NRC Comments on Draft Licensee-Developed Operating Test (Folder 2)
ML17114A381
Person / Time
Site: Ginna Constellation icon.png
Issue date: 03/09/2017
From:
Exelon Generation Co
To:
NRC Region 1
Shared Package
ML16210A441 List:
References
U01943
Download: ML17114A381 (7)


Text

2017 Ginna Operating Test Changes Document The following is a listing of the changes that were made to the 2017 Ginna Operating Test Exam Items based on the changes requested from those submitted at the 60-Day Submittal, following the review during the NRC Prep Week (February 2151-241h).

Document ES-201-2 ES-301-3 ES-301-4 ES-301-5 ES-301-6 Scenario N17-1-1 ES-D-1 Scenario N17-1-1 ES-D-2 Scenario N17-1-3 ES-D-1 Scenario N17-1-3 ES-D-2 Scenario N17-1-3 ES-D-2 1

1 1, 2 1-4 1, 2 1

1 1

19 43 Change Changed Rev date to 022717.

Changed Rev date to 022717.

Changed Rev date to 022717.

Changed Rev date to 022717.

Changed order of Simulator Scenarios to be run: (1) Monday N17 S, (2) Tuesday N17-1-1, (3) Wednesday N17-1-3, and (4) Thursday N17-1-6. NOTE: N17-1-4 is the spare scenario.

Changed Rev date to 022717.

Changed Rev date to 022117.

Changed validation time to lOS Minutes.

Changed Rev date to 022117.

Corrected Typo on NOTE associated with Step lS (The B CCW Pump has tripped).

Changed examiner NOTE on Step 2 from "will NOT be met when the crew arrives at this step," to "may NOT be met when the crew arrives at this step."

46 Added a NOTE to Major Bullet 3 of Step 19 to say that "NOTE: The C IAS Compressor is running."

47 Added a NOTE to Major Bullet 2 of Step 21 to say that "NOTE:

  • Adverse Containment may exist."

SS Deleted an extra line between steps 26 RNO and Step 27.

1 1

1 s

23 Changed Rev date to 022217.

Changed validation time to 87 Minutes.

Changed Rev date to 022217.

Added the following statement to Column 3, Row 1 of the Simulator Operator Instructions: Ensure PRCS-Ps/G graphed during the scenario.

Corrected Typo on NOTE associated with Step 11 Bullet 1

("Restoring")

24 Added a NOTE to LCO 3.4.1 statement that states "NOTE: According to Section 2.10.1 of the COLR, the Przr Pressure shall be ~217S psig."

2S Added a NOTE to LCO 3.4.1 Condition A statement that states "NOTE: The US will identify that this TS was entered and exited if 29 and when RCS pressure lowers to (and then rises above) 217S psig."

Added a Cue to the Sim Driver to Initiate Event S right after Bo ration

Document (Cont'd)

Scenario N17-1-4 ES-D-1 Scenario N17-1-4 ES-D-2 Scenario N17-1-4 ES-D-2 (Cont'd) 2017 Ginna Operating Test Changes Document 31 Change is started during the Rapid Down power.

Changed the Event 4 Transition to Event Cue to "When the Crew diagnoses the failed Feed Reg Valve, Lead Examiner move to Event

  1. 5."

49 Added the Continuous Action NOTE to Step 13.

49 Added the Continuous Action NOTE to Step 14.

53 Added the ECA-1.1 Foldout Page criteria just prior to procedure Step

1.

1 1

Changed Rev date to 022317.

Changed Event Type for Event 1 to N(TS)-SRO to credit the SRO for evaluating a Technical Specification in Event 1.

1 Changed the Event Description for Event 1 to "Load Ascension/High Secondary Activity" 2

Changed description of Event 1 to include the following: "During the load ascension, Chemistry will call the Control Room and report that the B Steam Generator Secondary Specific Activity is 0.12 µc/gm.

The operator will address Technical Specification LCO 3.7.14, "Secondary Specific Activity."

l.'

1 1

2 2

3*

Added "Technical Specification LCO 3.7.14, "Secondary Specific Activity" (Amendment 80)" as reference 4 to the list of references; and re-numbered remaining references.

Changed validation time to 95 Minutes.

Changed Rev date to 022317.

Changed Event Type for Event 1 to N(TS)-SRO to credit the SRO for evaluating a Technical Specification in Event 1.

Changed the Event Description for Event 1 to "Load Ascension/High Secondary Activity" Changed description of Event 1 to include the following: "During the load ascension, Chemistry will call the Control Room and report that the B Steam Generator Secondary Specific Activity is 0.12 µc/gm.

The operator will address Technical Specification LCO 3.7.14, "Secondary Specific Activity."

6 Changed the Event Description for Event 1 to "Load Ascension/High Secondary Activity" 7-11 Changed the Event Description for Event 1 in the Header to "Load Ascension/High Secondary Activity" 11 Added Sim Driver Instructions to call Control Room regarding the Chemistry Sample for high Secondary Specific Activity on the B SG; and the Tech Spec LCO, Applicability and Conditions.

16 Modified the Sim Driver Instruction associated with Step 4 to "SIM DRIVER: as RG&E ECC, acknowledge, and report that Ginna should maintain an output voltage as necessary to maintain MVARs at 50-100 LAG OUT."

20 Added a 4th Buller to Sub-step 4b RNO that states "Place Letdown Line Pressure Control Valve PCV-135 in Manual and Close the valve."

Document Scenario N17-1-5 ES-D-1 Scenario N17-1-5 ES-D-2 Scenario N17-1-6 ES-D-1 Scenario N17-1-6 ES-D-1 (Cont'd) 2017 Ginna Operating Test Changes Document Page#

24,29,30 25 25 Change Corrected typo in AP-ELEC.1, LOSS OF 12A AND/OR 128 BUSSES (remove the Tat the end of ELECT)

Eliminated NOTE associated with first Major Bullet associated with Step 6 {NOTE: Only the C SW Pump is running).

Modified NOTE associated Step 6.a RNO to read as follows: "NOTE:

The CO will manually start a second and/or third SW Pump."

26 Added a NOTE to Step 8 that reads as follows: "NOTE: The RNO will be performed if no Charging Pumps running."

27 Added a NOTE to Step 14, Bullet 1 that reads as follows: "NOTE: The RNO will be performed if no Charging Pumps running."

27 Modified Note associated with Step 15 RNO to say "NOTE: Excess Letdown may need to be re-established."

30 Modified NOTE associated with Step 6.1.3.8 Bullet 5 to say "NOTE:

The US may go to Step 6.2, however all 480 Volt Safeguards Buses are energized."

33 Identified Step 2 and Step 2 RNO as Immediate Action Steps.

40 Corrected Simulator Codes for isolating the RCP Seals locally.

43 Modified Examiner NOTE to reference ECA-0.1 Steps on Page 48, rather than Page 49.

1 1

1 17 Changed Rev date to 022217.

Changed validation time to 77 Minutes.

Changed Rev date to 022217.

Modified NOTE associated with Condition B of LCO 3.8.9 to state that "NOTE: The US will note that while Instrument Bus B was de-energized, they were in B.1, but came out of this action when power to the Bus was restored."

27 Changed Event 4 Page Reference from 35 to 36 in Examiner Note.

32 Eliminated incorrect NOTE associated with ~tep 17 Bullet {Top of Page).

32 Corrected DNB setpoint associated with LCO 3.4.1 Condition A from 2205 to 2175 psig.

33 Added Condition E as required Condition associated with TS LCO 3.4.11 because ACTION associated with B.1 cannot be completed.

36 Changed AP-TURB.5 Page Reference from 36 to 37 in Examiner Note.

44,45 Changed FR-S.1 Page Reference from 48 to 49 in Examiner Note.

50 Identified FR-S.1 Step 8 as a Continuous Action Step.

53 Changed E-0 Page Reference from 55 to 56 in Examiner Note.

57 Corrected Typo on Step 11 Bullet 2 {RCOP to RCP).

62 Corrected SIM DRIVER codes for EO completion of ATI-10.0.

63 Identified ECA-2.1 Step 3 as a Continuous Action Step.

1 1

2 Changed Rev date to 022317.

Corrected multiple font sizes in TURNOVER block.

Corrected the CCW Pump to be manually started in 5th paragraph.

Identified correct as the B CCW Pump, rather than the A CCW Pump.

Document Scenario Nl7-l-6 ES-D-2 ES-301-1 RO JPM Ala RO JPM Alb RO JPM Alb R01c.ont'd) 2017 Ginna Operating Test Changes Document 1

2 3

13 15 17 20 32 35 37-38 46 49 1

1 2

2 7

Change Changed Rev date to 022317.

Corrected multiple font sizes in TURNOVER block.

Corrected the CCW Pump to be manually started in 5th paragraph.

Identified correct as the B CCW Pump, rather than the A CCW Pump.

Corrected the CCW Pump to be manually started in the descriptive narrative of Event 3. Identified correct as the B CCW Pump, rather than the A CCW Pump.

Corrected typo on AP-CCW.2 Step 1Bullet1. (Changed "with" to "white" Modified SIM DRIVER EO report to indicate that the WHUT level is stable at 15%.

Added a NOTE at the beginning of the event to stating "NOTE: The crew may enter AP-RCS.1 first, but will ultimately shift to AP-RCP.l."

Corrected size of PRZR Steam Space break from "890,000" to "89,000)" in SIM DRIVER Instructions Block.

Changed E-0 Page Reference from 39 to 40 in Examiner Note.

Listed all CIVs that need to be manually closed in Step 6b RNO of ATI-27.0.

Corrected typo on Note associated with E-1 Foldout Page. (Was incorrectly identified as E-0 Foldout Page).

Corrected NOTE associated with CCW on ATI-8.SStep 1, Bullet 1, Sub-Bullet 1 to indicated that "NOTE: The B CCW may be running, or is available to start."

Changed Rev Date to 022717.

Changed Rev Date to 022217.

Added an Initial Condition that states "There are no stuck control rods, or control rods that are NOT fully inserted."

Modified the initial Cue to read as follows: "The US has directed you to perform a Xenon Reactivity Calculation in accordance with 0-3, Hot Shutdown With Xenon Present, up to Step 6.2.2."

Added an Initial Condition that states "There are no stuck control rods, or control rods that are NOT fully inserted."

7 Modified the initial Cue to read as follows: "The US has directed you to perform a Xenon Reactivity Calculation in accordance with 0-3, Hot Shutdown With Xenon Present, up to Step 6.2.2."

1 5

5 Changed Rev Date to 022217.

Changed standard 2 (0-3.1, 6.2/6.2.1) for JPM Step 4 to be 411 ppm (400-420 ppm). This permits a band to be used if the operator interprets the curve on Attachment 1, rather than reads directly from the table at the bottom.

Changed standard 2 (0-3.1, 6.2.2) for JPM Step 5 to be 811 ppm (800-820 ppm). This permits a band to be used if the operator interprets the curve on Attachment 1, rather than reads directly

Document JPM A2 RO JPM A3 RO ES-301-1 SRO JPM Ala SRO JPM Alb SRO JPM A2SRO JPM A3SRO JPM A4SRO ES-301-2 RO ES-301-2 SRO (I)

ES-301-2 SRO (U)

JPMA 2017 Ginna Operating Test Changes Document 7

7 KEY 1

2 2

7 1

1 1

2 1

2 1

1 1

3 1

1 1

1 Change from the table at the bottom in JPM Step 4.

Changed standard 2 (0-3.1, 6.3.4) for JPM Step 9 to be 848.3 (837.3-857.3) ppm. This permits a band to be used if the operator interprets the curve on Attachment 1, rather than reads directly from the table at the bottom in JPM Step 4.

Changed standard (Directed Action) for JPM Step 10 to be 848.3 (837.3-857.3) ppm. This permits a band to be used if the operator interprets the curve on Attachment 1, rather than reads directly from the table at the bottom in JPM Step 4.

Modified KEY to permit the band allowed at JPM Step 4 to be carried forward.

Changed Rev Date to 022217.

Made sure that Initial Conditions and Cues as read by the Examiner to the Applicant were all located on one page (Page 2).

Modified the Initial Conditions for Annunciator A-31 to include the clause "(No Tags have been or will be hung)."

Modified the Initial Conditions for Annunciator A-31 to include the clause "(No Tags have been or will be hung)."

Changed Rev Date to 022217.

Changed Rev Date to 022717.

Changed Rev Date to 022217.

Made sure that Initial Conditions and Cues as read by the Examiner to the Applicant were all located on one page (Page 2).

Changed Rev Date to 022217.

Made sure that Initial Conditions as read by the Examiner to the Applicant were all locat~d on one page (Page 2).

Changed Rev Date to 022217.

Changed Rev Date to 022217.

Changed Rev Date to 022217.

Changed Handout 1 so that the EAL Wall Charts are handed out rather than EP-AA-1012 Addendum 3.

Changed Rev Date to 022717.

Changed Rev Date to 022717.

Changed Rev Date to 022717.

Changed Rev Date to 022217.

Document JPM B JPM C JPM D JPM E "JPM F JPMG JPM Gteoned>

JPM H 2017 Ginna Operating Test Changes Document Page#

7-8 13 1

2 3

11 1

7 1

2 7

11 1

10 1

6 Change Modified the design of JPM Step 3 (Including Examiner Cues and SIM Driver responses) to account for the possibility that the operator may wait for the EO to respond after discovering that MOV-813 has NOT closed. If so, the Examiner can provide the cues; and the SIM Driver must take actions per JPM Step 11, accordingly. If the operator continues performing the procedure as expected following the EO local directions; the SIM Driver will provide the necessary cues atJPM Step 10.

Added a Terminating Cue to signal that the JPM is complete.

Changed Rev Date to 022217.

Made sure that Initial Conditions and Cues as read by the Examiner to the Applicant were all located on one page (Page 2).

Identified JPM Step 8 as a Critical Step.

Added a Terminating Cue to signal that the JPM is complete.

Changed Rev Date to 022217.

Added a Terminating Cue to signal that the JPM is complete.

Changed Rev Date to 022217.

Made sure that Initial Conditions and Cues as read by the Examiner to the Applicant were all located on one page (Page 2).

Changed Font Size on JPM Step 4 to be consistent with the remainder of the JPM.

Added a Terminating Cue to signal that the JPM is complete.

Changed Rev Date to 022217.

Added a Terminating Cue to signal that the JPM is complete.

Changed Rev Date to 022217.

Modified JPM Step 5 SIM DRIVER such that the cue can be given by the Examiner instead of the SIM DRIVER.

6 Modified JPM Step 6 SIM DRIVER such that the cue can be given by the Examiner instead of the SIM DRIVER.

7 Modified JPM Step 7 SIM DRIVER such that the cue can be given by the Examiner instead of the SIM DRIVER.

9 Modified JPM Step 11 SIM DRIVER such that the cue can be given by the Examiner instead of the SIM DRIVER.

9 Added a Terminating Cue to signal that the JPM is complete.

1 6

7 1

Changed Rev Date to 022317.

Added an Examiner Note after Step 6 stating "Examiner NOTE:

Terminate JPM as soon as Containment pressure is observed to be rising."

Added a Terminating Cue to signal that the JPM is complete.

Changed Rev Date to 022317.

Document JPM I JPMJ JPM K 2017 Ginna Operating Test Changes Document Page#

10 1

5 8

1 7

1 5

Change Added a Terminating Cue to signal that the JPM is complete.

Changed Rev Date to 022317.

Modified JPM Step 5 standard to include marking the procedure step NA.

Added a Terminating Cue to signal that the JPM is complete.

Changed Rev Date to 022317.

Added a Terminating Cue to signal that the JPM is complete.

Changed Rev Date to 022317.

Added a Terminating Cue to signal that the JPM is complete.