ML11243A100
ML11243A100 | |
Person / Time | |
---|---|
Site: | Prairie Island |
Issue date: | 08/31/2011 |
From: | Robert Daley Engineering Branch 3 |
To: | Schimmel M Northern States Power Co |
References | |
IR-11-012 | |
Download: ML11243A100 (9) | |
See also: IR 05000282/2011012
Text
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION III
2443 WARRENVILLE ROAD, SUITE 210
LISLE, IL 60532
-4352 August 31, 2011
Mr. Mark A. Schimmel
Site Vice President
Prairie Island Nuclear Generating Plant
Northern States Power Company, Minnesota
1717 Wakonade Drive East
Welch, MN 55089
SUBJECT: PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNITS
1 AND 2 - INFORMATION REQUEST FOR THE TRIENNIAL PERMANENT PLANT MODIFICATIONS AND EVALUATIONS OF CHANGES, TESTS, OR EXPERIMENTS (MOD/50.59)
BASELINE INSPECTION
05000282/2011012(DRS); 05000306/2011012(DRS) Dear Mr. Schimmel: On October 31, 2011 , the U.S. Nuclear Regulatory Commission (NRC) will begin a MOD/50.59
baseline inspection at the Prairie Island Nuclear Generating Plant, Units
1 and 2. This inspection
will be performed in accordance with the NRC baseline Inspection Procedure
(IP) 71111.17. The
on-sit e portion of the inspection will take place on October 31 - November 4, 2011, and November 14 - 18, 2011. Experience has shown that these baseline inspections are extremely resource intensive, both for the NRC inspectors and the licensee staff. In order to minimize the inspection impact on the
site and to ensure a productive inspection for both parties, we have enclosed a request for documents needed for th
e inspection. These documents have been divided into
three groups.
The first group of information is necessary to ensure that the inspection team
is adequately prepared for the inspection. This information should be made available via compact disc and delivered to the regional office no later than September
26, 2011. The inspection team will review this information
and, by September 30, 2011, will request specific items that should be provided for review in the regional office by October 14, 2011. The second group of requested documents contains additional items that the inspection team will
review, or need access to, during the inspection. Certain documents contained within this group, i.e., Item (1), will be requested for review in the regional office prior to the inspection by October 14, 2011, as identified above. The remaining documents should be available by the first day of the on
-site inspection, October 31, 2011.
M. Schimmel -2- The third group
lists information necessary to aid the inspection team in tracking issues identified as a result of the inspection.
The remaining documents in group three should be
available by the first day of the on
-site inspection, October 31, 2011. It is requested that this information be provided to the lead inspector as the information is generated during the inspection. It is important that all of these documents are up to date and complete in order to minimize the number of additional documents requested during the preparation and/or
the on-site portions of the
inspection.
The lead inspector for this inspection is
Mr. George M. Hausman. We understand that our
regulatory contact for this inspection is Mr.
Sam J. DiPasquale of your organization.
If there are any questions about the inspection or the material requested, please contact the
lead inspector at
(630) 829-9743 or via e-mail at George.Hausman@nrc.gov
. This letter does not contain new or amended information collection requirements subject to the
Paperwork Reduction Act of 1995 (44
U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, control number 3150
-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for
information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number.
In accordance with 10
CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS),
accessible from the NRC Web site at http://www.nrc.gov/reading
-rm/adams.html
(the Public Electronic Reading Room).
Sincerely, /RA by G. M. Hausman for/
Robert C. Daley, Chief Engineering Branch
3 Division of Reactor Safety
Docket Nos.
- 50-282; 50-306 License Nos.
MODIFICATION 50.59 BASELINE INSPECTION INITIAL DOCUMENT REQUEST
cc w/encl:
Distribution via ListServ
MODIFICATION 50.59 BASELINE INSPECTION
INITIAL DOCUMENT REQUEST
Enclosure 1 Inspection Report : 05000282/2011012(DRS); 05000306/2011012(DRS) Inspection Dates
- October 31 - November 4, 2011, and November
14 - 18, 2011 Inspection ProcedureInspect i on Team Leade
r: George M. Hausman
- IP 71111.17 , "Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications" (630) 829-9 7 43 George.Hausman@nrc.gov I. Information Requested for In-Office Preparation Week
The following information is requested by September 26, 2011, or sooner, to facilitate the selection of
specific items that will be reviewed during the on
-site inspection week. The inspection team will select
specific items from the information requested below and submit a list to your staff by September 30, 2011. We will request that certain items be made available to the regional office
prior to the inspection by October 14, 2011. We request that the remaining items selected from the lists be available and ready for review on the first day of inspection
(i.e., January 10, 2011). All requested information should identify the associated system and cover the time frame from the receipt of information for the last MOD/50.59 Inspection on December 5, 2008 , to the present.
The required information identified below should be provided on compact disc
(CD). Please provide three copies of each CD
submitted (i.e., one for each inspector).
The preferred file format is a searchable "pdf" file. The CD
s should be indexed and hyper
-linked to facilitate ease of use, if possible.
If you have any questions regarding this information, please call the inspection team leader as soon as possible.
(1) List of "permanent plant modifications" to systems, structures, or components that are field work complete. (For the purpose of this inspection, permanent plant modifications include permanent: plant changes, design changes, set
point changes, equivalency evaluations, suitability analyses, and commercial grade dedications.)
The list should contain the number of each document, the title, the revision (or
date), and the affected system. In addition to the list, please provide a description of each modification and a list of associated calculations and affected procedures.
MODIFICATION 50.59 BASELINE INSPECTION
INITIAL DOCUMENT REQUEST
Enclosure 2 (2) List of all 10
CFR 50.59 completed evaluations involving (a)
calculations
, (b) procedure revisions
, (c) changes to the facility (modifications)
, (d) non-routine operating configurations
, or (e) departures in methods of analyses. This list should include 50.59 evaluations for the following:
a. Changes that have been made under the pr
ovisions of 10
CFR 50.59 tha t have been updated in accordance with 10
CFR 50.71(e)(4) since July 1 , 2007; b. Modifications that are field work complete; and
c. Changes to calculations (or initiation of new calculations) that have been
issued. The list should contain the number and title of each document, a brief description of the change, and the corresponding number and type of
the affected document (i.e., the modification or procedure to which the evaluation applies). The list should NOT i
nclude any evaluations in which prior NRC approval was sought and obtained.
(3) A list of all 10
CFR 50.59 changes that have been screened out as not requiring a full evaluation involving: (a)
calculations; (b)
procedure revisions; (c)
changes to th
e facility (modifications); (d)
non-routine operating configurations; or (e)
departures in methods of analyses.
The list should contain the number and title of each document, a brief description of the change, and the corresponding number and type of the affected document (i.e., the modification or procedure to which the evaluation applies).
(4) A list of any modifications, procedure revisions, or
UFSAR changes where it was determined that 10
CFR 50.59 did not apply.
(5) A list of calculation changes that have been
issued for use.
(6) A list of corrective action documents (open and closed) that address permanent plant modification
s or 10 CFR 50.59 issues, concerns, or processes. These documents should also include the corrective action documents associated with the modification and the 50.59 change implementation.
The list should contain the number, title and revision (or date) of each document, the affected system and corresponding documentation (if applicable), and should be sorted in order of significance
. (7) C opies of procedures addressing the following: modifications, design changes, set point changes, equivalency evaluations or suitability analyses, commercial grade dedications, post-modification testing, 10
CFR 50.59 evaluation
s and screenings, and UFSAR updates.
MODIFICATION 50.59 BASELINE INSPECTION
INITIAL DOCUMENT REQUEST
Enclosure 3 (8) UFSAR updates submitted in accordance with 10
CFR 50.71(e)(4). Provide copies of the complete submittal.
(9) Copy of the
UFSAR change log or a synopsis of
the changes. This should include all of the changes made to the
UFSAR that were incorporated in the last
10 CFR 50.71(e)(4) submittal.
(10) Electronic copy of the
UFSAR and technical specifications, if available.
(11) Name(s) and phone numbers for the regulatory and technical contacts.
(12) Current management and engineering organizational chart. II. Information Requested to be Available Prior to Inspection (Request will be Made by September 30, 2011 , for Availability of Documents by October 14, 2011 , [Item 1]) or on First Day of Inspection
(October 31, 2011) [Items 2, 3 and 4] (1) Copies of all selected items from Section
I. This includes copies(2) Copies of these documents do not need to be solely available to the inspection team as long as the inspectors have easy and unrestrained access to them.
of associated documents such as calculations, post
-modification test packages, 10
CFR 50.59 evaluations or screenings, and any corrective action documents.
a. Updated Final Safety Analysis Report
, if not previously provided
- b. Original FSAR Volumes
- c. Original SER and Supplements
- d. FSAR Question and Answers
- e. Quality Assurance Plan;
f. Technical Specifications
, if not previously provided
- g. Latest IPE/PRA Report;
h. Vendor Manuals; and
i. The latest 10
CFR 50.59 UFSAR Update Submittal
(3) Please ensure that other supporting documents for the selected items have been located and are readily retrievable as the inspection team will likely be requesting these documents during the inspection. Examples of supporting documents are:
MODIFICATION 50.59 BASELINE INSPECTION
INITIAL DOCUMENT REQUEST
Enclosure 4 a. Drawings supporting the modifications;
b. Procedures affected by the modifications; and
c. UFSAR change papers generated due to a 10
CFR 50.59 evaluation.
(4) Assessment and
Corrective Actions:
a. The most recent MOD
/50.59 Quality Assurance (QA) audit and/or self-assessment; and
b. Corrective action documents (e.g., condition reports, including status of corrective actions) generate as a result of the most recent
MOD/50.59 QA audit and/or self
-assessment.
III. Information Requested to be provided throughout the inspection
(1) Copies of any corrective action documents generated as a result of the
inspection
team's questions or queries during this inspection.
(2) Copies of the list of questions submitted by the inspection team members and the status/resolution of
the information requested (provide daily during the inspection to each inspection team member).
If you have any questions regarding the information requested, please contact the inspection team leader.
M. Schimmel
-2- The third group lists information necessary to aid the inspection team in tracking issues identified as a result of the inspection. The remaining documents in group three should be
available by the first day of the on
-site inspection, October 31, 2011. It is requested that
this information be provided to the lead inspector as the information is generated during the inspection. It is important that all of these documents are up to date and complete in order to minimize the number of additional documents requested during the
preparation and/or the on-site portions of the inspection.
The lead inspector for this inspection is Mr.
George M. Hausman. We understand that our regulatory contact for this inspection is Mr.
Sam J. DiPasquale of your organization. If there are any questions about the inspection or the material requested, please contact the lead inspector at (630)
829-9743 or via e
-mail at George.Hausman@nrc.gov
. This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44
U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, control number 3150
-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection
requirement unless the requesting document displays a currently valid Office of Management and Budget control number.
In accordance with 10
CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading
-rm/adams.html
(the Public Electronic Reading Room).
Sincerely, /RA by G. M. Hausman for/
Robert C. Daley, Chief
Engineering Branch
3 Division of Reactor Safety
Docket Nos.
- 50-282; 50-306 License Nos.
MODIFICATION 50.59 BASELINE INSPECTION INITIAL DOCUMENT REQUEST
cc w/encl:
Distribution via ListServ
DISTRIBUTIONSee next page
- DOCUMENT NAME: G:\DRSIII\DRS\Work in Progress
\Ltr. 83111 Prairie Island Request for Information GMH.docx
-Publicly Available
-Sensitive To receive a copy of this document, indicate in the concurrence box
"C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy
OFFICE RIII E RIII NAME GHausman: ls
RDaley DATE 08/31/11 08/31/11 OFFICIAL RECORD COPY
Letter to Mr.
Mark A. Schimmel from Mr. Robert C. Daley dated August
31, 2011. SUBJECT: PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNITS 1 AND 2 - INFORMATION REQUEST FOR THE TRIENNIAL PERMANENT PLANT
MODIFICATIONS AND EVALUATIONS OF CHANGES, TESTS, OR
EXPERIMENTS (MOD/50.59) BASELINE INSPECTION 05000282/2011012(DRS); 05000306/2011012(DRS) DISTRIBUTION: Daniel Merzke
RidsNrrPMPrairieIsland Resource
RidsNrrDorlLpl3
-1 Resource
RidsNrrDirsIrib Resource
Cynthia Pederson
DRPIII DRSIII Patricia Buckley
ROPreports Resource