MONTHYEARML24274A1482024-09-30030 September 2024 NRR E-mail Capture - Davis-Besse - RAI Re Relief Request L-23-214 ML24221A0082024-08-0707 August 2024 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Acceptance of License Amendment Request to Remove the Table of Contents from the Technical Specifications ML24204A0012024-07-17017 July 2024 NRR E-mail Capture - Request for Additional Information Vistraops Fleet Exemption for the Requirements in 10 CFR 50.71 Pertaining to the Submittal of Updated Final Safety Analysis Reports ML24170B0562024-06-18018 June 2024 NRR E-mail Capture - Acceptance Review Results for Davis-Besse, Unit No. 1 - RR-A1 ISI Impracticality ML24061A1002024-03-29029 March 2024 Energy Harbor Fleet- Closing of Transaction Between Vistra Operations Company LLC and Energy Harbor Nuclear Corporation (Email) ML24080A3922024-03-20020 March 2024 NRR E-mail Capture - Beaver Valley Power Station, Unit Nos. 1 and 2, Davis-Besse Power Station Unit No. 1, and Perry Nuclear Power Plant, Unit No. - Acceptance of Requested Licensing Action Exemption for Final Safety Analysis Report Update ML23128A1612023-05-0808 May 2023 NRR E-mail Capture - Comanche Peak Nuclear Power Plant, Units 1 and 2, Beaver Valley Power Station, Unit Nos. 1 and 2, Davis-Besse Nuclear Power Station, Unit 1, and Perry Nuclear Power Plant, Unit No. 1 - Acceptance of Requested Licensing ML23086B9862023-03-27027 March 2023 NRR E-mail Capture - Davis-Besse, Unit No. 1 - Acceptance Review Results for Davis-Besse, Unit No. 1 - Proposed Alternative Request RP-5 ML23033A0322023-02-0101 February 2023 NRR E-mail Capture - Request for Additional Information for Davis-Besse's 2022 Steam Generator Inspection Report (L-2022-LRO-0115) ML22266A1102022-09-23023 September 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding July 21, 2022, Request for Withholding Information from Public Disclosure ML22164A8572022-06-13013 June 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding License Amendment Request to Revise the Emergency Plan ML22118A6862022-04-28028 April 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding Alternative to Extend the Steam Generator Weld Inspection Interval ML22112A1092022-04-22022 April 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding License Amendment Request to Revise the Design Basis for the Shield Building ML22090A1692022-03-30030 March 2022 Re_ Action Tracking Item 2022 SST - 335 - Tom Gurdziel, E-mail Re_ Event Number 55734 at Davis Besse, a Matter of Interpretation ML22080A2512022-03-18018 March 2022 NRR E-mail Capture - (External_Sender) ASME OM Code Case OMN-27, Alternative Requirements for Testing Category a Valves (Non- Piv/Civ) ML22055B0382022-02-24024 February 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Upcoming Steam Generator Tube Inservice Inspection ML22055A0872022-02-23023 February 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding Relief Request RP-3 ML22045A4962022-02-14014 February 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Acceptance of License Amendment Request to Revise the Emergency Plan ML22040A1832022-02-0707 February 2022 LTR-22-0033 Tom Gurdziel, E-mail Event Number 55734 at Davis Besse, a Matter of Interpretation ML22034A9472022-02-0303 February 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Revised Review Estimates for Proposed Alternative to Extend the Steam Generator Weld Inspection Interval ML22033A0632022-02-0101 February 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Acceptance of License Amendment Request to Revise the Design Basis for the Shield Building Containment Structure ML21321A3792021-11-16016 November 2021 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding Alternative to Extend the Steam Generator Weld Inspection Interval ML21321A3782021-11-16016 November 2021 NRR E-mail Capture - Energy Harbor Fleet, Beaver Valley Units 1 and 2 and DAVIS-BESSEL Unit 1 - Acceptance of License Amendment Request Adoption of TSTF-554 EPID-L-2021-LLA-0193 ML21287A0382021-10-14014 October 2021 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Acceptance of Requests for Relief from Certain Inservice Testing Requirements ML21271A1332021-09-28028 September 2021 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Acceptance of Proposed Alternative RR-A2 for Certain Steam Generator Weld Inspections ML21119A2152021-04-28028 April 2021 NRR E-mail Capture - Energy Harbor Fleet, Beaver Valley Units 1 and 2 and DAVIS-BESSE Unit 1 - Acceptance of Relief Request Proposed Alternative to Use ASME OM Code Case OMN-27 ML21041A5452021-02-10010 February 2021 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding Steam Generator Tube Inspection Reports ML21007A3732021-01-0707 January 2021 NRR E-mail Capture - (External_Sender) (External) Request for Additional Information Regarding License Amendment Request to Incorporate the Applicable Standard Technical Specification 5.2.2, Unit Staff, ML21004A1442020-12-30030 December 2020 NRR E-mail Capture - Request for Additional Information Regarding License Amendment Request to Incorporate the Applicable Standard Technical Specification 5.2.2, Unit Staff ML20329A3832020-11-24024 November 2020 NRR E-mail Capture - Davis Besse Nuclear Power Station, Unit No. 1 - Request for an Exemption from the 2020 Force-on-Force Exercises ML20304A2842020-10-29029 October 2020 50.59 Inspection 2nd Request for Information ML20289A0992020-10-0505 October 2020 NRR E-mail Capture - Energy Harbor Fleet, Results of Acceptance Review Request to Use Provision in Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI, EPID-l-2020-LLR-0132 ML20281A3692020-10-0505 October 2020 Energy Harbor Fleet, Results of Acceptance Review Request to Use Provision in Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI, EPID-l-2020-LLR-0132 ML20239A7942020-08-25025 August 2020 NRR E-mail Capture - Energy Harbor Fleet, Beaver Valley Units 1 and 2 and DAVIS-BESSEL Unit 1 - Acceptance of License Amendment Request Incorporation of Applicable Standard in TS 5.2.2.e ML20203M3722020-07-21021 July 2020 Ultimate Heat Sink Request for Information Part 1 and Part 2 ML20203M3712020-07-21021 July 2020 Ultimate Heat Sink Request for Information Part 1 L-20-183, Response to Request for Additional Information Regarding License Amendment Request for Adoption of TSTF-425, Revision 3, Relocate Surveillance Frequencies to Licensee Control - Risk Informed Technical Specification Task Force2020-06-23023 June 2020 Response to Request for Additional Information Regarding License Amendment Request for Adoption of TSTF-425, Revision 3, Relocate Surveillance Frequencies to Licensee Control - Risk Informed Technical Specification Task Force ML20154K7642020-06-0202 June 2020 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding License Amendment Request to Adopt TSTF-425 ML20127H8672020-05-0606 May 2020 NRR E-mail Capture - Beaver Valley, Davis-Besse, and Perry - Request for Additional Information Regarding Request for Exemptions from Part 73 Security Requalification Requirements ML20058D3152020-02-27027 February 2020 Completion of License Transfer for the Beaver Valley, Davis-Besse and Perry Nuclear Units ML20024E0092020-01-23023 January 2020 NRR E-mail Capture - FENOC License Transfer - January 23, 2020 Call Summary ML20021A3162020-01-21021 January 2020 NRR E-mail Capture - Davis-Besse Nuclear Power Station - Request for Additional Information Regarding License Amendment Request to Revise Containment Leakage Rate Testing ML19346B3972019-12-11011 December 2019 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Acceptance of License Amendment Request to Adopt TSTF-425 ML19273A1132019-09-27027 September 2019 NRR E-mail Capture - Davis-Besse Nuclear Power Station - Acceptance of License Amendment Request to Extend Containment Leakage Rate Test Interval ML19179A1382019-06-28028 June 2019 NRR E-mail Capture - Davis-Besse - Request for Additional Information Regarding the Decommissioning Quality Assurance Program ML19164A1532019-06-13013 June 2019 NRR E-mail Capture - Davis-Besse Nuclear Power Station - Request for Additional Information Regarding License Amendment Request for Post-Shutdown Emergency Plan ML19162A3922019-06-11011 June 2019 NRR E-mail Capture - Davis-Besse Nuclear Power Station - Request for Additional Information Regarding License Amendment Request for Permanently Defueled Technical Specifications ML19161A2132019-06-0606 June 2019 NRR E-mail Capture - Results of Acceptance Review - FENOC Fleet - Request for Approval of Request for Approval of Lrradiated Fuel Management Plans, EPID L-2019-LRO-0016 ML19149A6202019-05-29029 May 2019 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Approval of the Decommissioning Quality Assurance Program ML19130A2082019-05-0808 May 2019 Email - NRC Email to FEMA Dated May 8, 2019: NRC Response to Comment on FEMA Review of Proposed Changes to DBNPS Emergency Plan for Permanently Defueled Condition 2024-09-30
[Table view] Category:News Article
MONTHYEARML12200A2282011-12-0505 December 2011 Email from V. Mitlyng, Rill to T. Briley, Rill Et Al. on Davis-Besse Coverage ML0417503872004-05-31031 May 2004 Gao Report Excerpts 2011-12-05
[Table view] |
Text
CuadradoDeJesus, Samuel From: Mitlyng, Viktoria Sent: Monday, Decembi'K05, 2011 8:44 AM To: Briley, Thomas; Murphy, Martin; Cameron, Jamnes; Wilson, Adam; Kimble, Daniel;Rutkowski, John; Hills, David; Haskell, Russell; Nolan, Ryan; Mahoney, Michael; Hernandez, Pete; Chandrathil, Prema; Neurauter, James; Zimmerman, Jacob; Hoang, Dan; Logaras, Harral; Barker, Allan; Sheikh, Abdul; Snyder, Amy; Wiebe, Joel; Meghani, Vijay; Smagacz, Phillip; Riley (OCA), Timothy; Jessup, William; Graves, Herman; Sakai, Stacie; Manoly, Kamal; Rezai, Ali; Sanchez Santiago, Elba; Steffes, Jakob; Lupold, Timothy; Gonzalez, Hipolito; Thorp, John; CuadradoDeJesus, Samuel; Thomas, George; Auluck, Rajender;Lehman, Bryce; Morey, Dennis; Burza, Justine; Stone, AnnMarie; Hogan, Rosemary; Case, Michael; Richards, Stuart; Hiland, Patrick; Orth, Steven; Cheok, Michael; Boland, Anne;Lougheed, Patricia; Zerth, Marjorie Cc: Shear, Gary; OBrien, Kenneth; West, Steven; Reynolds, Steven; Pederson, Cynthia; Uhle, Jennifer
Subject:
Davis-Besse coverage Regulators Will Allow Ohio Nuclear Plant To Reopen, Say Cracks Found In Concrete Not A Danger (AP)Associated Press, December 2, 2011 OAK HARBOR, Ohio -Federal regulators will allow an Ohio nuclear reactor to reopen after being satisfied that cracks discovered in concrete at the plant don't pose a safety concern.The Nuclear Regulatory Commission said Friday that the operator of the nuclear plant along Lake Erie has given them reasonable assurance that cracks found on the outside of the reactor containment building don't pose a safety threat.The Davis-Besse (BEH'-see) plant outside Toledo was shut down in October for installation of the 82-ton reactor head. Soon afterward, crews discovered a 30-foot hairline crack in the outer wall.Plant operator FirstEnergy Corp. says it will closely monitor the containment building and try to find out what led to the cracks.Davis-Besse Allowed To Restart Operations (TOLB)By David Patch Toledo (OH) Blade, December 2, 2011 OAK HARBOR, Ohio -The Nuclear Regulatory Commission has given FirstEnergy a green light to restart the Davis-Besse nuclear power plant while ordering the company to investigate further the cause and extent of cracks discovered during October in the plant's concrete shield building.In a "confirmatory action letter" to FirstEnergy Nuclear Operating Co., Cynthia Pederson, the NRC's acting regional administrator, wrote that her agency had been provided "reasonable assurance that the shield building is capable of performing its safety functions" despite the multiple hairline cracks discovered after a hole was cut in the concrete through which reactor heads were swapped out.But the letter requires FirstEnergy to "provide the results of the root cause evaluation and corrective actions to the NRC, including any long-term monitoring requirements, by Feb. 28, 2012" and describes the nature of further testing necessary to determine if the cracks are spreading or widening.Further study also will be required during a refueling outage scheduled for next year, Ms. Pederson wrote.NRC also announced that a public meeting will be held, on a date and at a place to be determined, during which FirstEnergy will"discuss their technical analysis and explain why the plant is safe to continue to operate with the cracks in the shield building." The commission said it would issue its own inspection report and conclusions about the plant on Jan. 16.Jennifer Young, a FirstEnergy spokesman, confirmed that the re-start go-ahead had been received, but declined to say when Davis-Besse would be back on-line."We are wrapping up our outage activities, and beginning the re-start," Ms. Young said Friday.13 The Davis-Besse plant's reactor chamber is enclosed by a 1.5-inch thick steel containment vessel and the shield building, made of concrete 2.5 feet thick. Officials have described the shield building's primary role as protection of the plant against terrorism or natural disasters, but it also would provide secondary containment if the steel enclosure were breached.FirstEnergy is in the midst of applying for an extension of Davis-Besse's operating license, which expires in 2017. Anti-nuclear activists have argued that the cracking concrete in the shield building is yet another reason, on top of the plant's troubled safety history, for Davis-Besse's license not to be renewed or, alternatively, to be extended for a shorter time than the 20-year extension FirstEnergy has requested.
A 30-foot, barely visible crack was discovered in "architectural concrete" adorning the outside of the Shield Building after workers used hydro-demolition
-high-pressure water -Oct. 10 to cut the hole for the reactor-head exchange.
Additional, similar cracks were later discovered during investigation.
Michael Keegan, one of several critics who have intervened in the re-licensing proceedings, called the Confirmatory Action Letter "a big fat nothing" and repeated his doubts about the wisdom of re-starting Davis-Besse.
The NRC's re-start approval, he said, is "a promise to kick the can down the road and roll the dice one more time. The concept of'Use As Is,' when it comes to operating a nuclear power plant, is a risky proposition." In a Nov. 21 letter to the NRC, US Rep. Dennis Kucinich (D., Cleveland) questioned the Shield Building's structural soundness in light of the crack and requested a hearing like the one the agency said it will hold -except that Mr. Kucinich wanted the hearing held before the plant's restart.Business Briefs -- Dec. 2 (AKRONBJ)Akron Beacon Journal, December 2, 2011 Business briefs -- Dec. 2 LOCAL BUSINESS Davis-Besse cleared to restart The US Nuclear Regulatory Commission on Friday said it had determined that FirstEnergy Corp.'s Davis-Besse nuclear power plant can safely restart. The NRC was informed on Oct. 10 by FirstEnergy Nuclear Operating Co. that it had identified cracks in the shield building while conducting work to replace the reactor vessel head. The NRC will schedule a public meeting to discuss the technical analysis.
The agency has also issued a letter detailing the company's agreement to ensure the cracks do not affect safety in the future.YRC stock adjusted Nuclear Power Plant Safe To Restart, NRC Determines (PWRMAG)Power Engineering Magazine, December 2, 2011 The US Nuclear Regulatory Commission (NRC) said that the operators of the 913 MWe Davis-Besse nuclear power plant, FirstEnergy Nuclear Operating Corp. (FENOC), have provided "reasonable assurance" that the shield building is capable of performing its safety functions and that the utility can proceed with restarting the plant.On Oct. 10, the NRC was informed by FENOC that while conducting work to replace the reactor vessel head, workers identified cracks in the shield building.
The shield building is a 2.5 foot thick reinforced concrete building that surrounds a 1.5 inch thick steel containment vessel that encloses the reactor. The two buildings are separated by a 4.5 foot space.The NRC said it's independent assessment evaluated a range of information such as technical details ranging from the size of the cracks, the utility's sampling and testing of the concrete in the building to determine the extent of the cracks, and its structural analysis.The NRC, though, has issued a Confirmatory Action Letter (CAL) to FENOC. The CAL details and confirms FENOC's agreement to take certain actions to monitor and ensure the cracks in the shield building continue to not adversely impact safety going forward.The NRC will review and evaluate FENOC's actions in response to the CAL in order to make sure they are thorough and complete.The FENOC commitments to the NRC include: 2
-Determine and provide the root cause of the cracks in the shield building, corrective actions, and develop a long-term monitoring program;* Select multiple areas in the shield building that have no cracks but are adjacent to known cracks to determine whether the area of the cracks has spread;-Perform additional analysis in known cracked areas to determine whether the width of the cracks has increased.
The NRC said it will continue to inspect whether the shield building in its current condition meets all design requirements in the plant's license. Failure to meet the commitments in the CAL may result in additional regulatory action if the utility does not provide reasonable assurance that the NRC can rely on the FENOC to meet the NRC's requirements and protect public health and safety.WTVG-TVam Toledo, Ohio (12/3, 9:54 a.m., EDT) broadcast, "Federal regulators are going to allow the Davis Besse plant to re-open. The Nuclear Regulatory Commission said that the plant's operator has given regulators reasonable assurance that cracks found on the outside of the reactor containment building doesn't pose a safety threat. Davis Besse closed in October for the installation of an 82 ton reactor head. Soon after that crews discovered a 30 foot hairline crack in the outer wall. First Energy says it will monitor the containment building to try to find what led to the crack." WTOL-TV b Toledo, Ohio (12/3, 9:03 a.m., EDT) also covered this story.3