C"Gas Delay Tank is being released.

0 The HCO informs you R-14 radiation monitor has just failed low.

0 All other plan1 equipment is operating properly.

Initiating Cue: What are your actions?

Page 2 of 6

Appendix C Job Performance Measure Form ES-C-1 PERFORMANCE INFORMATION START TIME:

.I= CRITICAL STEP ODCM Performance Step: 1 Identifies entry into ODCM required.

Standard: Recognizes entry condition for OCDM and finds a copy of the OCDM.

Comment:

ODCM, section 3.2 4 Performance Step: 2 Enters section 3.2,Gaseous Effluent Monitors.

Reads and understands Controls, Applicability, Notes and Actions (2).

Standard: First Action: N/A.

Second Alction: With less than the minimum number of radioactive! gaseous effluent monitoring instrumentation channels OPERABLE, take the ACTION shown in Table 3.2-1. Restore the inoperable instrumentation to OPERABLE status within 30 days or, if not, explain in the next Annual Radioactive Effluent Release Report, pursuant to Section 6.2 of the ODCM, why this inoperability was not corrected in a timely manner.

CUE: Acknowledge report.

Comment:

ODCM, setction 3.2

/, Performance Step: 3 Enters section 3.2,Gaseous Effluent Monitors.

Reads and understands Controls, Applicability, Notes and Actions for: C GDT Release Standard: 1. Identifies R-14is required for GDT release. Orders C GDT release secured, per table 3.2-1, step c, note (b).

CUE: Acknowledge report.

Comment:

Page 3 of 6

Appendix C Job Performance Measure Form ES-C-1 PERFORMANCE INFORMATION ODCM, section 3.2

/, Performance Step: 4 Enters section 3.2, Gaseous Effluent Monitors.

Reads and understands Controls, Applicability, Notes and Actions for: Aux Building Ventilation running Standard: 1. Identifies Aux Building Ventilation still running with R-14 and R-14AEi out of service. Orders action # 2: If the number of OPERABLE channels is less than required by the Minimum Channctls OPERABLE requirement, effluent releases via this pathway may continue provided (orders) grab samples are taken aind analyzed for isotopic activity at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />, per table 3.2-1, step c, action 2.

CUE: Acknowledge report.

Comment:

Terminating Cue: Evaluation on this JPM is complete.

STOP TIME: TIME CRITICAL STOP TIME:

iDage4 of 6

Appendix C Jab Performance Measure Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.: 2008 IqRC JPM N-SA-4 Examinees Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

Result: SAT UNSAT Examiners Signature: Date:

Page 5 of 6

Appendix C Job Performance Measure Form ES-C-1 JPM CUE SHEET Initial Conditions: 0 You are the (CRS.

0 The plant is In MODE 1 with a normal at power lineup.

R-14A5 has been out of service for the past week.

"C" Gas Delay Tank is being released.

The HCO infxms you R-14 radiation monitor has just failed low.

All other plarit equipment is operating properly.

Initiating Cue: What are your actions?

Page 6 of 6

Appendix C Jclb Performance Measure Form ES-C-1 Worksheet Facility: Ginna Task No.: 340-001-05-02C TasWJPM

Title:

Event Classification JPM NO.: 2008 NRC JPM N-SA-5 WA

Reference:

2.4.41 4.6 Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testina:

Simulated Performance: Actual Performance: X Classroom Simulator X Plant Applicability: SRO SUBMITTED BY: Ted Coe DATE: 6/30/08 Developer REVIEWED BY: Art Vest DATE: 6/30/08 Training Technical Reviewer REVIEWED BY: Vince Fabrizio DATE: 6/30/08 Operations Technical Reviewer APPROVED BY: John Bipown DATE: 6/30/08 Training Management Page 1 of 5

Appendix C Job Performance Measure Form ES-C-1 Worksheet Task Standard: Correct classifica1:ionlevel, EAL number and all critical tasks evaluated as satisfactory.

Required Materials: None General

References:

EPlP 1-0: Ginna !Station Event Evaluation and Classification, Rev.

04200 Handouts: EPIP 1-0: Ginna !Station Event Evaluation and Classification, Rev.

04200 Time Critical Task: YES, 15 minutes Validation Time: 10 minutes Alternate Path: NO Instructor Notes: To be performed i'ollowing an evaluated simulator scenario.

READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions: You have jus1 completed an evaluated simulator scenario.

Initiating Cue: 0 Classify this event per EPlP 1-0.

Provide classlification level and EAL number.

This is a time critical JPM.

Page 2 of 5

I Appendix C Job Performance Measure Form ES-C-1 PERFORMANCE INFORMATION START TIME:

.I= CRITICAL STEP Performance Step: 1 Locate a controlled COPY of EPlP 1.0, Ginna Station Event Evaluation and Classification.

Standard: Locates a controlled copy of EPlP 1.O.

Comment:

EPlP 1.0, section 4.0 Performance Step: 2 Review Pi,ecautionssection of procedure.

Standard: Reviews Precautions section of procedure.

Comment:

EPlP 1.0, section 5.0 Performance Step: 3 Review Prerequisites section of procedure.

Standard: Reviews Prerequisites section of procedure.

Comment:

EPlP 1.O, section 6.0

/, PerformanceStep: 4 Evaluate event as per EPlP 1.O.

Standard: Determines event classification and EAL number correctly per siniulator scenario guide.

0 Makes declaration within 15 minutes of initiating cue.

Comment:

Terminating Cue: Evaluation on this JPM is complete.

STOP TIME: TIME CRITICAL STOP TIME:

Page 3 of 5

Appendix C Job Performance Measure Form ES-C-1 VERIFKATION OF COMPLETION Job Performance Measure No.: 2008 IVRC JPM N-SA-5 Examinees Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

Result: SAT -- UNSAT Examiners Signature: Date:

Page 4 of 5

Appendix C Job Performance Measure Form ES-C-1 JPM CUE SHEET Initial Conditions: 0 You have just completed an evaluated simulator scenario.

Initiating Cue: 0 Classify this event per EPlP 1-0.

Provide classification level and EAL number.

0 This is a time critical JPM.

Page 5 of 5